EP0822320A1 - Installation à turbines à gaz et à vapeur - Google Patents
Installation à turbines à gaz et à vapeur Download PDFInfo
- Publication number
- EP0822320A1 EP0822320A1 EP97117410A EP97117410A EP0822320A1 EP 0822320 A1 EP0822320 A1 EP 0822320A1 EP 97117410 A EP97117410 A EP 97117410A EP 97117410 A EP97117410 A EP 97117410A EP 0822320 A1 EP0822320 A1 EP 0822320A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- steam
- gas
- steam generator
- turbine
- fired
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 42
- 239000007789 gas Substances 0.000 claims description 134
- 238000011084 recovery Methods 0.000 claims description 29
- UGFAIRIUMAVXCW-UHFFFAOYSA-N Carbon monoxide Chemical compound [O+]#[C-] UGFAIRIUMAVXCW-UHFFFAOYSA-N 0.000 claims description 27
- 239000003546 flue gas Substances 0.000 claims description 27
- 239000002918 waste heat Substances 0.000 claims description 15
- 238000004140 cleaning Methods 0.000 claims description 11
- 238000010438 heat treatment Methods 0.000 claims description 11
- 238000011144 upstream manufacturing Methods 0.000 claims description 4
- 238000002485 combustion reaction Methods 0.000 abstract description 27
- 239000002803 fossil fuel Substances 0.000 abstract description 12
- 238000000034 method Methods 0.000 description 13
- 239000000446 fuel Substances 0.000 description 12
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 5
- 239000003245 coal Substances 0.000 description 5
- 239000001301 oxygen Substances 0.000 description 5
- 229910052760 oxygen Inorganic materials 0.000 description 5
- 238000009420 retrofitting Methods 0.000 description 5
- 239000003921 oil Substances 0.000 description 4
- MWUXSHHQAYIFBG-UHFFFAOYSA-N Nitric oxide Chemical compound O=[N] MWUXSHHQAYIFBG-UHFFFAOYSA-N 0.000 description 3
- 238000001704 evaporation Methods 0.000 description 3
- 230000008020 evaporation Effects 0.000 description 3
- 239000003990 capacitor Substances 0.000 description 2
- 238000006243 chemical reaction Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 239000010813 municipal solid waste Substances 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 239000002023 wood Substances 0.000 description 2
- 230000006978 adaptation Effects 0.000 description 1
- 239000000567 combustion gas Substances 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000006477 desulfuration reaction Methods 0.000 description 1
- 230000023556 desulfurization Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000001035 drying Methods 0.000 description 1
- 238000010304 firing Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000002737 fuel gas Substances 0.000 description 1
- 239000000295 fuel oil Substances 0.000 description 1
- 230000020169 heat generation Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000003303 reheating Methods 0.000 description 1
- 239000004449 solid propellant Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
- F01K23/106—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with water evaporated or preheated at different pressures in exhaust boiler
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
- F01K23/103—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with afterburner in exhaust boiler
Definitions
- the invention relates to a gas and steam turbine plant according to the preamble of claim 1.
- Such System is from the patents DE 38 15 536 C1 and US 4,852,344 known.
- the steam generator is suitable for the combined process with a downstream one Heat recovery steam generator especially for retrofitting one already existing gas turbine plant.
- a new system usually a number of gas turbines with a corresponding one Number of heat recovery steam generators on a common Steam turbine switched. Because in this combination process steam generation is limited to pure heat recovery, the overall efficiency of the system is also only limited.
- the invention is therefore based on the object of a gas and Specify steam turbine plant, in which at the same time particularly high overall efficiency using one from one Variety of gas turbines of different sizes freely selectable gas turbine is possible.
- a first partial flow of the exhaust gas is generated to generate steam the gas turbine for burning a fossil fuel used.
- a second partial flow of the exhaust gas from the gas turbine is used to generate waste heat, with both the Steam generation by burning the fossil fuel as also waste heat generation in a common water-steam cycle the steam turbine.
- This is advantageous pressurized feed water of the water-steam cycle preheated in partial flows, the Preheating a first partial flow of the feed water by means of resulting from the combustion of fossil fuel Flue gas occurs.
