- EP1113125B1 EP1113125B1 EP20000126486 EP00126486A EP1113125B1 EP 1113125 B1 EP1113125 B1 EP 1113125B1 EP 20000126486 EP20000126486 EP 20000126486 EP 00126486 A EP00126486 A EP 00126486A EP 1113125 B1 EP1113125 B1 EP 1113125B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- support
- scaffolding
- headpiece
- laying
- support member
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G1/152—Platforms made of metal or with metal-supporting frame
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G1/154—Non-detachably fixed and secured connections between platform and scaffold
Definitions
- the invention relates to a facade scaffold, which consists of up and degradable vertical frame and between adjacent vertical frame in several levels superimposed horizontal frame, on the horizontal frame walkable and serve as support and run surfaces covering parts are installable and removable to install, which in or supporting parts attached to the vertical frame and / or horizontal frame.
- the covering protection of scaffold coverings is therefore of enormous importance because it must be ensured by suitable measures that the coverings installed in the scaffold system are securely anchored and in particular withstand lifting forces, caused for example by wind.
- EP-A-0 737 788 relates to a facade scaffold with upright and degradable vertical frame and between the vertical frame in several levels stacked horizontal frame on which serving as Auflager- and run levels covering parts are installable and removable mounted on the in or Supported on the vertical frame and / or horizontal frame support parts are supported, each covering part at its two front ends each as a support on a arranged on the frame support member releasably and lockable to be mounted headpiece, and provided the head pieces and the support members with inter-engageable movable locking means are, which prevent accidental lifting of the floor coverings (1), for example, under wind pressure, positively.
- the invention has for its object to provide a buildable and degradable facade scaffolding, in which the coverings in the support area of the scaffold planks can be installed easily and effectively secured against unwanted lifting.
- the scaffold planks are formed so that they have a construction in the support area, which in a simple manner, i. ensure safe installation without additional installation parts or without the operation of machanic installation aids and in particular provide an effective lift-off, even if the coverings are used outside of the actual frame or the vertical frame thereof, for example in the cantilevered console area or on so-called modular scaffolding.
- Each inventively designed scaffold 1 is provided at its two ends each with a head piece 2, which is formed as an angle section, in the illustrated embodiment in Z-shape.
- This head piece 2 includes two opposing, eccentrically mounted guide slots 3 and 3 ', which are incorporated in the angle section of the head piece 2.
- the scaffold pad 1 and its head pieces 2 are intended to be releasably attached to a support part 4, which is installed horizontally in the facade scaffold, not shown here.
- This support member 4 is formed in the shape of an I-profile and carries on both sides of a central web 9 each have a head bolt 5 wherein the arranged on opposite sides of the web 9 and projecting beyond the support part 4 head bolt 5 are offset in the same manner against each other, as the guide slots 3 and 3 'of the head pieces 2 of the scaffold planks 1 to be mounted or attached thereto.
- the mounted on both sides of the support part 4 head bolts 5 are positioned so that they can be inserted into one of the guide slots 3, 3 'of the head piece 2 of a scaffold plating 1, and if the relevant scaffold plating 1 on the relevant support part 4 finally mounted or mounted is, in the relevant guide 3 or 3 'positively engages and is brought about a slope 10 in a stable, secured against unwanted lifting end position, which in Figs. 5 and 6 - in particular Fig. 5 - is shown.
- the vertical load transfer of the scaffolding 1 located in the mounting position via support tabs 6, 6 ', projecting at right angles from the head piece 2 and hang on a scaffolding system not shown on the support part 4, for example, on a console is attached or may be part of a console of a facade scaffolding.
- Fig. 1 of the scaffolding is shown in uninstalled condition.
- 2 and 3 show this state from another viewing direction, wherein the insertion of a head bolt in one of the provided in the head piece 2 guide slots 3, 3 'is shown.
- Fig. 4 it can be seen how the intended for anchoring head bolt 5 is brought over the slope 10 of the relevant guide slot in the desired end position within this guide slot.
