EP0956799A2 - Shower partition - Google Patents

Shower partition Download PDF

Info

Publication number
EP0956799A2
EP0956799A2 EP99107896A EP99107896A EP0956799A2 EP 0956799 A2 EP0956799 A2 EP 0956799A2 EP 99107896 A EP99107896 A EP 99107896A EP 99107896 A EP99107896 A EP 99107896A EP 0956799 A2 EP0956799 A2 EP 0956799A2
Authority
EP
European Patent Office
Prior art keywords
guide rail
shower partition
partition according
shower
suspension
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP99107896A
Other languages
German (de)
French (fr)
Other versions
EP0956799B1 (en
EP0956799A3 (en
Inventor
Paul-Jean Munch
Original Assignee
Dorma Deutschland GmbH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dorma Deutschland GmbH filed Critical Dorma Deutschland GmbH
Publication of EP0956799A2 publication Critical patent/EP0956799A2/en
Publication of EP0956799A3 publication Critical patent/EP0956799A3/en
Application granted granted Critical
Publication of EP0956799B1 publication Critical patent/EP0956799B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • AHUMAN NECESSITIES
    • A47FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
    • A47KSANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
    • A47K3/00Baths; Douches; Appurtenances therefor
    • A47K3/28Showers or bathing douches
    • A47K3/30Screens or collapsible cabinets for showers or baths
    • A47K3/34Slidable screens
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05DHINGES OR SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS
    • E05D15/00Suspension arrangements for wings
    • E05D15/06Suspension arrangements for wings for wings sliding horizontally more or less in their own plane
    • E05D15/0621Details, e.g. suspension or supporting guides
    • E05D15/0626Details, e.g. suspension or supporting guides for wings suspended at the top
    • E05D15/063Details, e.g. suspension or supporting guides for wings suspended at the top on wheels with fixed axis
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05DHINGES OR SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS
    • E05D15/00Suspension arrangements for wings
    • E05D15/06Suspension arrangements for wings for wings sliding horizontally more or less in their own plane
    • E05D15/0621Details, e.g. suspension or supporting guides
    • E05D15/0626Details, e.g. suspension or supporting guides for wings suspended at the top
    • E05D15/0652Tracks
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2201/00Constructional elements; Accessories therefore
    • E05Y2201/60Suspension or transmission members; Accessories therefore
    • E05Y2201/606Accessories therefore
    • E05Y2201/61Cooperation between suspension or transmission members
    • E05Y2201/612Cooperation between suspension or transmission members between carriers and rails
    • E05Y2201/614Anti-derailing means
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2201/00Constructional elements; Accessories therefore
    • E05Y2201/60Suspension or transmission members; Accessories therefore
    • E05Y2201/622Suspension or transmission members elements
    • E05Y2201/684Rails
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2201/00Constructional elements; Accessories therefore
    • E05Y2201/60Suspension or transmission members; Accessories therefore
    • E05Y2201/622Suspension or transmission members elements
    • E05Y2201/688Rollers
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2800/00Details, accessories and auxiliary operations not otherwise provided for
    • E05Y2800/15Applicability
    • E05Y2800/16Applicability applicable on combinations of fixed and movable wings
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2800/00Details, accessories and auxiliary operations not otherwise provided for
    • E05Y2800/26Form, shape
    • E05Y2800/28Form, shape tubular
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2800/00Details, accessories and auxiliary operations not otherwise provided for
    • E05Y2800/67Materials; Strength alteration thereof
    • E05Y2800/672Glass
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2900/00Application of doors, windows, wings or fittings thereof
    • EFIXED CONSTRUCTIONS
    • E05LOCKS; KEYS; WINDOW OR DOOR FITTINGS; SAFES
    • E05YINDEXING SCHEME RELATING TO HINGES OR OTHER SUSPENSION DEVICES FOR DOORS, WINDOWS OR WINGS AND DEVICES FOR MOVING WINGS INTO OPEN OR CLOSED POSITION, CHECKS FOR WINGS AND WING FITTINGS NOT OTHERWISE PROVIDED FOR, CONCERNED WITH THE FUNCTIONING OF THE WING
    • E05Y2900/00Application of doors, windows, wings or fittings thereof
    • E05Y2900/10Application of doors, windows, wings or fittings thereof for buildings or parts thereof
    • E05Y2900/114Application of doors, windows, wings or fittings thereof for buildings or parts thereof for showers
    • EFIXED CONSTRUCTIONS
    • E06DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
    • E06BFIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
    • E06B3/00Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
    • E06B3/32Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing
    • E06B3/34Arrangements of wings characterised by the manner of movement; Arrangements of movable wings in openings; Features of wings or frames relating solely to the manner of movement of the wing with only one kind of movement
    • E06B3/42Sliding wings; Details of frames with respect to guiding
    • E06B3/46Horizontally-sliding wings
    • E06B3/4681Horizontally-sliding wings made of glass panes without frames

