EP0448518B1 - Procédé et appareil pour rattacher des mèches d'une manière synchrone pour l'alimentation continue de celles-ci à un métier à filer à anneaux - Google Patents

Procédé et appareil pour rattacher des mèches d'une manière synchrone pour l'alimentation continue de celles-ci à un métier à filer à anneaux Download PDF

Info

Publication number
EP0448518B1
EP0448518B1 EP19910810184 EP91810184A EP0448518B1 EP 0448518 B1 EP0448518 B1 EP 0448518B1 EP 19910810184 EP19910810184 EP 19910810184 EP 91810184 A EP91810184 A EP 91810184A EP 0448518 B1 EP0448518 B1 EP 0448518B1
Authority
EP
European Patent Office
Prior art keywords
roving
rovings
spinning frame
draft
draft parts
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
EP19910810184
Other languages
German (de)
English (en)
Other versions
EP0448518A3 (en
EP0448518A2 (fr
Inventor
Kenji Sasaki
Shinji Kato
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Howa Machinery Ltd
Original Assignee
Howa Machinery Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Howa Machinery Ltd filed Critical Howa Machinery Ltd
Publication of EP0448518A2 publication Critical patent/EP0448518A2/fr
Publication of EP0448518A3 publication Critical patent/EP0448518A3/en
Application granted granted Critical
Publication of EP0448518B1 publication Critical patent/EP0448518B1/fr
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • DTEXTILES; PAPER
    • D01NATURAL OR MAN-MADE THREADS OR FIBRES; SPINNING
    • D01HSPINNING OR TWISTING
    • D01H15/00Piecing arrangements ; Automatic end-finding, e.g. by suction and reverse package rotation; Devices for temporarily storing yarn during piecing

Definitions

  • the above-mentioned supplemental rovings are combined with corresponding rovings fed from the almost exhausted roving bobbins, respectively, and the rovings, which are connected to the respective roving bobbins, are separated from the combined portion of the rovings immediately after the above-mentioned combination.
  • the above-mentioned unit operation is carried out from one end of the spindle alignment of the ring spinning frame to the other end, by utilizing a roving piecing apparatus having a function of synchronously carrying out the unit operation for a group of a plurality of successive spindles, for example, two to six spindles. It is also possible to carrying out the above-mentioned unit operation manually.
  • the unit operation by the apparatus is carried out by successive operations such as a first operation for reserving supplemental rovings at the respective positions close to the trumpets of the corresponding draft parts, and a second operation, i.e., the joint piecing operation of supplemental rovings with the corresponding rovings, which are fed from the respective roving bobbins, at the above-mentioned positions, and a third operation of cutting the rovings which are supplied from the respective roving bobbins arranged at the creel portion of the ring spinning frame, at the respective positions upstream of the corresponding trumpets of the draft parts, and the above-mentioned unit operation by the apparatus is successively carried out by displacing the apparatus along the spindle alignment.
  • the time required to carry out the roving piecing operation at the time of exchanging almost exhausted roving bobbins for the full packaged roving bobbins, utilizing the above-mentioned known apparatus is fairly long.
  • This problem becomes more serious when producing a coarse count yarn, which is preferably produced by utilizing a ring spinning frame having a larger number of spindles than the standard size spinning frame, because the time required to produce the full size yarn package is shorter than the time required to complete the successive roving piecing operation for all spindles of the ring spinning frame. Accordingly, the above-mentioned roving piecing method and apparatus are not suitable for producing a coarse count yarn.
  • EP-A-0310871 discloses a method and apparatus for carrying out a roving bobbin exchanging operation, wherein an automatic roving bobbin exchanging apparatus is intermittently displaced from one side to the other side of a spinning machine, for carrying out a unit roving bobbin exchanging operation. Accordingly, the EP-A-0310871 has the same drawbacks as the above-mentioned Japanese document.
