EP0783619B1 - Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur - Google Patents
Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur Download PDFInfo
- Publication number
- EP0783619B1 EP0783619B1 EP95931137A EP95931137A EP0783619B1 EP 0783619 B1 EP0783619 B1 EP 0783619B1 EP 95931137 A EP95931137 A EP 95931137A EP 95931137 A EP95931137 A EP 95931137A EP 0783619 B1 EP0783619 B1 EP 0783619B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- gas
- steam
- turbine
- gas turbine
- exhaust gas
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
- F01K23/106—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with water evaporated or preheated at different pressures in exhaust boiler
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
- F01K23/103—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle with afterburner in exhaust boiler
Definitions
- the invention relates to a method for operating a gas and steam turbine plant according to the preamble of Claim 1. Such a method is from the patents DE 38 15 536 C 1 and US 4,852,344 known.
- the steam generator is suitable for the combined process with a downstream one Heat recovery steam generator especially for retrofitting one already existing gas turbine plant.
- a new system usually a number of gas turbines with a corresponding one Number of heat recovery steam generators on a common Steam turbine switched. Because in this combination process steam generation is limited to pure heat recovery, the overall efficiency of the system is also only limited. In addition, it is also problematic with this combination process when a replacement is required or desired the gas turbine against a gas turbine with a comparatively high Performance to find a suitable gas turbine model.
- the invention is therefore based on the object of a method to operate a gas and steam turbine plant, with a particularly high overall efficiency the plant uses one of a variety of gas turbines freely selectable gas turbine of different output sizes is possible.
- a first partial flow of the exhaust gas is generated to generate steam the gas turbine for burning a fossil fuel used.
- a second partial flow of the exhaust gas from the gas turbine is used to generate waste heat, with both the Steam generation by burning the fossil fuel as also waste heat generation in a common water-steam cycle the steam turbine.
- the preheating of a second partial flow of the Feed water takes place by means of the second, the heat recovery steam generator flowing part of the exhaust gas from the Gas turbine.
- a third sub-stream of the feed water is preheated from the steam turbine by means of bleed steam.
- the three partial flows of the feed water are preheated expediently multi-stage, the preheating of the first Partial stream and the third partial stream in a common second preheating stage by means of combustion of the flue gas produced from fossil fuel.
- the invention is based on the consideration that by the combination of pure waste heat use and use as Combustion air divides these types of use of the exhaust gas from the gas turbine regardless of its output size best possible with regard to the overall efficiency of the system is tunable if additionally in the exhaust gas from the gas turbine and in the combustion of fossil fuel Flue gas contained and not for steam generation more usable residual heat is used for preheating the feed water becomes.
- the fired steam generator can advantageously large range of fuels are used.
- fuels for example as fossil fuel oil, gas, coal or special fuels, such as. Garbage, wood or waste oil can be used.
- Garbage, wood or waste oil can be used.
- the exhaust gas temperature behind the Gas turbine at around 500 ° C for coal drying under certain circumstances is too high, can suitably as combustion air serving first partial flow of the exhaust gas from the Gas turbine be mixed with a cold air stream.
- the oxygen-containing exhaust gas from the gas turbine for example 15% oxygen content serves as the sole combustion air for those to be burned in the fired steam generator fossil fuels, the fired steam generator expediently only with the one required for combustion Exhaust gas volume is applied.
- a possible one Flue gas cleaning system must therefore only for the first partial flow of the exhaust gas from the gas turbine and not for the whole Exhaust gas volume can be designed, this as combustion air serving first partial flow of the exhaust gas from the gas turbine along with that when burning the fossil The resulting flue gas is cleaned.