- the preheating of a second partial flow of the Feed water takes place by means of the second, the heat recovery steam generator flowing part of the exhaust gas from the Gas turbine.
- a third partial flow of the feed water is by means of Tap steam preheated from the steam turbine. This is done the preheating of the three partial flows of the feed water expediently multi-stage, the preheating of the first Partial stream and the third partial stream in a common second preheating stage by means of combustion of the flue gas produced from fossil fuel.
- the invention is based on the consideration that by the combination of pure waste heat use and use as Combustion air divides these types of use of the exhaust gas from the gas turbine regardless of its power size best possible with regard to the overall efficiency of the system is tunable if additionally in the exhaust gas from the gas turbine and in the combustion of fossil fuel Flue gas contained and not for steam generation more usable residual heat is used for preheating the feed water becomes.
- the fired steam generator can advantageously large range of fuels are used.
- fuels for example as fossil fuel oil, gas, coal or special fuels, such as. Garbage, wood or waste oil can be used.
- Garbage, wood or waste oil can be used.
- the exhaust gas temperature behind the Gas turbine at around 500 ° C for coal drying under certain circumstances is too high, can suitably as combustion air serving first partial flow of the exhaust gas from the Gas turbine be mixed with a cold air stream.
- the oxygen-containing exhaust gas from the gas turbine for example 15% oxygen content serves as the sole combustion air for those to be burned in the fired steam generator fossil fuels, the fired steam generator expediently only with the one required for combustion Exhaust gas volume is applied.
- a possible one Flue gas cleaning system must therefore only for the first partial flow of the exhaust gas from the gas turbine and not for the whole Exhaust gas volume can be designed, this as combustion air serving first partial flow of the exhaust gas from the Gas turbine along with that when burning the fossil The resulting flue gas is cleaned.
- the fired steam generator is in a practical embodiment a flue gas cleaning system downstream of the flue gas side. Since the flue gas cleaning system is only for the first Partial flow of the exhaust gas from the gas turbine and for that in the fossil fired steam generator designed amount of flue gas must not occur with a new system or with a Retrofitting an old system Problems with a required Limiting the size of the cleaning system Space constraints. An undesirable reduction in steam generator output in the case of a cleaning system to be retrofitted, due to the space available on site only for one limited exhaust gas volume is sufficient is therefore not necessary.
- the fired Steam generator a series connection of two flue gas-heated high-pressure preheaters on the water / steam side upstream. This is done in a first high-pressure preheater or boiler economizer all of the fired steam generator supplied feed water preheated while in one second downstream of the boiler economizer on the flue gas side second high pressure preheater or boiler parts economizer only the first partial flow of the feed water is preheated.
- the steam turbine process can consist of one or more pressure stages be constructed.
- a two-pressure system is expedient provided with reheating and condensate preheating.
- the waste heat steam generator includes a condensate preheater and this upstream medium pressure heating surfaces with a reheater and advantageously arranged at least partially parallel to these on the exhaust side and high pressure heating surfaces connected in parallel on the water / steam side.
- the reheater located in the heat recovery steam generator is another conveniently provided Reheater of the fired steam generator on the water / steam side connected in parallel.
- the advantages achieved with the invention are in particular in that by combining a fired steam generator and a heat recovery steam generator at the same time Distribution of the exhaust gas from the gas turbine in the steam generators supplied partial streams not only in the fired steam generator a wide range of fuels, e.g. Coal, heavy oil, Low gases or special fuels, e.g. Garbage, wood or Waste oil, can be used. Rather, it can decrease Boiler output of the fired steam generator as a result a fuel conversion of e.g. Oil on coal or as a result of Conversion to a low nitrogen oxide firing is still a special one high steam turbine output and thus a higher system efficiency due to the additional steam generator output be maintained from the heat recovery steam generator.
- fuels e.g. Coal, heavy oil, Low gases or special fuels, e.g. Garbage, wood or Waste oil
- FIG. 1 An embodiment of the invention is based on a Drawing explained in more detail.
- the figure shows a circuit diagram a combined gas and steam turbine system with the gas turbine downstream of both a fossil-fired Steam generator as well as a heat recovery steam generator.