  • the present invention is intended to overcome the above-mentioned drawbacks. To this end, it has for object a method and apparatus for synchronously piecing roving for a countinuous feeding thereof to a ring spinning frame according to claims 1, respectively 9.
  • the present invention is based on the following technical concept. Namely, it is well known that the yarn piecing operation of a ring spinning frame is carried out in a period between a time at which the size of the yarn package reaches one-third of the full size thereof and a time at which the size of the yarn package becomes 90% of the full size thereof, because the spinning condition, such as a variation of yarn tension, are very stable, and thus the average yarn tension is such that possible yarn breakages will not occur.
  • the roving piecing operation is carried out in a restricted period during which the ring rail takes a position as close as possible to the uppermost position of the ring rail in a chase formation, the roving piecing operation can be carried out in a condition such that possible yarn breakage will not occur.
  • the chase forming is carried out synchronously for all spindles of the ring spinning frame, if the roving piecing operation is synchronously carried out for all of the draft parts for which the roving piecing operation is required, the above-mentioned desirable condition for carrying out the roving piecing operation can be created.
  • supplemental rovings are taken from the corresponding supplemental full size roving bobbins, which are located at the creel position of a ring spinning frame, and these rovings are carried to respective standby reserve positions close to the corresponding rovings being fed to the corresponding draft parts respectively, during the above-mentioned desirable period, and when the roving bobbins mounted at the creel position of a ring spinning frame reach an almost exhausted condition, the supplemental rovings from the supplemental roving bobbins are introduced synchronously into the respective draft parts together with the corresponding rovings from the almost exhausted roving bobbins, while the rovings from the almost exhausted roving bobbins are separated from the above-mentioned rovings which are being fed to the respective draft parts, immediately after the above-mentioned operation, hereinafter referred to as "joint piecing
  • the above-mentioned roving piecing operation is carried out synchronously at all draft parts to which the rovings are being fed from the respective almost exhausted roving bobbins held by a bobbin carriage supported at the creel position of the ring spinning frame.
  • the above-mentioned all draft parts are hereinafter referred to as "all draft parts concerned”. Therefore, the time required to complete the roving piecing operation can be remarkably reduced when compared with the known method.
  • the apparatus for carrying out the above-mentioned method according to the present invention it is essential to provide a means for synchronously reserving free end portions of supplemental rovings taken from the respective supplemental roving bobbins at the respective positions in the trumpets of the corresponding draft parts, wherein each position is close to the passage of the roving fed from the roving bobbin which is supplying the roving to the identical draft part, a means for synchronously introducing the above-mentioned free end portions of the supplemental rovings into the corresponding draft parts in a doubled condition with the corresponding rovings which are being fed from the respective roving bobbins which have reached an almost exhausted condition, so that a joint piecing operation of the respective supplemental rovings to the corresponding rovings which are being fed to the corresponding draft parts is completed, and a means for cutting the rovings at the respective positions upstream of
  • the above-mentioned essential means for carrying out the synchronous roving piecing operation are designed in another combination, i.e., machine elements of the practical apparatus perform parts of the functions of the above-mentioned means respectively, so that the essential function of completing the synchronous roving piecing operation according to the present invention can be created by the combination of the functions of the machine elements of the practical apparatus as hereinafter explained in detail.
  • the present invention is carried out in cooperation with a conventional roving bobbin transporting system utilizing main transporting rails arranged between a room wherein a plurality of roving frames are installed and a room wherein a plurality of ring spinning frames are installed.
  • each bobbin carriage is provided with a plurality of bobbin hangers and is capable of carrying roving bobbins along the transporting rail between a particular position in the roving room and a particular position in the ring spinning frame.
  • This transporting system is well known in the art, however, and therefore, a detailed explanation thereof is omitted, except for the points which are necessary to the explanation of the present invention.
