EP0822320A1 - Installation à turbines à gaz et à vapeur - Google Patents

Installation à turbines à gaz et à vapeur Download PDF

Info

Publication number
EP0822320A1
EP0822320A1 EP97117410A EP97117410A EP0822320A1 EP 0822320 A1 EP0822320 A1 EP 0822320A1 EP 97117410 A EP97117410 A EP 97117410A EP 97117410 A EP97117410 A EP 97117410A EP 0822320 A1 EP0822320 A1 EP 0822320A1
Authority
EP
European Patent Office
Prior art keywords
steam
gas
steam generator
turbine
fired
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP97117410A
Other languages
German (de)
English (en)
Other versions
EP0822320B1 (fr
Inventor
Hermann Brückner
Erich Schmid
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens AG
Original Assignee
Siemens AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens AG filed Critical Siemens AG
Publication of EP0822320A1 publication Critical patent/EP0822320A1/fr
Application granted granted Critical
Publication of EP0822320B1 publication Critical patent/EP0822320B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/106Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with water evaporated or preheated at different pressures in exhaust boiler
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01KSTEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
    • F01K23/00Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
    • F01K23/02Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
    • F01K23/06Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
    • F01K23/10Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
    • F01K23/103Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with afterburner in exhaust boiler

Definitions

  • the invention relates to a gas and steam turbine plant according to the preamble of claim 1.
  • Such System is from the patents DE 38 15 536 C1 and US 4,852,344 known.
  • the steam generator is suitable for the combined process with a downstream one Heat recovery steam generator especially for retrofitting one already existing gas turbine plant.
  • a new system usually a number of gas turbines with a corresponding one Number of heat recovery steam generators on a common Steam turbine switched. Because in this combination process steam generation is limited to pure heat recovery, the overall efficiency of the system is also only limited.
  • the invention is therefore based on the object of a gas and Specify steam turbine plant, in which at the same time particularly high overall efficiency using one from one Variety of gas turbines of different sizes freely selectable gas turbine is possible.
  • a first partial flow of the exhaust gas is generated to generate steam the gas turbine for burning a fossil fuel used.
  • a second partial flow of the exhaust gas from the gas turbine is used to generate waste heat, with both the Steam generation by burning the fossil fuel as also waste heat generation in a common water-steam cycle the steam turbine.
  • This is advantageous pressurized feed water of the water-steam cycle preheated in partial flows, the Preheating a first partial flow of the feed water by means of resulting from the combustion of fossil fuel Flue gas occurs.
  • the preheating of a second partial flow of the Feed water takes place by means of the second, the heat recovery steam generator flowing part of the exhaust gas from the Gas turbine.
  • a third partial flow of the feed water is by means of Tap steam preheated from the steam turbine. This is done the preheating of the three partial flows of the feed water expediently multi-stage, the preheating of the first Partial stream and the third partial stream in a common second preheating stage by means of combustion of the flue gas produced from fossil fuel.
  • the invention is based on the consideration that by the combination of pure waste heat use and use as Combustion air divides these types of use of the exhaust gas from the gas turbine regardless of its power size best possible with regard to the overall efficiency of the system is tunable if additionally in the exhaust gas from the gas turbine and in the combustion of fossil fuel Flue gas contained and not for steam generation more usable residual heat is used for preheating the feed water becomes.
  • the fired steam generator can advantageously large range of fuels are used.
  • fuels for example as fossil fuel oil, gas, coal or special fuels, such as. Garbage, wood or waste oil can be used.
  • Garbage, wood or waste oil can be used.
  • the exhaust gas temperature behind the Gas turbine at around 500 ° C for coal drying under certain circumstances is too high, can suitably as combustion air serving first partial flow of the exhaust gas from the Gas turbine be mixed with a cold air stream.
  • the oxygen-containing exhaust gas from the gas turbine for example 15% oxygen content serves as the sole combustion air for those to be burned in the fired steam generator fossil fuels, the fired steam generator expediently only with the one required for combustion Exhaust gas volume is applied.