- the advantages achieved with the invention are in particular in that by combining a fired steam generator and a heat recovery steam generator at the same time Distribution of the exhaust gas from the gas turbine in the steam generators supplied partial streams not only in the fired steam generator a wide range of fuels, e.g. Coal, heavy oil, Low gases or special fuels, e.g. Garbage, wood or Waste oil, can be used. Rather, it can decrease Boiler output of the fired steam generator as a result a fuel conversion of e.g. Oil on coal or as a result of Conversion to a low nitrogen oxide firing is still a special one high steam turbine output and thus a higher system efficiency due to the additional steam generator output be maintained from the heat recovery steam generator.
- fuels e.g. Coal, heavy oil, Low gases or special fuels, e.g. Garbage, wood or Waste oil
- FIG. 1 An embodiment of the invention is based on a Drawing explained in more detail.
- the figure shows a circuit diagram a combined gas and steam turbine system with the gas turbine downstream of both a fossil-fired Steam generator as well as a heat recovery steam generator.
- the gas and steam turbine plant 1 comprises a Gas turbine system with a gas turbine 2 with coupled Air compressor 3 and one of the gas turbine 2 upstream Combustion chamber 4, which is connected to a fresh air line 5 of the air compressor 3 is connected.
- a combustion chamber 4 of the gas turbine 2 opens a fuel or fuel gas line 6.
- Die Gas turbine 2 and the air compressor 3 and a generator 7 sit on a common shaft 8.
- the gas and steam turbine system 1 further comprises a steam turbine system with a steam turbine 10 with coupled Generator 11 and in a water-steam cycle 12 one of the Steam turbine 10 downstream capacitor 13 and a fired steam generator 14 and a heat recovery steam generator 15.
- the steam turbine 10 consists of a high pressure part 10a and a medium pressure part 10b and a low pressure part 10c, which drive the generator 11 via a common shaft 16.
- a first partial flow line 18 is connected to an inlet 14a of the fired steam generator 14 in order to supply working fluid or exhaust gas A relaxed in the gas turbine 2 to the fired steam generator 14.
- a first partial flow t 1 of the exhaust gas A from the gas turbine 2 with an oxygen content of approx. 15%, which is conducted via the partial flow line 18, serves as combustion air during the combustion of a gaseous, liquid or solid fuel B. This is fired via an inlet 14b Steam generator 14 connected fuel line 20 led into the fired steam generator 14.
- a control flap 22 connected to the partial flow line 18 is provided for setting the first partial flow t 1 .
- the flue gas cleaning system 26 comprises a flue gas desulfurization device and a denitrification device (DeNO x system) and a dedusting device in a manner not shown.
- a second partial flow line 28 with a control flap 29 is connected to an inlet 15a of the waste heat steam generator 15.
- the partial flow t 2 of the relaxed exhaust gas A from the gas turbine 2 leaves the heat recovery steam generator 15 via its outlet 15b in the direction of the chimney.
- a third partial flow line or bypass line 30 with a flap 32 is - e.g. when starting and stopping the system 1 - neither for the fired steam generator 14 nor for the waste heat steam generator 15 required exhaust gas A from the gas turbine 2 led.
- this bypass line 30 is used to discharge the exhaust gas A from the gas turbine 2, if operated alone in so-called single-cycle operation becomes.
- a fresh air line 34 into which a blower 36 and a steam-heated heat exchanger 38 and a flap 40 are connected, opens into the partial flow line t 1 .
- cold fresh air KL can be mixed into the partial stream t 1 of the exhaust gas A from the gas turbine 2 via this fresh air line 34.
- the heat recovery steam generator 15 comprises a preheater as heating surfaces 42, between its inlet and outlet a circulation pump 44 is switched.
- the preheater 42 is on the input side connected to the output of a condensate preheater 46, which in turn on the input side via a condensate pump 48 with the Capacitor 13 is connected.
- the condensate preheater 46 will via one with the low pressure part 10c of the steam turbine 10 connected tap 50 heated with steam.
- Two the condensate preheater 46 downstream and also over with the Low pressure part 10c connected tap lines 52 and 54 heated Preheaters 56 and 58 are in the heat recovery steam generator 15 arranged preheater 42 connected in parallel and on the output side connected to a feed water tank 60.