- the gas and steam turbine system 1 comprises a gas turbine system with a gas turbine 2 with coupled Air compressor 3 and one of the gas turbine 2 upstream Combustion chamber 4, which is connected to a fresh air line 5 of the air compressor 3 is connected.
- a combustion chamber 4 of the gas turbine 2 opens a fuel or fuel gas line 6. Die Gas turbine 2 and the air compressor 3 and a generator 7 sit on a common shaft 8.
- the gas and steam turbine system 1 further comprises a steam turbine system with a steam turbine 10 with coupled Generator 11 and in a water-steam cycle 12 one of the Steam turbine 10 downstream capacitor 13 and a fired steam generator 14 and a heat recovery steam generator 15.
- the steam turbine 10 consists of a high pressure part 10a and a medium pressure part 10b and a low pressure part 10c, which drive the generator 11 via a common shaft 16.
- a first partial flow line 18 is connected to an inlet 14a of the fired steam generator 14 in order to supply working fluid or exhaust gas A relaxed in the gas turbine 2 to the fired steam generator 14.
- a first partial flow t 1 of the exhaust gas A from the gas turbine 2 with an oxygen content of approx. 15%, which is conducted via the partial flow line 18, serves as combustion air during the combustion of a gaseous, liquid or solid fuel B. This is fired via an inlet 14b Steam generator 14 connected fuel line 20 led into the fired steam generator 14.
- a control flap 22 connected to the partial flow line 18 is provided for setting the first partial flow t 1 .
- the flue gas R formed and the partial flow t 1 of the exhaust gas A serving as combustion air from the gas turbine 2 leave the fired steam generator 14 via a flue gas line 24 and after it has been cleaned in a cleaning system 26 in the direction of a (not shown) Stack.
- the flue gas cleaning system 26 comprises a flue gas desulfurization device and a denitrification device (DeNO x system) and a dedusting device in a manner not shown.
- a second partial flow line 28 with a control flap 29 is connected to an inlet 15a of the waste heat steam generator 15.
- the partial flow t 2 of the relaxed exhaust gas A from the gas turbine 2 leaves the heat recovery steam generator 15 via its outlet 15b in the direction of the chimney.
- a third partial flow line or bypass line 30 with a flap 32 is - e.g. when starting and stopping the system 1 - neither for the fired steam generator 14 nor for the waste heat steam generator 15 required exhaust gas A from the gas turbine 2 led.
- this bypass line 30 is used to discharge the exhaust gas A from the gas turbine 2, if operated alone in so-called single-cycle operation becomes.
- a fresh air line 34 into which a blower 36 and a steam-heated heat exchanger 38 and a flap 40 are connected, opens into the partial flow line t 1 .
- cold fresh air KL can be mixed into the partial stream t 1 of the exhaust gas A from the gas turbine 2 via this fresh air line 34.
- the heat recovery steam generator 15 comprises a preheater as heating surfaces 42, between its inlet and outlet a circulation pump 44 is switched.
- the preheater 42 is on the input side connected to the output of a condensate preheater 46, which in turn on the input side via a condensate pump 48 with the Capacitor 13 is connected.
- the condensate preheater 46 will via one with the low pressure part 10c of the steam turbine 10 connected tap 50 heated with steam.
- Two the condensate preheater 46 downstream and also over with the Low pressure part 10c connected tap lines 52 and 54 heated Preheaters 56 and 58 are in the heat recovery steam generator 15 arranged preheater 42 connected in parallel and on the output side connected to a feed water tank 60.
- the heat recovery steam generator 15 further comprises one as heating surfaces Medium pressure preheater or economizer 62 and a medium pressure evaporator 64 and a medium pressure superheater 66, the output side to one with the high pressure part 10a Steam turbine 10 connected steam line 68 and with a reheater 70 is connected.
- the medium pressure heating surfaces 62, 64, 66 are via the reheater 70 to one in the Medium pressure part 10b of the steam turbine 10 opening steam line 72 connected.
- the medium pressure heating surfaces 62, 64, 66 and the reheater 70 and the medium pressure part 10b of the Steam turbine 10 thus form a medium pressure stage of the water-steam cycle 12th
- the heat recovery steam generator 15 further comprises in a high pressure stage two high-pressure preheaters connected in series as heating surfaces or -Economizer 74 and 75 and a high pressure evaporator 76 and a high pressure superheater 78.