Definitions

  • the invention relates to a shower partition with an upper guide rail, on the at least one fixed side part and at least a sliding sash is slidably suspended, the sliding sash equipped with a suspension bracket overlapping the guide rail is, which is preferably arranged on the inside of the shower partition is.
  • a shower cubicle in which the wings are secured against by a stop unintentional lifting are secured in DE 195 11 036 A1 discloses.
  • a wing On a guide rail there is a wing that can be moved Procedures have been suspended in such a way that on the guide rail in a roller runs within a groove in the upper area and that in the lower area In the area of the guide rail there is a securing bracket which is a Prying out the unintentional type.
  • a partition for a shower with at least a fixed partition and at least one sliding door shown in its upper area by a horizontal guide rail is held and managed.
  • the sliding door is above suspensions connected to the guide rail and in turn on the fixed Partition wall by means of at least one or two brackets or claw-like holder attached. Through this type of attachment the partition is held on the guide rail.
  • the Bracket down to an opening for the passage of the suspensions is suitable so that this in the longitudinal direction of the sliding door this bracket can be moved through.
  • the object of the invention is to provide a shower partition further develop that their manufacturing costs are reduced can and also a shower partition with an aesthetic appearance can be created.
  • the object of the invention is based on the characterizing part of the claim 1 solved.
  • the subclaims give a further embodiment of the idea of the invention again.
  • the shower partition has an upper guide rail which attached both the fixed side panels and the sliding sash are.
  • the guide rail is designed so that it on has a guide groove in the top, into the corresponding support rollers intervene for the sliding sash, and further on the bottom of the Guide rail there is another guide groove in the corresponding one Guide rollers engage to prevent accidental prying out to prevent the sliding sash.
  • the fixed side parts are also attached to the guide rail, this by appropriate screw elements or can also happen through an inseparable connection.
  • the connection the fixed side part is on the inside of the shower cubicle made so that the bracket of the sliding wing on the Connection of the fixed side part can move away.
  • connection of the fixed side part runs from the inside the guide rail via a curved bracket to the outside of the shower cabin, and the bracket is there via a corresponding connection connected to the side part.
  • Corresponding devices for Alignment of the side part is integrated.
  • Both the sliding sash and the fixed side panels can be made of glass or an equivalent material.
  • the shape of the guide rail can be designed differently be, i.e. a round guide rail can be used that a through hole or is made of solid material; However, it is also possible, the guide rail in addition to the round shape oval or angular to execute. Furthermore, on the underside of the guide rail existing groove can be dispensed with if there is a corresponding one Glider that has the shape of the guide rail on the overlapping Bracket is put on.
  • the entire shower partition can be on the one hand on the guide rail be hung, i.e. in such a case the guide rail would be attached to the wall, but it is also possible to attach it to the wall to do without the guide rail, in which case the fixed side panels must be attached to the wall To ensure the stability of the shower enclosure.
  • the guide rails are preferred only executed as straight pieces, and with a corresponding one Corner shower through a connector that the corresponding Has angled, connected. For this are inside the guide rail the holes necessary to insert the connector to be able to.
  • the connector is here over corresponding Screw elements fixed.
  • FIG. 1 shows a partial representation of a shower partition shown, the fixed side parts 1, 4 and interacting with it Sliding wings 2, 3 exist.
  • the fixed side parts 1, 4 are connected to a wall 77 by wall fastenings 5.
  • On the sliding sashes 2, 3 are each a handle 41 around the sliding sash 2, 3 to be able to spend in the directions of movement 42.
  • the guide rails are connected 6 in the angular range through a connector 9.
  • the side parts 1, 4 are formed by hooks 7, which are hook-shaped are on the inside of the shower partition on the guide rail 6 non-positively and positively attached.
  • the sliding sashes 2, 3 slidable on the guide rail by means of appropriate suspensions 8 6 placed.
  • the guide rails 6 face the wall area a distance 76 each, i.e. the guide rail is not with the Wall attached, it is held by the suspensions 7 ..
  • the guide rail 6 is as one-piece part, i.e. the connector 9 is missing. Furthermore, this guide rail 6 is attached directly to the wall 77.
  • the fixed side parts 1, 4 are proposed fixed on the one hand with wall rails 43 on the wall 77 and are above set beyond the suspensions 7.
  • the sliding sash 2 is on the guide rail through the suspension 8 6 slidably mounted, the guide rail 6 has in its upper Area a guide groove 31, in which a support roller 10 engages.
  • On the underside of the guide rail 6 is another guide groove 30 is present, in which a guide roller 11 engages.
  • the Guide roller 11 is on an axis 15 of a bracket 12 which between the guide roller 11 and the support roller 10 is connected, and thereby grips around the guide rail 6 in the outer area of the shower partition, connected.
  • the idler roller 10 is also rotatably supported on an axis 16, the axis 16 may also have a threaded extension 36 which extends into a leg 70 of the suspension 8.
  • the suspension bracket 13 has in addition to the leg 70, preferably angled by 90 °, a further, preferably angled by 90 °, leg 69.
  • Leg 69 is a bore 75 in which a connecting element 18 penetrates that at the same time the positive and positive connection between the sliding sash 2 and the suspension 8 reproduces.
  • the connecting element 18 is designed as a screw, wherein whose head lies in a counter plate 20, and through a bore 19, which is in the sliding sash 2 penetrates.
  • a tab 17 On the leg 69 is a tab 17, which is preferably an angled Leg 72 has a non-positive and positive Connection 39, preferably as a soldered or welded connection.
  • the glass pane is between the tab 17 and the counter plate 20 of the sliding wing 2 via the connecting element 18 with the Leg 69 of the suspension 8 connected.
  • the side part 1 is in the representation of Figure 2 on the suspension 7th connected to the guide rail 6.
  • the suspension 7 has one Fastening leg 27 on the 6 on the guide rail a fastening screw 22 is non-positively and positively fastened.
  • For Adjustment is an elongated hole 78 in the mounting leg 27, Align the side part 1 in height and also at an angle to wall 77 to be able to.
  • the setting is made via a backup and Adjustment screw 21.
  • the mounting leg 27 is thus on the one hand on the guide rail 6 fixed, and the suspension bracket 13 of the sliding wing 2 goes over the fastening leg 27. Thus, a movement of the Sliding wing 2 without interference from the mounting leg 27 given.
  • the fastening leg 27 extends from the guide rail 6 straight down and has an angle of about 90 ° Leg 29 on, in a U-shaped lever 28th ends.
  • the leg 29 thus spans the sliding sash 2 and that Side part 1, the connection between the side part 1 and the U-shaped Lever 28 is ensured by a tab 25.
  • the tab 25 is designed as an angle bracket, with a leg 73 on the upper edge of the side part 1 comes to the plant.
  • the tab 25 is also through a non-positive and positive connection 39 with the U-shaped lever 28 connected.
  • an adjustment screw 23 which is located inside of the leg 29 is located to adjust the side part 1.
  • FIG. 2 clearly shows that on the guide rail 6 in a functional manner both the fixed side part 1 and also the sliding sash 2 can be connected without it here Functional impairment can occur, although the side part 1 and also the sliding sash 2 on the inside of the shower cubicle facing side of the guide rail 6 are attached or connected.
  • FIG 3 is a partial view outside the shower cubicle on the sliding sash 2 and on the guide rail 6 reproduced.
  • the Carrier roller 10 through the bracket 12 with the guide roller 11, which in the engages lower guide groove 30, is connected.
  • To the inside of the shower extends the suspension bracket 13 to which the bracket 12 is attached is, and so gives the connection between the guide rail 6th and the sliding sash 2 again.
  • the suspension bracket 13 is the Tab 17 for connecting the sliding wing 2 has been reproduced.
  • the counter plate acts with the tab 17 20 together.
  • the guide rail 6 was formed as a straight piece and connected by a connector 9.
  • This connector 9 engages in holes 34, each in the guide rails 6 be included.
  • To fix the connector 9 is achieved by appropriate connecting elements, preferably in the form of grub screws, fixing the connecting piece 9 reached.
  • FIGS. 4 and 5 have shown the possibility of by a stop 40, which is within the guide groove 31, the here is preferably designed as a dovetail-shaped groove, limit the range of movement of the sliding sash 2, 3. Of the Stop 40 can thus be set continuously and offers above it also a safe possibility that the sliding leaf 2, 3 only one certain way can be moved.
  • the guide rail 44 is as Full rail has been designed, furthermore it shows on the inside the shower partition has a flat on which the fastening leg 27 of the suspension 7 via the fastening screw 22 can be assembled. This also applies to the execution in an analogous manner 8 to where the guide rail 46 as an angular guide rail has been shown. An oval guide rail 45 gives the Figure 7 again.
  • a guide rail 47 that has only one guide groove 31 on the top shows the figure 9 again. This is due to the introduction of the guide groove 31 has been dispensed with and instead is on the bracket 12 Slider 48 has been attached. This slider 48 has the same contour like the guide rail 47 and thus also ensures that the sliding sash 2, 3 not accidentally brought out of the suspension can be.
  • Fixing screw 22 for the suspension 7 on the guide rail 6, 44, 45, 46, 47 can be dispensed with if instead over a weld or solder seam 49 of the fastening legs 27 of the suspension 7 is attached directly to the guide rail 6, 44, 45, 46, 47.
  • the suspensions 7, 8 and the bracket 12 can, depending on the design Possibility of round material or in stainless steel or any other Form are made.
  • a material made of brass can also aluminum both for the guide rails 6, 44, 45, 46, 47 and can also be used for the suspensions 7, 8.

Abstract

The guide rail (6) has a guide groove (31) for support rollers (10) and a further guide groove (30) for a guide roller (11). The guide roller and support roller are connected together by a yoke (12). The rollers are connected on the inside of the partition to the sliding panels (2) by a suspension yoke (8). The fixed side parts (1) of the shower are fixed on the guide rail with mountings (7) which engage round from the inside of the shower partition. The mountings can be aligned by adjusting screws (21, 23).

Description

Die Erfindung betrifft eine Duschabtrennung mit einer oberen Führungsschiene, an der wenigstens ein feststehendes Seitenteil und mindestens ein Schiebeflügel verschiebbar aufgehängt ist, wobei der Schiebeflügel mit einem die Führungsschiene übergreifenden Aufhängungsbügel ausgestattet ist, der bevorzugt an der Innenseite der Duschabtrennung angeordnet ist.The invention relates to a shower partition with an upper guide rail, on the at least one fixed side part and at least a sliding sash is slidably suspended, the sliding sash equipped with a suspension bracket overlapping the guide rail is, which is preferably arranged on the inside of the shower partition is.

In der DE 41 06 235 C1 wird eine Duschabtrennung für eine Runddusche beschrieben, die eine obere Führungsschiene, die als Rohr ausgeführt ist, wiedergibt. Hieran sind Führungsrollen mit einer auf der Innenseite der Dusche übergreifenden Bügelkonstruktion aufgehängt, so daß an dem unteren Teil des Bügels der verschiebbare Flügel der Dusche angebracht werden kann. Dabei bietet sich eine gewisse Angleichung an die bauseitigen Toleranzen dadurch, daß innerhalb der Aufnahmebohrung eine exzentrische Aufnahme vorhanden ist. Während die übergreifenden Bügel für die Schiebeflügel auf der Innenseite plaziert sind, sind bei der Ausführung mit einem feststehenden Seitenteil einer eckigen Dusche die Seitenteile seitlich durch Rohrelemente begrenzt, und im oberen Bereich durch abknickende Bügel im Außenbereich der Dusche mit der Führungsschiene verbunden. Gleichzeitig ist hierbei eine Vorrichtung vorhanden, die eine Ausrichtung der Führungsschiene zuläßt. Dadurch, daß die Schiebeflügel nur aufgehängt sind, werden sie durch die Schwerkraft zum Boden der Duschabtrennung gezogen, dieses kann bedeuten, daß bei entsprechendem seitlichen Druck die Schiebeflügel aus ihrer Führung herausgedrückt werden.DE 41 06 235 C1 describes a shower partition for a circular shower described, the an upper guide rail, which is designed as a tube, reproduces. Here are guide rollers with one on the inside of the Cross-shower bracket structure suspended, so that on the lower part of the bracket attached to the sliding wing of the shower can be. There is a certain alignment to the on-site Tolerances in that an eccentric within the receiving bore Recording is available. While the overarching temples for the sliding sash are placed on the inside, are in the execution with a fixed side part of a square shower the side parts laterally delimited by tubular elements, and in the upper area by kinking bracket in the outside area of the shower with the guide rail connected. At the same time, there is a device that allows alignment of the guide rail. The fact that the sliding sash only hung up, they become gravity to the ground the shower partition pulled, this can mean that with appropriate lateral pressure pushed the sliding sash out of its guide become.