- Figures 4, 5 and 6 show the scaffold deck 1 in the final mounting position from different directions.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Ladders (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Movable Scaffolding (AREA)
Description
Die Erfindung betrifft ein Fassaden-Gerüst, das aus auf- und abbaubaren Vertikalrahmen sowie zwischen benachbarten Vertikalrahmen in mehreren Ebenen übereinander angeordneten Horizontalrahmen besteht, wobei auf den Horizontalrahmen begehbare und als Auflager- und Laufebenen dienende Belagteile ein- und ausbaubar anzubringen sind, welche auf in oder an den Vertikalrahmen und/oder Horizontalrahmen angebrachten Auflagerteilen abzustützen sind.The invention relates to a facade scaffold, which consists of up and degradable vertical frame and between adjacent vertical frame in several levels superimposed horizontal frame, on the horizontal frame walkable and serve as support and run surfaces covering parts are installable and removable to install, which in or supporting parts attached to the vertical frame and / or horizontal frame.
Die für einen unkomplizierten und damit wenig zeitaufwendigen Einbau und Ausbau vorgesehenen Beläge von Fassaden-Gerüsten müssen gegen unerwünschtes Abheben von deren Auflagern gesichert werden. Der Belagsicherung von Gerüstbelägen kommt deshalb eine enorme Bedeutung zu, weil durch geeignete Maßnahmen sicherzustellen ist, dass die in das Gerüstsystem eingebauten Beläge sicher verankert sind und insbesondere abhebenden Kräften, beispielsweise durch Wind verursacht, widerstehen.The provided for a straightforward and thus less time-consuming installation and removal coverings of facade scaffolding must be secured against unwanted lifting of their supports. The covering protection of scaffold coverings is therefore of enormous importance because it must be ensured by suitable measures that the coverings installed in the scaffold system are securely anchored and in particular withstand lifting forces, caused for example by wind.
Bisher ist es bekannt und allgemein üblich, eine Abhebesicherung bei Belägen, die innerhalb von Rahmengerüsten eingesetzt werden, dadurch zu gewährleisten, dass die Vertikalrahmen eine untere vertikale Strebe aufweisen, die mit dem Einbau des betreffenden Vertikalrahmens die Abhebesicherung der jeweiligen Belagebene bildet. Problematisch und aufwendig wird jedoch die Realisierung einer Abhebesicherung, wenn Beläge ausserhalb der zuvor beschriebenen Vertikalrahmen eingesetzt werden, zum Beispiel im Bereich auskragender Konsolen oder auf sogenannten Modulgerüsten. In diesen Fällen ist es bisher notwendig, Zusatzteile einzubauen oder Verriegelungsmechanismen zu betätigen, um die gewünschte Abhebesicherung zu gewährleisten.So far, it is known and common practice to ensure a lift-off for coverings that are used within frameworks, thereby ensuring that the vertical frame have a lower vertical strut, which forms the Abhebesicherung the respective deck level with the installation of the respective vertical frame. However, the realization of a lift-off protection is problematic and costly if linings are used outside the vertical frame described above, for example in the area of projecting consoles or on so-called modular stands. In these cases, it has hitherto been necessary to install additional parts or actuate locking mechanisms in order to ensure the desired lift-off protection.
