EP0479263A1 - Forms for rooms as a whole, for making constructions with at least one level - Google Patents

Forms for rooms as a whole, for making constructions with at least one level Download PDF

Info

Publication number
EP0479263A1
EP0479263A1 EP19910116805 EP91116805A EP0479263A1 EP 0479263 A1 EP0479263 A1 EP 0479263A1 EP 19910116805 EP19910116805 EP 19910116805 EP 91116805 A EP91116805 A EP 91116805A EP 0479263 A1 EP0479263 A1 EP 0479263A1
Authority
EP
European Patent Office
Prior art keywords
formwork
room
elements
formwork elements
balloon envelope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP19910116805
Other languages
German (de)
French (fr)
Other versions
EP0479263B1 (en
Inventor
Klaus Schumann
Original Assignee
ALTER HABITATIO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ALTER HABITATIO filed Critical ALTER HABITATIO
Publication of EP0479263A1 publication Critical patent/EP0479263A1/en
Application granted granted Critical
Publication of EP0479263B1 publication Critical patent/EP0479263B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/04Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for structures of spherical, spheroid or similar shape, or for cupola structures of circular or polygonal horizontal or vertical section; Inflatable forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G11/00Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
    • E04G11/04Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for structures of spherical, spheroid or similar shape, or for cupola structures of circular or polygonal horizontal or vertical section; Inflatable forms
    • E04G11/045Inflatable forms

Definitions

  • the invention relates to a room evaluation for creating an at least one-storey building, with outer formwork elements for the outer walls that are at least higher by the thickness of the later floor ceiling and an inflatable balloon envelope to be arranged in the interior of a space formed by the outer formwork elements, the height of which in the inflated state essentially corresponds to that Corresponds to the room height.
  • inner formwork elements are to be arranged at a distance from the outer formwork elements, the height of which is less than that of the inflated balloon cover, that a horizontally extending groove is formed in the region of the upper edge of the inner formwork elements, and that the balloon cover has a circumferential, bead-shaped, inflatable holding tube is formed, the cross section of which is adapted to that of the groove of the inner formwork elements, the holding tube being inserted into the groove of the inner formwork elements when the room formwork is assembled, so that the balloon envelope covers the space enclosed by the inner formwork elements in a hood-like and sealed manner.
  • This combination of inner formwork elements with the balloon envelope creates a room formwork that behaves very uncritically when the cavities are poured out with concrete.
  • the internal formwork elements can be anchored to the foundation of the building, which indirectly also holds the balloon envelope. It is also advantageous with these room formworks if the balloon envelope is filled with a relatively heavy liquid; However, it is not particularly critical for the work result if the liquid level in the balloon envelope is not exactly adapted to the filling level of the concrete.
  • the combination of interior formwork elements and balloon envelope enables rooms to be created that have smooth walls but a vaulted ceiling. Such a vaulted ceiling is desirable in many high-quality buildings and previously had to be achieved by applying plaster of Paris later.
  • the holding hose that can be inserted into the groove of the formwork elements can be removed again simply by reducing the pressure in the holding hose. Inflating the holding tube also creates an effective seal between the balloon and the inner formwork, which prevents concrete from penetrating between the formwork and the balloon.
  • the formwork elements can also be provided with a seal on their lower edge
  • a second, circumferential, bead-shaped holding hose is preferably provided on the balloons and a further horizontal groove is provided on the formwork elements in the lower region thereof, in which the holding hose is similar to that upper holding hose is inserted and pressurized.
  • the attachment of the balloon envelope to the upper edge and to the lower area of the formwork elements has the advantage that the balloon envelope is fixed and sufficiently precisely aligned before inflation, so that there are no major displacements during inflation of the balloon.
  • the grooves in the formwork elements are provided with undercuts, which are engaged behind by the holding hoses in their inserted and inflated state.
  • the holding hoses are not only held securely in the grooves; a kind of labyrinth seal is also formed, which prevents concrete from penetrating between the balloon sleeve and the formwork elements.
  • the formwork elements have at their lower end an L-shaped, angled fastening flange with screw holes for screw fastening to the foundation. This considerably facilitates the assembly of the formwork elements, especially when you consider that a relatively large number of small formwork elements must be used, since the formwork elements can only be removed through window or door openings after the building has been completed.
  • a multi-storey house can be produced in a simple manner if the outer formwork elements have double storey height and if upper, form-provided room formwork for the upper floor can be attached to the outer formwork elements at a distance above the balloon envelopes of the lower room formwork in such a way that the formwork spaces can be attached up to approximately
  • the upper edge of the outer formwork elements can be poured out with concrete.
  • the upper room formwork from the top open cube or. cuboid tubs best hen, which have cranked mounting flanges at their edge, so that the individual room formwork can be screwed together and with the outer formwork.
  • these upper formworks can be weighted with water, which is filled in at the same time as the concrete.
  • the invention also relates to spacers for keeping the individual formwork walls apart, e.g. two adjacent room formwork or one room formwork and one outer formwork.
  • These spacers are characterized in that they are designed as concrete elements which can be suspended between the formwork elements, in particular concrete balls, which are integrated into the walls when the formwork is poured out with concrete.
  • External formwork elements 1 are used to build the lower floor, in principle conventional formwork panels, the height H of which corresponds to the lower floor height plus the thickness of the floor height. However, it is also possible to use external formwork elements whose height H 'corresponds to a multiple of the floor height h.
  • outer formwork elements 1 serve to form the outer walls 2 from the outside.
  • formwork 3 which consists of panel-shaped formwork elements 4 and a balloon envelope 5 each.
  • the height of the formwork elements 4 does not have to correspond to the floor height h; it can be lower. They will usually be selected according to the type of room walls that are desired, since the room walls only run vertically up to the height of the formwork elements 4.
  • All formwork elements 1 and 3 described so far have at their lower end an L-shaped protruding fastening flange 6, in which fastening holes are provided for the passage of fastening screws 7.
  • the fastening screws 7 can be screwed into anchoring plugs 8, which are embedded in the foundation plate 9.
  • the balloon envelopes can consist of a flexible material such as rubber or plastic, a fabric insert preferably being provided, so that the balloon envelope is flexible but only extensible to a small extent.
  • an upper and a lower circumferential, bead-shaped holding tube 10 and 11 are formed on the balloon envelope 5.
  • the holding tubes 10 and 11 protrude from the outside of the balloon envelope and fit into grooves 12 and 13 formed on the inside of the formwork elements 4, on their upper edge or in the lower region.
  • the grooves 12 and 13 have undercuts 14 on their edge, which the holding tubes 10 and 11 engage behind as soon as the holding tubes 12 and 13 have been inserted into the grooves and inflated (see FIG. 3).
  • the holding tubes 10 are connected to a blower or a compressor (not shown here) for the purpose of inflation.
  • the supply lines can be placed through window or door openings, which are also not shown here.
  • the balloon envelopes 5 are also connected to feed lines to a blower or a compressor.
  • the upper room formwork 15 consist of open cuboid boxes, which are provided with a floor. These upper formworks are expediently designed as a body having a floor, so that they do not have to be assembled from individual parts on the construction site. At the upper edge of the room formwork, these have angled vertical fastening flanges 16 with which the room formwork 15 can be screwed together and with the outer formwork elements 1. In order to be able to remove the upper room formwork 15 more easily after pouring out the walls, they can taper slightly downwards so that they can simply be pulled out after the building has been constructed.
  • spacers 17 in the form of concrete balls 18 are also provided, which can be suspended between the formwork elements, as will be described later.
  • the foundation plate 9 is erected, at the same time the anchoring dowels 8 provided for the attachment of the formwork elements are let in. Then the formwork elements 4 are screwed to the intended anchoring plugs, so that the rooms are surrounded by the formwork elements 4 in the lower floor area. Then the balloon sleeves 5 are attached in the spaces surrounded by the formwork elements 4 by first inserting the sleeves with their upper holding hose into the upper groove 12 of the formwork elements 4 and then with the lower holding hose 11 into the lower groove 13. Then the holding tubes 10 and 11 are pressurized with compressed air via a compressor, so that the balloon envelope is held in the grooves 12 and 13 in a form-fitting manner. The outer formwork elements are then screwed to the foundation plate in the same way.
  • a horizontal iron reinforcement 19 can be inserted for the floor slabs. If necessary, horizontal tensioning rods 20 must also be drawn in for the outer formwork elements 1. In the same way, it is also possible to provide vertical bars 21 between the formwork elements 4 or 4 and 1, which support the iron reinforcement 9 from below (see FIG. 2). The concrete balls 18 are then hung on the horizontal tie rods 20 so that they extend between the formwork elements 4 or 4 and 1.
  • the upper room formwork 15 with its fastening flange is screwed onto the outer formwork elements 1 by means of screws 22, whereby between the room formwork 15 and the outer formwork elements 1 further concrete balls 18 can be attached to the screws 22, which keep the room formwork 15 at a distance in their lower area.
  • the balloon sleeves 5 of the lower casing are inflated by means of a blower or a compressor until they have the shape shown in FIG. 1. Then the spaces between the formwork elements 4 or 4 and 1 are filled with concrete. As soon as the concrete level has arrived above the balloon envelopes 5 and in the area of the bottom of the upper room formwork 15, one starts to fill the upper room formwork 15 with water 23 in order to reduce the load on the screw connections 22 or to prevent the upper room formwork 15 from floating . When the formwork is filled to below the fastening flanges 16 of the upper room formwork 15, the concrete is allowed to harden. Then the upper room formwork 15 can be loosened after loosening the screw connections 22, e.g. be lifted out by means of a crane, the water 23 being pumped out beforehand. The outer formwork elements 21 can also be easily removed to the outside after loosening the fastening screws 7.
  • the air must first be released from the balloon envelopes 5 and from the holding tubes 10 and 11.
  • the balloon envelope 5 then collapses, after which the holding tubes 10 and 11 can be pulled out of the grooves 12 and 13.
  • the collapsed balloon envelope 5 can then be made to the outside through window or door openings.
  • the formwork elements 4 can also be removed individually through the door or window opening.
  • sealing strips 24 can still be attached under the fastening flanges 6 of the formwork elements 4 or 1 if the surface of the foundation plate is so rough that penetration of concrete would have to be feared.