  • horizontal supporting arms 4 are rigidly mounted on upper end portions of creel pillars 3, which are vertically and rigidly mounted on a machine frame 2 of a ring spinning frame, with a predetermined pitch along the lengthwise direction thereof.
  • a pair of transporting rails 5, 6 are secured to these supporting arms 4 in parallel along the lengthwise direction of the spinning frame, whereby a creel portion 1 is formed at each side of the spinning frame.
  • the transporting rails 5 and 6 are connected with a main transporting rail (not shown) at each terminal portion thereof, respectively.
  • the main transporting rail and the transporting rails 5 and 6 have an identical cross-sectional construction. As shown in Fig.
  • these transporting rails are provided with a hollow frame having a rectangular cross section and a guide opening portion 7 formed at a bottom portion of the hollow frame such that the guide opening 7 extends along the lengthwise direction of the hollow frame, so that a pair of inside guide surfaces 8 are formed inside the hollow frame at both sides of the guide opening portion 7, respectively.
  • a bobbin carriage 9 is displaceably supported by the main transporting rail (not shown) and the transporting rails 5, 6.
  • the bobbin carriage 9 is formed by a plurality of carriage elements 9a connected in an alignment, and each carriage element 9a comprises a carriage bar 10 provided with a pair of vertical supporting rods 11, which are disposed on the carriage bar 10 at both end portions thereof, and each supporting rod 11 is provided with a guide roller 14 rotatable about the central axis thereof so that, when the carriage element 9a is assembled with the main transporting rail and the transporting rails 5 and 6, the guide roller 14 is rotatably guided by the opening 7 of the main transporting rail and transporting rails 5 and 6, respectively.
  • a pair of rotation rollers 13 are secured on a horizontal shaft (not shown) which passes rotatably through the vertical supporting rod 11 at the top end portion thereof in a condition such that, when the bobbin carriage 9 is assembled with the main transporting rail and transporting rails 5 and 6, the rotation rollers 13 are able to rotate on the corresponding inside surfaces 8,8 of the hollow frame of the main transporting rail and the transporting rails 5 and 6, respectively.
  • the carriage bar 10 is provided with a plurality of horizontal frames 15 rigidly mounted thereon in a condition such that a pair of horizontal wing portions 15a of an identical length are extended to the outer sides from a central point thereof, and the angle between each wing portion 15a and the lengthwise direction of the carriage bar 10 is 90 degrees.
  • Each horizontal frame 15 is provided with a vertical rod 17 which is projected downwards from the central point thereof. These horizontal frames 15 are arranged at an identical predetermined pitch which is double that of the spindle pitch, and bobbin hangers 16 are rigidly supported by each horizontal frame 15 at both end portions of the wing portions 15a thereof. As shown in Fig. 7, a roving guide 18 is mounted on the bottom end portion of each vertical rod 17, and each roving guide 18 is provided with a pair of guide pins 18a formed at both sides of the vertical rod 17 in a condition such that each guide pin 18a is directed upward. A plurality of the carriage bars 9a are connected in alignment by utilizing universal joints 19 to form the bobbin carriage 9, so that the number of bobbin hangers 16 of each bobbin carriage 9 is identical to 1/2 the number of spindles at each side of the spinning frame.
  • the above-mentioned bobbin carriage 9 is transported along the main transporting rail and the transporting rails 5 and 6 by a suitable means for displacing the bobbin carriage between the roving room and the ring spinning room, such as a carrying apparatus (e.g., a battery car as disclosed by Japanese Unexamined Patent Publication Sho 62 [1987]-263332, etc.).
  • a carrying apparatus e.g., a battery car as disclosed by Japanese Unexamined Patent Publication Sho 62 [1987]-263332, etc.
  • a supporting bar 21 is rigidly mounted on each creel pillar 3 and a pair of guide bars 22, 23 are horizontally supported by the supporting bars 21 in a condition such that these guide bars 22, 23 extend the entire length of the spindle alignment of each side of the spinning frame, so that rovings S1 supplied from the respective bobbins supported by the corresponding bobbin hangers 16 of the bobbin carriage 9 positioned at the creel position of the ring spinning frame are fed to the corresponding draft parts by way of the roving guides 18 and roving guide bars 22, 23.
