- EP0643666A1 EP0643666A1 EP94912540A EP94912540A EP0643666A1 EP 0643666 A1 EP0643666 A1 EP 0643666A1 EP 94912540 A EP94912540 A EP 94912540A EP 94912540 A EP94912540 A EP 94912540A EP 0643666 A1 EP0643666 A1 EP 0643666A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- station
- spools
- coils
- control
- configuration
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000012546 transfer Methods 0.000 title description 14
- 238000004804 winding Methods 0.000 claims abstract description 26
- 238000004519 manufacturing process Methods 0.000 claims abstract description 25
- 238000007689 inspection Methods 0.000 claims abstract description 10
- 239000004753 textile Substances 0.000 claims abstract 7
- 238000003860 storage Methods 0.000 description 13
- 238000012545 processing Methods 0.000 description 7
- 230000008901 benefit Effects 0.000 description 2
- 238000012432 intermediate storage Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000008707 rearrangement Effects 0.000 description 2
- 230000000717 retained effect Effects 0.000 description 2
- 238000009987 spinning Methods 0.000 description 2
- 239000000969 carrier Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000004806 packaging method and process Methods 0.000 description 1
- 238000012856 packing Methods 0.000 description 1
- 230000008521 reorganization Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
- 238000005303 weighing Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/06—Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H67/00—Replacing or removing cores, receptacles, or completed packages at paying-out, winding, or depositing stations
- B65H67/06—Supplying cores, receptacles, or packages to, or transporting from, winding or depositing stations
- B65H67/064—Supplying or transporting cross-wound packages, also combined with transporting the empty core
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65H—HANDLING THIN OR FILAMENTARY MATERIAL, e.g. SHEETS, WEBS, CABLES
- B65H2701/00—Handled material; Storage means
- B65H2701/30—Handled filamentary material
- B65H2701/31—Textiles threads or artificial strands of filaments
Definitions
- the invention relates to a transport system for transporting thread spools.
- a transport system for transporting thread spools.
- Such a transport system is known from EP-A 92 115 224.5 (Bag. 1943).
- End storage, intermediate storage, packaging stations, loading stations or similar can be considered as the end station.
- the object of this invention is to quickly and effectively perform the rearrangement of the thread spools between the manufacturing or processing machine, individual control and end station so that the control device (doffer) by which the thread spool is removed from the machine does not take so long in time becomes that the operation of the machine suffers.
- the thread bobbins removed from the machine are removed from the doffer in the production configuration or part of the production configuration, i.e. H. aligned one behind the other, taken over and handed over in this form to another transport device. Only this intermediate transport device leads the thread bobbin to a reordering station, in which the bobbins are reloaded onto a further transport device - also referred to below as a check car, control transport device - and thereby rearranged into a surface configuration.
- a surface configuration is an order in which the coils of a production spindle are arranged one above the other and / or next to one another essentially in a common surface.
- the thread spools can then be moved through the control station in this form.
- Figure 1 shows the map of a transport system according to the invention.
- Fig. 2 is a vertical pallet, which is suitable for the arrangement of the coils in a surface configuration and for storage at the same time.
- Figure 3 shows the vertical pallet of FIG. 2 with a transfer station.
- FIG. 1 the machine 1 for the production (spinning machine) and / or processing (stretching machine) of threads is shown only schematically. Shown are the frames of the winding devices, which are designated with I. to VIII. In each winding machine six spools 3 are produced on a spindle 2. These coils are on an empty tube formed. It is indicated schematically that the winding machine I. has just been emptied. Therefore, only empty tubes 4 can be seen on the winding spindle. The winding machine II. Is in the winding trip. The coils are therefore still relatively small. The winding machines IV. To VIII. Are still in the winding cycle or shortly before the end of the same. In particular, the winding spindle of the winding machine V.
- the Doffern 5 are handling and transport devices that can be moved along an operating path along the machine front. Each doffer 5 has two mandrels 6. Each mandrel 6 has the length of three coils or three empty tubes 4. the winding machine III. it is shown that the carrying mandrel 6 of the doffer is already loaded with three coils. The doffer has now been moved into a position in which its other mandrel 6 with the spindle 2 of the dishwasher III. flees.
- the loaded doffer is then driven on the operating path 7, which is looped around the machine 1, to an unloading station 11.