Eine Duschkabine, bei der die Flügel sicher durch einen Anschlag gegen unbeabsichtigtes Herausheben gesichert sind, wird in der DE 195 11 036 A1 offenbart. An einer Führungsschiene ist ein Flügel zum beweglichen Verfahren in der Art aufgehängt worden, daß an der Führungsschiene im oberen Bereich eine Rolle innerhalb einer Nut läuft, und daß im unteren Bereich der Führungsschiene ein Sicherungsbügel vorhanden ist, der ein Aushebeln der unbeabsichtigten Art ausschließt.A shower cubicle, in which the wings are secured against by a stop unintentional lifting are secured in DE 195 11 036 A1 discloses. On a guide rail there is a wing that can be moved Procedures have been suspended in such a way that on the guide rail in a roller runs within a groove in the upper area and that in the lower area In the area of the guide rail there is a securing bracket which is a Prying out the unintentional type.

In der DE 33 02 454 C1 wird eine Trennwand für eine Dusche mit wenigstens einer feststehenden Abtrennwand sowie mindestens einer Schiebetür gezeigt, die in ihrem oberen Bereich von einer horizontalen Führungsschiene gehalten und geführt ist. Dabei ist die Schiebetür über Aufhängungen mit der Führungsschiene verbunden und ihrerseits an der feststehenden Abtrennwand mittels wenigstens einer oder zweier Bügel oder klauenartig umgreifender Halter befestigt. Durch diese Art der Anbringung wird die Abtrennwand an der Führungsschiene gehalten. Dabei weist der Bügel nach unten hin eine Öffnung auf, die für den Durchtritt der Aufhängungen geeignet ist, so daß diese in Längsrichtung der Schiebetür durch diese Halterung hindurch verschoben werden können.In DE 33 02 454 C1 a partition for a shower with at least a fixed partition and at least one sliding door shown in its upper area by a horizontal guide rail is held and managed. The sliding door is above suspensions connected to the guide rail and in turn on the fixed Partition wall by means of at least one or two brackets or claw-like holder attached. Through this type of attachment the partition is held on the guide rail. The Bracket down to an opening for the passage of the suspensions is suitable so that this in the longitudinal direction of the sliding door this bracket can be moved through.

Die Aufgabe der Erfindung besteht darin, eine Duschabtrennung dahingehend weiterzuentwickeln, daß deren Fertigungskosten gesenkt werden können und darüber hinaus eine Duschabtrennung mit ästhetischem Erscheinungsbild geschaffen werden kann.The object of the invention is to provide a shower partition further develop that their manufacturing costs are reduced can and also a shower partition with an aesthetic appearance can be created.

Die Aufgabe der Erfindung wird nach dem Kennzeichen des Patentanspruches 1 gelöst. Die Unteransprüche geben eine weitere Ausgestaltung des erfindungsgemäßen Gedankens wieder.The object of the invention is based on the characterizing part of the claim 1 solved. The subclaims give a further embodiment of the idea of the invention again.

Dabei weist die Duschabtrennung eine obere Führungsschiene auf, an der sowohl die feststehenden Seitenteile als auch die Schiebeflügel angebracht sind. Die Führungsschiene ist dabei so ausgebildet, daß sie an ihrer Oberseite eine Führungsnut aufweist, in die entsprechende Tragrollen für den Schiebeflügel eingreifen, und ferner auf der Unterseite der Führungsschiene eine weitere Führungsnut vorhanden ist, in die entsprechende Führungsrollen eingreifen, um ein unbeabsichtigtes Heraushebeln des Schiebeflügels zu unterbinden. Dabei sind die Führungsrollen und die Tragrollen durch einen die Führungsschiene übergreifenden Bügel miteinander verbunden, der sich außerhalb des Duschkabinenbereiches erstreckt. In dem Innenbereich der Duschkabine ist ein weiterer Bügel vorhanden, der die Verbindung zwischen der Tragrolle und dem unterhalb der Führungsschiene befindlichen Schiebeflügel herstellt. The shower partition has an upper guide rail which attached both the fixed side panels and the sliding sash are. The guide rail is designed so that it on has a guide groove in the top, into the corresponding support rollers intervene for the sliding sash, and further on the bottom of the Guide rail there is another guide groove in the corresponding one Guide rollers engage to prevent accidental prying out to prevent the sliding sash. The leading roles and the Carrying rollers with each other through a bracket overlapping the guide rail connected, which extends outside the shower cubicle area. There is another bracket in the interior of the shower cabin, the connection between the idler and the one below the sliding door located on the guide rail.

Die feststehenden Seitenteile sind ebenfalls an der Führungsschiene befestigt, wobei dieses durch entsprechende Schraubelemente oder aber auch durch eine unlösbare Verbindung geschehen kann. Die Anbindung des feststehenden Seitenteiles wird dabei auf der Innenseite der Duschkabine vorgenommen, so daß sich der Bügel des Schiebeflügels über die Anbindung des feststehenden Seitenteiles hinwegbewegen kann.The fixed side parts are also attached to the guide rail, this by appropriate screw elements or can also happen through an inseparable connection. The connection the fixed side part is on the inside of the shower cubicle made so that the bracket of the sliding wing on the Connection of the fixed side part can move away.

Die Anbindung des feststehenden Seitenteiles verläuft von der Innenseite der Führungsschiene über einen gebogenen Bügel zur Außenseite der Duschkabine, und der Bügel wird dort über eine entsprechende Verbindung mit dem Seitenteil verbunden. Entsprechende Vorrichtungen zum Ausrichten des Seitenteiles sind dabei integriert.The connection of the fixed side part runs from the inside the guide rail via a curved bracket to the outside of the Shower cabin, and the bracket is there via a corresponding connection connected to the side part. Corresponding devices for Alignment of the side part is integrated.

Sowohl die Schiebeflügel als auch die feststehenden Seitenteile können aus Glas oder einem äquivalenten Material hergestellt werden.Both the sliding sash and the fixed side panels can be made of glass or an equivalent material.

Die Formgestaltung der Führungsschiene kann unterschiedlich ausgebildet sein, d.h. es kann eine runde Führungsschiene verwendet werden, die eine Durchgangsbohrung bzw. aus Vollmaterial gestaltet ist; es ist jedoch auch möglich, die Führungsschiene neben der runden Form oval oder eckig auszuführen. Ferner kann auf die auf der Unterseite der Führungsschiene vorhandene Nut verzichtet werden, wenn hier ein entsprechender Gleiter, der die Form der Führungsschiene hat, an dem übergreifenden Bügel aufgesetzt wird.The shape of the guide rail can be designed differently be, i.e. a round guide rail can be used that a through hole or is made of solid material; However, it is also possible, the guide rail in addition to the round shape oval or angular to execute. Furthermore, on the underside of the guide rail existing groove can be dispensed with if there is a corresponding one Glider that has the shape of the guide rail on the overlapping Bracket is put on.

Die gesamte Duschabtrennung kann zum einen an der Führungsschiene aufgehängt werden, d.h. in einem solchen Fall wäre die Führungsschiene an der Wand befestigt, es ist jedoch auch möglich, auf die Wandbefestigung der Führungsschiene zu verzichten, wobei in einem solchen Fall die feststehenden Seitenteile wandseits befestigt werden müssen, um die Stabilität der Duschabtrennung zu gewährleisten.The entire shower partition can be on the one hand on the guide rail be hung, i.e. in such a case the guide rail would be attached to the wall, but it is also possible to attach it to the wall to do without the guide rail, in which case the fixed side panels must be attached to the wall To ensure the stability of the shower enclosure.