  • the rovings S2 from the supplemental roving bobbins supported by the corresponding bobbin hangers 16 of the bobbin carriage 9 positioned at the other creel position of the ring spinning frame are also introduced to the corresponding draft parts in the same condition as mentioned above, when the synchronous roving piecing operation according to the present invention is carried out.
  • the draft parts 30 are disposed on the corresponding roller stands 31 at a position below the arrangement of the supporting arms 21.
  • the main portion of the synchronous roving piecing apparatus of the present invention is shown in Figs. 1 and 3. That is, in each draft part 30, top rollers 35, 36, and 37 are disposed on a front roller 32, a second roller 33 and back roller 34, respectively, in a rotatable condition at both sides of a top arm 38, and trumpet 39 is disposed at an entrance of each back roller 34.
  • the opening portion of the trumpet 39 is expanded to be larger than that of the conventional trumpet to attain the purpose of the present invention. Namely, since the opening of the trumpet 39 is expanded, the rovings S1 and S2 can be introduced therein synchronously when the roving piecing operation of the present invention is carried out.
  • a supplemental common feed roller 40 is rotatably mounted in the draft parts of the spinning frame at a position closely upstream of the trumpets 39 in a condition such that the roller 40 extends along the entire length of the spinning frame.
  • the supplemental feed roller 40 is driven by a suitable drive system 41 such as a gear train, at a surface rotation speed equal to that of the back roller 34 and the starting and stopping of the rotation of the roller 40 is controlled by a clutch and brake mechanism comprising a clutch and a brake 42a, which is arranged between the drive system and the supplemental feed roller 40, as shown in Figs. 1 and 2.
  • a bifurcate lever 43 is provided and comprises two elementary lever portions connected to each other, and is mounted in swingable condition about a horizontal shaft mounted on each top arm 38, and a horizontal supporting shaft 44 is mounted so that a pair of nip rollers 44a and 44b are rotatably mounted on the shaft 44 in a condition such that these nip rollers 44a and 44b are projected toward an outer side from the top arm 38 respectively, to take respective positions at both sides of the roving S1 supplied to the corresponding draft part as shown in Figs. 1 and 2.
  • Each bifurcate lever 43 is provided with a coil expansion spring 45 between the top arm 38 and the upper elementary lever portion so that, when the top arm 38 is set at the working position thereof, the nip rollers 44a and 44b are pressed against the supplemental feed roller 40 in a rotatable condition as shown in Fig. 3. Therefore, the above-mentioned contact between the supplemental feed shaft 40 and the nip rollers 44a, 44b can be released by turning the lever 43 upwards about the horizontal axis of the top arm 38.
  • a solid support member 50 is rigidly mounted on each roll, stand 31 as shown in Fig. 1.
  • Each solid support member 51 is provided with a guide groove 50a having a rectangular cross section.
  • a roving guide member 51 extending the entire length of the spindle alignment is slidably inserted in the guide groove 50a of each solid supporting member 50, for controlling the supply direction of the rovings S1 and S2, respectively, to the trumpet 39 of each draft unit 30.
  • the roving guide member 51 comprises a solid rod 51a having a rectangular cross section and provided with a plurality of sets of three guide pins 51b, 51c and 51d planted vertically on the upper surface thereof in the respective positions for controlling the introducing positions of the sliver S1 and the sliver S2 into each draft part 30.
  • a bracket 53 is connected to a piston rod 52a of a reciprocal pneumatic cylinder 52, so that the transversal reciprocal motion of the roving guide member 51 along the lengthwise direction of the spinning frame can be obtained.
  • the relative position between the arrangement of the guide pins 51b, 51c and 51d and the arrangement of the nip rollers 44a and 44b is designed to satisfy the following condition.