Abstract

In order, in a construction, especially a dwelling or holiday house, to be able to cast the walls and the intermediate floor situated above in one step from concrete without having to attach a separate ceiling form after erection of the walls, it is proposed to use for each room of the construction a room form consisting of a plurality of assembled form elements (4) which bound the room and of an inflatable balloon envelope (5) which is arranged in this room. After inflating the balloon envelope, the latter completely fills the room surrounded by the form elements (4) and covers it in the manner of a dome. If a formwork erected in this way is filled with concrete, the wall surfaces of the rooms are defined by the form elements (4), whereas the ceiling surface is formed by the dome-like balloon envelope. The external form elements (1) are for this purpose at least as high as the storey height plus the thickness of the intermediate floor. <IMAGE>

Description

Die Erfindung bezieht sich auf eine Raumschaluung zum Erstellen eines zumindest eingeschossigen Gebäudes, mit zumindest um die Dicke der späteren Geschoßdecke höheren Außenschalungselementen für die Außenwände und einer im Inneren eines durch die Außenschalungselemente gebildeten Raum anzuordnenden, aufblasbaren Ballonhülle, deren Höhe im aufgeblasenen Zustand im wesentlichen der Raumhöhe entspricht.The invention relates to a room evaluation for creating an at least one-storey building, with outer formwork elements for the outer walls that are at least higher by the thickness of the later floor ceiling and an inflatable balloon envelope to be arranged in the interior of a space formed by the outer formwork elements, the height of which in the inflated state essentially corresponds to that Corresponds to the room height.

Aus der US-A-23 24 554 ist bereits ein Verfahren bekannt, bei dem unter Verwendung einer aufblasbaren Ballonhülle Schalungselemente in Position gehalten werden. Ferner ist aus der FR-A-24 16 320 bereits bekannt, ein mehrgeschossiges Haus mit übereinander angeordneten Raumschalungen in einem Zuge monolithisch aus Beton herzustellen. Beide Verfahren sind verhältnismäßig aufwendig, da geeignete Maßnahmen getroffen werden müssen, um zu verhindern, daß die Raumschalungen aufschwimmen.From US-A-23 24 554 a method is already known in which formwork elements are held in position using an inflatable balloon envelope. Furthermore, it is already known from FR-A-24 16 320 to produce a multi-storey house with concrete formwork arranged one above the other in one go. Both methods are relatively complex since appropriate measures must be taken to prevent the room formwork from floating.

Es ist Aufgabe der vorliegenden Erfindung, eine Raumschalung zur Verfügung zu stellen, mit der die monolithische Herstellung der Wände und der Decke eines zumindest eingeschossigen Gebäudes auf besonders einfache Weise möglich ist.It is an object of the present invention to provide a room formwork with which the monolithic production of the walls and the ceiling of an at least one-storey building is possible in a particularly simple manner.