Um bei der Fertigung flexibel zu sein, werden die Führungsschienen vorzugsweise nur als gerade Stücke ausgeführt, und bei einer entsprechenden Eckdusche durch ein Verbindungsstück, welches die entsprechende Abwinkelung aufweist, verbunden. Hierfür sind innerhalb der Führungsschiene die Bohrungen notwendig, um das Verbindungsstück einsetzen zu können. Das Verbindungsstück wird hierbei über entsprechende Schraubelemente festgesetzt. Es ist jedoch auch möglich, die Führungsschiene selbst abzuwinkeln, wobei in einem solchen Fall die Verbindungsstücke entfallen würden und gleichzeitig auf die Innenbohrung in der Führungsschiene verzichtet werden könnte.In order to be flexible in manufacturing, the guide rails are preferred only executed as straight pieces, and with a corresponding one Corner shower through a connector that the corresponding Has angled, connected. For this are inside the guide rail the holes necessary to insert the connector to be able to. The connector is here over corresponding Screw elements fixed. However, it is also possible to use the guide rail bend itself, in which case the connectors would be omitted and at the same time on the inner bore the guide rail could be dispensed with.

Die Erfindung wird anhand verschiedener möglicher schematisch dargestellter Ausführungsbeispiele in den nachfolgenden Figuren wiedergegeben. Es zeigt:

Figur 1:
eine Duschabtrennung mit gerader Führungsschiene
Figur 1a:
eine Duschabtrennung mit abgewinkelter Führungsschiene
Figur 2:
Detailausschnitt mit Schnittdarstellung der Führungsschiene mit Seitenteil und Schiebeflügel
Figur 2a:
Ausschnitt der Darstellung der Figur 2, jedoch mit einer anderen Ausführungsform der Halterung des Schiebeflügels an der Führungsschiene
Figur 3:
Teilausschnitt aus einer Schiebeflügelaufhängung in der Vorderansicht
Figur 4:
Schnittdarstellung der Verbindung zweier Führungsschienen in der Vorderansicht
Figur 5:
Verbindung zweier Führungsschienen in der Draufsicht
Figur 6:
wie Figur 2, jedoch mit einer Ausführung der Führungsschiene
Figur 7:
wie Figur 2, jedoch mit einer anderen Ausführung der Führungsschiene
Figur 8:
wie Figur 2, jedoch mit einer anderen Ausführung der Führungsschiene
Figur 9:
wie Figur 2, jedoch mit einer anderen Ausführung der Führungsschiene
Figur 10:
wie Figur 2, jedoch mit einer weiteren Ausbildung der Anbindung des Seitenteiles an die Führungsschiene
The invention is shown in the following figures using various possible schematically illustrated exemplary embodiments. It shows:
Figure 1:
a shower partition with a straight guide rail
Figure 1a:
a shower partition with angled guide rail
Figure 2:
Detail section with sectional view of the guide rail with side part and sliding sash
Figure 2a:
Section of the illustration of Figure 2, but with another embodiment of the holder of the sliding sash on the guide rail
Figure 3:
Partial section of a sliding sash suspension in the front view
Figure 4:
Sectional view of the connection of two guide rails in the front view
Figure 5:
Connection of two guide rails in top view
Figure 6:
as Figure 2, but with a design of the guide rail
Figure 7:
as Figure 2, but with a different design of the guide rail
Figure 8:
as Figure 2, but with a different design of the guide rail
Figure 9:
as Figure 2, but with a different design of the guide rail
Figure 10:
as Figure 2, but with a further development of the connection of the side part to the guide rail

In der Figur 1 wird ausschnittsweise die Wiedergabe einer Duschabtrennung gezeigt, die aus feststehenden Seitenteilen 1, 4 und damit zusammenwirkenden Schiebeflügeln 2, 3 besteht. Die feststehenden Seitenteile 1, 4 sind durch Wandbefestigungen 5 mit einer Wand 77 verbunden. An den Schiebeflügeln 2, 3 befinden sich jeweils ein Griff 41, um die Schiebeflügel 2, 3 in die Bewegungsrichtungen 42 verbringen zu können. Dabei werden die Schiebeflügel 2,3 hinter die feststehenden Seitenteile 1, 4, d.h. zum Innenraum der Duschabtrennung, verschoben.FIG. 1 shows a partial representation of a shower partition shown, the fixed side parts 1, 4 and interacting with it Sliding wings 2, 3 exist. The fixed side parts 1, 4 are connected to a wall 77 by wall fastenings 5. On the sliding sashes 2, 3 are each a handle 41 around the sliding sash 2, 3 to be able to spend in the directions of movement 42. Here the sliding sash 2, 3 behind the fixed side parts 1, 4, i.e. to the interior of the shower enclosure.

Oberhalb der Schiebeflügel 2, 3 und der Seitenteile 1, 4 befindet sich eine Führungsschiene 6, die jeweils über den Bereich der Seitenteile 1, 4 und der Schiebeflügel 2, 3 weitergeführt ist. Verbunden werden die Führungsschienen 6 in dem Winkelbereich durch ein Verbindungsstück 9. Die Seitenteile 1, 4 werden durch Aufhängungen 7, die hakenförmig ausgebildet sind, auf der Innenseite der Duschabtrennung an der Führungsschiene 6 kraft- und formschlüssig befestigt. Dagegen sind die Schiebeflügel 2, 3 durch entsprechende Aufhängungen 8 verschiebbar an der Führungsschiene 6 plaziert. Zum Wandbereich weisen die Führungsschienen 6 jeweils einen Abstand 76 auf, d.h. die Führungsschiene ist nicht mit der Wand befestigt, sie wird durch die Aufhängungen 7 gehalten..One is above the sliding sash 2, 3 and the side parts 1, 4 Guide rail 6, each over the area of the side parts 1, 4 and the sliding sash 2, 3 is continued. The guide rails are connected 6 in the angular range through a connector 9. The side parts 1, 4 are formed by hooks 7, which are hook-shaped are on the inside of the shower partition on the guide rail 6 non-positively and positively attached. In contrast, the sliding sashes 2, 3 slidable on the guide rail by means of appropriate suspensions 8 6 placed. The guide rails 6 face the wall area a distance 76 each, i.e. the guide rail is not with the Wall attached, it is held by the suspensions 7 ..

In dem Ausführungsbeispiel der Figur 1a ist die Führungsschiene 6 als einstückiges Teil dargestellt worden, d.h. das Verbindungsstück 9 fehlt. Des weiteren wird diese Führungsschiene 6 direkt an der Wand 77 befestigt. Die feststehenden Seitenteile 1, 4 werden dabei vorschlagsweise zum einen mit Wandschienen 43 an der Wand 77 befestigt und sind darüber hinaus über die Aufhängungen 7 festgelegt.In the embodiment of Figure 1a, the guide rail 6 is as one-piece part, i.e. the connector 9 is missing. Furthermore, this guide rail 6 is attached directly to the wall 77. The fixed side parts 1, 4 are proposed fixed on the one hand with wall rails 43 on the wall 77 and are above set beyond the suspensions 7.

Die genaue Aufhängung und Anbindung sowohl der Seitenteile 1, 4 als auch der Schiebeflügel 2, 3 wird in einer Darstellung der Figur 2 wiedergegeben. Der Einfachheit halber sind jedoch in diesem Ausführungsbeispiel nur ein Seitenteil, nämlich das Seitenteil 1, und ein Schiebeflügel, nämlich der Schiebeflügel 2, wiedergegeben worden. Die nachfolgende Beschreibung trifft jedoch auch auf die anderen Ausführungen von Duschen zu.The exact suspension and connection of both the side parts 1, 4 as the sliding sash 2, 3 is also shown in an illustration in FIG. 2. For the sake of simplicity, however, are in this embodiment only one side part, namely side part 1, and one sliding sash, namely the sliding sash 2 has been reproduced. The following However, description also applies to the other versions of showers to.