  • the roving guide member 51 is to act as a means for synchronously cutting the slivers S1 fed to the corresponding draft parts 30.
  • the rovings S1 are continuously supplied from the roving bobbins S of two parallel alignments of the bobbin carriage 9 temporarily located at a creel position of a ring spinning frame represented by the transporting rail 5, at corresponding draft parts of each side of the ring spinning frame, respectively in each draft part 30, the roving S1 is introduced to the trumpet 39 of the corresponding draft part 30 by way of the roving guide 18, the roving guide bars 22 and 23, and the intervening space 55a, and therefore, a bundle of fibers delivered from the draft part 30 is twisted and wound on a bobbin mounted on the corresponding spindle.
  • the clutch 42 of the supplemental feed roller 40 is released, and synchronously the brake 42a is actuated, and the following operation is carried out successively at all draft parts 30 of the spinning frame, that is, a supplemental roving S2 is taken from the corresponding full packaged roving bobbin F, and then a free end portion of the roving S2 is introduced to the roving guide bar 23 so that the free end portion of the roving S2 is temporarily hung on the roving guide bar 23.
  • the above-mentioned free end portion of the roving S2 is inserted to an intervening space 33a between the nip roller 44b and the supplemental feed roller 40 via a roving guide intervening space 55b, immediately after the lever 43 of the top arm 38 is turned upward about the axial center thereof to thereby separate the nip rollers 44a and 44b from the supplemental feed roller 40, so that the free end of the supplemental roving S2 is introduced to a position inside the trumpet 39 in a condition such that the free end of the roving S2 is close to the running roving S1, and thereafter, the lever 43 is turned back to the normal position at which the nip rollers 44a and 44b are in rotatable contact with the supplemental feed roller 40.
  • the supplemental roving S2 is gripped by the nip roller 44b and the supplemental feed roller 40 which is held stationary (Fig. 3).
  • the above-mentioned operation is carried out to all draft parts 30 concerned at each side of the spinning frame.
  • the rotation of the supplemental feed roller 40 is started at the same surface rotation speed as that of the back roller 34, so that the supplemental roving S2 maintained at the standby position in the trumpet 39 of each draft part 30, is carried to the running position of the roving S1, and accordingly, the roving S2 is fed to the back roller 34 of each draft part synchronously, so that the supplemental roving S2 is introduced to the back roller 34 of each draft part 30. Therefore, a joint piecing of the rovings is carried out synchronously at the all draft parts 30 concerned at each side of the ring spinning frame.
  • the piston rod 52a of the reciprocal cylinder 52 is actuated to project outwards as shown in Fig. 2, so that the roving guide member 51 is displaced in a direction identical to the projected direction of the piston rod 52a (right-hand direction in Fig. 2).
  • the roving S1 and the supplemental roving S2 are displaced toward the above-mentioned direction, by the guide pins 51b, 51c and 51d respectively, so that the roving S1 is displaced to a position at which the roving S1 is passed through the nip point between the nip roller 44a and the supplemental roving feed roller 40.
  • the free end portion of the supplemental roving S2 which was doubled with the running roving S1 by the above-mentioned joint piecing operation, is displaced to the intervening space between the supporting shaft 44 and an intervening portion of the supplemental roving feed roller 40 between the nip rollers 44a and 44b, from the condition of gripping the free end portion of supplemental roving S2 between the nip roller 44b and the supplemental roving feed roller 40.
  • the clutch 42 is actuated to stop the transmission of power and the brake 42a is actuated to instantly stop the rotation of the supplemental roving feed roller 40.
  • the rovings S1 from the almost exhausted roving bobbins S are synchronously cut in a condition such that the rovings S1 are still gripped by the corresponding nip roller 44a and the supplemental roving feed roller 40.
