- EP0873455B1 EP0873455B1 EP97901002A EP97901002A EP0873455B1 EP 0873455 B1 EP0873455 B1 EP 0873455B1 EP 97901002 A EP97901002 A EP 97901002A EP 97901002 A EP97901002 A EP 97901002A EP 0873455 B1 EP0873455 B1 EP 0873455B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- storage device
- supporting
- scaffolding
- stack
- connection element
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
- B66C1/28—Duplicate, e.g. pivoted, members engaging the loads from two sides
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
- E04G21/16—Tools or apparatus
- E04G21/167—Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/003—Devices for storing material on the scaffold
Definitions
- the invention relates to a storage device for providing of stackable building materials, such as Thermal insulation panels on a building, facade or the like.
- Framework as known from DE-U-89 10 626.
- a storage device is in shape of an only upward open basket for Thermal insulation boards described the outside of the railing of a facade scaffold can be attached.
- the thermal insulation boards stand upright in the basket and have to go can be taken from above.
- the basket is attached to the hand Facade scaffolding hung, after which the panels in the basket be used.
- the well-known basket can be folded.
- the invention has for its object a storage device to provide stackable building material, in particular thermal insulation panels on a building or facade scaffolding to create those who are on the scaffolding People as little as possible in their freedom of movement restricted and which allows easy handling.
- the storage device that is stackable building material in a supporting frame device housed the two side elements and one of these two Has connecting elements connecting side elements.
- this connecting element the one ends connecting the frame side members are those ends opposite ends of the frame side members over a Carrier element coupled together.
- On this support element the stack of building materials is at rest.
- the support frame device can be by means of an attachment device attach without detachable and detachable to the outside of the scaffolding by the support frame device, in particular on the parapet of the scaffold is preferably attached. So that is the support frame device and thus the Building material stack outside of the floor of the Defined work area.
- a hanging device provided, by means of which the support frame device on the load bearing member (in particular hooks or the like) one Lifts can be attached.
- the frame side elements, the connecting element and the support element for folding and / or folding the support frame device are movably coupled to one another or can be coupled. In order to the support frame device can be convenient because little Taking up space, transporting.
- the stackable building material to be processed to be stored outside the work area of the scaffolding.
- the So construction workers have the full work area of the scaffolding.
- the storage device can usually be conveniently carried out with a on a construction site existing freight elevator or crane to the individual Transport the fields of the scaffolding up.
- About the Attachment device which is the simplest Case is U-shaped hooks open at the bottom, lets the storage device then adapts to that field upper breastwork belonging to the scaffolding hook up.
- the side of the Storage device is open, so that now the building material conveniently from that on the floor of this field standing construction workers can be removed.
- the storage device surrounds the Support frame device to the building material stack at four of the six side surfaces. In the area of two opposite Side faces, which are particularly the two large sides of the stack of building materials this is free.
- lashing element in particular elastic webbing or the like.
- Lashing element preferably between two opposite one another Elements (frame side elements or connecting element and support element) attached. Outside on the scaffolding attached state of the support frame device is or is this corresponding or the corresponding lashing elements removed to now from the floor ceiling of the scaffold remove the building material from the supporting frame device to be able to.
- the attachment device is expediently provided with at least one and preferably two hooks for hooking the Support frame device equipped on the breastwork of the scaffold.
- the hooks or the attachment device on the frame side elements of the support frame device arranged.
- the frame side elements face each other parallel edges, two of each in to Extension of the connecting element extending vertically Levels.
- the hooks of the attachment device are arranged on two in one and for extension of the connecting element extending vertically Flat edges of the frame side elements.
- the carrier element of the Support frame device around a pallet or the like.
- Carrier body on which the stack of materials rests.
- stacks of building materials standing on the floor can be conveyed by means of the support frame device is then particularly easy to pick up, if the support frame device as a gripping device is formed, which has two gripper arms, which the Form frame side elements of the support frame device.
- the stack of building materials can be together with support element (e.g. pallet) reach under. This way is convenient and easy Possibility of picking up the stack of building materials given by the support frame device.
- the stackable building material by means of the gripping device, which has two gripper arms.
- This gripping device is with an attachment device for detachable attachment, in particular hooking the gripping device from the outside on the so-called breast brigades of the scaffolding Mistake. So that the gripping device depends on outside of the scaffolding and thus outside of the Floor of the scaffolding defined work area.
- There is also a suspension device on the gripping device to hang the strapping device the hook of a scaffolding lift or another construction site goods lift.