  • a possible one Flue gas cleaning system must therefore only for the first partial flow of the exhaust gas from the gas turbine and not for the whole Exhaust gas volume can be designed, this as combustion air serving first partial flow of the exhaust gas from the Gas turbine along with that when burning the fossil The resulting flue gas is cleaned.
  • the fired steam generator is in a practical embodiment a flue gas cleaning system downstream of the flue gas side. Since the flue gas cleaning system is only for the first Partial flow of the exhaust gas from the gas turbine and for that in the fossil fired steam generator designed amount of flue gas must not occur with a new system or with a Retrofitting an old system Problems with a required Limiting the size of the cleaning system Space constraints. An undesirable reduction in steam generator output in the case of a cleaning system to be retrofitted, due to the space available on site only for one limited exhaust gas volume is sufficient is therefore not necessary.
  • the fired Steam generator a series connection of two flue gas-heated high-pressure preheaters on the water / steam side upstream. This is done in a first high-pressure preheater or boiler economizer all of the fired steam generator supplied feed water preheated while in one second downstream of the boiler economizer on the flue gas side second high pressure preheater or boiler parts economizer only the first partial flow of the feed water is preheated.
  • the steam turbine process can consist of one or more pressure stages be constructed.
  • a two-pressure system is expedient provided with reheating and condensate preheating.
  • the waste heat steam generator includes a condensate preheater and this upstream medium pressure heating surfaces with a reheater and advantageously arranged at least partially parallel to these on the exhaust side and high pressure heating surfaces connected in parallel on the water / steam side.
  • the reheater located in the heat recovery steam generator is another conveniently provided Reheater of the fired steam generator on the water / steam side connected in parallel.
  • the advantages achieved with the invention are in particular in that by combining a fired steam generator and a heat recovery steam generator at the same time Distribution of the exhaust gas from the gas turbine in the steam generators supplied partial streams not only in the fired steam generator a wide range of fuels, e.g. Coal, heavy oil, Low gases or special fuels, e.g. Garbage, wood or Waste oil, can be used. Rather, it can decrease Boiler output of the fired steam generator as a result a fuel conversion of e.g. Oil on coal or as a result of Conversion to a low nitrogen oxide firing is still a special one high steam turbine output and thus a higher system efficiency due to the additional steam generator output be maintained from the heat recovery steam generator.
  • fuels e.g. Coal, heavy oil, Low gases or special fuels, e.g. Garbage, wood or Waste oil
  • FIG. 1 An embodiment of the invention is based on a Drawing explained in more detail.
  • the figure shows a circuit diagram a combined gas and steam turbine system with the gas turbine downstream of both a fossil-fired Steam generator as well as a heat recovery steam generator.
  • the gas and steam turbine system 1 comprises a gas turbine system with a gas turbine 2 with coupled Air compressor 3 and one of the gas turbine 2 upstream Combustion chamber 4, which is connected to a fresh air line 5 of the air compressor 3 is connected.
  • a combustion chamber 4 of the gas turbine 2 opens a fuel or fuel gas line 6. Die Gas turbine 2 and the air compressor 3 and a generator 7 sit on a common shaft 8.
  • the gas and steam turbine system 1 further comprises a steam turbine system with a steam turbine 10 with coupled Generator 11 and in a water-steam cycle 12 one of the Steam turbine 10 downstream capacitor 13 and a fired steam generator 14 and a heat recovery steam generator 15.
  • the steam turbine 10 consists of a high pressure part 10a and a medium pressure part 10b and a low pressure part 10c, which drive the generator 11 via a common shaft 16.
  • a first partial flow line 18 is connected to an inlet 14a of the fired steam generator 14 in order to supply working fluid or exhaust gas A relaxed in the gas turbine 2 to the fired steam generator 14.
  • a first partial flow t 1 of the exhaust gas A from the gas turbine 2 with an oxygen content of approx. 15%, which is conducted via the partial flow line 18, serves as combustion air during the combustion of a gaseous, liquid or solid fuel B. This is fired via an inlet 14b Steam generator 14 connected fuel line 20 led into the fired steam generator 14.
  • a control flap 22 connected to the partial flow line 18 is provided for setting the first partial flow t 1 .