  • all of the rovings S1 from the almost exhausted roving bobbins S of the bobbin carriage 9 supported by the transporting rail 5, are synchronously cut at the respective positions close upstream of the supplemental feed roller 40, respectively.
  • the lever 43 is turned upward about the axial center of the supporting shaft 43a mounted on each top arm 38, so that the grip to the roving S1 by the respective nip roller 44a and the supplemental roving feed roller 40 are released, and thereafter, the rovings S1 connected to the almost exhausted roving bobbins S are successively rewound by the corresponding roving bobbin S of the bobbin carriage 9 supported by the transporting rail 5, with respect to all draft parts 30 concerned.
  • the bobbin carriage 9 supporting the almost exhausted roving bobbins S is displaced from the transporting rail 5 to the roving room, and a bobbin carriage supporting full packaged roving bobbins F is introduced to the transporting rail 5 from which the bobbin carriage having the almost exhausted roving bobbins S has been discharged.
  • the operation can be carried out regardless of the time required for completing the formation of full yarn packages, and of the number of spindles, and since the roving piecing operation according to the present invention is carried out under a preferable condition such that the ring rail is located at the uppermost position in the chase formation, wherein the ballooning is very small, possible yarn breakages can be easily prevented.
  • a bobbin carriage 9 having a plurality of bobbin hangers, a number of which is 1/2 of the total number of spindles arranged on each side of the spinning frame, is displacably supported.
  • a pair of roving guide members 61 and 62 are disposed at respective positions behind the supplemental roving feed roller 40 in a condition such that they can be displaced along the lengthwise direction of the spinning frame.
  • a pair of roving guide members 61 and 62 are utilized, and a plurality of groups of three guide pins 61b, 61c and 61d are planted vertically to the respective positions of the roving guide members 61, and a plurality of three guide pins 62b, 62c, and 62d are planted vertically to the roving guide member 62.
  • the plurality of groups of guide members 61b, 61c, and 61d introduce roving to corresponding draft parts 30 which form a group of alternate draft parts of the alignment of all of the draft parts 30 arranged at one side of the ring spinning frame, and a plurality of groups of the guide members 62b, 62c, and 62d introduce roving to corresponding draft parts 30 which form other alternate draft parts in an identical alignment of the draft parts 30 at each side of the spinning frame.
  • the roving guide members 61, 62 are displaced along the lengthwise direction of the spinning frame by the action of the reciprocal pneumatic cylinders 63 and 64 respectively, as in the first embodiment.
  • machine elements having the same function as the machine elements of the first embodiment are identified by the same reference numerals as used in Fig. 10.
  • the transporting rails 5a and 5b support the respective bobbin carriage 9 holding the roving bobbins S for feeding rovings to the corresponding draft parts 30 of the spinning frame.
  • the successive roving piecing operation applied to the roving bobbins S of the bobbin carriage 9 supported by the transporting rail 5a and the full packaged roving bobbins F of the bobbin carriage 9 supported by the transporting rail 5c is hereinafter explained in detail.
  • the number of full packaged roving bobbins F is a 1/2 of the number of spindles at each side of the spinning frame, and the supplemental rovings S2 taken from the respective full packaged roving bobbins F are introduced to the respective positions in the trumpets of the corresponding draft parts respectively in almost the manner as in the first embodiment, and then free end portions of the supplemental rovings S2 are nipped by the nip roller 44b and the supplemental roving feed roller 40 at the respective positions upstream of the corresponding draft parts 30.
  • the free end portion of the above-mentioned supplemental roving S2 takes a position close to the roving S1, which is supplied to the corresponding draft part 30 in the trumpet 39 thereof, and the rovings 61 and 62 take a position controlled by the roving guide member 62 as shown in Fig. 10.
  • the following synchronous roving piecing operation is started in a preferable condition such that the ring rail of the spinning frame takes a position close to the uppermost position in the chase formation.