- This hanging device is suitable also around the gripping device on the hook a crane or the like hook up.
- the gripping device of the Storage device according to the invention is with two gripper arms provided that including the stack of building materials of the support element on two opposite one another Grasp sides of the stack of building materials (the Gripping device on the underside of the stack of building materials or the support element also formed continuously can be).
- the support frame device as a gripping device and with a stack of building materials the building material leaves the (earth) supporting support element so in the area of the other two vertical sides, the across to the sides gripped by the gripper arms of the stack of building materials run freely. So that can Building material on one of these two free sides on the outside state of the storage device hanging on the scaffolding removed and processed between the gripper arms.
- the two gripper arms in their the building material stack laterally encompassing condition among themselves are connected, by means of at least one lashing element.
- two lashing elements crossing each other used that diagonally across the scaffolding and thus the attachment device facing away from the Storage device or gripping device attached are. These lashing elements are on the gripper arms hooked when the stack of building materials resting on the floor reach around to the side.
- lashing elements on the storage device special holding elements can also be provided the unwanted tilting of the stack of building materials to the Prevent the side facing away from the scaffolding and thus the stack of building materials to back up.
- these holding elements it is in particular ropes, chains or, if appropriate elastic bands that oppose rigid elements the advantage of space-saving accommodation with bring yourself when the storage device is not needed becomes.
- the two gripper arms via a suspension device having connecting element with each other are coupled, the two gripper arms each are articulated to the connecting element.
- This Connection element is in the building material stack comprehensive condition of the storage device on or above the top of the stack of building materials.
- the connecting element is divided into two, the two parts of the connecting element articulated with each other are connected.
- the hinge axis between the two Parts of the connecting element and the hinge axes of the Gripper arms on the connecting element or its two Parts all run parallel to each other.
- Also at rigid design of the connecting element can be Place the storage device in a space-saving manner by the two gripper arms from below against the connecting element be swung up. Is also the connecting element still divided into two, this can be divided between the two essentially parallel gripper arms fold up. In both cases there is one particularly space-saving arrangement of the gripper arms.
- suspension device of the storage device expediently there are two Tension elements in the form of ropes, chains or the like.
- flexible Elements the two ends of each tension element with the Wrapping device are connected, in particular with the connecting element of the gripping device.
- the suspension device can advantageously also as a (freely accessible) strut or the like Be designed to accommodate the storage device, on the gripping device or the connecting element is provided and on the hook of a freight elevator, Attach construction site or scaffolding crane or lift leaves.
- the two gripper arms point at their articulated axes facing lower ends preferably protruding laterally Under-grip projections for reaching under the stack of building materials load-bearing carrier element or for reaching under of the building material stack itself.
- the storage device according to the invention when used the storage device according to the invention in particular With regard to the space-saving accommodation of the building material advantages on the scaffolding.
- the additional can be used as a gripping device Achieve the advantage that the resting on the floor Building materials can be easily picked up and transported can.
- Carrier element Building material is stacked using the gripper arms the gripping device laterally.
- the storage device stops the gripping device the building material stack.
- the gripper arms it is advantageous if the gripper arms not too wide.
- the gripping device for gripping one on a pallet resting thermal insulation panel stack is designed, the Has a width of half a euro pallet.
- To the building site themselves are expediently adjacent to one another in pairs Stack of thermal insulation boards half the width Euro pallet delivered, these two each on a half-wide stack of thermal insulation panels at rest are surrounded by a shrink film.
- the "half-shell" remains Shrink film around the stack of insulation boards including half the euro pallet; the gripping device should be placed around the stack of thermal insulation panels in this way be that the inside of the half a stack of insulation boards hanging in the scaffolding Condition of the storage device the working area of the Scaffolding is facing.
- Fig. 1 is a storage device for housing one resting on a carrier element such as a pallet 10 Stack 12 of thermal insulation panels 14 shown in perspective.
- the storage device has a gripping device 16 on, the stack 12 on two opposite one another Vertical pages (narrow pages in the case of Thermal insulation boards) and surrounds at the top.
- the gripping device 16 is provided with two gripper arms 18, each of which is made from a surrounding metal rectangular frame 20 with metal grating 22 held by this.
- the upper cross section of the frame 20 of each gripper arm 18 is via hinge axes 24 with a connecting element 26 pivotally connected via the two gripper arms 18 are coupled together.