Diese Aufgabe wird erfindungsgemäß dadurch gelöst, daß mit Abstand zu den Außenschalungselementen anzuordnende Innenschalungselemente vorgesehen sind, deren Höhe geringer ist als die der aufgeblasenen Ballonhülle, daß im Bereich der Oberkante der Innenschalungselemente eine horizontal verlaufende Nut ausgebildet ist, und daß die Ballonhülle mit einem umlaufenden, wulstförmigen, aufblasbaren Halteschlauch ausgebildet ist, dessen Querschnitt dem der Nut der Innenschalungselemente angepaßt ist, wobei bei zusammengebauter Raumschalung der Halteschlauch in die Nut der Innenschalungselemente eingelegt ist, damit die Ballonhülle den durch die Innenschalungselemente umstellten Raum haubenartig und abgedichtet abdeckt.This object is achieved in that inner formwork elements are to be arranged at a distance from the outer formwork elements, the height of which is less than that of the inflated balloon cover, that a horizontally extending groove is formed in the region of the upper edge of the inner formwork elements, and that the balloon cover has a circumferential, bead-shaped, inflatable holding tube is formed, the cross section of which is adapted to that of the groove of the inner formwork elements, the holding tube being inserted into the groove of the inner formwork elements when the room formwork is assembled, so that the balloon envelope covers the space enclosed by the inner formwork elements in a hood-like and sealed manner.

Durch diese Kombination von Innenschalungselementen mit der Ballonhülle ist eine Raumschalung geschaffen, die sich beim Ausgießen der Hohlräume mit Beton sehr unkritisch verhält. Die Innenschalungselemente können am Fundament des Gebäudes verankert sein, wodurch indirekt auch die Ballonhülle gehalten ist. Zwar ist es auch bei diesen Raumschalungen vorteilhaft, wenn die Ballonhülle mit einer verhältnismäßig schweren Flüssigkeit befüllt wird; für das Arbeitsergebnis ist es jedoch nicht besonders kritisch, wenn der Flüssigkeitsspiegel in der Ballonhülle der Füllhöhe des Betons nicht genau angepaßt ist. Durch die Kombination von Innenschalungselementen und Ballonhülle lassen sich Räume herstellen, die glatte Wände, aber eine gewölbte Decke aufweisen. Eine solche Deckenwölbung ist bei vielen hochwertigeren Bauten erwünscht und mußte früher durch nachträgliches Aufbringen von Stuckgips erreicht werden. Der in die Nut der Schalungselemente einlegbare Halteschlauch kann einfach wieder entfernt werden, indem der Druck in dem Halteschlauch vermindert wird. Das Aufblasen des Halteschlauchs bewirkt außerdem eine wirksame Abdichtung zwischen Ballon und Innenschalung, die das Eindringen von Beton zwischen Schalung und Ballon verhindert.This combination of inner formwork elements with the balloon envelope creates a room formwork that behaves very uncritically when the cavities are poured out with concrete. The internal formwork elements can be anchored to the foundation of the building, which indirectly also holds the balloon envelope. It is also advantageous with these room formworks if the balloon envelope is filled with a relatively heavy liquid; However, it is not particularly critical for the work result if the liquid level in the balloon envelope is not exactly adapted to the filling level of the concrete. The combination of interior formwork elements and balloon envelope enables rooms to be created that have smooth walls but a vaulted ceiling. Such a vaulted ceiling is desirable in many high-quality buildings and previously had to be achieved by applying plaster of Paris later. The holding hose that can be inserted into the groove of the formwork elements can be removed again simply by reducing the pressure in the holding hose. Inflating the holding tube also creates an effective seal between the balloon and the inner formwork, which prevents concrete from penetrating between the formwork and the balloon.

Obgleich man die Schalungselemente an ihrer Unterkante auch mit einer Dichtung versehen kann, wird man bevorzugterweise an den Ballons einen zweiten, umlaufenden, wulstförmigen Halteschlauch und an den Schalungselementen in deren unteren Bereich eine weitere horizontale Nut vorsehen, in welcher der Halteschlauch in ähnlicher Weise wie der obere Halteschlauch eingesetzt und mit Druck beaufschlagt wird. Die Befestigung der Ballonhülle an der oberen Kante und am unteren Bereich der Schalungselemente hat den Vorteil, daß die Ballonhülle bereits vor dem Aufpumpen fixiert und ausreichend genau ausgerichtet ist, so daß sich während des Aufblasens des Ballons keine größeren Verschiebungen mehr ergeben.Although the formwork elements can also be provided with a seal on their lower edge, a second, circumferential, bead-shaped holding hose is preferably provided on the balloons and a further horizontal groove is provided on the formwork elements in the lower region thereof, in which the holding hose is similar to that upper holding hose is inserted and pressurized. The attachment of the balloon envelope to the upper edge and to the lower area of the formwork elements has the advantage that the balloon envelope is fixed and sufficiently precisely aligned before inflation, so that there are no major displacements during inflation of the balloon.

In besonders bevorzugter Weise sind die Nuten in den Schalungselementen mit Hinterschneidungen versehen, die von den Halteschläuchen in deren eingesetztem und aufgepumptem Zustand hintergriffen werden. Auf diese Weise werden die Halteschläuche nicht nur sicher in den Nuten gehalten; es wird auch eine Art Labyrinth-Dichtung gebildet, die das Eindringen von Beton zwischen die Ballonhüle und die Schalungselemente verhindert.In a particularly preferred manner, the grooves in the formwork elements are provided with undercuts, which are engaged behind by the holding hoses in their inserted and inflated state. In this way, the holding hoses are not only held securely in the grooves; a kind of labyrinth seal is also formed, which prevents concrete from penetrating between the balloon sleeve and the formwork elements.

Ferner wird bevorzugt, wenn die Schalungselemente an ihrem unteren Ende einen L-förmigen, abgewinkelten Befestigungsflansch mit Schraublöchern zur Schraubbefestigung am Fundament aufweisen. Dies erleichtert die Montage der Schalungselemente beträchtlich, insbesondere wenn man bedenkt, daß relativ viele kleine Schalungselemente verwendet werden müssen, da die Schalungselemente nach Fertigstellung des Gebäudes nur noch durch Fenster- bzw. Türöffnungen entfernt werden können.It is further preferred if the formwork elements have at their lower end an L-shaped, angled fastening flange with screw holes for screw fastening to the foundation. This considerably facilitates the assembly of the formwork elements, especially when you consider that a relatively large number of small formwork elements must be used, since the formwork elements can only be removed through window or door openings after the building has been completed.