  • the synchronous roving piecing operation is carried out during a period in which the size of the yarn package becomes 30% of the full size yarn package and the size of the yarn package becomes 90% of the full yarn package.
  • the synchronous roving piecing operation is carried out as follows: First, the clutch 42 is connected and synchronously, the action of the brake 42a is released so that the rotation of the supplemental roving feed roller 40 is started at a surface rotation speed identical to that of the back roller 34. According to this operation, the free end of the supplemental roving S2 is doubled with the roving S1 supplied and introduced into the corresponding draft part 30, whereby the joint piecing of two rovings S1 and S2 is performed.
  • the roving guide member 62 is displaced only for a predetermined distance along the lengthwise direction of the spinning frame (in Fig.
  • the cut rovings S1 connected to the respective roving bobbins S which are created by the above-mentioned synchronous operation, are rewound on the corresponding almost exhausted roving bobbins S and then the bobbin carriage 9 holding these almost exhausted roving bobbins S is discharged from the transporting rail 5a of the spinning frame and a fresh bobbin carriage 9 holding full packaged roving bobbins F is introduced the transporting rail 5a to replace the above-mentioned bobbin carriage 9 discharged therefrom.
  • the rovings S2 from the above-mentioned fresh full packaged roving bobbins F are introduced to the respective trumpets 39 of the corresponding draft parts 30 which form the other alternate draft parts of the identical alignment of all draft parts 30 at each side of the spinning frame. (draft parts 30 positioned at the left-hand side with respect to each top arm 38), by passing through the respective roving guide intervening spaces 65b formed between each pair of guide pins 61c and 61d of the roving guide member 61, while the free end of each roving S2 is nipped by the corresponding nip roller 44b and the supplemental roving guide roller 40.
  • the synchronous roving piecing operation is carried out by a method almost identical to the above-mentioned synchronous roving piecing operation, except that the roving guide member 61 is displaced only towards the direction opposite to the first embodiment (left-hand side in Fig. 11).
  • the construction of the apparatus of the third embodiment differs from the second embodiment only in the construction of the roving guide member. That is, in the third embodiment, a single roving guide member formed by a line shaft 71 is extended for the entire length of the spindle alignment of the ring spinning frame, instead of utilizing a pair of roving guide members 61 and 62 as in the second embodiment.
  • the line shaft 71 is mounted on the spinning frame in a condition such that the line shaft 71 is able to rotate about the axis thereof, and able to slide along the axis thereof.
  • One end of the line shaft 71 is rotatably supported by a shift-plate 72 as shown in Fig. 13.
  • the shift-plate 72 is connected to a piston rod 52a of a pneumatic cylinder 52, a motor 73 is rigidly mounted on the shift-plate 72, and the line shaft 71 is rotated by 180 degrees once, by a suitable power transmission system such as an endless chain driving system, when the motor 73 is actuated.
  • a suitable power transmission system such as an endless chain driving system
  • the line shaft 71 is provided with two groups of guide means, one group consisting of a pair of guide grooves 75a and 75b, and the other group consisting of a pair of guide groups 76a and 76b.
  • the pairs of guide grooves belonging to one group and the pairs of guide grooves belonging to the other group are alternately formed in the line shaft, and these first pairs of grooves 75a, 75b, and the second pairs of grooves 76a, 76b, are formed in the line shaft 71 in a condition such that the angular phase difference between the first pairs of grooves 75a, 75b and the second pairs of grooves 76a, 76b is 180 degrees, as shown in Fig. 15.
  • first pairs of grooves 75a, 75b and the second pairs of grooves 76a, 76b is such that, when the first pair of guide grooves 75a, 75b face one of the corresponding nip rollers 44a, 44b, the second pair of guide grooves 76a, 76b face the respective intervening positions between the corresponding pairs of the nip rollers 44a and 44b.
  • each roving S1 from the corresponding roving bobbin S is introduced to the trumpet 39 of the corresponding draft part 30 after passing a position below the line shaft 71.