- the connecting element 26 has two substantially equal parts 28, of each one in the form of a rectangular frame 30 with this held metal grid 32 is formed.
- the two Parts 28 of the connecting element 26 are on their hinge axes 24 inner sides facing away via articulated axes 34 connected with each other.
- the hinge axes 24 and 34 run parallel to each other and allow the folding the gripping device 16
- the encircling device 16 or have the gripper arms 22 and the two parts 28 of the connecting element 26 a width that is substantially is equal to the width of the thermal insulation panel stack 12.
- the lower ends 36 of the gripper arms facing away from the joint axes 24 22 stands from the lower frame cross sections each a lower grip projection in the form of a U-shaped Strap 38 from.
- the two brackets 38 face each other and reach under the pallet 10 from below.
- Every gripper arm 18 is on one of its longitudinal frame sections a U-shaped attachment hook open towards the lower end 36 40 provided. Both attachment hooks 40 protrude over the same exposed side surface of the stack of thermal insulation boards 12 over.
- lashing elements 42 3 On the attachment hook 40 facing away from it (Back) side of the gripping device 16 are the two gripper arms 18 crosswise through lashing elements 42 3 interconnected. These lashing elements 42, which are expediently wire ropes, secure the gripper arms 18 against an unwanted Swing away from the stack 12 and also secure the stack 12 of thermal insulation panels 14 against tipping over when the gripping device 16 hangs on the outside of a scaffolding like it in the figures 3 and 4 is shown, to which further will be discussed below.
- a hanging device on the connecting element 26 43 consisting of two tension elements 44 in the form of ropes, chains or the like especially flexible or elastic elements consists.
- the tension elements 44 are at their ends on the Frame 30 of the two parts 28 of the connecting element 26 attached.
- a hook 46 of a freight elevator can be the entire storage device in this way lift and transport to the scaffolding.
- FIGS. 3rd and 4. 4 The attachment of the storage device or the gripping device 16 on a scaffolding 48 is shown in FIGS. 3rd and 4. 4, the scaffolding 48 is on a vertical wall 50, e.g. Building facade, fortified and has several floors 52.
- the scaffolding 48 is there from a variety of interconnected vertical, Horizontal and diagonal struts, which are shown in Figs. 3rd and 4 are not provided with reference numerals.
- Work areas 54 serve on the one hand in the amount of Baseboards 56 arranged on the floors and in basin and horizontal struts 58 (so-called Nipples).
- the gripping device 16 by means of the attachment hooks 40 in the upper of the two Parapets 58 of a field 60 of the scaffolding 48 hooked in.
- the lower ends 36 of the gripper arms 18 lie in this state from the outside on the skirting board 56 of this scaffolding field 60 on.
- the gripper arms 18 of FIG outside also on the lower parapet 58 of the scaffolding field 60 on.
- the vertical side provided with the lashing elements 42 the stack 12 faces away from the frame 48, while the side surface of the stack facing the frame 48 12 is exposed, so that, as in the lower part of Fig. 4th shown by a construction worker standing on the floor 52 the thermal insulation panels 14 conveniently from the storage device can be removed.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Building Environments (AREA)
- Pallets (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
- Fig. 1
- eine perspektivische Ansicht der Lagerungsvorrichtung, wobei der Zustand dargestellt ist, in dem die Greiferarme der Umgreifvorrichtung einen auf einer halbbreiten Euro-Palette ruhenden Wärmedämmplattenstapel seitlich umgreifen,
- Fig. 2
- eine Seitenansicht der Lagerungsvorrichtung im zusammengelegten Zustand,
- Fig. 3
- eine Vorderansicht eines Feldes eines Baugerüsts mit an dessen oberer Brustwehr eingehängter Lagerungsvorrichtung, wobei deren dem Baugerüst abgewandten und mit Verzurrelementen versehenen Rückseite dargestellt ist, und
- Fig. 4
- eine Ansicht des Baugerüsts entsprechend dem Pfeil IV der Fig. 3.