Ein mehrgeschossiges Haus läßt sich auf einfache Weise herstellen, wenn die Außenschalungselemente doppelte Geschoßhöhe aufweisen und wenn an den Außenschalungselementen mit Abstand oberhalb der Ballonhüllen der unteren Raumschalungen obere, mit einem Boden versehene Raumschalungen für das darüberliegende Stockwerk derart anbringbar sind, daß die Schalungszwischenräume bis etwa zur Oberkante der Außenschalungselemente mit Beton ausgießbar sind. Dabei können die oberen Raumschalungen aus oben offenen kubusbzw. quaderförmigen Wannen bestehen, die an ihrem Rand abgekröpfte Befestigungsflansche aufweisen, so daß die einzelnen Raumschalungen fest miteinander und mit den Außenschalungen verschraubt werden können. Diese oberen Raumschalungen können, um dem hydrostatischen Druck des Betons entgegenzuwirken, mit Wasser beschwert werden, das gleichzeitig mit dem Beton eingefüllt wird.A multi-storey house can be produced in a simple manner if the outer formwork elements have double storey height and if upper, form-provided room formwork for the upper floor can be attached to the outer formwork elements at a distance above the balloon envelopes of the lower room formwork in such a way that the formwork spaces can be attached up to approximately The upper edge of the outer formwork elements can be poured out with concrete. The upper room formwork from the top open cube or. cuboid tubs best hen, which have cranked mounting flanges at their edge, so that the individual room formwork can be screwed together and with the outer formwork. In order to counteract the hydrostatic pressure of the concrete, these upper formworks can be weighted with water, which is filled in at the same time as the concrete.

Schließlich betrifft die Erfindung auch noch Abstandshalter zum Auseinanderhalten der einzelnen Schalungswände, z.B. zweier benachbarter Raumschalungen oder einer Raumschalung und einer Außenschalung. Diese Abstandshalter zeichnen sich dadurch aus, daß sie als zwischen die Schalungselemente einhängbare Betonelemente, insbesondere Betonkugeln ausgebildet sind, die beim Ausgießen der Schalungen mit Beton in die Wände integriert werden.Finally, the invention also relates to spacers for keeping the individual formwork walls apart, e.g. two adjacent room formwork or one room formwork and one outer formwork. These spacers are characterized in that they are designed as concrete elements which can be suspended between the formwork elements, in particular concrete balls, which are integrated into the walls when the formwork is poured out with concrete.

Im folgenden wird eine Ausführungsbeispiel der Erfindung anhand einer Zeichnung näher erläutert. Es zeigen:

  • Fig. 1 in einer schematischen Darstellung im Querschnitt ein fertig eingeschaltes Gebäude,
  • Fig. 2 in einer vergrößerten Ansicht das Detail 11 aus Fig. 1, und
  • Fig. 3 in einer weiter vergrößerten Ansicht das Detail 111 aus Fig. 2.
An exemplary embodiment of the invention is explained in more detail below with reference to a drawing. Show it:
  • 1 is a schematic representation in cross section of a building that is already switched on,
  • FIG. 2 shows an enlarged view of detail 11 from FIG. 1, and
  • 3 shows the detail 111 from FIG. 2 in a further enlarged view.

Zunächst werden die einzelnen Schalungselemente beschrieben, wonach dann das Verfahren zum Errichten des Gebäudes näher erläutert wird.First, the individual formwork elements are described, after which the method for erecting the building is explained in more detail.

Zum Errichten des unteren Stockwerkes werden Außenschalungselemente 1 verwendet, im Prinzip herkömmliche Schaltafeln, deren Höhe H der unteren Geschoßhöhe, zuzüglich der Stärke der Geschoßhöhe entspricht. Es ist jedoch auch möglich, Außenschalungselemente zu verwenden, deren Höhe H' gleich ein Mehrfaches der Geschoßhöhe h entspricht.External formwork elements 1 are used to build the lower floor, in principle conventional formwork panels, the height H of which corresponds to the lower floor height plus the thickness of the floor height. However, it is also possible to use external formwork elements whose height H 'corresponds to a multiple of the floor height h.

Diese Außenschalungselemente 1 dienen dazu, die Außenwände 2 von außen einzuschalen. Für die Räume des unteren Geschosses werden Raumschalungen 3 verwendet, die aus tafelförmigen Schalungselementen 4 und jeweils einer Ballonhülle 5 bestehen. Die Höhe der Schalungselemente 4 muß nicht der Geschoßhöhe h entsprechen; sie kann niedriger sein. Man wird sie in der Regel danach auswählen, welche Art Zimmerwände gewünscht ist, da die Zimmerwände nur bis zur Höhe der Schalungselemente 4 senkrecht verlaufen.These outer formwork elements 1 serve to form the outer walls 2 from the outside. For the rooms on the lower floor, formwork 3 is used, which consists of panel-shaped formwork elements 4 and a balloon envelope 5 each. The height of the formwork elements 4 does not have to correspond to the floor height h; it can be lower. They will usually be selected according to the type of room walls that are desired, since the room walls only run vertically up to the height of the formwork elements 4.

Alle bislang beschriebenen Schalungselemente 1 und 3 weisen an ihrem unteren Ende einen L-förmig abstehenden Befestigungsflansch 6 auf, in dem Befestigungslöcher zum Durchführen von Befestigungsschrauben 7 vorgesehen sind. Die Befestigungsschrauben 7 können in Verankerungsdübel 8 eingeschraubt werden, die in der Fundamentplatte 9 eingelassen sind.All formwork elements 1 and 3 described so far have at their lower end an L-shaped protruding fastening flange 6, in which fastening holes are provided for the passage of fastening screws 7. The fastening screws 7 can be screwed into anchoring plugs 8, which are embedded in the foundation plate 9.

In einer zur vorliegenden Patentanmeldung parallelen Anmeldung desselben Anmelders, die an demselben Tag eingereicht worden ist, ist ein Verfahren beschrieben, wie die Dübel mittels einer Schablone in die noch weiche Fundamentplatte eingesetzt werden können. Auf diese Anmeldung wird zum Zwecke der Offenbarung Bezug genommen.In a parallel application to the present patent application, which was filed on the same day, describes a method of how the dowels can be inserted into the still soft foundation plate by means of a template. This application is referred to for the purpose of disclosure.

Die Ballonhüllen können aus einem flexiblen Material wie Gummi oder Kunststoff bestehen, wobei vorzugsweise eine Gewebeeinlage vorgesehen ist, so daß die Ballonhülle zwar flexibel, aber nur in geringem Ausmaß dehnbar ist.The balloon envelopes can consist of a flexible material such as rubber or plastic, a fabric insert preferably being provided, so that the balloon envelope is flexible but only extensible to a small extent.