EP-A-0 737 788 betrifft ein Fassaden-Gerüst mit auf- und abbaubaren Vertikalrahmen und mit zwischen den Vertikalrahmen in mehreren Ebenen übereinander angeordneten Horizontalrahmen, auf denen als Auflager- und Laufebenen dienende Belagteile ein- und ausbaubar anzubringen sind, die auf in oder an den Vertikalrahmen und/oder Horizontalrahmen angebrachten Auflagerteilen abzustützen sind, wobei jedes Belagteil an seinen beiden Stirnenden je ein als Auflager auf einem am Gerüst angeordneten Auflagerteil lösbar und verriegelbar anzubringendes Kopfstück aufweist, und die Kopfstücke und die Auflagerteile mit untereinander in Eingriff bringbaren beweglichen Verriegelungsmitteln versehen sind, die ein ungewolltes Abheben der Bodenbeläge (1), beispielsweise unter Winddruck, formschlüssig verhindern.EP-A-0 737 788 relates to a facade scaffold with upright and degradable vertical frame and between the vertical frame in several levels stacked horizontal frame on which serving as Auflager- and run levels covering parts are installable and removable mounted on the in or Supported on the vertical frame and / or horizontal frame support parts are supported, each covering part at its two front ends each as a support on a arranged on the frame support member releasably and lockable to be mounted headpiece, and provided the head pieces and the support members with inter-engageable movable locking means are, which prevent accidental lifting of the floor coverings (1), for example, under wind pressure, positively.
Der Erfindung liegt die Aufgabe zugrunde, ein auf- und abbaubares Fassaden-Gerüst zu schaffen, bei dem im Auflagerbereich der Gerüstbeläge die Beläge einfach und wirkungsvoll gegen unerwünschtes Abheben gesichert eingebaut werden können.The invention has for its object to provide a buildable and degradable facade scaffolding, in which the coverings in the support area of the scaffold planks can be installed easily and effectively secured against unwanted lifting.
Diese Aufgabe wird erfindungsgemäss mit einem Fassaden-Gerüst gelöst, welches die Merkmale des Anspruches 1 aufweist.This object is achieved according to the invention with a facade scaffold, which has the features of
Vorteilhafte Ausgestaltungen und Weiterbildungen der Erfindung sind Gegenstand der Unteransprüche.Advantageous embodiments and modifications of the invention are the subject of the dependent claims.
Bei dem erfindungsgemäßen Fassaden-Gerüst sind die Gerüstbeläge so ausgebildet, dass sie im Auflagerbereich eine Konstruktion aufweisen, die auf einfache Art und Weise, d.h. ohne zusätzliche Einbauteile beziehungsweise ohne die Betätigung machanischer Einbauhilfen einen sicheren Einbau gewährleisten und insbesondere eine wirkungsvolle Abhebesicherung bieten, und zwar auch dann, wenn die Beläge ausserhalb des eigentlichen Gerüstes beziehungsweise der Vertikalrahmen desselben eingesetzt werden, beispielsweise im auskragenden Konsolbereich oder auf sogenannten Modulgerüsten.In the facade scaffolding according to the invention, the scaffold planks are formed so that they have a construction in the support area, which in a simple manner, i. ensure safe installation without additional installation parts or without the operation of machanic installation aids and in particular provide an effective lift-off, even if the coverings are used outside of the actual frame or the vertical frame thereof, for example in the cantilevered console area or on so-called modular scaffolding.
In der Zeichnung ist ein Ausführungsbeispiel eines erfindungsgemässen Gerüstbelages und eines für diesen vorgesehenen Auuflagerteiles schematisch dargestellt, und zwar zeigt
- Fig. 1 eine schaubildliche Ansicht dieser beiden Teile vor dem Zusammenbau derselben,
- Fig. 2 eine schaubildliche Ansicht wie in Fig. 1, wobei der Beginn der Montage des Gerüstbelages an dem zugehörigen Auflagerteil gezeigt ist,
- Fig. 3 die Situation wie in Fig.2, jedoch aus einer anderen schaubildlichen Ansicht,
- Fig. 4 eine weitere schaubildliche Ansicht beim Anbringen des Gerüstbelages an dem zugehörigen Auflagerteil,
- Fig. 5 eine schaubildliche Ansicht wie in Fig. 4, woraus die Situation nach erfolgter Montage des Gerüstbelages am zugehörigen Auflagerteil zu erkennen ist, und
- Fig. 6 eine andere schaubildliche Ansicht des am zugehörigen Auflagerteil angebrachten Gerüstbelages.