- the High-pressure superheater 78 is on the outlet side via a steam line 80 with the entrance of the high pressure part 10a of the steam turbine 10 connected.
- the medium-pressure economizer 62 and the high-pressure economizer 74, 75 are arranged within the heat recovery steam generator 15 in the region of the same exhaust gas temperature, the high-pressure evaporator 76 and the high-pressure superheater 78 are off in the flow direction of the partial flow t 2 of the exhaust gas A from the gas turbine 2 before the series connection the medium pressure evaporator 64 and the medium pressure superheater 66, the intermediate superheater 70 and the high pressure superheater 78 being arranged in the region of the same exhaust gas temperature.
- the feed water tank 60 is via a high pressure pump 82 and a heat exchanger arrangement with a series connection from three preheaters 84, 86, 88 with the fired Steam generator 14 connected.
- the feed water tank 60 is also via a medium pressure pump 90 with the medium pressure economizer 62 connected.
- a partial flow line 92a connected via a boiler part economizer 94 between preheaters 86 and 88 the feed water line 92 is connected. This is also via a further partial flow line 92b with the high-pressure economizer 74 connected.
- the boiler parts economizer 94 and the preheater or boiler economizer 88 are in the Flue gas line 24 of the fired steam generator 14 switched.
- the fired steam generator 14 is on the output side via a High-pressure superheater 96, the steam line on the outlet side 80 is connected to the input of the high pressure part 10a of the steam turbine 10 connected.
- One in the heat recovery steam generator 15 arranged reheaters 70 connected in parallel Intermediate heater 98 is on the input side via the Steam line 68 with the outlet of the high pressure part 10a and on the output side with the medium pressure part 10b of the steam turbine 10 connected.
- the preheaters 84 and 86 are via steam lines 100 and 102 using bleed steam from the medium pressure section 10b or the high pressure part 10a of the steam turbine 10 is heated.
- a fuel B ′ is supplied to the combustion chamber 4 of the gas turbine 2 in a manner not shown in detail via the fuel line 6.
- the fuel B ' is burned in the combustion chamber 4 with compressed fresh air L from the air compressor 3.
- the hot combustion gas V formed during the combustion is conducted into the gas turbine 2 via a gas line 6a. There it relaxes and drives the gas turbine 2, which in turn drives the air compressor 3 and the generator 7.
- the hot exhaust gas A emerging from the gas turbine 2 is conducted in the first partial flow t 1 via the partial flow line 18 as combustion air into the fired steam generator 14.
- the second partial flow t 2 of the hot exhaust gas A from the gas turbine 2 is conducted via the partial flow line 28 and through the heat recovery steam generator 15.
- the hot flue gas R which arises when the partial flow t 1 of the exhaust gas A from the gas turbine 2 is produced during the combustion of the fossil fuel B is used there to generate steam and then leaves the fired steam turbine 14 via the flue gas line 24 in the direction of the flue gas cleaning system 26, previously has first been cooled in the boiler economizer 88 and then in the boiler part economizer 94 by heat exchange with feed water from the feed water tank 60.
- the feed water is preheated in three partial flows S 1 to S 3 .
- a first partial flow S 1 of the feed water under high pressure which is adjustable by means of a valve 104 connected to the partial flow line 92 a, is passed through the boiler part economizer 94 and preheated by means of the flue gas R and the partial flow t 1 of the exhaust gas A of the gas turbine 2.
- a second partial flow S 2 which can be set by means of a valve 106 connected to the partial flow line 92b, is led through the high-pressure economizers 74 and 75 and preheated by heat exchange with the second partial flow t 2 of the exhaust gas A from the gas turbine 2.
- the preheating of the feed water both for the fired steam generator 14 and for the waste heat steam generator 15 is thus carried out in several stages.
- a two-stage preheating of the feed water partial stream S 2 takes place within the heat recovery steam generator 15 in the high pressure economizers 74 and 75 connected in series on the water / steam side.
- the feed water for the fired steam generator 15 is preheated in three stages.