- the heat recovery steam generator 15 further comprises heating surfaces a medium pressure preheater or economizer 62 and one Medium pressure evaporator 64 and a medium pressure superheater 66, the output side to one with the high pressure part 10a Steam turbine 10 connected steam line 68 and with a reheater 70 is connected.
- the medium pressure heating surfaces 62, 64, 66 are via the reheater 70 to one in the Medium pressure part 10b of the steam turbine 10 opening steam line 72 connected.
- the medium pressure heating surfaces 62, 64, 66 as well the reheater 70 and the medium pressure part 10b of the Steam turbine 10 thus form a medium pressure stage of the water-steam cycle 12th
- the heat recovery steam generator 15 further comprises in a high pressure stage two high-pressure preheaters connected in series as heating surfaces or -Economizer 74 and 75 as well as a high pressure evaporator 76 and a high pressure superheater 78.
- the High-pressure superheater 78 is on the output side via a steam line 80 with the entrance of the high pressure part 10a of the steam turbine 10 connected.
- the medium-pressure economizer 62 and the high-pressure economizers 74, 75 are arranged within the heat recovery steam generator 15 in the region of the same exhaust gas temperature
- the high-pressure evaporator 76 and the high-pressure superheater 78 are in the flow direction of the partial flow t 2 of the exhaust gas A from the gas turbine 2 arranged before the series connection of the medium-pressure evaporator 64 and the medium-pressure superheater 66, the intermediate superheater 70 and the high-pressure superheater 78 being arranged in the region of the same exhaust gas temperature.
- the feed water tank 60 is via a high pressure pump 82 and a heat exchanger arrangement with a series connection from three preheaters 84, 86, 88 with the fired Steam generator 14 connected.
- the feed water tank 60 is also via a medium pressure pump 90 with the medium pressure economizer 62 connected.
- a partial flow line 92a connected via a boiler part economizer 94 between preheaters 86 and 88 the feed water line 92 is connected. This is also via a further partial flow line 92b with the high-pressure economizer 74 connected.
- the boiler parts economizer 94 and the preheater or boiler economizer 88 are in the Flue gas line 24 of the fired steam generator 14 switched.
- the fired steam generator 14 is on the output side via a High-pressure superheater 96, the steam line on the outlet side 80 is connected to the input of the high pressure part 10a of the steam turbine 10 connected.
- One in the heat recovery steam generator 15 arranged reheaters 70 connected in parallel Intermediate heater 98 is on the input side via the Steam line 68 with the outlet of the high pressure part 10a and on the output side with the medium pressure part 10b of the steam turbine 10 connected.
- the preheaters 84 and 86 are via steam lines 100 and 102 using bleed steam from the medium pressure section 10b or the high pressure part 10a of the steam turbine 10 is heated.
- a fuel B ′ is supplied to the combustion chamber 4 of the gas turbine 2 in a manner not shown in detail via the fuel line 6.
- the fuel B ' is burned in the combustion chamber 4 with compressed fresh air L from the air compressor 3.
- the hot combustion gas V formed during the combustion is conducted into the gas turbine 2 via a gas line 6a. There it relaxes and drives the gas turbine 2, which in turn drives the air compressor 3 and the generator 7.
- the hot exhaust gas A emerging from the gas turbine 2 is conducted in the first partial flow t 1 via the partial flow line 18 as combustion air into the fired steam generator 14.
- the second partial flow t 2 of the hot exhaust gas A from the gas turbine 2 is conducted via the partial flow line 28 and through the heat recovery steam generator 15.
- the hot flue gas R which arises when the partial flow t 1 of the exhaust gas A from the gas turbine 2 is produced during the combustion of the fossil fuel B is used there to generate steam and then leaves the fired steam turbine 14 via the flue gas line 24 in the direction of the flue gas cleaning system 26, previously has first been cooled in the boiler economizer 88 and then in the boiler part economizer 94 by heat exchange with feed water from the feed water tank 60.