- 1 is a perspective view of these two parts prior to assembly thereof,
- 2 is a perspective view as in Fig. 1, wherein the beginning of the assembly of the scaffold plating is shown on the associated support member,
- 3 shows the situation as in Figure 2, but from another perspective view,
- 4 shows a further perspective view when attaching the scaffold covering to the associated support part,
- Fig. 5 is a perspective view as in Fig. 4, from which the situation after installation of the scaffold plating on the associated support part can be seen, and
- Fig. 6 is another perspective view of the attached to the associated support part scaffolding.
Jeder erfindungsgemäss ausgestaltete Gerüstbelag 1 ist an seinen beiden Stirnenden jeweils mit einem Kopfstück 2 versehen, das als Winkelprofil, beim dargestellten Ausführungsbeispiel in Z-Form, ausgebildet ist. Dieses Kopfstück 2 enthält zwei einander gegenüberliegende, aussermittig angebrachte Führungsschlitze 3 und 3', die in das Winkelprofil des Kopfstückes 2 eingearbeitet sind.Each inventively designed
Der Gerüstbelag 1 beziehungsweise seine Kopfstücke 2 sind dazu vorgesehen, um an einem Auflagerteil 4 lösbar angebracht werden zu können, das horizontal in das hier nicht näher dargestellte Fassaden-Gerüst eingebaut ist. Dieses Auflagerteil 4 ist in Form eines I-Profils ausgebildet und trägt auf beiden Seiten eines mittleren Steges 9 je einen Kopfbolzen 5 wobei die an gegenüberliegenden Seiten des Steges 9 angeordneten und über das Auflagerteil 4 überstehenden Kopfbolzen 5 in gleicher Weise aussermittig gegeneinander versetzt sind, wie die Führungsschlitze 3 und 3' der Kopfstücke 2 der daran zu montierenden beziehungsweise anzubringenden Gerüstbeläge 1.The
Die auf beiden Seiten des Auflagerteils 4 angebrachten Kopfbolzen 5 sind so positioniert, dass sie in jeweils einen der Führungsschlitze 3, 3' des Kopfstückes 2 eines Gerüstbelages 1 eingeführt werden können, und, wenn der betreffende Gerüstbelag 1 am betreffenden Auflagerteil 4 endgültig angebracht beziehungsweise montiert ist, in die betreffende Führung 3 beziehungsweise 3' formschlüssig einrastet und über eine Schräge 10 in eine stabile, gegen unerwünschtes Abheben gesicherte Endlage gebracht ist, die in Fig. 5 und 6 - insbesondere Fig. 5 - gezeigt ist.The mounted on both sides of the
Die vertikale Lastabtragung des in der Montagestellung befindlichen Gerüstbelages 1 erfolgt über Auflagerzungen 6, 6', die rechtwinklig vom Kopfstück 2 vorstehen und sich auf ein am nicht dargestellten Gerüstsystem befindliches Auflagerteil 4 auflegen, das beispielsweise auf einer Konsole angebracht ist oder Teil einer Konsole eines Fassaden-Gerüstes sein kann.The vertical load transfer of the
Zwischen den Auflagerzungen 6 und 6' befindet sich eine Ausnehmung 11, welche dazu vorgesehen ist insbesondere für die Montage die Position der Führungsschlitze 3, 3' gegenüber den Kopfbolzen 5 beobachten zu können.Between the