Der Schiebeflügel 2 ist durch die Aufhängung 8 an der Führungsschiene 6 verschiebbar gelagert Dabei weist die Führungsschiene 6 in ihrem oberen Bereich eine Führungsnut 31 auf, in welche eine Tragrolle 10 eingreift. Auf der Unterseite der Führungsschiene 6 ist eine weitere Führungsnut 30 vorhanden, in welche eine Führungsrolle 11 eingreift. Die Führungsrolle 11 ist auf einer Achse 15 eines Bügels 12, der zwischen der Führungsrolle 11 und der Tragrolle 10 angeschlossen ist, und dabei die Führungsschiene 6 im Außenbereich der Duschabtrennung umgreift, verbunden. Die Tragrolle 10 ist ebenfalls auf einer Achse 16 drehgelagert, wobei die Achse 16 auch einen Gewindeansatz 36 haben kann, der sich in einen Schenkel 70 der Aufhängung 8 erstreckt. Gesichert wird diese Verbindung darüber hinaus durch einen Sicherungsstift 14, so daß die Tragrolle 10, die Führungsrolle 11 und der Bügel 12 kraft- und formschlüssig mit der Aufhängung 8, die im wesentlichen aus einem Aufhängungsbügel 13 besteht, verbunden ist. Der Aufhängungsbügel 13 weist neben dem vorzugsweise um 90° abgewinkelten Schenkel 70 einen weiteren, vorzugsweise um 90° abgewinkelten, Schenkel 69 auf. In dem Schenkel 69 ist eine Bohrung 75 vorhanden, in welche ein Verbindungselement 18 eindringt, das gleichzeitig die kraft- und formschlüssige Verbindung zwischen dem Schiebeflügel 2 und der Aufhängung 8 wiedergibt. Dabei ist das Verbindungselement 18 als Schraube ausgeführt, wobei dessen Kopf in einer Gegenplatte 20 liegt, und durch eine Bohrung 19, die sich in dem Schiebeflügel 2 befindet, hindurchdringt.The sliding sash 2 is on the guide rail through the suspension 8 6 slidably mounted, the guide rail 6 has in its upper Area a guide groove 31, in which a support roller 10 engages. On the underside of the guide rail 6 is another guide groove 30 is present, in which a guide roller 11 engages. The Guide roller 11 is on an axis 15 of a bracket 12 which between the guide roller 11 and the support roller 10 is connected, and thereby grips around the guide rail 6 in the outer area of the shower partition, connected. The idler roller 10 is also rotatably supported on an axis 16, the axis 16 may also have a threaded extension 36 which extends into a leg 70 of the suspension 8. Is backed up this connection also by a locking pin 14 so that the support roller 10, the guide roller 11 and the bracket 12 non-positively and positively with the suspension 8, which essentially consists of a suspension bracket 13 exists, is connected. The suspension bracket 13 has in addition to the leg 70, preferably angled by 90 °, a further, preferably angled by 90 °, leg 69. By doing Leg 69 is a bore 75 in which a connecting element 18 penetrates that at the same time the positive and positive connection between the sliding sash 2 and the suspension 8 reproduces. The connecting element 18 is designed as a screw, wherein whose head lies in a counter plate 20, and through a bore 19, which is in the sliding sash 2 penetrates.

An dem Schenkel 69 ist eine Lasche 17, die vorzugsweise einen abgewinkelten Schenkel 72 aufweist, durch eine kraft- und formschlüssige Verbindung 39, vorzugsweise als Löt- oder Schweißverbindung, angebracht. Zwischen der Lasche 17 und der Gegenplatte 20 wird die Glasscheibe des Schiebeflügels 2 über das Verbindungselement 18 mit dem Schenkel 69 der Aufhängung 8 verbunden. Es versteht sich von selbst, daß die vorbeschriebene Einzelverbindung jeweils bei den Schiebeflügeln 2, 3 doppelt ausgeführt wird.On the leg 69 is a tab 17, which is preferably an angled Leg 72 has a non-positive and positive Connection 39, preferably as a soldered or welded connection. The glass pane is between the tab 17 and the counter plate 20 of the sliding wing 2 via the connecting element 18 with the Leg 69 of the suspension 8 connected. It goes without saying that the above-described individual connection in each case with the sliding sashes 2, 3 is executed twice.

Das Seitenteil 1 ist in der Darstellung der Figur 2 über die Aufhängung 7 mit der Führungsschiene 6 verbunden. Dabei weist die Aufhängung 7 einen Befestigungsschenkel 27 auf, der an der Führungsschiene 6 über eine Befestigungsschraube 22 kraft- und formschlüssig befestigt wird. Zur Justage befindet sich in dem Befestigungsschenkel 27 ein Langloch 78, um das Seitenteil 1 in der Höhe und auch im Winkel zur Wand 77 ausrichten zu können. Festgesetzt wird die Einstellung über eine Sicherungs-und Justierschraube 21.The side part 1 is in the representation of Figure 2 on the suspension 7th connected to the guide rail 6. The suspension 7 has one Fastening leg 27 on the 6 on the guide rail a fastening screw 22 is non-positively and positively fastened. For Adjustment is an elongated hole 78 in the mounting leg 27, Align the side part 1 in height and also at an angle to wall 77 to be able to. The setting is made via a backup and Adjustment screw 21.

Der Befestigungsschenkel 27 liegt somit einerseits an der Führungsschiene 6 fest, und der Aufhängungsbügel 13 des Schiebeflügels 2 geht über den Befestigungsschenkel 27 hinweg. Somit ist eine Bewegung des Schiebeflügels 2 ohne Beeinträchtigung durch den Befestigungsschenkel 27 gegeben.The mounting leg 27 is thus on the one hand on the guide rail 6 fixed, and the suspension bracket 13 of the sliding wing 2 goes over the fastening leg 27. Thus, a movement of the Sliding wing 2 without interference from the mounting leg 27 given.

Der Befestigungsschenkel 27 erstreckt sich ausgehend von der Führungsschiene 6 gerade nach unten und weist einen um etwa 90° abgewinkelten Schenkel 29 auf, der in einem U-förmig gestalteten Hebel 28 endet. Der Schenkel 29 überspannt somit den Schiebeflügel 2 und das Seitenteil 1, wobei die Verbindung zwischen dem Seitenteil 1 und dem U-förmigen Hebel 28 durch eine Lasche 25 sichergestellt ist. Die Lasche 25 ist als Winkellasche ausgeführt, wobei ein Schenkel 73 an der Oberkante des Seitenteiles 1 zur Anlage kommt. Die Lasche 25 ist ebenfalls durch eine kraft- und formschlüssige Verbindung 39 mit dem U-förmigen Hebel 28 verbunden. Gegen eine Anlagefläche 38, die sich an der Außenseite des Schenkels 73 befindet, greift eine Justierschraube 23, die sich innerhalb des Schenkels 29 befindet, um das Seitenteil 1 zu justieren.The fastening leg 27 extends from the guide rail 6 straight down and has an angle of about 90 ° Leg 29 on, in a U-shaped lever 28th ends. The leg 29 thus spans the sliding sash 2 and that Side part 1, the connection between the side part 1 and the U-shaped Lever 28 is ensured by a tab 25. The tab 25 is designed as an angle bracket, with a leg 73 on the upper edge of the side part 1 comes to the plant. The tab 25 is also through a non-positive and positive connection 39 with the U-shaped lever 28 connected. Against a contact surface 38, which is on the outside of the leg 73 is located, an adjustment screw 23 which is located inside of the leg 29 is located to adjust the side part 1.

In dem Seitenteil 1 ist eine Bohrung 19 vorhanden, durch die ein Verbindungselement 26 hindurchgreift, das in eine Bohrung 74, die sich innerhalb eines Schenkels 71 des U-förmigen Hebels 28 befindet, eingreift. Der Kopf des Verbindungselementes 26 kommt in einer Gegenplatte 24 zur Anlage, die auf der entgegengesetzten Seite der Lasche 25 des Seitenteiles 1 liegt. In the side part 1 there is a bore 19 through which a connecting element 26 passes through it, in a bore 74 which is inside of a leg 71 of the U-shaped lever 28 is engaged. The head of the connecting element 26 comes in a counter plate 24 to the system, which is on the opposite side of the tab 25 of the side part 1 lies.

Durch die Darstellung der Figur 2 wird deutlich, daß an der Führungsschiene 6 in funktionaler Weise sowohl das feststehende Seitenteil 1 als auch der Schiebeflügel 2 angebunden werden können, ohne daß es hier zu einer Funktionsbeeinträchtigung kommen kann, obwohl das Seitenteil 1 und auch der Schiebeflügel 2 auf der zur Innenseite der Duschkabine gewandten Seite der Führungsschiene 6 befestigt bzw. angebunden sind.The illustration in FIG. 2 clearly shows that on the guide rail 6 in a functional manner both the fixed side part 1 and also the sliding sash 2 can be connected without it here Functional impairment can occur, although the side part 1 and also the sliding sash 2 on the inside of the shower cubicle facing side of the guide rail 6 are attached or connected.