- the third partial flow S 3, which is preheated in two stages in the preheaters 84 and 86, is then preheated together with the partial flow S 1 preheated in parallel in the boiler part economizer 94 in the boiler economizer 88 in the common third stage.
- This multi-stage preheating of the feed water in three partial streams S 1 to S 3 enables a particularly advantageous distribution or division of the feed water between the two steam generators 14 and 15, so that undesired evaporation within their gas-heated preheaters 74, 75 and 88, 94 as a result of an increased Heat input from the partial streams t 1 and t 2 of the exhaust gas A from the gas turbine 2 and from the flue gas R is practically avoided even when using a particularly powerful gas turbine 2.
- the steam generated in the waste heat steam generator 15 in the high pressure evaporator 76 and superheated in the high pressure superheater 78 is conducted together with the steam generated in the fired steam generator 14 and superheated in the superheater 96 into the high pressure part 10a of the steam turbine 10.
- the steam which is partially expanded in the high pressure part 10a is partly overheated again in the superheater 70 arranged in the waste heat steam generator 15 and partly in the intermediate superheater 98 of the fired steam generator 14 and then fed to the medium pressure part 10b of the steam turbine 10.
- the steam which is further expanded in the medium pressure part 10b is used partly for heating the feed water in the feed water tank 60 and partly for preheating the feed water part flow S 3 led through the preheater 84, and partly directly into the low pressure part 10c of the steam turbine 10.
- the steam released in the low-pressure part 10c is used via the bleed lines 50 to 54 for preheating condensate K fed into the feed water tank 60.
- the steam emerging from the low-pressure part 10c is condensed in the condenser 13 and conveyed as condensate K via the condensate pump 48 and the preheaters 46, 56 and 58 into the feed water tank 60.
- the water-steam circuit 12 common to the fired steam generator 14 and the waste heat steam generator 15 is thus closed.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4434526 | 1994-09-27 | ||
DE4434526A DE4434526C1 (de) | 1994-09-27 | 1994-09-27 | Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende Anlage |
EP95931137A EP0783619B1 (fr) | 1994-09-27 | 1995-09-14 | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95931137A Division EP0783619B1 (fr) | 1994-09-27 | 1995-09-14 | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0822320A1 true EP0822320A1 (fr) | 1998-02-04 |
EP0822320B1 EP0822320B1 (fr) | 2000-07-12 |
Family
ID=6529324
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95931137A Expired - Lifetime EP0783619B1 (fr) | 1994-09-27 | 1995-09-14 | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur |
EP97117410A Expired - Lifetime EP0822320B1 (fr) | 1994-09-27 | 1995-09-14 | Installation à turbines à gaz et à vapeur |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95931137A Expired - Lifetime EP0783619B1 (fr) | 1994-09-27 | 1995-09-14 | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur |
Country Status (7)
Country | Link |
---|---|
US (1) | US5887418A (fr) |
EP (2) | EP0783619B1 (fr) |
JP (1) | JPH10506165A (fr) |
KR (1) | KR100385372B1 (fr) |
CN (1) | CN1067137C (fr) |
DE (3) | DE4434526C1 (fr) |
WO (1) | WO1996010124A1 (fr) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10001997A1 (de) * | 2000-01-19 | 2001-07-26 | Alstom Power Schweiz Ag Baden | Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes |
ITBS20090224A1 (it) * | 2009-12-16 | 2011-06-17 | Turboden Srl | Sistema e metodo per la produzione di energia elettrica a partire da sorgenti termiche a temperatura variabile |
WO2014177372A1 (fr) * | 2013-05-02 | 2014-11-06 | Siemens Aktiengesellschaft | Traitement thermique des eaux dans des concepts de centrales à turbine à gaz avec injection de vapeur (stig) |