Claims (15)
- Lagerungsvorrichtung zum Bereitstellen von stapelbarem Baumaterial, wie z.B. Wärmedämmplatten, an einem Bau- oder Fassadengerüst, miteiner Tragrahmenvorrichtung (16) zur Aufnahme des Stapels (12), wobei die Tragrahmenvorrichtung (16) zwei Rahmenseitenelemente (18), ein oberes die beiden Rahmenseitenelemente (18) verbindendes Verbindungselement (26) und ein unteres mit den beiden Rahmenseitenelementen (18) verbundenes Trägerelement (10) zum Stützen des Stapels (12) aufweist, undeiner Aufhängevorrichtung (43) zum Aufhängen der Tragrahmenvorrichtungen (16) an einem Lastaufnahmeorgan eines Lastenaufzuges,daß eine Anbringungsvorrichtung (40) zum aufstandsfreien, lösbaren Anbringen der Tragrahmenvorrichtung (16) außen an dem Gerüst (48) und außerhalb von durch Geschoßdecken des Gerüsts (48) definierten Arbeitsbereichen vorgesehen ist unddaß die Rahmenseitenelemente (18), das Verbindungselement (26) und das Trägerelement (10) zum Zusammenlegen und/oder Zusammenklappen der Tragrahmenvorrichtung (16) bewegbar miteinander gekoppelt und/oder koppelbar sind.
- Lagerungsvorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß zwischen den beiden Rahmenseitenelementen (18) und/oder zwischen dem Verbindungselement (26) und dem Trägerelement (10) mindestens ein Verzurrelement (42) angeordnet ist, das an den beiden Rahmenseitenelementen (18) und/oder an dem Verbindungselement (26) und dem Trägerelement (10) angreift.
- Lagerungsvorrichtung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Aufhängevorrichtung (43) an dem Verbindungselement (26) vorgesehen ist.
- Lagerungsvorrichtung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Tragrahmenvorrichtung als Umgreifvorrichtung (16) ausgebildet ist, die zwei Greiferarme (18) zum Umgreifen des BaumaterialStapels (12) einschließlich des Trägerelements (10) an zwei einander gegenüberliegenden Seiten aufweist.
- Lagerungsvorrichtung nach Anspruch 4, dadurch gekennzeichnet, daß die beiden Greiferarme (18) in ihrem den Baumaterial-Stapel (12) und das Trägerelement (10) seitlich umgreifenden Zustand mittels mindestens eines Verzurr- und/oder Halteelements (42) untereinander verbunden sind.
- Lagerungsvorrichtung nach Anspruch 5, dadurch gekennzeichnet, daß zwei sich kreuzende Verzurr- und/oder Halteelemente (42) vorgesehen sind.
- Lagerungsvorrichtung nach einem der Ansprüche 3 bis 6, dadurch gekennzeichnet, daß die beiden Greiferarme (16) über das Verbindungselement (26) miteinander gekoppelt sind und daß die beiden Greiferarme (16) jeweils über Gelenkachsen (24) gelenkig mit dem Verbindungselement (26) verbunden sind.
- Lagerungsvorrichtung nach Anspruch 7, dadurch gekennzeichnet, daß das Verbindungselement (26) zwei Teile (28) aufweist, die untereinander um eine zu den Gelenkachsen (24) der Greiferarme (18) parallele Drehachse (34) schwenkbar miteinander verbunden sind.
- Lagerungsvorrichtung nach einem der Ansprüche 1 bis 8, dadurch gekennzeichnet, daß die Aufhängevorrichtung (43) zwei Zugelemente (44) aufweist und daß die beiden Enden jedes Zugelements (44) mit dem Verbindungselement (26) verbunden sind.
- Lagerungsvorrichtung nach Anspruch 8 und 9, dadurch gekennzeichnet, daß die Enden des Zugelements (44) mit beiden Teilen (28) des Verbindungselements (26) verbunden sind.
- Lagerungsvorrichtung nach einem der Ansprüche 7 bis 10, dadurch gekennzeichnet, daß die beiden Greiferarme (18) an ihren den Gelenkachsen (24) abgewandten unteren Enden (36) seitlich abstehende Untergreif-Vorsprünge (38) zum Untergreifen des Trägerelements (10) aufweisen.
- Lagerungsvorrichtung nach einem der Ansprüche 1 bis 11, dadurch gekennzeichnet, daß die Anbringungsvorrichtung mindestens einen Haken (40) zum Einhaken der Tragrahmenvorrichtung (16) an der Brustwehr (58) des Gerüsts (48) aufweist.
- Lagerungsvorrichtung nach einem der Ansprüche 1 bis 12, dadurch gekennzeichnet, daß die Anbringungsvorrichtung (16) an den Rahmenseitenelementen (18) der Tragrahmenvorrichtung (16) angeordnet ist.
- Lagerungsvorrichtung nach einem der Ansprüche 1 bis 13, dadurch gekennzeichnet, daß die Anbringungsvorrichtung (16) an zwei Rändern in einer gemeinsamen zur Erstreckung des Verbindungselements (26) senkrecht verlaufenden Ebene liegen.