In dem Ausführungsbeispiel der Figur 2 ist die gleiche Anbindung des Seitenteiles 1 und des Schiebeflügels 2 gegeben, aus diesem Grunde ist auf die Darstellungsform verzichtet worden. Jedoch ist in diesem Ausführungsbeispiel die Tragrolle 10 fortgelassen worden und stattdessen ist ein Gleiter 82 verwendet worden, der in die Führungsnut 30 eingreift. Der Gleiter 82 ist in analoger Weise auf der Achse 15 des Bügels 12 aufgesteckt worden.In the embodiment of Figure 2, the same connection of the Given side part 1 and the sliding wing 2, for this reason the form of presentation has been dispensed with. However, in this embodiment the idler 10 has been omitted and is instead a Slider 82 has been used, which engages in the guide groove 30. Of the Slider 82 is attached in an analogous manner to the axis 15 of the bracket 12 been.

In der Ausschnittdarstellung der Figur 3 wird eine Teilansicht und zwar außerhalb der Duschkabine auf den Schiebeflügel 2 und auf die Führungsschiene 6 wiedergegeben. Innerhalb der Führungsnut 31 liegt die Tragrolle 10, die durch den Bügel 12 mit der Führungsrolle 11, die in die untere Führungsnut 30 eingreift, verbunden ist. Zum Duscheninnenbereich erstreckt sich der Aufhängungsbügel 13, an dem der Bügel 12 befestigt ist, und gibt so die Verbindung zwischen der Führungsschiene 6 und dem Schiebeflügel 2 wieder. Dabei ist an dem Aufhängebügel 13 die Lasche 17 zur Anbindung des Schiebeflügels 2 wiedergegeben worden. Auf der Außenseite des Schiebeflügels 2 wirkt mit der Lasche 17 die Gegenplatte 20 zusammen.3 is a partial view outside the shower cubicle on the sliding sash 2 and on the guide rail 6 reproduced. Within the guide groove 31 is the Carrier roller 10 through the bracket 12 with the guide roller 11, which in the engages lower guide groove 30, is connected. To the inside of the shower extends the suspension bracket 13 to which the bracket 12 is attached is, and so gives the connection between the guide rail 6th and the sliding sash 2 again. The suspension bracket 13 is the Tab 17 for connecting the sliding wing 2 has been reproduced. On the outside of the sliding sash 2, the counter plate acts with the tab 17 20 together.

In der Figur 1 war die Führungsschiene 6 als gerades Stück ausgebildet und durch ein Verbindungsstück 9 verbunden worden. Dieses Verbindungsstück 9 greift in Bohrungen 34, die jeweils in den Führungsschienen 6 enthalten sein, ein. Um eine Festlegung des Verbindungsstückes 9 zu erreichen wird durch entsprechende Verbindungselemente, vorzugsweise in Form von Madenschrauben, eine Festsetzung des Verbindungsstückes 9 erreicht. Gleichzeitig ist jedoch auch eine Möglichkeit der Toleranzanpassung gegeben, da aufgrund der Verschieberichtung 35 das Verbindungsstück 9 mehr oder weniger tief in die Führungsschiene 6 eindringen kann. Ferner ist in den Figuren 4 und 5 die Möglichkeit aufgezeigt worden, durch einen Anschlag 40, der sich innerhalb der Führungsnut 31, die hier vorzugsweise als schwalbenschwanzförmige Nut ausgeführt ist, erstreckt, den Bewegungsbereich der Schiebeflügel 2, 3 zu begrenzen. Der Anschlag 40 kann somit kontinuierlich eingestellt werden und bietet darüber hinaus eine sichere Möglichkeit, daß die Schiebeflügel 2, 3 nur einen bestimmten Weg verschoben werden können.In Figure 1, the guide rail 6 was formed as a straight piece and connected by a connector 9. This connector 9 engages in holes 34, each in the guide rails 6 be included. To fix the connector 9 is achieved by appropriate connecting elements, preferably in the form of grub screws, fixing the connecting piece 9 reached. At the same time, however, there is also a possibility of tolerance adjustment given, because of the direction of displacement 35, the connector 9 penetrate more or less deeply into the guide rail 6 can. Furthermore, FIGS. 4 and 5 have shown the possibility of by a stop 40, which is within the guide groove 31, the here is preferably designed as a dovetail-shaped groove, limit the range of movement of the sliding sash 2, 3. Of the Stop 40 can thus be set continuously and offers above it also a safe possibility that the sliding leaf 2, 3 only one certain way can be moved.

Bei dem Ausführungsbeispiel der Figur 6 ist die Führungsschiene 44 als Vollschiene ausgebildet worden, darüber hinaus weist sie auf der Innenseite der Duschabtrennung eine Abflachung auf, an welcher der Befestigungsschenkel 27 der Aufhängung 7 über die Befestigungsschraube 22 montiert werden kann. Dieses trifft auch in analoger Weise auf die Ausführung der Figur 8 zu, wo die Führungsschiene 46 als eckige Führungsschiene dargestellt worden ist. Eine ovale Führungsschiene 45 gibt die Figur 7 wieder.In the embodiment of Figure 6, the guide rail 44 is as Full rail has been designed, furthermore it shows on the inside the shower partition has a flat on which the fastening leg 27 of the suspension 7 via the fastening screw 22 can be assembled. This also applies to the execution in an analogous manner 8 to where the guide rail 46 as an angular guide rail has been shown. An oval guide rail 45 gives the Figure 7 again.

Eine Führungsschiene 47, die nur eine Führungsnut 31 an der Oberseite aufweist, gibt die Figur 9 wieder. Hierbei ist auf die Einbringung der Führungsnut 31 verzichtet worden und stattdessen ist an dem Bügel 12 ein Gleiter 48 angebracht worden. Dieser Gleiter 48 hat die gleiche Kontur wie die Führungsschiene 47 und stellt somit auch sicher, daß die Schiebeflügel 2, 3 nicht unbeabsichtigt aus der Aufhängung herausgebracht werden können.A guide rail 47 that has only one guide groove 31 on the top shows the figure 9 again. This is due to the introduction of the guide groove 31 has been dispensed with and instead is on the bracket 12 Slider 48 has been attached. This slider 48 has the same contour like the guide rail 47 and thus also ensures that the sliding sash 2, 3 not accidentally brought out of the suspension can be.

Es kann auch auf die in den vorhergehenden Ausführungsbeispielen angegebene Befestigungsschraube 22 für die Aufhängung 7 an die Führungsschiene 6, 44, 45, 46, 47 verzichtet werden, wenn stattdessen über eine Schweiß- oder Lötnaht 49 der Befestigungsschenkel 27 der Aufhängung 7 direkt an der Führungsschiene 6, 44, 45, 46, 47 befestigt wird.It can also refer to the one given in the previous exemplary embodiments Fixing screw 22 for the suspension 7 on the guide rail 6, 44, 45, 46, 47 can be dispensed with if instead over a weld or solder seam 49 of the fastening legs 27 of the suspension 7 is attached directly to the guide rail 6, 44, 45, 46, 47.

Die Aufhängungen 7, 8 und der Bügel 12 können je nach gestalterischer Möglichkeit aus Rundmaterial oder aber auch in Edelstahl oder jeder anderen Form hergestellt werden. Neben einem Material aus Messing kann auch Aluminium sowohl für die Führungsschienen 6, 44, 45, 46, 47 als auch für die Aufhängungen 7, 8 verwendet werden. The suspensions 7, 8 and the bracket 12 can, depending on the design Possibility of round material or in stainless steel or any other Form are made. In addition to a material made of brass can also aluminum both for the guide rails 6, 44, 45, 46, 47 and can also be used for the suspensions 7, 8.