- a doffer 5.1. to see who is still fully loaded.
- the unloading takes place on an intermediate transport device 8.
- This intermediate transport device is configured similarly to a doffer 5. That is, the intermediate transport device has mandrels 9 which have the same distance and the same length as the carrying mandrels 6 of the doffer. Therefore, by means of a suitable push-off device (see e.g.
- the manufacturing configuration is also retained when reloading onto the doffer, since the manufacturing configuration - namely the aligned arrangement of the coils - is only shared.
- the bobbin change must take place very quickly so that the newly placed empty tubes with the rapidly growing new bobbins do not grow against the full bobbins and blow up the winding machine. Because the undivided or divided production configuration with several aligned coils is retained even when the doffer is unloaded in the unloading station 11, the doffer is Lich only used briefly. This has the advantage that every doffer is available again for the actual machine operation after a short transfer time. This can save doffer. This is important because the doffers are complicated devices and in particular also contain devices (not shown here) for the supply of empty tubes (not shown here and not described).
- a sorting device 13 takes over the removal of the full bobbins from the intermediate transport device 8.1 and the loading of the control transport device 14.
- FIG. 2 and FIG. 3 Such a control transport device is shown in FIG. 2 and FIG. 3 in the top view and in the view. It is a standing pallet.
- the pallet vertical pallet
- the pallet has a horizontal base 15 with a vertical pallet wall 16, which is fastened upright on a longitudinal edge of the base.
- On the pallet wall 16 are several, for. B. six, mandrels 17 attached cantilevered vertically.
- the outside diameter of the mandrels 17 is smaller than the inside diameter of the sleeves for the coils.
- the support mandrels 17 are arranged in a surface grid. A grid of three vertical and two horizontal rows is shown.
- Each mandrel 17 has the length of several coil sleeves, here three coil sleeves. It is shown in FIGS.
- the coils delivered in the partial manufacturing configuration are distributed to the mandrels 17 in the transfer station 12 by a sorting device 13. This is done by placing a coil on each of the mandrels, the coil being on the front end of the respective mandrel.
- the coils from the production configuration rearranged into a surface configuration.
- Each vertical pallet is independently stable on its floor 15 and can be transported on a hanging conveyor 18.
- a hanging conveyor 18 has horizontally discharging support arms 25 with which it engages under the bottom of the vertical pallet.
- the overhead conveyor can be moved on a control track 19 to the control station and then to the warehouse 21.
- the overhead conveyor 18 initially travels with the bobbins into a waiting loop 20.
- the overhead conveyor 18 remains there until bobbins of the same thread type are produced and are brought into the transfer station 12 by one of the intermediate transport devices 8.
- the waiting overhead conveyor is also moved into the sorting device 13.
- the freshly delivered spools are pushed onto one of the mandrels 17 of the vertical pallet.
- the coils already on it are pushed one place further.
- the newly delivered coils are now also in a surface configuration, so that they can also be weighed in the control station and checked in some other way.
- the overhead conveyor moves with the vertical pallet again into the bypass 20 and waits as shown.
- bobbins of different provenance can be conveyed through the intermediate transport devices 8 to the sorting device 13 and there to other lowering devices. legal palettes are rearranged.
- the mandrels 17 of the vertical pallet are again equipped with one coil each.
- the newly delivered coils are again in a surface configuration so that they can be checked.
- the now fully loaded overhead conveyor with the coils is moved to an end station.
- the storage 21 with the transfer station 22 serves as such end station.
- the sorting device 13 of the sorting station - in FIG. 3 with the Letter A denotes - shown.
- a detail of the sorting device 13 results from the section in FIG. 3A.
- the supervision according to FIG. 3 shows that the sorting device has a vertical support 27.
- the carrier 28 is rotatably mounted on the support 27.
- Two mandrels 29 are attached to the carrier 28. Both mandrels have the same design and are offset by 180 °.
- the mandrels have an outer diameter that is smaller than the inner diameter of the sleeves.
- the mandrels are hollow and have a slot 30 on their upper side, which is aligned axially parallel and extends essentially over the entire usable length of the dome.
- a telescopic cylinder 31 is mounted in each dome.
- the stand 27 is set up in a stationary manner at the transfer station 12. For re-sorting, the overhead conveyor 18 is moved in such a way that one of the support domes 17 of the intermediate transport device 8 alternates with one of the mandrels 29 of the sorting device 13 are cursed.