Wie besonders gut aus Fig. 2 ersichtlich ist, sind an der Ballonhülle 5 ein oberer und ein unterer umlaufender, wulstförmiger Halteschlauch 10 und 11 ausgebildet. Die Halteschläuche 10 und 11 stehen zur Außenseite der Ballonhülle ab und passen in auf der Innenseite der Schalungselmente 4, an deren oberen Rand bzw. im unteren Bereich ausgebildete Nuten 12 und 13 hinein. Die Nuten 12 und 13 weisen an ihrem Rand Hinterschneidungen 14 auf, die von den Halteschläuchen 10 und 11 hintergreifen werden, sobald die Halteschläuche 12 und 13 in die Nuten eingesetzt und aufgepumpt worden sind (vgl. Fig. 3).As can be seen particularly well from FIG. 2, an upper and a lower circumferential, bead-shaped holding tube 10 and 11 are formed on the balloon envelope 5. The holding tubes 10 and 11 protrude from the outside of the balloon envelope and fit into grooves 12 and 13 formed on the inside of the formwork elements 4, on their upper edge or in the lower region. The grooves 12 and 13 have undercuts 14 on their edge, which the holding tubes 10 and 11 engage behind as soon as the holding tubes 12 and 13 have been inserted into the grooves and inflated (see FIG. 3).

Die Halteschläuche 10 sind zum Zwecke des Aufpumpens mit einem hier nicht näher dargestellten Gebläse bzw. einem Kompressor verbunden. Die Zuführleitungen können durch hier ebenfalls nicht näher dargestellte Fenster- bzw. Türöffnungen gelegt werden. In gleicher Weise sind auch die Ballonhüllen 5 mit Zuleitungen zu einem Gebläse bzw. einem Kompressor verbunden.The holding tubes 10 are connected to a blower or a compressor (not shown here) for the purpose of inflation. The supply lines can be placed through window or door openings, which are also not shown here. In the same way, the balloon envelopes 5 are also connected to feed lines to a blower or a compressor.

Die oberen Raumschalungen 15 bestehen aus oben offenen quaderförmigen Kästen, die mit einem Boden versehen sind. Diese oberen Raumschalungen sind zweckmäßigerweise als ein einen Boden aufweisender Körper ausgebildet sind, so daß sie auf der Baustelle nicht aus einzelnen Teilen zusammengesetzt werden müssen. Am oberen Rand der Raumschalungen weisen diese abgekröpfte vertikale Befestigungsflansche 16 auf, mit denen die Raumschalungen 15 untereineinander und mit den Außenschalungselementen 1 verschraubt werden können. Um nach dem Ausgießen der Wände die oberen Raumschalungen 15 leichter entfernen zu können, können diese nach unten leicht konisch zulaufen, so daß sie nach Erstellung des Gebäudes einfach nach oben herausgezogen werden können.The upper room formwork 15 consist of open cuboid boxes, which are provided with a floor. These upper formworks are expediently designed as a body having a floor, so that they do not have to be assembled from individual parts on the construction site. At the upper edge of the room formwork, these have angled vertical fastening flanges 16 with which the room formwork 15 can be screwed together and with the outer formwork elements 1. In order to be able to remove the upper room formwork 15 more easily after pouring out the walls, they can taper slightly downwards so that they can simply be pulled out after the building has been constructed.

Um die Schalungselemente 1, 4 und auch die Raumschalungen 15 untereinander und zur Außenschalung auf Abstand zu halten, sind ferner Abstandshalter 17 in Form von Betonkugeln 18 vorgesehen, die zwischen die Schalungselemente eingehängt werden können, wie nachher noch beschrieben wird.In order to keep the formwork elements 1, 4 and also the space formwork 15 at a distance from one another and from the outer formwork, spacers 17 in the form of concrete balls 18 are also provided, which can be suspended between the formwork elements, as will be described later.

Im folgenden wird nun beschrieben, wie ein Gebäude mit Hilfe der oben beschriebenen Schalungselemente errichtet wird.The following describes how a building is erected using the formwork elements described above.

Zunächst wird die Fundamentplatte 9 errichtet, wobei zugleich die für die Anbringung der Schalungselemente vorgesehenen Verankerungsdübel 8 eingelassen werden. Dann werden die Schalungselemente 4 an den vorgesehenen Verankerungsdübeln festgeschraubt, so daß im unteren Geschoßbereich die Räume von den Schalungselementen 4 umstellt sind. Dann werden die Ballonhüllen 5 in den durch die Schalungselemente 4 umstellten Räumen angebracht, indem man die Hüllen mit ihrem oberen Halteschlauch zunächst in die obere Nut 12 der Schalungselemente 4 und dann mit dem unteren Halteschlauch 11 in die untere Nut 13 einlegt. Dann werden die Halteschläuche 10 und 11 über einen Kompressor mit Druckluft beaufschlagt, so daß die Ballonhülle formschlüssig in den Nuten 12 und 13 gehalten ist. Anschließend werden die Außenschalungselmente in gleicher Weise mit der Fundamentplatte verschraubt. Nun kann für die Geschoßdecken noch eine horizontale Eisenbewehrung 19 eingelegt werden. Gegebenenfalls müssen für die Außenschalungselemente 1 auch noch horizontale Spannstäbe 20 eingezogen werden. In gleicher Weise ist es auch möglich, Vertikaleisen 21 zwischen den Schalungselementen 4 bzw. 4 und 1 vorzusehen, die die Eisenbewehrung 9 von unten abstützen (vgl. Fig. 2). An die horizontalen Spannstäbe 20 werden dann die Betonkugeln 18 gehängt, so daß sie zwischen die Schalungselemente 4 bzw. 4 und 1 reichen.First, the foundation plate 9 is erected, at the same time the anchoring dowels 8 provided for the attachment of the formwork elements are let in. Then the formwork elements 4 are screwed to the intended anchoring plugs, so that the rooms are surrounded by the formwork elements 4 in the lower floor area. Then the balloon sleeves 5 are attached in the spaces surrounded by the formwork elements 4 by first inserting the sleeves with their upper holding hose into the upper groove 12 of the formwork elements 4 and then with the lower holding hose 11 into the lower groove 13. Then the holding tubes 10 and 11 are pressurized with compressed air via a compressor, so that the balloon envelope is held in the grooves 12 and 13 in a form-fitting manner. The outer formwork elements are then screwed to the foundation plate in the same way. Now a horizontal iron reinforcement 19 can be inserted for the floor slabs. If necessary, horizontal tensioning rods 20 must also be drawn in for the outer formwork elements 1. In the same way, it is also possible to provide vertical bars 21 between the formwork elements 4 or 4 and 1, which support the iron reinforcement 9 from below (see FIG. 2). The concrete balls 18 are then hung on the horizontal tie rods 20 so that they extend between the formwork elements 4 or 4 and 1.