- the feed water is preheated in three partial flows S 1 to S 3 .
- a first partial flow S 1 of the feed water under high pressure which is adjustable by means of a valve 104 connected to the partial flow line 92 a, is passed through the boiler part economizer 94 and preheated by means of the flue gas R and the partial flow t 1 of the exhaust gas A of the gas turbine 2.
- a second partial flow S 2 which can be set by means of a valve 106 connected to the partial flow line 92b, is led through the high-pressure economizers 74 and 75 and preheated by heat exchange with the second partial flow t 2 of the exhaust gas A from the gas turbine 2.
- the preheating of the feed water both for the fired steam generator 14 and for the waste heat steam generator 15 is thus carried out in several stages.
- a two-stage preheating of the feed water partial stream S 2 takes place within the waste heat steam generator 15 in the high pressure economizers 74 and 75 connected in series on the water / steam side.
- the feed water for the fired steam generator 15 is preheated in three stages.
- the third partial flow S 3, which is preheated in two stages in the preheaters 84 and 86, is then preheated together with the partial flow S 1 preheated in parallel in the boiler part economizer 94 in the boiler economizer 88 in the common third stage.
- This multi-stage preheating of the feed water in three partial streams S 1 to S 3 enables a particularly advantageous distribution or division of the feed water between the two steam generators 14 and 15, so that undesired evaporation within their gas-heated preheaters 74, 75 and 88, 94 as a result of an increased Heat input from the partial streams t 1 and t 2 of the exhaust gas A from the gas turbine 2 and from the flue gas R is practically avoided even when using a particularly powerful gas turbine 2.
- the steam generated in the heat recovery steam generator 15 in the high pressure evaporator 76 and superheated in the high pressure superheater 78 is conducted together with the steam generated in the fired steam generator 14 and superheated in the superheater 96 into the high pressure part 10a of the steam turbine 10.
- the steam which is partially expanded in the high pressure part 10a is partly overheated again in the superheater 70 arranged in the waste heat steam generator 15 and partly in the intermediate superheater 98 of the fired steam generator 14 and then fed to the medium pressure part 10b of the steam turbine 10.
- the steam which is further expanded in the medium-pressure part 10b is used partly for heating the feed water in the feed-water tank 60 and partly for preheating the feed-water partial flow S 3 passed through the preheater 84, and partly directly into the low-pressure part 10c of the steam turbine 10.
- the steam released in the low-pressure part 10c is used via the bleed lines 50 to 54 for preheating condensate K fed into the feed water tank 60.
- the steam emerging from the low-pressure part 10c is condensed in the condenser 13 and conveyed as condensate K via the condensate pump 48 and the preheaters 46, 56 and 58 into the feed water tank 60.
- the water-steam circuit 12 common to the fired steam generator 14 and the waste heat steam generator 15 is thus closed.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
Claims (4)
- Procédé pour faire fonctionner une installation (1) de turbine à gaz et de turbine à vapeur, dans lequel les gaz d'échappement (A) de la turbine à vapeur (2), contenant de l'oxygène, sont utilisés pour la production de vapeur, un premier courant partiel (t1) de gaz d'échappement (A) de la turbine à gaz (2) étant utilisé en tant qu'air de combustion pour la combustion d'un combustible fossile (B), et un deuxième courant partiel (t2) de gaz d'échappement (A) de la turbine à gaz (2) étant utilisé pour la production de vapeur de récupération, procédé dans lequel la production de vapeur est réalisée par combustion du combustible fossile (B), et la production de vapeur de récupération est réalisée dans un circuit eau-vapeur commun (12) de la turbine à vapeur (10), l'eau d'alimentation du circuit eau-vapeur (12) étant réchauffée dans des courants partiels (S1 à S3), caractérisé en ce que le réchauffage d'un premier courant partiel (S1) de l'eau d'alimentation est réalisé à l'aide des fumées (R, t1) qui se forment lors de la combustion du combustible fossile (B), le réchauffage d'un deuxième courant partiel (S2) de l'eau d'alimentation est réalisé à l'aide du deuxième courant partiel (t2) de gaz d'échappement (A) de la turbine à gaz (2), et le réchauffage d'un troisième courant partiel (S3) de l'eau d'alimentation est réalisé à l'aide de vapeur provenant de la turbine à vapeur (10).