- Lagerungsvorrichtung nach einem der Ansprüche 1 bis 14, dadurch gekennzeichnet, daß die Anbringungsvorrichtung (40) derart oberhalb des unteren Trägerelements (10) an der Tragrahmenvorrichtung (16) angeordnet ist, daß sich die Tragrahmenvorrichtung (16) im an der Brustwehr (58) eines Geschoßbodens (52) eines Gerüsts (48) angebrachten Zustand mit ihrem unteren Trägerelement (10) von außen an der Fußleiste (56) des Geschoßbodens (52) anliegend abstützt.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE29600453U | 1996-01-12 | ||
DE29600453 | 1996-01-12 | ||
PCT/EP1997/000108 WO1997025495A1 (de) | 1996-01-12 | 1997-01-11 | Lagerungsvorrichtung zum bereitstellen von stapelbarem baumaterial, insbesondere wärmedämmplatten, an einem bau- oder fassadengerüst |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0873455A1 EP0873455A1 (de) | 1998-10-28 |
EP0873455B1 true EP0873455B1 (de) | 1999-09-29 |
Family
ID=8017943
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP97901002A Expired - Lifetime EP0873455B1 (de) | 1996-01-12 | 1997-01-11 | Lagerungsvorrichtung zum bereitstellen von stapelbarem baumaterial, insbesondere wärmedämmplatten, an einem bau- oder fassadengerüst |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0873455B1 (de) |
AT (1) | ATE185182T1 (de) |
DE (2) | DE29700439U1 (de) |
WO (1) | WO1997025495A1 (de) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19741353C1 (de) * | 1997-09-19 | 1998-10-01 | Koch Marmorit Gmbh | Baugerüst, insbesondere Fassadengerüst |
DE19825365C2 (de) * | 1998-06-06 | 2003-10-30 | Rockwool Mineralwolle | Vorrichtung zur Anordnung und Lagerung von Verpackungseinheiten |
DE19825366C2 (de) * | 1998-06-06 | 2003-11-13 | Rockwool Mineralwolle | Verpackungseinheit |
DE19831974C2 (de) * | 1998-07-16 | 2001-07-05 | Sto Ag | Verwendung einer Vorrichtung zum Bereitstellen von Dämmplatten |
DE20117310U1 (de) | 2001-10-25 | 2002-01-03 | Hellmann, Paul, 48282 Emsdetten | Lagerungsvorrichtung zum Bereitstellen von Baumaterial, bestimmt zur Befestigung an einem im wesentlichen aus Holmen bestehenden Baugerüst, sowie Baugerüst, versehen wenigstens mit einer Lagerungsvorrichtung der vorgenannten Art |
ATE358056T1 (de) | 2002-08-09 | 2007-04-15 | Rockwool Mineralwolle | Vorrichtung zum höhentransport von palettenlosen verpackungseinheiten für plattenförmige baustoffe |
CN112177296B (zh) * | 2020-08-21 | 2022-05-13 | 中冶天工集团有限公司 | 一种外墙保温施工装置及施工方法 |
CN112249857B (zh) * | 2020-10-16 | 2022-11-04 | 中国建筑第八工程局有限公司 | 加气混凝土砌块快速吊运装置和吊运方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2852496A1 (de) * | 1978-12-05 | 1980-06-19 | Walter Duerr | Arbeitshilfsgestell fuer das verkleiden von gebaeudefassaden |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BE344120A (de) * | ||||
BE489129A (de) * | ||||
DE8409221U1 (de) * | 1984-03-26 | 1985-11-07 | Schütz, Horst, 5239 Unnau | Vorrichtung zur Bereitstellung und/oder zum Tragen von Platten |
DE8810244U1 (de) * | 1988-05-05 | 1988-10-13 | Möller, Hans, 3445 Waldkappel | An Gebäudegerüsten anbringbare Vorrichtung zum Auftragen von Massen |
DE8910626U1 (de) * | 1989-09-06 | 1989-10-26 | Humpert, Uwe, 4815 Schloß Holte-Stukenbrock | Fördereinrichtung für Steine o.dgl. |
GB8923779D0 (en) * | 1989-10-21 | 1989-12-06 | Kinzett Ian R | Lifting tool |
-
1997
- 1997-01-11 DE DE29700439U patent/DE29700439U1/de not_active Expired - Lifetime
- 1997-01-11 AT AT97901002T patent/ATE185182T1/de not_active IP Right Cessation
- 1997-01-11 DE DE59700502T patent/DE59700502D1/de not_active Expired - Fee Related
- 1997-01-11 EP EP97901002A patent/EP0873455B1/de not_active Expired - Lifetime
- 1997-01-11 WO PCT/EP1997/000108 patent/WO1997025495A1/de active IP Right Grant
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2852496A1 (de) * | 1978-12-05 | 1980-06-19 | Walter Duerr | Arbeitshilfsgestell fuer das verkleiden von gebaeudefassaden |