Dann werden an den Außenschalungselementen 1 die oberen Raumschalungen 15 mit ihrem Befestigungsflansch mittels Schrauben 22 angeschraubt, wobei zwischen den Raumschalungen 15 und den Außenschalungselementen 1 an den Schrauben 22 weitere Betonkugeln 18 angehängt werden können, die die Raumschalungen 15 in ihrem unteren Bereich auf Abstand halten.Then the upper room formwork 15 with its fastening flange is screwed onto the outer formwork elements 1 by means of screws 22, whereby between the room formwork 15 and the outer formwork elements 1 further concrete balls 18 can be attached to the screws 22, which keep the room formwork 15 at a distance in their lower area.

Wenn die Verschalung so weit errichtet ist, werden die Ballonhüllen 5 der unteren Verschalungen mittels eines Gebläses oder eines Kompressors aufgepumpt ist, bis sie die aus Fig. 1 ersichtliche Form aufweisen. Dann werden die Zwischenräume zwischen den Schalungselementen 4 bzw. 4 und 1 mit Beton ausgefüllt. Sobald der Betonspiegel oberhalb der Ballonhüllen 5 und im Bereich des Bodens der oberen Raumschalungen 15 angekommen ist, beginnt man, die oberen Raumschalungen 15 mit Wasser 23 zu befüllen, um die Belastung der Schraubverbindungen 22 zu verringern bzw. ein Aufschwimmen der oberen Raumschalungen 15 zu vermeiden. Wenn die Verschalung bis unterhalb der Befestigungsflansche 16 der oberen Raumschalungen 15 gefüllt ist, läßt man den Beton aushärten. Anschließend können die oberen Raumschalungen 15 nach Lösen der Schraubverbindungen 22 nach oben, z.B. mittels eines Krans, herausgehoben werden, wobei man vorher das Wasser 23 abpumpen würde. Die Außenschalungselemente 21 können ebenfalls nach Lösen der Befestigungsschrauben 7 einfach nach außen abgenommen werden.When the casing is erected so far, the balloon sleeves 5 of the lower casing are inflated by means of a blower or a compressor until they have the shape shown in FIG. 1. Then the spaces between the formwork elements 4 or 4 and 1 are filled with concrete. As soon as the concrete level has arrived above the balloon envelopes 5 and in the area of the bottom of the upper room formwork 15, one starts to fill the upper room formwork 15 with water 23 in order to reduce the load on the screw connections 22 or to prevent the upper room formwork 15 from floating . When the formwork is filled to below the fastening flanges 16 of the upper room formwork 15, the concrete is allowed to harden. Then the upper room formwork 15 can be loosened after loosening the screw connections 22, e.g. be lifted out by means of a crane, the water 23 being pumped out beforehand. The outer formwork elements 21 can also be easily removed to the outside after loosening the fastening screws 7.

Zum Entfernen der Raumschalungen 3 muß zunächst die Luft aus den Ballonhüllen 5 und aus den Halteschläuchen 10 und 11 abgelassen werden. Die Ballonhülle 5 kollabiert dann, wonach die Halteschläuche 10 und 11 aus den Nuten 12 und 13 herausgezogen werden können. Die kollabierte Ballonhülle 5 kann dann durch Fenster- bzw. Türöffnungen nach außen geschafft werden. Nach Lösen der Befestigungsschrauben 7 können auch die Schalungselemente 4 einzeln durch die Tür- bzw. Fensteröffnung entfernt werden.To remove the formwork 3, the air must first be released from the balloon envelopes 5 and from the holding tubes 10 and 11. The balloon envelope 5 then collapses, after which the holding tubes 10 and 11 can be pulled out of the grooves 12 and 13. The collapsed balloon envelope 5 can then be made to the outside through window or door openings. After loosening the fastening screws 7, the formwork elements 4 can also be removed individually through the door or window opening.

Nun muß lediglich noch ein Dachstuhl auf das obere Stockwerk aufgesetzt werden, wonach dann das Haus im Rohbau fertig ist.Now only a roof truss has to be placed on the upper floor, after which the shell of the house is finished.

Nachzutragen bleibt noch, daß man unter den Befestigungsflanschen 6 der Schalungselemente 4 bzw. 1 noch Dichtstreifen 24 anbringen kann, falls die Oberfläche der Fundamentplatte so rauh ist, daß ein Eindringen von Beton zu befürchten wäre.It remains to be added that sealing strips 24 can still be attached under the fastening flanges 6 of the formwork elements 4 or 1 if the surface of the foundation plate is so rough that penetration of concrete would have to be feared.

Obgleich das Verfahren so beschrieben wurde, daß der Beton in einem Zug in die Schalung eingebracht wird, wäre es auch denkbar, daß man die Schalung sukzessive mit Beton verfüllt, wobei man zur Verminderung des statischen Druckes den Beton in den unteren Bereichen bereits abbinden läßt, bevor weiter aufgefüllt wird.Although the method has been described in such a way that the concrete is introduced into the formwork in one go, it would also be conceivable for the formwork to be successively filled with concrete, the concrete in the lower areas already being set to reduce the static pressure before filling up further.

Ferner ist es auch möglich, an den Betonkugeln 18 Kerben 25 anzubringen, in welche z.B. Versorgungsleitungen eingelegt werden können, bevor die Schalungen mit Beton ausgegossen werden. Auf diese Weise werden die Versorgungsleitungen stets im nötigen Abstand zu den Wandoberflächen gehalten.Furthermore, it is also possible to make notches 25 on the concrete balls 18, into which e.g. Supply lines can be inserted before the formwork is poured with concrete. In this way, the supply lines are always kept at the necessary distance from the wall surfaces.