BezugszeichenReference numerals

11
SeitenteilSide panel
22nd
SchiebeflügelSliding sash
33rd
SchiebeflügelSliding sash
44th
SeitenteilSide panel
55
WandsbefestigungWall mounting
66
FührungsschieneGuide rail
77
Aufhängungsuspension
88th
Aufhängungsuspension
99
VerbindungsstückConnector
1010th
TragrollenIdlers
1111
FührungsrollenLeadership roles
1212th
Bügelhanger
1313
AufhängungsbügelSuspension bracket
1414
SicherungsstiftLocking pin
1515
Achseaxis
1616
Achseaxis
1717th
LascheTab
1818th
VerbindungselementFastener
1919th
Bohrungdrilling
2020th
GegenplatteCounter plate
2121
Sicherungs-und JustierschraubeLocking and adjusting screw
2222
BefestigungsschraubeFastening screw
2323
JustierschraubeAdjusting screw
2424th
GegenplatteCounter plate
2525th
LascheTab
2626
VerbindungselementFastener
2727
BefesügungsscheklAssessment schedule
2828
U-förmiger SchenkelU-shaped leg
2929
Schenkelleg
3030th
FührungsnutGuide groove
3131
FührungsnutGuide groove
3232
VerbindungsstückConnector
3333
VerbindungselementFastener
3434
Bohrung drilling
3535
VerschieberichtungDirection of displacement
3636
GewindeansatzThread approach
3737
GewindebohrungTapped hole
3838
AnlageflächeContact surface
3939
Verbindungconnection
4040
Anschlagattack
4141
GriffHandle
4242
BewegungsrichtungDirection of movement
4343
WandschieneWall rail
4444
FührungsschieneGuide rail
4545
FührungsschieneGuide rail
4646
FührungsschieneGuide rail
4747
FührungsschieneGuide rail
4848
GleiterGlider
4949
SchweißnahtWeld
6969
Schenkelleg
7070
Schenkelleg
7171
Schenkelleg
7272
Schenkelleg
7373
Schenkelleg
7474
Bohrungdrilling
7575
Bohrungdrilling
7676
Abstanddistance
7777
Wandwall
7878
LanglochLong hole
8080
Schenkelleg
8282
GleiterGlider

Claims (17)

Duschabtrennung mit einer oberen Führungsschiene (6, 44, 45, 46, 47), an der wenigstens ein feststehendes Seitenteil (1, 4) und mindestens ein Schiebeflügel (2, 3) aufgehängt sind, wobei der Schiebeflügel (2, 3) mit einer die Führungsschiene (6, 44, 45, 46, 47) übergreifenden Aufhängung (8) hineinragt, die bevorzugt in den Innenraum der Duschabtrennung angeordnet ist, wobei die Führungsschiene (6, 44, 45, 46, 47) wenigstens an ihrer Oberseite jeweils eine Führungsnut (31) aufweist, in die Tragrollen (10) eingreifen und an der Unterseite der Führungsschiene (6, 44, 45, 46, 47) eine weitere Führungsnut (30) vorhanden ist, in die eine Führungsrolle (11) eingreift und die Führungsrolle (11) und die Tragrolle (10) jeweils durch einen an der Außenseite der Duschabtrennung plazierten übergreifenden Bügel (12) untereinander und auf der Innenseite der Duschabtrennung durch den Aufhängungsbügel (8) mit den Schiebeflügeln (2, 3) verbunden, und daß gleichzeitig feststehende Seitenteil (1, 4) an der Führungsschiene (6, 44, 45, 46, 47) kraft- und formschlüssig durch von der Innenseite der Duschabtrennung her umgreifende Aufhängungen (7) befestigt sind.Shower partition with an upper guide rail (6, 44, 45, 46, 47) on which at least one fixed side part (1, 4) and at least one sliding sash (2, 3) are suspended, the Sliding sash (2, 3) with a guide rail (6, 44, 45, 46, 47) extends overlapping suspension (8), which preferably in the interior of the shower partition is arranged, the Guide rail (6, 44, 45, 46, 47) at least on its top each have a guide groove (31) into the support rollers (10) engage and on the underside of the guide rail (6, 44, 45, 46, 47) there is a further guide groove (30) into which one Guide roller (11) engages and the guide roller (11) and Carrier roller (10) by one on the outside of the The shower partition placed overlapping brackets (12) one below the other and on the inside of the shower partition by the Suspension bracket (8) connected to the sliding sashes (2, 3), and that at the same time fixed side part (1, 4) on the guide rail (6, 44, 45, 46, 47) through non-positive and positive suspensions encompassing the inside of the shower enclosure (7) are attached. Duschabtrennung nach Anspruch 1, dadurch gekennzeichnet, daß die Aufhängung (7) durch Justierschrauben (21, 23) ausrichtbar ist.Shower partition according to claim 1, characterized in that the suspension (7) can be aligned by adjusting screws (21, 23) is. Duschabtrennung nach Anspruch 1, dadurch gekennzeichnet, daß die Führungsschiene (6, 44, 45, 46, 47) einstückig und gebogen ausgeführt wird.Shower partition according to claim 1, characterized in that the guide rail (6, 44, 45, 46, 47) in one piece and bent is performed. Duschabtrennung nach Anspruch 1, dadurch gekennzeichnet, daß die Führungsschiene (6, 47) zweistückig ist und über ein Verbindungsstück (9) untereinander verbunden wird, wobei eine horizontale Justierbarkeit gegeben ist. Shower partition according to claim 1, characterized in that the guide rail (6, 47) is in two pieces and over one Connection piece (9) is interconnected, one horizontal adjustability is given. Duschabtrennung nach Anspruch 4, dadurch gekennzeichnet, daß das Verbindungsstück (9) in eine Bohrung (34) innerhalb der Führungsschiene (6, 47) eingreift und durch Verbindungselemente (33) festgesetzt wird.Shower partition according to claim 4, characterized in that the connector (9) in a bore (34) within the Guide rail (6, 47) engages and through connecting elements (33) is fixed. Duschabtrennung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Führungsschiene (6, 44, 45, 46, 47) rund, oval oder eckig ausgeführt sind.Shower partition according to one or more of the preceding Claims, characterized in that the guide rail (6, 44, 45, 46, 47) are round, oval or angular. Duschabtrennung nach Anspruch 1, dadurch gekennzeichnet, daß die Führungsnut (31) schwalbenschwanzförmig ausgebildet ist.Shower partition according to claim 1, characterized in that the guide groove (31) is dovetail-shaped is. Duschabtrennung nach Anspruch 1, dadurch gekennzeichnet, daß die Führungsnut (30) rechteckig ausgeführt ist.Shower partition according to claim 1, characterized in that the guide groove (30) is rectangular. Duschabtrennung nach Anspruch 1, dadurch gekennzeichnet, daß der Bügel (12) und die Aufhängung (8) lösbar miteinander verbunden sind.Shower partition according to claim 1, characterized in that the bracket (12) and the suspension (8) releasably together are connected. Duschabtrennung nach Anspruch 1, dadurch gekennzeichnet, daß die Aufhängung (7) im wesentlichen aus einem an der Führungsschiene (6, 44, 45, 46, 47) befestigten Schenkel (27) mit daran anschließendem abgewinkelten Schenkel (29), der in einen U-förmigen Verbindungsschenkel (28) übergeht, besteht.Shower partition according to claim 1, characterized in that the suspension (7) consists essentially of one on the guide rail (6, 44, 45, 46, 47) attached legs (27) with followed by angled leg (29), which in one U-shaped connecting leg (28) passes. Duschabtrennung nach Anspruch 10, dadurch gekennzeichnet, daß an dem Schenkel (28) ein Schenkel (71) vorhanden ist, der mit einer Lasche (25) kraft- und formschlüssig verbunden ist.Shower partition according to claim 10, characterized in that on the leg (28) there is a leg (71) which is non-positively and positively connected with a tab (25). Duschabtrennung nach den Ansprüchen 1 und 9, dadurch gekennzeichnet, daß die Aufhängung (8) im wesentlichen aus einem Aufhängebügel (13) mit Schenkeln (69, 70) besteht.Shower partition according to claims 1 and 9, characterized in that the suspension (8) consists essentially of one Suspension bracket (13) with legs (69, 70). Duschabtrennung nach Anspruch 12, dadurch gekennzeichnet, daß der Schenkel (69) mit einer Lasche (17) kraft- und formschlüssig verbunden ist. Shower partition according to claim 12, characterized in that the leg (69) with a tab (17) non-positively and positively connected is. Duschabtrennung nach den Ansprüchen 11 und 13, dadurch gekennzeichnet, daß die Laschen (17, 25) winkelförmig ausgeführt sind und mit Schenkeln (72, 73) an den Oberkanten der Seitenteile (1, 4) und der Schiebeflügel (2, 3) anliegen.Shower partition according to claims 11 and 13, characterized in that the tabs (17, 25) are angular are and with legs (72, 73) on the upper edges of the side parts (1, 4) and the sliding sash (2, 3). Duschabtrennung nach Anspruch 8, dadurch gekennzeichnet, daß in die Führungsnut (30) eine Führungsrolle (11) eingreift.Shower partition according to claim 8, characterized in that a guide roller (11) engages in the guide groove (30). Duschabtrennung nach Anspruch 8, dadurch gekennzeichnet, daß in die Führungsnut (30) ein Gleiter (82) eingreift.Shower partition according to claim 8, characterized in that a slider (82) engages in the guide groove (30). Duschabtrennung nach einem oder mehreren der vorhergehenden Ansprüche, dadurch gekennzeichnet, daß die Aufhängung (7, 8) sowie die Führungsschiene (6, 44, 45, 46, 47) aus Aluminium, Edelstahl oder Messing besteht.Shower partition according to one or more of the preceding Claims, characterized in that the suspension (7, 8) and the guide rail (6, 44, 45, 46, 47) made of aluminum, Stainless steel or brass.
EP99107896A 1998-05-13 1999-04-21 Shower partition Expired - Lifetime EP0956799B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE19821339 1998-05-13
DE19821339A DE19821339A1 (en) 1998-05-13 1998-05-13 Shower partition