  • the flue gas R formed and the partial flow t 1 of the exhaust gas A serving as combustion air from the gas turbine 2 leave the fired steam generator 14 via a flue gas line 24 and after it has been cleaned in a cleaning system 26 in the direction of a (not shown) Stack.
  • the flue gas cleaning system 26 comprises a flue gas desulfurization device and a denitrification device (DeNO x system) and a dedusting device in a manner not shown.
  • a second partial flow line 28 with a control flap 29 is connected to an inlet 15a of the waste heat steam generator 15.
  • the partial flow t 2 of the relaxed exhaust gas A from the gas turbine 2 leaves the heat recovery steam generator 15 via its outlet 15b in the direction of the chimney.
  • a third partial flow line or bypass line 30 with a flap 32 is - e.g. when starting and stopping the system 1 - neither for the fired steam generator 14 nor for the waste heat steam generator 15 required exhaust gas A from the gas turbine 2 led.
  • this bypass line 30 is used to discharge the exhaust gas A from the gas turbine 2, if operated alone in so-called single-cycle operation becomes.
  • a fresh air line 34 into which a blower 36 and a steam-heated heat exchanger 38 and a flap 40 are connected, opens into the partial flow line t 1 .
  • cold fresh air KL can be mixed into the partial stream t 1 of the exhaust gas A from the gas turbine 2 via this fresh air line 34.
  • the heat recovery steam generator 15 comprises a preheater as heating surfaces 42, between its inlet and outlet a circulation pump 44 is switched.
  • the preheater 42 is on the input side connected to the output of a condensate preheater 46, which in turn on the input side via a condensate pump 48 with the Capacitor 13 is connected.
  • the condensate preheater 46 will via one with the low pressure part 10c of the steam turbine 10 connected tap 50 heated with steam.
  • Two the condensate preheater 46 downstream and also over with the Low pressure part 10c connected tap lines 52 and 54 heated Preheaters 56 and 58 are in the heat recovery steam generator 15 arranged preheater 42 connected in parallel and on the output side connected to a feed water tank 60.
  • the heat recovery steam generator 15 further comprises one as heating surfaces Medium pressure preheater or economizer 62 and a medium pressure evaporator 64 and a medium pressure superheater 66, the output side to one with the high pressure part 10a Steam turbine 10 connected steam line 68 and with a reheater 70 is connected.
  • the medium pressure heating surfaces 62, 64, 66 are via the reheater 70 to one in the Medium pressure part 10b of the steam turbine 10 opening steam line 72 connected.
  • the medium pressure heating surfaces 62, 64, 66 and the reheater 70 and the medium pressure part 10b of the Steam turbine 10 thus form a medium pressure stage of the water-steam cycle 12th
  • the heat recovery steam generator 15 further comprises in a high pressure stage two high-pressure preheaters connected in series as heating surfaces or -Economizer 74 and 75 and a high pressure evaporator 76 and a high pressure superheater 78.
  • the High-pressure superheater 78 is on the outlet side via a steam line 80 with the entrance of the high pressure part 10a of the steam turbine 10 connected.
  • the medium-pressure economizer 62 and the high-pressure economizer 74, 75 are arranged within the heat recovery steam generator 15 in the region of the same exhaust gas temperature, the high-pressure evaporator 76 and the high-pressure superheater 78 are off in the flow direction of the partial flow t 2 of the exhaust gas A from the gas turbine 2 before the series connection the medium pressure evaporator 64 and the medium pressure superheater 66, the intermediate superheater 70 and the high pressure superheater 78 being arranged in the region of the same exhaust gas temperature.
  • the feed water tank 60 is via a high pressure pump 82 and a heat exchanger arrangement with a series connection from three preheaters 84, 86, 88 with the fired Steam generator 14 connected.
  • the feed water tank 60 is also via a medium pressure pump 90 with the medium pressure economizer 62 connected.
  • a partial flow line 92a connected via a boiler part economizer 94 between preheaters 86 and 88 the feed water line 92 is connected. This is also via a further partial flow line 92b with the high-pressure economizer 74 connected.
  • the boiler parts economizer 94 and the preheater or boiler economizer 88 are in the Flue gas line 24 of the fired steam generator 14 switched.
  • the fired steam generator 14 is on the output side via a High-pressure superheater 96, the steam line on the outlet side 80 is connected to the input of the high pressure part 10a of the steam turbine 10 connected.