Families Citing this family (28)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19542917A1 (de) * | 1994-12-21 | 1996-06-27 | Abb Management Ag | Kombianlage mit konventionellem Wasser/Dampf-Kreislauf |
DE19541914A1 (de) * | 1995-11-10 | 1997-05-15 | Asea Brown Boveri | Kühlluftkühler für Kraftwerksanlagen |
DE19619470C1 (de) * | 1996-05-14 | 1997-09-25 | Siemens Ag | Gas- und Dampfturbinenanlage sowie Verfahren zu deren Betrieb |
DE19626011A1 (de) * | 1996-06-28 | 1998-01-02 | Lentjes Kraftwerkstechnik | Kombinierte Gas-Dampf-Kraftanlage und Prozeß |
DE19720789B4 (de) * | 1997-05-17 | 2006-04-27 | Alstom | Verfahren und Vorrichtung zur Erzeugung von Dampf |
US6065280A (en) * | 1998-04-08 | 2000-05-23 | General Electric Co. | Method of heating gas turbine fuel in a combined cycle power plant using multi-component flow mixtures |
NL1009467C2 (nl) * | 1998-06-22 | 1999-12-27 | Stork Eng & Contractors Bv | Warmte-krachtinstallatie, en werkwijze voor het bedrijven daarvan. |
US6202782B1 (en) * | 1999-05-03 | 2001-03-20 | Takefumi Hatanaka | Vehicle driving method and hybrid vehicle propulsion system |
SE0004931D0 (sv) * | 2000-12-29 | 2000-12-29 | Addpower Ab | Sätt att konvertera värme i varma rökgaser |
US7073337B2 (en) * | 2003-05-30 | 2006-07-11 | General Electric Company | Combined power generation and desalinization apparatus and related method |
CN1948720B (zh) * | 2006-10-31 | 2011-08-10 | 章祖文 | 永磁传动低温多级涡轮发电机 |
US7628609B2 (en) * | 2006-12-29 | 2009-12-08 | Electrolux Home Products, Inc. | Hub and spoke burner with flame stability |
JP4939511B2 (ja) * | 2008-10-29 | 2012-05-30 | 三菱重工業株式会社 | 石炭ガス化複合発電設備 |
DE102011013325A1 (de) * | 2011-03-08 | 2012-09-13 | Rwe Technology Gmbh | Kraftwerk sowie Verfahren zum Betreiben eines Kraftwerks |
US9074494B2 (en) * | 2011-10-21 | 2015-07-07 | General Electric Company | System and apparatus for controlling temperature in a heat recovery steam generator |
DE202011107312U1 (de) * | 2011-11-02 | 2012-02-29 | Gammel Engineering Gmbh | Abgasnacherhitzungs-Vorrichtung |
US8955322B2 (en) * | 2012-03-05 | 2015-02-17 | Ormat Technologies Inc. | Apparatus and method for increasing power plant efficiency at partial loads |
CN103047047B (zh) * | 2013-01-24 | 2015-12-02 | 矫明义 | 发动机废气动力装置及使用方法 |
FR3005143A1 (fr) * | 2013-04-25 | 2014-10-31 | Pyraine | Installation thermique de production d'electricite par combustion |
GB2519129A (en) * | 2013-10-10 | 2015-04-15 | Ide Technologies Ltd | Pumping Apparatus |
WO2015187423A2 (fr) | 2014-06-04 | 2015-12-10 | Conlon William M | Centrale hybride d'énergie solaire à répartir |
JP6317652B2 (ja) * | 2014-09-12 | 2018-04-25 | 株式会社東芝 | プラント制御装置及びコンバインドサイクル発電プラント |
US10316700B2 (en) * | 2015-02-24 | 2019-06-11 | Siemens Aktiengesellschaft | Combined cycle power plant having supercritical steam turbine |
WO2017079617A1 (fr) | 2015-11-05 | 2017-05-11 | Conlon William M | Centrales électriques à cycle combiné et stockage acheminable |
US10174639B2 (en) * | 2017-01-31 | 2019-01-08 | General Electric Company | Steam turbine preheating system |
US10337357B2 (en) | 2017-01-31 | 2019-07-02 | General Electric Company | Steam turbine preheating system with a steam generator |
US10670334B2 (en) * | 2017-12-01 | 2020-06-02 | Dilip Kumar De | Highly cost effective technology for capture of industrial emissions without reagent for clean energy and clean environment applications |
CN108679587A (zh) * | 2018-05-11 | 2018-10-19 | 中国成达工程有限公司 | 一种燃气透平乏气并串级热量回收系统 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3815536C1 (en) * | 1988-05-06 | 1989-07-20 | Wolff Walsrode Ag, 3030 Walsrode, De | Heating and power station and method for generating heat energy in the form of steam and generating electrical energy |
US4852344A (en) * | 1988-06-06 | 1989-08-01 | Energy Economics & Development, Inc. | Waste disposal method and apparatus |