- the coils 3 are then pushed off the respective dome and pushed onto the mandrel 29.
- the carrier 28 is then rotated until the next empty mandrel 29 is aligned with the next still full mandrel 17 of the intermediate transport device 8. Then the remaining coils are pushed by the intermediate transport device 8 onto the empty dome 27.
- the intermediate transport device can now move again.
- the carrier 28 is now brought into alignment with the spikes 17 of the pallet wall 16.
- the control car is moved sideways step by step so that one coil each can be brought from the dome 29 to one of the dome 17 of the control car.
- Fig. 3 it is shown that the control car 14 is already equipped with a layer of coils. A coil is still missing in the second layer.
- the carrier 27 can also be moved in the vertical direction by means of a hydraulic cylinder, which is not shown here.
- a hydraulic cylinder which is not shown here.
- the control carriage 14 In order to bring one mandrel of the sorting device 13 into alignment with a dome of the vertical pallet, the control carriage 14 is moved laterally and the sorting device is moved in the vertical direction.
- the coils are loaded onto a storage device 23. This is done by pushing the vertical pallet, which can stand on its own, onto the storage device.
- the storage device 23 can then be moved on rails 24 along the storage front. It is set up so that the vertical pallets can be placed on the individual shelves of the warehouse.
- the bobbins become more expensive according to the type of thread produced.
- control transporter control transport device
Landscapes
- Replacing, Conveying, And Pick-Finding For Filamentary Materials (AREA)
- Warehouses Or Storage Devices (AREA)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| DE4310429 | 1993-03-31 | ||
| DE4310429 | 1993-03-31 | ||
| PCT/EP1994/000948 WO1994022754A1 (de) | 1993-03-31 | 1994-03-24 | Elektrohängebahn mit spulenübergabe |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| EP0643666A1 true EP0643666A1 (de) | 1995-03-22 |
Family
ID=6484296
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| EP94912540A Withdrawn EP0643666A1 (de) | 1993-03-31 | 1994-03-24 | Elektrohängebahn mit spulenübergabe |
Country Status (5)
| Country | Link |
|---|---|
| EP (1) | EP0643666A1 (ref) |
| KR (1) | KR950701591A (ref) |
| CN (1) | CN1106610A (ref) |
| TW (1) | TW286329B (ref) |
| WO (1) | WO1994022754A1 (ref) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102431849B (zh) * | 2011-10-10 | 2013-12-18 | 北京机械工业自动化研究所 | 纱锭自动输送系统及纱锭自动输送方法 |
| DE202011052251U1 (de) * | 2011-12-09 | 2013-03-13 | Ac-Automation Gmbh & Co. Kg | Filamentanlage |
| ITRM20120391A1 (it) * | 2012-08-03 | 2014-02-04 | Ind Meccaniche S R L | Apparato per il carico automatizzato diretto dele bobine di filo continuo dal magazzino al carrello |
| DE102014002255A1 (de) * | 2014-02-20 | 2015-08-20 | Atlantic C Handels- Und Beratungs-Gmbh | Verfahren und Vorrichtung zur Entnahme von Filamentspulen aus einer Aufwickelvorrichtung |
| CN105480463B (zh) * | 2016-01-20 | 2018-02-13 | 广东硕源科技股份有限公司 | 一种圆筒状物料运输包装系统 |
| CN110817595A (zh) * | 2019-11-08 | 2020-02-21 | 广东科达洁能股份有限公司 | 一种丝饼自动收料、分拣系统及其方法 |
| CN111115372A (zh) * | 2020-01-10 | 2020-05-08 | 北自所(北京)科技发展有限公司 | 拉丝区运输装置及转运方法 |
| CN117105011A (zh) * | 2023-10-11 | 2023-11-24 | 青岛双清智能科技有限公司 | 一种带缓存功能的筒纱自动输送系统及控制方法 |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| IT1247721B (it) * | 1989-09-18 | 1994-12-30 | Murata Machinery Ltd | Metodo ed apparecchio per trasportare rocche da una macchina di stiro con falsa torsione. |
| GB9021041D0 (en) * | 1990-09-27 | 1990-11-07 | Rieter Scragg Ltd | Bobbin transportation arrangement |