  • One in the heat recovery steam generator 15 arranged reheaters 70 connected in parallel Intermediate heater 98 is on the input side via the Steam line 68 with the outlet of the high pressure part 10a and on the output side with the medium pressure part 10b of the steam turbine 10 connected.
  • the preheaters 84 and 86 are via steam lines 100 and 102 using bleed steam from the medium pressure section 10b or the high pressure part 10a of the steam turbine 10 is heated.
  • a fuel B ′ is supplied to the combustion chamber 4 of the gas turbine 2 in a manner not shown in detail via the fuel line 6.
  • the fuel B ' is burned in the combustion chamber 4 with compressed fresh air L from the air compressor 3.
  • the hot combustion gas V formed during the combustion is conducted into the gas turbine 2 via a gas line 6a. There it relaxes and drives the gas turbine 2, which in turn drives the air compressor 3 and the generator 7.
  • the hot exhaust gas A emerging from the gas turbine 2 is conducted in the first partial flow t 1 via the partial flow line 18 as combustion air into the fired steam generator 14.
  • the second partial flow t 2 of the hot exhaust gas A from the gas turbine 2 is conducted via the partial flow line 28 and through the heat recovery steam generator 15.
  • the hot flue gas R which arises when the partial flow t 1 of the exhaust gas A from the gas turbine 2 is produced during the combustion of the fossil fuel B is used there to generate steam and then leaves the fired steam turbine 14 via the flue gas line 24 in the direction of the flue gas cleaning system 26, previously has first been cooled in the boiler economizer 88 and then in the boiler part economizer 94 by heat exchange with feed water from the feed water tank 60.
  • the feed water is preheated in three partial flows S 1 to S 3 .
  • a first partial flow S 1 of the feed water under high pressure which is adjustable by means of a valve 104 connected to the partial flow line 92 a, is passed through the boiler part economizer 94 and preheated by means of the flue gas R and the partial flow t 1 of the exhaust gas A of the gas turbine 2.
  • a second partial flow S 2 which can be set by means of a valve 106 connected to the partial flow line 92b, is led through the high-pressure economizers 74 and 75 and preheated by heat exchange with the second partial flow t 2 of the exhaust gas A from the gas turbine 2.
  • the preheating of the feed water both for the fired steam generator 14 and for the waste heat steam generator 15 is thus carried out in several stages.
  • a two-stage preheating of the feed water partial stream S 2 takes place within the heat recovery steam generator 15 in the high pressure economizers 74 and 75 connected in series on the water / steam side.
  • the feed water for the fired steam generator 15 is preheated in three stages.
  • the third partial flow S 3, which is preheated in two stages in the preheaters 84 and 86, is then preheated together with the partial flow S 1 preheated in parallel in the boiler part economizer 94 in the boiler economizer 88 in the common third stage.
  • This multi-stage preheating of the feed water in three partial streams S 1 to S 3 enables a particularly advantageous distribution or division of the feed water between the two steam generators 14 and 15, so that undesired evaporation within their gas-heated preheaters 74, 75 and 88, 94 as a result of an increased Heat input from the partial streams t 1 and t 2 of the exhaust gas A from the gas turbine 2 and from the flue gas R is practically avoided even when using a particularly powerful gas turbine 2.
  • the steam generated in the waste heat steam generator 15 in the high pressure evaporator 76 and superheated in the high pressure superheater 78 is conducted together with the steam generated in the fired steam generator 14 and superheated in the superheater 96 into the high pressure part 10a of the steam turbine 10.
  • the steam which is partially expanded in the high pressure part 10a is partly overheated again in the superheater 70 arranged in the waste heat steam generator 15 and partly in the intermediate superheater 98 of the fired steam generator 14 and then fed to the medium pressure part 10b of the steam turbine 10.
  • the steam which is further expanded in the medium pressure part 10b is used partly for heating the feed water in the feed water tank 60 and partly for preheating the feed water part flow S 3 led through the preheater 84, and partly directly into the low pressure part 10c of the steam turbine 10.
  • the steam released in the low-pressure part 10c is used via the bleed lines 50 to 54 for preheating condensate K fed into the feed water tank 60.
  • the steam emerging from the low-pressure part 10c is condensed in the condenser 13 and conveyed as condensate K via the condensate pump 48 and the preheaters 46, 56 and 58 into the feed water tank 60.
  • the water-steam circuit 12 common to the fired steam generator 14 and the waste heat steam generator 15 is thus closed.