Claims (6)

1. Raumschalung zum Erstellen eines zumindest eingeschossigen Gebäudes, mit zumindest um die Dicke der späteren Geschoßdecke höhere Außenschalungselemente (1) für die Außenwände und einer im Inneren eines durch die Außenschalungselemente gebildeten Raum anzuordnenden, aufblasbaren Ballonhülle (5), deren Höhe im aufgeblasenen Zustand im wesentlichen der Raumhöhe entspricht, dadurch gekennzeichnet, daß mit Abstand zu den Außenschalungselementen anzuordnende Innenschalungselemente (4) vorgesehen sind, deren Höhe geringer ist als die der aufgeblasenen Ballonhülle (5), daß im Bereich der Oberkante der Innenschalungselemente (4) eine horizontal verlaufende Nut (12) ausgebildet ist, und daß die Ballonhülle (5) mit einem umlaufenden, wulstförmigen, aufblasbaren Halteschlauch (10) ausgebildet ist, dessen Querschnitt dem der Nut (12) der Innenschalungselemente (4) angepaßt ist, wobei bei zusammengebauter Raumschalung der Halteschlauch (10) in die Nut (12) der Innenschalungselemente (4) eingelegt ist, damit die Ballonhülle (5) den durch die Innenschalungselemente (4) umstellten Raum haubenartig und abgedichtet abdeckt.1. Room formwork for creating an at least one-storey building, with outer formwork elements (1) for the outer walls that are at least higher by the thickness of the later floor ceiling and an inflatable balloon envelope (5) to be arranged inside a space formed by the outer formwork elements, the height of which in the inflated state in the essentially corresponds to the room height, characterized in that inner formwork elements (4) to be arranged at a distance from the outer formwork elements are provided, the height of which is less than that of the inflated balloon envelope (5), that in the area of the upper edge of the inner formwork elements (4) there is a horizontal extending groove (12) is formed, and that the balloon envelope (5) is formed with a circumferential, bead-shaped, inflatable retaining hose (10), the cross section of which is adapted to that of the groove (12) of the inner formwork elements (4), the assembled formwork being the Holding hose (10) is inserted into the groove (12) of the inner formwork elements (4) so that the balloon envelope (5) covers the space enclosed by the inner formwork elements (4) in a hood-like and sealed manner. 2. Raumschalung nach Anspruch 1, dadurch gekennzeichnet, daß an der Ballonhülle ein zweiter, umlaufender, wulstförmiger und aufblasbarer Halteschlauch vorgesehen ist, und daß an den Schalungselementen in deren unterem Bereich eine weitere horizontale Nut (13) zum Einsetzen des zweiten Halteschlauchs (11) vorgesehen ist.2. Space formwork according to claim 1, characterized in that a second, circumferential, bead-shaped and inflatable holding hose is provided on the balloon envelope, and that on the formwork elements in its lower region a further horizontal groove (13) for inserting the second holding hose (11) is provided. 3. Raumschalung nach Anspruch 1 oder 2, dadurch gekennzeichnet, daß die Nut (12, 13) Hinterschneidungen (14) aufweist, die der Halteschlauch (10, 11) im aufgepumpten und in die Nut eingesetzten Zustand hintergreift.3. Room formwork according to claim 1 or 2, characterized in that the groove (12, 13) has undercuts (14) which the holding hose (10, 11) engages behind when inflated and inserted into the groove. 4. Raumschalung nach einem der Ansprüche 1 bis 3, dadurch gekennzeichnet, daß die Schalungselemente (4, 1) an ihrem unteren Ende einen L-förmig abgewinkelten Befestigungsflansch (6) mit Schraublöchern zur Schraubbefestigung am Fundament (9) aufweisen.4. Room formwork according to one of claims 1 to 3, characterized in that the formwork elements (4, 1) have at their lower end an L-shaped angled mounting flange (6) with screw holes for screw fastening to the foundation (9). 5. Raumschalung nach einem der Ansprüche 1 bis 4, dadurch gekennzeichnet, daß die Außenschalungselemente (1) doppelte Geschoßhöhe (H') aufweisen, und daß oberhalb der aufgeblasenen Ballonhülle (5) eine Raumschalung (15) für das darüberliegende Stockwerk derart anbringbar ist, daß die Schalungszwischenräume bis etwa zur Oberkante der Außenschalungselemente mit Beton ausgießbar sind.5. Room formwork according to one of claims 1 to 4, characterized in that the outer formwork elements (1) have double storey height (H '), and that above the inflated balloon envelope (5) a room formwork (15) for the floor above can be attached in this way, that the formwork spaces can be poured with concrete up to about the upper edge of the outer formwork elements. 6. Abstandshalter für Schalwände, insbesondere Raumschalungen, nach einem der Ansprüche 1 bis 5, dadurch gekennzeichnet, daß die Abstandshalter (17) aus zwischen benachbarte Schalungswände einhängbaren Betonelementen, insbesondere Betonkugeln (18), bestehen.6. Spacer for formwork walls, in particular room formwork, according to one of claims 1 to 5, characterized in that the spacers (17) consist of concrete elements which can be suspended between adjacent formwork walls, in particular concrete balls (18).
EP91116805A 1990-10-04 1991-10-01 Forms for rooms as a whole, for making constructions with at least one level Expired - Lifetime EP0479263B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE4031406A DE4031406A1 (en) 1990-10-04 1990-10-04 METHOD FOR CREATING AN AT LEAST ONE-STOREY BUILDING
DE4031406 1990-10-04

Publications (2)

Publication Number Publication Date
EP0479263A1 true EP0479263A1 (en) 1992-04-08
EP0479263B1 EP0479263B1 (en) 1995-01-18

Family

ID=6415578

Family Applications (1)

Application Number Title Priority Date Filing Date
EP91116805A Expired - Lifetime EP0479263B1 (en) 1990-10-04 1991-10-01 Forms for rooms as a whole, for making constructions with at least one level

Country Status (3)

Country Link
EP (1) EP0479263B1 (en)
AT (1) ATE117401T1 (en)
DE (2) DE4031406A1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000079138A1 (en) * 1999-06-18 2000-12-28 Controlled Variable Buoyancy Systems Limited A coupling device
EP1116829A3 (en) * 2000-01-17 2002-04-10 Abbey Pynford Holdings plc Foundation raft
EP1375756A1 (en) * 2002-06-12 2004-01-02 AL-FER S.r.l. Compensation device to be applied on structural beams, foundations, walls, slabs or the like for the compensation of natural subsidences and/or bendings caused by load stresses
ITCR20090026A1 (en) * 2009-07-01 2011-01-02 Ezio Ferrari INFLATABLE BAG FOR THE REALIZATION OF VOLUMETRIC AND / OR SAGOMA DIMENSIONS.
GB2473017A (en) * 2009-08-27 2011-03-02 Jolyon Eric Emery Dome structure
EP3155189A4 (en) * 2014-06-11 2018-01-24 Bini, Nicolo Anchoring mechanisms for a binishell