- Procédé selon la revendication 1, caractérisé en ce que le réchauffage des trois courants partiels (S1 à S3) de l'eau d'alimentation est réalisé en plusieurs étapes, le réchauffage du premier courant partiel (S1 et du troisième courant partiel (S3) étant à cette occasion réalisé dans un deuxième étage commun de réchauffage (88), à l'aide des fumées (R, t1) qui se forment lors de la combustion du combustible fossile (B).
- Procédé selon la revendication 1 ou 2, caractérisé en ce qu'un courant d'air froid (KL) est mélangé au premier courant partiel (t1), servant d'air de combustion, de gaz d'échappement (A) de la turbine à gaz (2).
- Procédé selon l'une des revendications 1 à 3, caractérisé en ce que le premier courant partiel (t1), servant d'air de combustion, de gaz d'échappement (A) de la turbine à gaz (2), est épuré en même temps que les fumées (R) qui se forment lors de la combustion du combustible fossile (B).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP97117410A EP0822320B1 (fr) | 1994-09-27 | 1995-09-14 | Installation à turbines à gaz et à vapeur |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE4434526A DE4434526C1 (de) | 1994-09-27 | 1994-09-27 | Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende Anlage |
DE4434526 | 1994-09-27 | ||
PCT/DE1995/001263 WO1996010124A1 (fr) | 1994-09-27 | 1995-09-14 | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur, et installation fonctionnant selon ce procede |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP97117410A Division EP0822320B1 (fr) | 1994-09-27 | 1995-09-14 | Installation à turbines à gaz et à vapeur |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0783619A1 EP0783619A1 (fr) | 1997-07-16 |
EP0783619B1 true EP0783619B1 (fr) | 1998-06-03 |
Family
ID=6529324
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP95931137A Expired - Lifetime EP0783619B1 (fr) | 1994-09-27 | 1995-09-14 | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur |
EP97117410A Expired - Lifetime EP0822320B1 (fr) | 1994-09-27 | 1995-09-14 | Installation à turbines à gaz et à vapeur |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP97117410A Expired - Lifetime EP0822320B1 (fr) | 1994-09-27 | 1995-09-14 | Installation à turbines à gaz et à vapeur |
Country Status (7)
Country | Link |
---|---|
US (1) | US5887418A (fr) |
EP (2) | EP0783619B1 (fr) |
JP (1) | JPH10506165A (fr) |
KR (1) | KR100385372B1 (fr) |
CN (1) | CN1067137C (fr) |
DE (3) | DE4434526C1 (fr) |
WO (1) | WO1996010124A1 (fr) |
Families Citing this family (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19542917A1 (de) * | 1994-12-21 | 1996-06-27 | Abb Management Ag | Kombianlage mit konventionellem Wasser/Dampf-Kreislauf |
DE19541914A1 (de) * | 1995-11-10 | 1997-05-15 | Asea Brown Boveri | Kühlluftkühler für Kraftwerksanlagen |
DE19619470C1 (de) * | 1996-05-14 | 1997-09-25 | Siemens Ag | Gas- und Dampfturbinenanlage sowie Verfahren zu deren Betrieb |
DE19626011A1 (de) * | 1996-06-28 | 1998-01-02 | Lentjes Kraftwerkstechnik | Kombinierte Gas-Dampf-Kraftanlage und Prozeß |
DE19720789B4 (de) * | 1997-05-17 | 2006-04-27 | Alstom | Verfahren und Vorrichtung zur Erzeugung von Dampf |
US6065280A (en) * | 1998-04-08 | 2000-05-23 | General Electric Co. | Method of heating gas turbine fuel in a combined cycle power plant using multi-component flow mixtures |