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Engine Equipment That Uses Special Cycles (AREA)
EP97117410A 1994-09-27 1995-09-14 Installation à turbines à gaz et à vapeur Expired - Lifetime EP0822320B1 (fr)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
DE4434526 1994-09-27
DE4434526A DE4434526C1 (de) 1994-09-27 1994-09-27 Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende Anlage
EP95931137A EP0783619B1 (fr) 1994-09-27 1995-09-14 Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
EP95931137A Division EP0783619B1 (fr) 1994-09-27 1995-09-14 Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur

Publications (2)

Publication Number Publication Date
EP0822320A1 true EP0822320A1 (fr) 1998-02-04
EP0822320B1 EP0822320B1 (fr) 2000-07-12

Family

ID=6529324

Family Applications (2)

Application Number Title Priority Date Filing Date
EP95931137A Expired - Lifetime EP0783619B1 (fr) 1994-09-27 1995-09-14 Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur
EP97117410A Expired - Lifetime EP0822320B1 (fr) 1994-09-27 1995-09-14 Installation à turbines à gaz et à vapeur

Family Applications Before (1)

Application Number Title Priority Date Filing Date
EP95931137A Expired - Lifetime EP0783619B1 (fr) 1994-09-27 1995-09-14 Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur

Country Status (7)

Country Link
US (1) US5887418A (fr)
EP (2) EP0783619B1 (fr)
JP (1) JPH10506165A (fr)
KR (1) KR100385372B1 (fr)
CN (1) CN1067137C (fr)
DE (3) DE4434526C1 (fr)
WO (1) WO1996010124A1 (fr)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10001997A1 (de) * 2000-01-19 2001-07-26 Alstom Power Schweiz Ag Baden Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes
ITBS20090224A1 (it) * 2009-12-16 2011-06-17 Turboden Srl Sistema e metodo per la produzione di energia elettrica a partire da sorgenti termiche a temperatura variabile
WO2014177372A1 (fr) * 2013-05-02 2014-11-06 Siemens Aktiengesellschaft Traitement thermique des eaux dans des concepts de centrales à turbine à gaz avec injection de vapeur (stig)

Families Citing this family (28)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19542917A1 (de) * 1994-12-21 1996-06-27 Abb Management Ag Kombianlage mit konventionellem Wasser/Dampf-Kreislauf
DE19541914A1 (de) * 1995-11-10 1997-05-15 Asea Brown Boveri Kühlluftkühler für Kraftwerksanlagen
DE19619470C1 (de) * 1996-05-14 1997-09-25 Siemens Ag Gas- und Dampfturbinenanlage sowie Verfahren zu deren Betrieb
DE19626011A1 (de) * 1996-06-28 1998-01-02 Lentjes Kraftwerkstechnik Kombinierte Gas-Dampf-Kraftanlage und Prozeß
DE19720789B4 (de) * 1997-05-17 2006-04-27 Alstom Verfahren und Vorrichtung zur Erzeugung von Dampf
US6065280A (en) * 1998-04-08 2000-05-23 General Electric Co. Method of heating gas turbine fuel in a combined cycle power plant using multi-component flow mixtures
NL1009467C2 (nl) * 1998-06-22 1999-12-27 Stork Eng & Contractors Bv Warmte-krachtinstallatie, en werkwijze voor het bedrijven daarvan.
US6202782B1 (en) * 1999-05-03 2001-03-20 Takefumi Hatanaka Vehicle driving method and hybrid vehicle propulsion system
SE0004931D0 (sv) * 2000-12-29 2000-12-29 Addpower Ab Sätt att konvertera värme i varma rökgaser
US7073337B2 (en) * 2003-05-30 2006-07-11 General Electric Company Combined power generation and desalinization apparatus and related method
CN1948720B (zh) * 2006-10-31 2011-08-10 章祖文 永磁传动低温多级涡轮发电机
US7628609B2 (en) * 2006-12-29 2009-12-08 Electrolux Home Products, Inc. Hub and spoke burner with flame stability
JP4939511B2 (ja) * 2008-10-29 2012-05-30 三菱重工業株式会社 石炭ガス化複合発電設備
DE102011013325A1 (de) * 2011-03-08 2012-09-13 Rwe Technology Gmbh Kraftwerk sowie Verfahren zum Betreiben eines Kraftwerks
US9074494B2 (en) * 2011-10-21 2015-07-07 General Electric Company System and apparatus for controlling temperature in a heat recovery steam generator
DE202011107312U1 (de) * 2011-11-02 2012-02-29 Gammel Engineering Gmbh Abgasnacherhitzungs-Vorrichtung
US8955322B2 (en) * 2012-03-05 2015-02-17 Ormat Technologies Inc. Apparatus and method for increasing power plant efficiency at partial loads
CN103047047B (zh) * 2013-01-24 2015-12-02 矫明义 发动机废气动力装置及使用方法
FR3005143A1 (fr) * 2013-04-25 2014-10-31 Pyraine Installation thermique de production d'electricite par combustion
GB2519129A (en) * 2013-10-10 2015-04-15 Ide Technologies Ltd Pumping Apparatus
WO2015187423A2 (fr) 2014-06-04 2015-12-10 Conlon William M Centrale hybride d'énergie solaire à répartir
JP6317652B2 (ja) * 2014-09-12 2018-04-25 株式会社東芝 プラント制御装置及びコンバインドサイクル発電プラント
US10316700B2 (en) * 2015-02-24 2019-06-11 Siemens Aktiengesellschaft Combined cycle power plant having supercritical steam turbine
WO2017079617A1 (fr) 2015-11-05 2017-05-11 Conlon William M Centrales électriques à cycle combiné et stockage acheminable
US10174639B2 (en) * 2017-01-31 2019-01-08 General Electric Company Steam turbine preheating system
US10337357B2 (en) 2017-01-31 2019-07-02 General Electric Company Steam turbine preheating system with a steam generator
US10670334B2 (en) * 2017-12-01 2020-06-02 Dilip Kumar De Highly cost effective technology for capture of industrial emissions without reagent for clean energy and clean environment applications
CN108679587A (zh) * 2018-05-11 2018-10-19 中国成达工程有限公司 一种燃气透平乏气并串级热量回收系统