Publications (3)

Publication Number Publication Date
EP0956799A2 true EP0956799A2 (en) 1999-11-17
EP0956799A3 EP0956799A3 (en) 2000-09-13
EP0956799B1 EP0956799B1 (en) 2004-08-04

Family

ID=7867576

Family Applications (1)

Application Number Title Priority Date Filing Date
EP99107896A Expired - Lifetime EP0956799B1 (en) 1998-05-13 1999-04-21 Shower partition

Country Status (3)

Country Link
EP (1) EP0956799B1 (en)
AT (1) ATE272349T1 (en)
DE (2) DE19821339A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1136642A2 (en) * 2000-03-20 2001-09-26 Rudolph Leonhard Wildschut Slide system for shower stall door
CN101165302B (en) * 2006-10-19 2011-11-16 哈瓦有限公司 Device with a carriage for holding panels and a separation element
EP3434162A1 (en) * 2017-07-25 2019-01-30 Gebr. Willach GmbH Separation wall of a shower cubicle or partition for a shower or bath tray
EP3854974A1 (en) * 2020-01-21 2021-07-28 Sanotechnik Handelsgesellschaft m.b.H. Shower cabin sliding door system
US20220049531A1 (en) * 2018-03-08 2022-02-17 Inlay Door Systems LLC Sliding door system capable of inline closure and capable of use with corner openings

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3302454C1 (en) 1983-01-26 1984-04-26 Paul-Jean 7816 Münstertal Munch Separating wall for a shower having at least one fixed partition wall and at least one sliding door
DE4106235C1 (en) 1991-02-28 1992-08-06 Altura Leiden Holding B.V., Maastricht, Nl
DE19511036A1 (en) 1995-03-28 1996-10-02 Paul Jean Munch Shower cubicle with partition containing entry opening

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4308413A1 (en) * 1993-03-17 1994-09-22 Paul Jean Munch Shower partition wall with sliding door

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3302454C1 (en) 1983-01-26 1984-04-26 Paul-Jean 7816 Münstertal Munch Separating wall for a shower having at least one fixed partition wall and at least one sliding door
DE4106235C1 (en) 1991-02-28 1992-08-06 Altura Leiden Holding B.V., Maastricht, Nl
DE19511036A1 (en) 1995-03-28 1996-10-02 Paul Jean Munch Shower cubicle with partition containing entry opening

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1136642A2 (en) * 2000-03-20 2001-09-26 Rudolph Leonhard Wildschut Slide system for shower stall door
EP1136642A3 (en) * 2000-03-20 2004-12-22 Rudolph Leonhard Wildschut Slide system for shower stall door
CN101165302B (en) * 2006-10-19 2011-11-16 哈瓦有限公司 Device with a carriage for holding panels and a separation element
EP3434162A1 (en) * 2017-07-25 2019-01-30 Gebr. Willach GmbH Separation wall of a shower cubicle or partition for a shower or bath tray
US20220049531A1 (en) * 2018-03-08 2022-02-17 Inlay Door Systems LLC Sliding door system capable of inline closure and capable of use with corner openings
US11828095B2 (en) * 2018-03-08 2023-11-28 Inlay Door Systems LLC Sliding door system capable of inline closure and capable of use with corner openings
EP3854974A1 (en) * 2020-01-21 2021-07-28 Sanotechnik Handelsgesellschaft m.b.H. Shower cabin sliding door system
EP3854974B1 (en) 2020-01-21 2022-09-07 Sanotechnik Handelsgesellschaft m.b.H. Shower cabin sliding door system

Also Published As

Publication number Publication date
ATE272349T1 (en) 2004-08-15
EP0956799B1 (en) 2004-08-04
DE19821339A1 (en) 1999-11-25
EP0956799A3 (en) 2000-09-13
DE59910097D1 (en) 2004-09-09

Similar Documents

Publication Publication Date Title
DE102016123230B3 (en) Hinge arrangement for a control cabinet housing and a corresponding control cabinet housing
DE3705433C2 (en)
DE602004002173T2 (en) Device for a height-adjustable mounting of a gate
DE3800444C2 (en) Guide fitting for hanging and guiding a sliding door or a sliding wall in shower or bathtub partitions
AT511046B1 (en) FRAME SYSTEM OF A PARTICLE PROTECTION GRILLE
EP2927409B1 (en) Sealing arrangement for a push door
EP0956799B1 (en) Shower partition
EP2453097B1 (en) Side section door with locking device
EP1614843A2 (en) Support rails for rollers for supporting sliding doors, gates, window shutters or similar
DE602004003430T2 (en) Device for fastening a band to a wing
DE19839379C2 (en) Horizontal sliding door
EP0984126B1 (en) Guiding device for a sliding door
AT3946U1 (en) SHOWER SEPARATION
DE2925671C2 (en) Corner connection in a window, door frame or the like. arranged espagnolette
EP0730074B1 (en) Bolt device for mounting on the edge of the semi-fixed wing of double doors
EP1038486B1 (en) Kit for shower partitions
EP0006439B2 (en) Joint overlapping device for face plates
DE4438026C1 (en) Partition for shower cubicle with attachment to wall or outer partition
EP1400647B1 (en) Partition wall element with a top supporting device and a bottom floor guide
DE19734647B4 (en) Fitting part on a wing or a fixed frame of a window, a door od. Like.
DE102012210584A1 (en) sliding door system
EP1025790B1 (en) Shower partition
DE19744894B4 (en) Sliding guide and sliding door system
EP1469152A1 (en) Rail
DE8115218U1 (en) "SLIDING DOOR FOR INSTALLATION IN A WALL CUTOUT OR THE LIKE."

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): AT CH DE FR LI

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

EL Fr: translation of claims filed
PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

RIC1 Information provided on ipc code assigned before grant

Free format text: 7A 47K 3/22 A, 7A 47K 3/34 B

17P Request for examination filed

Effective date: 20010313

AKX Designation fees paid

Free format text: AT CH DE FR LI

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

RIC1 Information provided on ipc code assigned before grant

Ipc: 7A 47K 3/34 A

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT CH DE FR LI

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59910097

Country of ref document: DE

Date of ref document: 20040909

Kind code of ref document: P

DIN2 Information on inventor provided after grant (deleted)
RAP2 Party data changed (patent owner data changed or rights of a patent transferred)

Owner name: MUNCH, PAUL-JEAN

RIN2 Information on inventor provided after grant (corrected)

Inventor name: MUNCH, PAUL-JEAN

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20050510

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20050512

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20050519

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20050520

Year of fee payment: 7

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

REG Reference to a national code

Ref country code: CH

Ref legal event code: PUE

Owner name: PAUL-JEAN MUNCH

Free format text: DORMA GMBH + CO. KG#BRECKERFELDER STRASSE 42-48#58256 ENNEPETAL (DE) -TRANSFER TO- PAUL-JEAN MUNCH#LES EVAUX 629#68910 LABAROCHE (FR)

Ref country code: CH

Ref legal event code: NV

Representative=s name: BOVARD AG PATENTANWAELTE

ET Fr: translation filed
26N No opposition filed

Effective date: 20050506

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060421

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060430

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060430

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20061101

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

Effective date: 20061230

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20060502