JPH04362207A (ja) * | 1991-06-10 | 1992-12-15 | Toshiba Corp | 汽力発電設備のリパワリングシステム |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1312469A (fr) * | 1961-10-03 | 1962-12-21 | Babcock & Wilcox France | Perfectionnements aux installations de production d'énergie à cycle mixte vapeur et gaz |
DE1426443B2 (de) * | 1962-09-21 | 1971-09-09 | Waermekraftanlage | |
DE1426890A1 (de) * | 1963-08-30 | 1969-06-12 | Aeg Kanis Turbinen | Kraftwerk mit Muellverbrennung |
DE4029991A1 (de) * | 1990-09-21 | 1992-03-26 | Siemens Ag | Kombinierte gas- und dampfturbinenanlage |
DE4126036A1 (de) * | 1991-08-06 | 1993-02-11 | Siemens Ag | Gas- und dampfturbinenkraftwerk mit einem solar beheizten dampferzeuger |
US5628183A (en) * | 1994-10-12 | 1997-05-13 | Rice; Ivan G. | Split stream boiler for combined cycle power plants |
-
1994
- 1994-09-27 DE DE4434526A patent/DE4434526C1/de not_active Expired - Fee Related
-
1995
- 1995-09-14 WO PCT/DE1995/001263 patent/WO1996010124A1/fr active IP Right Grant
- 1995-09-14 KR KR1019970701998A patent/KR100385372B1/ko not_active IP Right Cessation
- 1995-09-14 JP JP8511259A patent/JPH10506165A/ja not_active Ceased
- 1995-09-14 DE DE59502433T patent/DE59502433D1/de not_active Expired - Lifetime
- 1995-09-14 DE DE59508574T patent/DE59508574D1/de not_active Expired - Lifetime
- 1995-09-14 CN CN95194614A patent/CN1067137C/zh not_active Expired - Fee Related
- 1995-09-14 EP EP95931137A patent/EP0783619B1/fr not_active Expired - Lifetime
- 1995-09-14 EP EP97117410A patent/EP0822320B1/fr not_active Expired - Lifetime
-
1997
- 1997-03-27 US US08/826,240 patent/US5887418A/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3815536C1 (en) * | 1988-05-06 | 1989-07-20 | Wolff Walsrode Ag, 3030 Walsrode, De | Heating and power station and method for generating heat energy in the form of steam and generating electrical energy |
US4852344A (en) * | 1988-06-06 | 1989-08-01 | Energy Economics & Development, Inc. | Waste disposal method and apparatus |
JPH04362207A (ja) * | 1991-06-10 | 1992-12-15 | Toshiba Corp | 汽力発電設備のリパワリングシステム |
Non-Patent Citations (1)
Title |
---|
PATENT ABSTRACTS OF JAPAN vol. 017, no. 233 (M - 1407) 12 May 1993 (1993-05-12) * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10001997A1 (de) * | 2000-01-19 | 2001-07-26 | Alstom Power Schweiz Ag Baden | Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes |
US6598399B2 (en) | 2000-01-19 | 2003-07-29 | Alstom (Switzerland) Ltd | Integrated power plant and method of operating such an integrated power plant |
ITBS20090224A1 (it) * | 2009-12-16 | 2011-06-17 | Turboden Srl | Sistema e metodo per la produzione di energia elettrica a partire da sorgenti termiche a temperatura variabile |
WO2014177372A1 (fr) * | 2013-05-02 | 2014-11-06 | Siemens Aktiengesellschaft | Traitement thermique des eaux dans des concepts de centrales à turbine à gaz avec injection de vapeur (stig) |
Also Published As
Publication number | Publication date |
---|---|
EP0822320B1 (fr) | 2000-07-12 |
DE59508574D1 (de) | 2000-08-17 |
DE59502433D1 (de) | 1998-07-09 |
CN1155318A (zh) | 1997-07-23 |
EP0783619A1 (fr) | 1997-07-16 |
CN1067137C (zh) | 2001-06-13 |
DE4434526C1 (de) | 1996-04-04 |
KR100385372B1 (ko) | 2003-08-19 |
WO1996010124A1 (fr) | 1996-04-04 |
KR970706444A (ko) | 1997-11-03 |
EP0783619B1 (fr) | 1998-06-03 |
JPH10506165A (ja) | 1998-06-16 |
US5887418A (en) | 1999-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0822320B1 (fr) | Installation à turbines à gaz et à vapeur | |
EP0523467B1 (fr) | Procédé pour opérer une installation à turbines à gaz et à vapeur et installation pour la mise en oeuvre du procédé | |
EP0591163B2 (fr) | Installation combinee a turbines a gaz et a vapeur | |
EP0778397B1 (fr) | Procédé d'opération d'une centrale combinée avec une chaudière de récuperation et un consommateur de vapeur | |
DE10001997A1 (de) | Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes | |
EP1023526A1 (fr) | Systeme de turbine a gaz et a vapeur et procede permettant de faire fonctionner un systeme de ce type | |