NL1009467C2 (nl) * | 1998-06-22 | 1999-12-27 | Stork Eng & Contractors Bv | Warmte-krachtinstallatie, en werkwijze voor het bedrijven daarvan. |
US6202782B1 (en) * | 1999-05-03 | 2001-03-20 | Takefumi Hatanaka | Vehicle driving method and hybrid vehicle propulsion system |
DE10001997A1 (de) * | 2000-01-19 | 2001-07-26 | Alstom Power Schweiz Ag Baden | Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes |
SE0004931D0 (sv) * | 2000-12-29 | 2000-12-29 | Addpower Ab | Sätt att konvertera värme i varma rökgaser |
US7073337B2 (en) * | 2003-05-30 | 2006-07-11 | General Electric Company | Combined power generation and desalinization apparatus and related method |
CN1948720B (zh) * | 2006-10-31 | 2011-08-10 | 章祖文 | 永磁传动低温多级涡轮发电机 |
US7871264B2 (en) * | 2006-12-29 | 2011-01-18 | Electrolux Home Products, Inc. | Hub and spoke burner port configuration |
JP4939511B2 (ja) * | 2008-10-29 | 2012-05-30 | 三菱重工業株式会社 | 石炭ガス化複合発電設備 |
ITBS20090224A1 (it) * | 2009-12-16 | 2011-06-17 | Turboden Srl | Sistema e metodo per la produzione di energia elettrica a partire da sorgenti termiche a temperatura variabile |
DE102011013325A1 (de) * | 2011-03-08 | 2012-09-13 | Rwe Technology Gmbh | Kraftwerk sowie Verfahren zum Betreiben eines Kraftwerks |
US9074494B2 (en) | 2011-10-21 | 2015-07-07 | General Electric Company | System and apparatus for controlling temperature in a heat recovery steam generator |
DE202011107312U1 (de) * | 2011-11-02 | 2012-02-29 | Gammel Engineering Gmbh | Abgasnacherhitzungs-Vorrichtung |
US8955322B2 (en) * | 2012-03-05 | 2015-02-17 | Ormat Technologies Inc. | Apparatus and method for increasing power plant efficiency at partial loads |
CN103047047B (zh) * | 2013-01-24 | 2015-12-02 | 矫明义 | 发动机废气动力装置及使用方法 |
FR3005143A1 (fr) * | 2013-04-25 | 2014-10-31 | Pyraine | Installation thermique de production d'electricite par combustion |
DE102013208002A1 (de) * | 2013-05-02 | 2014-11-06 | Siemens Aktiengesellschaft | Thermische Wasseraufbereitung bei STIG Kraftwerkskonzepten |
GB2519129A (en) * | 2013-10-10 | 2015-04-15 | Ide Technologies Ltd | Pumping Apparatus |
US9816490B2 (en) * | 2014-06-04 | 2017-11-14 | William M. Conlon | Dispatchable solar hybrid power plant |
JP6317652B2 (ja) * | 2014-09-12 | 2018-04-25 | 株式会社東芝 | プラント制御装置及びコンバインドサイクル発電プラント |
US10316700B2 (en) * | 2015-02-24 | 2019-06-11 | Siemens Aktiengesellschaft | Combined cycle power plant having supercritical steam turbine |
ES2940609T3 (es) | 2015-11-05 | 2023-05-09 | Pintail Power Llc | Plantas eléctricas de ciclo combinado de almacenamiento disponible |
US10174639B2 (en) * | 2017-01-31 | 2019-01-08 | General Electric Company | Steam turbine preheating system |
US10337357B2 (en) | 2017-01-31 | 2019-07-02 | General Electric Company | Steam turbine preheating system with a steam generator |
US10670334B2 (en) * | 2017-12-01 | 2020-06-02 | Dilip Kumar De | Highly cost effective technology for capture of industrial emissions without reagent for clean energy and clean environment applications |
CN108679587A (zh) * | 2018-05-11 | 2018-10-19 | 中国成达工程有限公司 | 一种燃气透平乏气并串级热量回收系统 |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1312469A (fr) * | 1961-10-03 | 1962-12-21 | Babcock & Wilcox France | Perfectionnements aux installations de production d'énergie à cycle mixte vapeur et gaz |
DE1426443B2 (de) * | 1962-09-21 | 1971-09-09 | Waermekraftanlage | |