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3815536C1 (en) * 1988-05-06 1989-07-20 Wolff Walsrode Ag, 3030 Walsrode, De Heating and power station and method for generating heat energy in the form of steam and generating electrical energy
US4852344A (en) * 1988-06-06 1989-08-01 Energy Economics & Development, Inc. Waste disposal method and apparatus
JPH04362207A (ja) * 1991-06-10 1992-12-15 Toshiba Corp 汽力発電設備のリパワリングシステム

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1312469A (fr) * 1961-10-03 1962-12-21 Babcock & Wilcox France Perfectionnements aux installations de production d'énergie à cycle mixte vapeur et gaz
DE1426443B2 (de) * 1962-09-21 1971-09-09 Waermekraftanlage
DE1426890A1 (de) * 1963-08-30 1969-06-12 Aeg Kanis Turbinen Kraftwerk mit Muellverbrennung
DE4029991A1 (de) * 1990-09-21 1992-03-26 Siemens Ag Kombinierte gas- und dampfturbinenanlage
DE4126036A1 (de) * 1991-08-06 1993-02-11 Siemens Ag Gas- und dampfturbinenkraftwerk mit einem solar beheizten dampferzeuger
US5628183A (en) * 1994-10-12 1997-05-13 Rice; Ivan G. Split stream boiler for combined cycle power plants

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3815536C1 (en) * 1988-05-06 1989-07-20 Wolff Walsrode Ag, 3030 Walsrode, De Heating and power station and method for generating heat energy in the form of steam and generating electrical energy
US4852344A (en) * 1988-06-06 1989-08-01 Energy Economics & Development, Inc. Waste disposal method and apparatus
JPH04362207A (ja) * 1991-06-10 1992-12-15 Toshiba Corp 汽力発電設備のリパワリングシステム

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN vol. 017, no. 233 (M - 1407) 12 May 1993 (1993-05-12) *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE10001997A1 (de) * 2000-01-19 2001-07-26 Alstom Power Schweiz Ag Baden Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes
US6598399B2 (en) 2000-01-19 2003-07-29 Alstom (Switzerland) Ltd Integrated power plant and method of operating such an integrated power plant
ITBS20090224A1 (it) * 2009-12-16 2011-06-17 Turboden Srl Sistema e metodo per la produzione di energia elettrica a partire da sorgenti termiche a temperatura variabile
WO2014177372A1 (fr) * 2013-05-02 2014-11-06 Siemens Aktiengesellschaft Traitement thermique des eaux dans des concepts de centrales à turbine à gaz avec injection de vapeur (stig)

Also Published As

Publication number Publication date
EP0822320B1 (fr) 2000-07-12
DE59508574D1 (de) 2000-08-17
DE59502433D1 (de) 1998-07-09
CN1155318A (zh) 1997-07-23
EP0783619A1 (fr) 1997-07-16
CN1067137C (zh) 2001-06-13
DE4434526C1 (de) 1996-04-04
KR100385372B1 (ko) 2003-08-19
WO1996010124A1 (fr) 1996-04-04
KR970706444A (ko) 1997-11-03
EP0783619B1 (fr) 1998-06-03
JPH10506165A (ja) 1998-06-16
US5887418A (en) 1999-03-30