EP0898641B1 (fr) | Installation a turbine a gaz et a turbine a vapeur et procede permettant de la faire fonctionner | |
EP0515911B1 (fr) | Méthode pour opérer une installation à turbines à gaz et à vapeur et une installation correspondante | |
DE4321081A1 (de) | Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende GuD-Anlage | |
EP0523466B1 (fr) | Procédé de fonctionnement d'une installation à turbines à gaz et à vapeur et installation pour la mise en oeuvre du procédé | |
EP0595009B1 (fr) | Procédé de fonctionnement d'une centrale et centrale fonctionnant suivant ce procédé | |
EP0199902A1 (fr) | Installation combinée à vapeur et à air chaud | |
EP0840837B1 (fr) | Procede d'exploitation d'une installation de turbines a gaz et a vapeur et installation exploitee selon ce procede | |
DE4117189C2 (de) | Verfahren zur Erzeugung elektrischer Energie in einer kombinierten Gas-Dampfkraftanlage und Anlage zur Durchführung des Verfahrens | |
DE3815993A1 (de) | Zweistoff-turbinenanlage | |
DE19612921A1 (de) | Kraftwerksanlage und Verfahren zum Betrieb einer Kraftwerksanlage | |
DE4409811C1 (de) | Verfahren zum Betreiben eines Abhitzedampferzeugers sowie danach arbeitender Abhitzedampferzeuger | |
DE4025527C1 (en) | Steam boiler with economiser - incorporates combustion chamber with recirculation circuit | |
EP1404947B1 (fr) | Procede pour faire fonctionner une installation motrice a vapeur et installation motrice a vapeur pour mettre en oeuvre ce procede | |
DE10004187C1 (de) | Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende Anlage | |
DE4231151C2 (de) | Gasturbinenanlage und Verfahren zu ihrem Betreiben | |
DE19849740A1 (de) | Gas- und Dampfturbinenanlage | |
WO1997007323A1 (fr) | Installation a turbine a gaz et a vapeur et procede de fonctionnement de ladite installation ainsi que generateur de vapeur de chaleur perdue pour une telle installation | |
EP0915233B1 (fr) | Centrale hybride d'énergie | |
WO1989003471A1 (fr) | Centrale thermique a gaz et a vapeur |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 783619 Country of ref document: EP |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): CH DE FR GB IT LI NL SE |
|
17P | Request for examination filed |
Effective date: 19980720 |
|
17Q | First examination report despatched |
Effective date: 19990122 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AC | Divisional application: reference to earlier application |
Ref document number: 783619 Country of ref document: EP |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): CH DE FR GB IT LI NL SE |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 59508574 Country of ref document: DE Date of ref document: 20000817 |
|
ITF | It: translation for a ep patent filed | ||
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20000914 |
|
ET | Fr: translation filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20001214 Year of fee payment: 6 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20010913 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20010914 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20010928 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010930 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010930 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020915 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030401 |
|
EUG | Se: european patent has lapsed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030603 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050914 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20120917 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20121119 Year of fee payment: 18 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20130914 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 59508574 Country of ref document: DE Effective date: 20140401 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130914 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140401 |