Also Published As
Publication number | Publication date |
---|---|
EP0873455A1 (de) | 1998-10-28 |
DE59700502D1 (de) | 1999-11-04 |
WO1997025495A1 (de) | 1997-07-17 |
ATE185182T1 (de) | 1999-10-15 |
DE29700439U1 (de) | 1997-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0332060B1 (de) | Transporteinrichtung für Stellrahmen von Gerüsten | |
EP0873455B1 (de) | Lagerungsvorrichtung zum bereitstellen von stapelbarem baumaterial, insbesondere wärmedämmplatten, an einem bau- oder fassadengerüst | |
DE4113314A1 (de) | Stapelbares traggestell fuer lager- und transportgut | |
DE3907595A1 (de) | Transporteinrichtung fuer stellrahmen von geruesten | |
EP0276489A1 (de) | Gerüstrahmentafel | |
DE19517925C1 (de) | Gestell zum Lagern und/oder Transportieren von Glasscheibenpaketen | |
DE4302604B4 (de) | Stapel aus Rahmenschalungselementen | |
DE102015016064B4 (de) | Montagegerüst mit begehbaren Laufflächen in unterschiedlichen Höhenbereichen mit einer Vorrichtung zum Bereithalten und zeitweiligen Lagern von Dämmstoffen | |
WO2002010055A2 (de) | Vorrichtung zum transportieren und heben von sperrigen gütern | |
DE19825365C2 (de) | Vorrichtung zur Anordnung und Lagerung von Verpackungseinheiten | |
DE29906684U1 (de) | Lagerungsvorrichtung zum Bereitstellen von stapelbarem Baumaterial, wie beispielsweise Wärmedämmplatten, an einem Bau- oder Fassadengerüst | |
DE19741353C1 (de) | Baugerüst, insbesondere Fassadengerüst | |
DE1922468A1 (de) | Lastentraeger | |
DE29707782U1 (de) | Lagerungsvorrichtung zum Bereitstellen von Leichtdämmstoffplatten zur Fassadendämmung an Baugerüsten | |
DE8107930U1 (de) | Transportgestell fuer flaechige Gegenstaende | |
DE3117012A1 (de) | Schutzkorb fuer krangabeln | |
DE19751187C2 (de) | Baugerüst mit anbringbarem Baumaterialsammler | |
EP0565928B1 (de) | Lager- und Transportpalette mit Seitenwänden | |
DE4427073B4 (de) | Stapel aus Rahmenschalungselementen | |
DE2040995C (de) | Vorrichtung zum Lagern, Verladen und Transportieren von Stückgut, insbesondere Glasprofilen | |
DE4405011C1 (de) | Gerüstbock | |
DE10238954A1 (de) | Traverse für hochkant stehende, groß, flache Kisten | |
DE19850837A1 (de) | Vorrichtung zum Halten von Baumaterial | |
AT413530B (de) | Vorrichtung zum heben und absetzen von lasten | |
DE20218392U1 (de) | Ortsveränderliche Lagervorrichtung für Fassadendämmplatten o.dgl. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19980708 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT CH DE GB LI |
|
17Q | First examination report despatched |
Effective date: 19981026 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AT CH DE GB LI |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: MARMORIT GMBH |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT CH DE GB LI |
|
REF | Corresponds to: |
Ref document number: 185182 Country of ref document: AT Date of ref document: 19991015 Kind code of ref document: T |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: TROESCH SCHEIDEGGER WERNER AG Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 59700502 Country of ref document: DE Date of ref document: 19991104 |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20000106 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20070123 Year of fee payment: 11 Ref country code: CH Payment date: 20070123 Year of fee payment: 11 Ref country code: AT Payment date: 20070123 Year of fee payment: 11 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20070307 Year of fee payment: 11 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20080111 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080131 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080801 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080131 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080111 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080111 |