Similar Documents

Publication Publication Date Title
EP0822320B1 (fr) Installation à turbines à gaz et à vapeur
EP0523467B1 (fr) Procédé pour opérer une installation à turbines à gaz et à vapeur et installation pour la mise en oeuvre du procédé
EP0591163B2 (fr) Installation combinee a turbines a gaz et a vapeur
EP0778397B1 (fr) Procédé d'opération d'une centrale combinée avec une chaudière de récuperation et un consommateur de vapeur
DE10001997A1 (de) Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes
EP1023526A1 (fr) Systeme de turbine a gaz et a vapeur et procede permettant de faire fonctionner un systeme de ce type
EP0898641B1 (fr) Installation a turbine a gaz et a turbine a vapeur et procede permettant de la faire fonctionner
EP0515911B1 (fr) Méthode pour opérer une installation à turbines à gaz et à vapeur et une installation correspondante
DE4321081A1 (de) Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende GuD-Anlage
EP0523466B1 (fr) Procédé de fonctionnement d'une installation à turbines à gaz et à vapeur et installation pour la mise en oeuvre du procédé
EP0595009B1 (fr) Procédé de fonctionnement d'une centrale et centrale fonctionnant suivant ce procédé
EP0199902A1 (fr) Installation combinée à vapeur et à air chaud
EP0840837B1 (fr) Procede d'exploitation d'une installation de turbines a gaz et a vapeur et installation exploitee selon ce procede
DE4117189C2 (de) Verfahren zur Erzeugung elektrischer Energie in einer kombinierten Gas-Dampfkraftanlage und Anlage zur Durchführung des Verfahrens
DE3815993A1 (de) Zweistoff-turbinenanlage
DE19612921A1 (de) Kraftwerksanlage und Verfahren zum Betrieb einer Kraftwerksanlage
DE4409811C1 (de) Verfahren zum Betreiben eines Abhitzedampferzeugers sowie danach arbeitender Abhitzedampferzeuger
DE4025527C1 (en) Steam boiler with economiser - incorporates combustion chamber with recirculation circuit
EP1404947B1 (fr) Procede pour faire fonctionner une installation motrice a vapeur et installation motrice a vapeur pour mettre en oeuvre ce procede
DE10004187C1 (de) Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende Anlage
DE4231151C2 (de) Gasturbinenanlage und Verfahren zu ihrem Betreiben
DE19849740A1 (de) Gas- und Dampfturbinenanlage
WO1997007323A1 (fr) Installation a turbine a gaz et a vapeur et procede de fonctionnement de ladite installation ainsi que generateur de vapeur de chaleur perdue pour une telle installation
EP0915233B1 (fr) Centrale hybride d'énergie
WO1989003471A1 (fr) Centrale thermique a gaz et a vapeur

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AC Divisional application: reference to earlier application

Ref document number: 783619

Country of ref document: EP

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): CH DE FR GB IT LI NL SE

17P Request for examination filed

Effective date: 19980720

17Q First examination report despatched

Effective date: 19990122

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAG Despatch of communication of intention to grant

Free format text: ORIGINAL CODE: EPIDOS AGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AC Divisional application: reference to earlier application

Ref document number: 783619

Country of ref document: EP

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): CH DE FR GB IT LI NL SE

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: SIEMENS SCHWEIZ AG

Ref country code: CH

Ref legal event code: EP

REF Corresponds to:

Ref document number: 59508574

Country of ref document: DE

Date of ref document: 20000817

ITF It: translation for a ep patent filed
GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 20000914

ET Fr: translation filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20001214

Year of fee payment: 6

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: SE

Payment date: 20010913

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20010914

Year of fee payment: 7

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20010928

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010930

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010930

REG Reference to a national code

Ref country code: GB

Ref legal event code: IF02

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: SE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20020915

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030401

EUG Se: european patent has lapsed
PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20030603

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050914

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20120917

Year of fee payment: 18

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20121119

Year of fee payment: 18

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20130914

REG Reference to a national code

Ref country code: DE

Ref legal event code: R119

Ref document number: 59508574

Country of ref document: DE

Effective date: 20140401

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20130914

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20140401