DE1426890A1 (de) * | 1963-08-30 | 1969-06-12 | Aeg Kanis Turbinen | Kraftwerk mit Muellverbrennung |
DE3815536C1 (en) * | 1988-05-06 | 1989-07-20 | Wolff Walsrode Ag, 3030 Walsrode, De | Heating and power station and method for generating heat energy in the form of steam and generating electrical energy |
US4852344A (en) * | 1988-06-06 | 1989-08-01 | Energy Economics & Development, Inc. | Waste disposal method and apparatus |
DE4029991A1 (de) * | 1990-09-21 | 1992-03-26 | Siemens Ag | Kombinierte gas- und dampfturbinenanlage |
JPH04362207A (ja) * | 1991-06-10 | 1992-12-15 | Toshiba Corp | 汽力発電設備のリパワリングシステム |
DE4126036A1 (de) * | 1991-08-06 | 1993-02-11 | Siemens Ag | Gas- und dampfturbinenkraftwerk mit einem solar beheizten dampferzeuger |
US5628183A (en) * | 1994-10-12 | 1997-05-13 | Rice; Ivan G. | Split stream boiler for combined cycle power plants |
-
1994
- 1994-09-27 DE DE4434526A patent/DE4434526C1/de not_active Expired - Fee Related
-
1995
- 1995-09-14 DE DE59502433T patent/DE59502433D1/de not_active Expired - Lifetime
- 1995-09-14 KR KR1019970701998A patent/KR100385372B1/ko not_active IP Right Cessation
- 1995-09-14 JP JP8511259A patent/JPH10506165A/ja not_active Ceased
- 1995-09-14 WO PCT/DE1995/001263 patent/WO1996010124A1/fr active IP Right Grant
- 1995-09-14 EP EP95931137A patent/EP0783619B1/fr not_active Expired - Lifetime
- 1995-09-14 CN CN95194614A patent/CN1067137C/zh not_active Expired - Fee Related
- 1995-09-14 DE DE59508574T patent/DE59508574D1/de not_active Expired - Lifetime
- 1995-09-14 EP EP97117410A patent/EP0822320B1/fr not_active Expired - Lifetime
-
1997
- 1997-03-27 US US08/826,240 patent/US5887418A/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH10506165A (ja) | 1998-06-16 |
CN1155318A (zh) | 1997-07-23 |
WO1996010124A1 (fr) | 1996-04-04 |
DE59502433D1 (de) | 1998-07-09 |
CN1067137C (zh) | 2001-06-13 |
EP0822320B1 (fr) | 2000-07-12 |
KR100385372B1 (ko) | 2003-08-19 |
DE59508574D1 (de) | 2000-08-17 |
KR970706444A (ko) | 1997-11-03 |
EP0783619A1 (fr) | 1997-07-16 |
DE4434526C1 (de) | 1996-04-04 |
US5887418A (en) | 1999-03-30 |
EP0822320A1 (fr) | 1998-02-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0783619B1 (fr) | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur | |
EP0523467B1 (fr) | Procédé pour opérer une installation à turbines à gaz et à vapeur et installation pour la mise en oeuvre du procédé | |
EP0591163B2 (fr) | Installation combinee a turbines a gaz et a vapeur | |
EP0778397B1 (fr) | Procédé d'opération d'une centrale combinée avec une chaudière de récuperation et un consommateur de vapeur | |
EP0750718B1 (fr) | Procede permettant de faire fonctionner une installation a turbines a gaz et a vapeur et installation fonctionnant selon ledit procede | |
DE10001997A1 (de) | Verbund-Kraftwerk sowie Verfahren zum Betrieb eines solchen Verbund-Kraftwerkes | |
EP1023526A1 (fr) | Systeme de turbine a gaz et a vapeur et procede permettant de faire fonctionner un systeme de ce type | |
EP0898641B1 (fr) | Installation a turbine a gaz et a turbine a vapeur et procede permettant de la faire fonctionner | |
EP0515911B1 (fr) | Méthode pour opérer une installation à turbines à gaz et à vapeur et une installation correspondante | |
DE4321081A1 (de) | Verfahren zum Betreiben einer Gas- und Dampfturbinenanlage sowie danach arbeitende GuD-Anlage | |