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE19815520A1 (en) * 1998-03-31 1999-10-07 Kesting Fertiggaragen Und Haus Prefabricated construction room space units such as garages

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2324554A (en) * 1940-08-12 1943-07-20 Vacuum Concrete Inc Building construction
FR1489329A (en) * 1966-08-09 1967-07-21 Method for erecting buildings consisting mainly of a one-piece load-bearing structure, equipment for carrying out this method, and building thus obtained
FR2416320A1 (en) * 1978-02-06 1979-08-31 Egli Hans PROCESS FOR THE REALIZATION OF THE STRUCTURE FOR A HOUSE, STRUCTURE CARRIED OUT ACCORDING TO THIS PROCEDURE AND ITS USE
WO1985000846A1 (en) * 1983-08-17 1985-02-28 Theodore Travis Thoeny Method for forming structures

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2324554A (en) * 1940-08-12 1943-07-20 Vacuum Concrete Inc Building construction
FR1489329A (en) * 1966-08-09 1967-07-21 Method for erecting buildings consisting mainly of a one-piece load-bearing structure, equipment for carrying out this method, and building thus obtained
FR2416320A1 (en) * 1978-02-06 1979-08-31 Egli Hans PROCESS FOR THE REALIZATION OF THE STRUCTURE FOR A HOUSE, STRUCTURE CARRIED OUT ACCORDING TO THIS PROCEDURE AND ITS USE
WO1985000846A1 (en) * 1983-08-17 1985-02-28 Theodore Travis Thoeny Method for forming structures

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2000079138A1 (en) * 1999-06-18 2000-12-28 Controlled Variable Buoyancy Systems Limited A coupling device
EP1116829A3 (en) * 2000-01-17 2002-04-10 Abbey Pynford Holdings plc Foundation raft
EP1375756A1 (en) * 2002-06-12 2004-01-02 AL-FER S.r.l. Compensation device to be applied on structural beams, foundations, walls, slabs or the like for the compensation of natural subsidences and/or bendings caused by load stresses
ITCR20090026A1 (en) * 2009-07-01 2011-01-02 Ezio Ferrari INFLATABLE BAG FOR THE REALIZATION OF VOLUMETRIC AND / OR SAGOMA DIMENSIONS.
GB2473017A (en) * 2009-08-27 2011-03-02 Jolyon Eric Emery Dome structure
WO2011024008A3 (en) * 2009-08-27 2013-03-07 Jolyon Eric Emery Dome structure
GB2473017B (en) * 2009-08-27 2014-10-29 Jolyon Eric Emery Inflatable dome structure
EP3155189A4 (en) * 2014-06-11 2018-01-24 Bini, Nicolo Anchoring mechanisms for a binishell

Also Published As

Publication number Publication date
DE4031406A1 (en) 1992-04-09
DE59104313D1 (en) 1995-03-02
EP0479263B1 (en) 1995-01-18
ATE117401T1 (en) 1995-02-15

Similar Documents

Publication Publication Date Title
DE1911352C3 (en) Inflatable formwork
DE2139197A1 (en) Prefabricated building components - with lost forms incorporated for subsequent fill with concrete
EP0479263B1 (en) Forms for rooms as a whole, for making constructions with at least one level
DE1659159A1 (en) Multipurpose building block and masonry made from it
DD296139A5 (en) METHOD FOR PRODUCING A BUILDING STRUCTURE
CH648889A5 (en) STEEL CONCRETE PANEL UNIT AND METHOD FOR THE PRODUCTION THEREOF.
DE2111730A1 (en) Component for building walls
EP0515724B1 (en) Method and prefabricated module for the fabrication of structures and buildings
DE2322920C3 (en) Prefabricated component for the manufacture of buildings
CH627506A5 (en) METHOD OF BUILDING A HOUSE.
DE3422871A1 (en) Process and apparatus for the subsequent filling of existing cellars, tunnels and the like with concrete
DE3925591A1 (en) Building set for balcony - consists of prefab. consists slab with shackles for anchoring into brickwork and two supporting columns
EP2122075A2 (en) Constructional element comprising inner formwork
DE2430635A1 (en) Reinforced-concrete skeleton and concrete external wall structure - with whole-height-ribbed concrete wall components and columns cast between ribs
DE10255335A1 (en) Building constructed from individual building modules
DE3039626A1 (en) METHOD FOR BUILDING PREFabricated Building and Prefabricated Building
DE102010032789A1 (en) Method for manufacturing heat-insulated concrete wall portion, involves molding concrete prospective frame to wall portion for fastening light well, where frame is covered by thermal insulation above fastening region of light well
EP0480295B1 (en) Set for the construction of private or holiday homes
WO1984001976A1 (en) One storey-high prefabricated panel
DE2200052A1 (en) CONCRETE ELEMENTS AND RESIDENTIAL BUILDINGS BUILT WITH IT
DE2406852A1 (en) PROCESS FOR THE PRODUCTION OF BUILDINGS WITH ROCK CONCRETE WALLS AND REINFORCED CONCRETE SOLID SLABS
DE19923078A1 (en) Silo with open top and floating lid
AT230069B (en) Building
DE2904163A1 (en) METHOD OF CREATING THE BODY CONSTRUCTION FOR A HOUSE, BODY CONSTRUCTION BY THE PROCEDURE AND ITS USE
DE10121864B4 (en) Drempelwandvorrichtung

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE DK ES FR GB IT LI NL

17P Request for examination filed

Effective date: 19921007

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: KLAUS SCHUMANN

RIN1 Information on inventor provided before grant (corrected)

Inventor name: KLAUS SCHUMANN

17Q First examination report despatched

Effective date: 19931118

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE DK ES FR GB IT LI NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19950118

Ref country code: DK

Effective date: 19950118

Ref country code: BE

Effective date: 19950118

REF Corresponds to:

Ref document number: 117401

Country of ref document: AT

Date of ref document: 19950215

Kind code of ref document: T

ITF It: translation for a ep patent filed

Owner name: KLAUS SCHUMANN

REF Corresponds to:

Ref document number: 59104313

Country of ref document: DE

Date of ref document: 19950302

GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 19950207

ET Fr: translation filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19960816

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19960828

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19960920

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 19960927

Year of fee payment: 6

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19961128

Year of fee payment: 6

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971001

Ref country code: AT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971001

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971031

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19971031

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19980327

Year of fee payment: 7

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980501

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 19971001

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

NLV4 Nl: lapsed or anulled due to non-payment of the annual fee

Effective date: 19980501

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19980701

REG Reference to a national code

Ref country code: FR

Ref legal event code: D3

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19990630

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20051001