In der in Fig. 5 und 6 dargestellten Endlage des montierten Gerüstbelages 1 ist ein unbeabsichtigtes Lösen dieses Belages von dem am Gerüstsystem angebrachten Auflagerteil 4 nicht möglich, da hierzu ein horizontales Verschieben des Gerüstbelages 1 gegenüber dem Auflagerteil 4 notwendig wäre und der in einen der Führungsschlitze 3, 3' eingerastete Kopfbolzen 5 wegen der Enge des betreffenden Führungsschlitzes ein horizontales Verschieben verhindert. Zum Lösen ist vielmehr eine axiale, vertikale und seitliche Verschiebung des Gerüstbelages notwendig, die allein durch planmässiges Verkanten und axiales Verschieben ein Lösen ermöglicht. Durch Wind oder durch sonstige äußere Einwirkung ist ein solches planmässiges Verkanten und Verschieben nicht möglich, nicht zuletzt auch deshalb, weil die am Auflagerteil 4 stirnseitig vorgesehenen Endplatten 7, 7' ein seitliches horizontales Verschieben des in der Montageposition befindlichen Gerüstbelages 1 in Verbindung mit einer am Auflagerteil 4 befindlichen oberen Auflagerfläche 8 verhindern.In the illustrated in Fig. 5 and 6 end position of the assembled
In Fig. 1 ist der Gerüstelag im uneingebauten Zustand gezeigt. Fig. 2 und 3 zeigen diesen Zustand aus einer anderen Blickrichtung, wobei das Einführen eines Kopfbolzens in einen der im Kopfstück 2 vorgesehenen Führungsschlitze 3, 3' gezeigt ist. Aus Fig. 4 erkennt man, wie der für die Verankerung vorgesehene Kopfbolzen 5 über die Schräge 10 des betreffenden Führungsschlitzes in die gewünschte Endposition innerhalb dieses Führungsschlitzes gebracht wird. Die Figuren 4, 5 und 6 zeigen den Gerüstbelag 1 in der endgültigen Montageposition aus unterschiedlichen Blickrichtungen.In Fig. 1 of the scaffolding is shown in uninstalled condition. 2 and 3 show this state from another viewing direction, wherein the insertion of a head bolt in one of the provided in the
Claims (6)
- Facade scaffolding having vertical frames capable of being assembled and dismantled, and horizontal frames, which are disposed one above the other on several levels, and on which laying members, which serve as support levels and walking levels, can be mountably and removably attached, which laying members can be supported on support members mounted in or on the vertical frames and/or horizontal frames, wherein each laying member (1) has a headpiece (2) that can be detachably and lockably attached to a support member (4) arranged as a support on the scaffolding,
and wherein the headpieces (2) and the support members (4) are provided with locking means (3, 3', 5, 7, 7', 8) that can be brought into engagement with each other, which prevent by positive fit an unintended lifting of the laying shelves (1), for example due to wind pressure,
characterized in that each support member (4) is formed as a retainer for a headpiece (2) and that it has one set bolt (5) respectively, on opposite sides, the set bolt being engageable in a slot (3, 3') provided in the headpiece (2). - Scaffolding according to claim 1, characterized in that each set bolt (5) protrudes, in its axial dimension over the support member (4) formed as an I section in which the set bolt is attached.
- Scaffolding according to one of the claims 1 to 2, characterized in that each slot (3, 3') arranged in the headpieces (2) contains a slope (10) formed as an undercut.
- Scaffolding according to one of the claims 1 to 3, characterized in that each headpiece includes two undercut slots (3, 3') next to each other that are formed in a mirror-inverted manner, and that the set bolts (5) arranged on the two sides of the support members (4) are laterally offset relative to each other, corresponding to the lateral offset of the two slots (3, 3') of the headpieces (2).
- Scaffolding according to one of the claims 1 to 4, characterized in that each headpiece (2) is provided with support tongues (6, 6') that can be laid on support surfaces (8) of a support member (4).