| EP0531910B1 (de) * | 1991-09-12 | 1995-06-14 | Barmag Ag | Spinnanlage |
-
1994
- 1994-03-24 CN CN94190156A patent/CN1106610A/zh active Pending
- 1994-03-24 EP EP94912540A patent/EP0643666A1/de not_active Withdrawn
- 1994-03-24 WO PCT/EP1994/000948 patent/WO1994022754A1/de not_active Ceased
- 1994-04-01 TW TW083102990A patent/TW286329B/zh active
- 1994-11-28 KR KR1019940704289A patent/KR950701591A/ko not_active Ceased
Non-Patent Citations (1)
| Title |
|---|
| See references of WO9422754A1 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN1106610A (zh) | 1995-08-09 |
| WO1994022754A1 (de) | 1994-10-13 |
| TW286329B (ref) | 1996-09-21 |
| KR950701591A (ko) | 1995-04-28 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| EP0531910B1 (de) | Spinnanlage | |
| EP0528907B1 (de) | Verfahren und vorrichtung zum transportieren von flachkannen zwischen faserbänder be- oder verarbeitenden maschinen oder vorrichtungen | |
| EP0531905B1 (de) | Vorrichtung zum Verladen von Spulhülsen | |
| EP2788270A2 (de) | Filamentanlage | |
| EP1991485A1 (de) | Vorrichtung zur spulenabnahme | |
| EP0931188B1 (de) | Handhabungssystem für filamentspulen oder doffs | |
| EP0344507B1 (de) | Transportsystem zwischen Textilmaschinen, insb. zwischen Ringspinn- und Spulmaschinen | |
| WO1994022754A1 (de) | Elektrohängebahn mit spulenübergabe | |
| DE4219707A1 (de) | Vorrichtung zum transport von spulen | |
| DE19905856A1 (de) | Hülsenliefereinrichtung für eine Kreuzspulen herstellende Textilmaschine | |
| EP1027275B1 (de) | Verfahren zum lagern von spulen und lagereinrichtung | |
| DE29704497U1 (de) | Garnspulenlager für Textilfaser-Produktionsanlagen | |
| DE4229112C2 (de) | Verfahren und Vorrichtung zum Positionieren von Spulen | |
| DE3942492A1 (de) | Palettiervorrichtung fuer spulen | |
| DE2656811A1 (de) | Verfahren und vorrichtung zum transportieren einer gruppe von garnwickeln zwischen aufeinanderfolgenden bearbeitungsstufen bei der garnherstellung | |
| DE3912513A1 (de) | Verfahren zum automatischen abraeumen der auflaufspulen einer zweiseitigen textilmaschine, insbesondere einer spul-, spinn- oder zwirnmaschine beim wilden wechsel | |
| DE3636654A1 (de) | Vorrichtung und verfahren zum automatischen abnehmen fertig gesponnener kopse von einer ringspinnmaschine | |
| DE3636705A1 (de) | Verfahren und vorrichtung zum abtransportieren fertig gesponnener kopse von ringspinnmaschinen | |
| DE4312855A1 (de) | Be- und Entladestation zum Be- und Entladen von Caddy's, auf deren Aufsteckdorne Textilspulen oder Textilspulenhülsen aufgesetzt sind | |
| DE69114807T2 (de) | Verfahren zum selbsttätigen Bedienen von Wickelvorrichtungen in Textilmaschinen. | |
| WO2017001297A1 (de) | Vorrichtung zum aufnehmen und abtransportieren von gewickelten spulen | |
| EP1027485A1 (de) | Verfahren und handhabungssystem für filamentspulen oder doffs | |
| DE19641756A1 (de) | Symmetrische Spulenabräumeinrichtung | |
| DE102022004449A1 (de) | Handlingsystem zum Transport von Spulen in einer Wicklergasse und Container, insbesondere für das Handlingsystem | |
| DE4306815A1 (en) | Overhead moving carrier with number of reception units or chucks - has chucks carrying conically shaped yarn cheeses at lift platform suspended from carrier and units are provided for selecting one chuck |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
| 17P | Request for examination filed |
Effective date: 19941026 |
|
| AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE IT |
|
| 17Q | First examination report despatched |
Effective date: 19961219 |
|
| STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
| 18D | Application deemed to be withdrawn |
Effective date: 19970430 |