DE10001995A1 (de) | Verfahren zur Einstellung bzw. Regelung der Dampftemperatur des Frischdampfes und/oder Zwischenüberhitzerdampfers in einem Verbundkraftwerk sowie Verbundkraftwerk zur Durchführung des Verfahrens | |
EP0523466B1 (fr) | Procédé de fonctionnement d'une installation à turbines à gaz et à vapeur et installation pour la mise en oeuvre du procédé | |
EP0595009B1 (fr) | Procédé de fonctionnement d'une centrale et centrale fonctionnant suivant ce procédé | |
EP0840837B1 (fr) | Procede d'exploitation d'une installation de turbines a gaz et a vapeur et installation exploitee selon ce procede | |
DE19720789B4 (de) | Verfahren und Vorrichtung zur Erzeugung von Dampf | |
DE19943782C5 (de) | Gas- und Dampfturbinenanlage | |
DE19627425A1 (de) | Verfahren zum Betrieb einer Hybrid-Solar-Kombianlage sowie eine Hybrid-Solar-Kombianlage | |
EP0709561A1 (fr) | Centrale électrique | |
EP0931978B1 (fr) | Méthode pour éviter la vaporisation dans un générateur de vapeur à circulation forcée | |
DE3815993A1 (de) | Zweistoff-turbinenanlage | |
DE19612921A1 (de) | Kraftwerksanlage und Verfahren zum Betrieb einer Kraftwerksanlage | |
DE4409811C1 (de) | Verfahren zum Betreiben eines Abhitzedampferzeugers sowie danach arbeitender Abhitzedampferzeuger | |
EP2372239A2 (fr) | Procédé destiné au fonctionnement d'une centrale à turbines à vapeur avec combustion à lit fluidisé | |
EP1404947B1 (fr) | Procede pour faire fonctionner une installation motrice a vapeur et installation motrice a vapeur pour mettre en oeuvre ce procede | |
DE19849740A1 (de) | Gas- und Dampfturbinenanlage |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19970121 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): CH DE FR GB IT LI NL SE |
|
17Q | First examination report despatched |
Effective date: 19970922 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): CH DE FR GB IT LI NL SE |
|
DX | Miscellaneous (deleted) | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG Ref country code: CH Ref legal event code: EP |
|
REF | Corresponds to: |
Ref document number: 59502433 Country of ref document: DE Date of ref document: 19980709 |
|
ET | Fr: translation filed | ||
ITF | It: translation for a ep patent filed |
Owner name: STUDIO JAUMANN P. & C. S.N.C. |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 19980807 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20001214 Year of fee payment: 6 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20010913 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20010914 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20010928 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010930 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20010930 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20020915 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030401 |
|
EUG | Se: european patent has lapsed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20030603 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20050914 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20120917 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20121119 Year of fee payment: 18 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20130914 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 59502433 Country of ref document: DE Effective date: 20140401 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130914 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140401 |