- Scaffolding according to one of the claims 1 to 5, characterized in that each support member (4) formed as an I section has, on both ends, one endplate (7, 7'), respectively, serving as a limitation for lateral displacements of the headpieces (2) arranged on the laying members (1).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29922847U | 1999-12-27 | ||
DE29922847U DE29922847U1 (en) | 1999-12-27 | 1999-12-27 | Facade scaffolding |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1113125A2 EP1113125A2 (en) | 2001-07-04 |
EP1113125A3 EP1113125A3 (en) | 2003-03-19 |
EP1113125B1 true EP1113125B1 (en) | 2006-11-22 |
Family
ID=8083567
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20000126486 Expired - Lifetime EP1113125B1 (en) | 1999-12-27 | 2000-12-08 | Façade scaffolding |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1113125B1 (en) |
DE (2) | DE29922847U1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2949834A1 (en) * | 2014-05-30 | 2015-12-02 | Tobler AG | Fixing console for scaffolding boards, scaffolding board and scaffold |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH439679A (en) * | 1966-08-27 | 1967-07-15 | Huwyler Rudolf | Scaffolding |
DE4319479C2 (en) * | 1993-06-11 | 2003-02-20 | Plettac Ag | Lifting protection for scaffolding planks |
DE4406517A1 (en) * | 1994-02-28 | 1995-08-31 | Scozzari Agostino | Framework system or scaffolding system with stand |
TW277087B (en) * | 1995-04-14 | 1996-06-01 | Tatsuo Ono | Scaffolding planks |
-
1999
- 1999-12-27 DE DE29922847U patent/DE29922847U1/en not_active Expired - Lifetime
-
2000
- 2000-12-08 DE DE50013770T patent/DE50013770D1/en not_active Expired - Lifetime
- 2000-12-08 EP EP20000126486 patent/EP1113125B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
EP1113125A3 (en) | 2003-03-19 |
EP1113125A2 (en) | 2001-07-04 |
DE29922847U1 (en) | 2000-03-23 |
DE50013770D1 (en) | 2007-01-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0918912B1 (en) | Dismountable facade scaffold | |
EP1571275A2 (en) | Device for the assembling of a temporary railing of a scaffold | |
DE102019002078A1 (en) | Guardrail post for a leading guardrail for a scaffold, scaffolding with a leading guardrail and method for moving a leading guardrail on a scaffold | |
EP1005598A1 (en) | Trelliswork modular scaffolding system | |
CH657175A5 (en) | System floor shuttering with lowering head | |
DE102012214396A1 (en) | Wall formwork with connection device | |
DE102021004490A1 (en) | Modular scaffolding and modular scaffolding bars for such | |
DE69603503T2 (en) | LIFTING DEVICE FOR ROOF CHAIRS AND EVENTULE FOR COMPONENTS RESTING ON THESE ROOF CHAIRS | |
WO2011095288A1 (en) | Support device and shuttering system | |
EP1113125B1 (en) | Façade scaffolding | |
WO2018024448A1 (en) | System for constructing framework | |
DE102016002845A1 (en) | Floor structure system | |
DE19703558B4 (en) | Bar equipment for a scaffolding system | |
DE2119246A1 (en) | Break deflector, especially for a gradual expansion for underground operations | |
EP0736648B1 (en) | Scaffold | |
DE202006009860U1 (en) | Support frame for the vertical shuttering supports for concrete floors has open grip profiles and adjustable clamps | |
EP3748107B1 (en) | Mounting adapter, safety rail, kit for a scaffold, scaffold and method therefor | |
DE9409626U1 (en) | Balcony construction | |
DE102018217043A1 (en) | Coupling plate for mechanically coupling several modular scaffold posts as well as multi-part scaffold stands with such a coupling plate, in particular as part of a heavy-duty support | |
DE102004039470B4 (en) | Concrete encased lock comprises a first lock part having a hook and a second lock part having a receiving shoe for the hook | |
EP1001112B1 (en) | Support for a formwork for the execution of a haunch | |
DE102011075905A1 (en) | System for hooking an aircraft seat in a mounting rail | |
DE102010025667B4 (en) | High ropes course | |
DE29705696U1 (en) | Device for simplifying the formwork of ceiling surfaces in building and civil engineering | |
WO2011095289A1 (en) | Railing element |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO SI |
|
17P | Request for examination filed |
Effective date: 20030822 |
|
AKX | Designation fees paid |
Designated state(s): DE |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: HUENNEBECK GMBH |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): DE |
|
REF | Corresponds to: |
Ref document number: 50013770 Country of ref document: DE Date of ref document: 20070104 Kind code of ref document: P |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20070823 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20150205 Year of fee payment: 15 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 50013770 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160701 |