  • the rovings S1 passes through the roving guide groove 75a, which is facing downwards, to the corresponding draft part 30 as shown in Fig. 13.
  • the supplemental rovings S2 are taken from the full packaged roving bobbins F and then introduced to the respective nip rollers 44b of the corresponding draft parts 30, and the free end portions of the supplemental rovings F are nipped between the nip roller 44b of the corresponding draft part 30 and the supplemental roving feed roller 40.
  • the supplemental rovings S2 are supplied to the corresponding draft parts 30 by rotating the supplemental roving feed roller 40 by the operation of the clutch 42 and the brake 42a.
  • the line shaft 71 is synchronously displaced toward the direction of the nip rollers 44a (left-hand side in Fig. 13) so that the supplied roving S1 is nipped by the nip roller 44a of the corresponding draft part 30 and the supplemental roving feed roller 40, while the supplemental roving S2 is released from the nipping action by the nip roller 44b of the corresponding draft part 30 and the supplemental roving feed roller 40.
  • the joint piecing of the roving S2 with the roving S1 is carried out synchronously in the draft parts 30 which are alternate draft parts of the alignment of the draft parts 30 at each side of the ring spinning frame.
  • the rovings S1 connected to the respective almost exhausted roving S are synchronously cut by the action of the clutch 42 and the brake 42a, as described in the second embodiment and thereafter, these rovings S1 are rewound on the corresponding almost exhausted roving bobbins S of the bobbin carriage 9 supported by the transporting rail 5a, and this bobbin carriage 9 is discharged from the transporting rail 5a.
  • a fresh bobbin carriage 9 holding the full packaged roving bobbins F is carried to the transporting rail 5a.
  • the roving guide grooves 76a and 76b are in the respective positions facing upward, the rovings S1 which are supplied to the corresponding draft parts are not displaced towards the nip roller 44a of each draft part 30, but are introduced into the corresponding guide groove 76a of each draft part 30, where the roving guide groove 76a faces the nip roller 44a of each corresponding draft part 30.
  • the motor 73 is actuated so that the line shaft 71 is turned by 180 degrees, and accordingly, the positions of the pairs of the roving guide grooves 76a and 76b, which are facing the other rovings S1, are changed to the respective positions facing downward, and accordingly,the another rovings S1 are introduced into the corresponding roving guide grooves 76b.
  • the supplemental rovings S2 taken from the full packaged roving bobbins F of the bobbin carriage 9 supported by the transporting rail 5a are introduced to the respective positions close to the mity to the corresponding nip rollers 44a respectively, by way of the corresponding roving guide grooves 76a facing the respective nip rollers 44a, and then nipped by the corresponding nip rollers 44a and the supplemental roving feed roller 40, and the synchronous roving piecing operation is carried out after displacing the line shaft 71 towards the direction opposite to the direction of the previous synchronous roving piecing operation (right-hand side in Fig. 13).
  • the fourth embodiment of the present invention is hereinafter explained in detail with reference to Figs. 16, 17, and 18.
  • the roving S1, which are supplied from the respective almost exhausted roving bobbins S1 are synchronously cut by a cutting means at the respective positions upstream of the respective draft parts, and the supplemental roving S2 are synchronously supplied to the corresponding draft parts together with the roving S1 which are separated from the respective roving S1 connected to the corresponding roving bobbins S after the above-mentioned cutting operation or synchronously therewith, to carry out the above-mentioned cutting operation.
  • the roving cutting means 80 comprises a line shaft 71 supported by a supporting member 50 at a position upstream of the supplemental feed roller 40, and a cutting shaft 81 which is rotatably supported by the supporting member 50 in parallel to the line shaft 71, at a position below the shaft 71.
  • the shaft 71 is able to rotate about the axial center thereof and is able to be synchronously displaced along the axial direction thereof.
  • the line shaft 71 is provided with roving guide grooves 75a for guiding rovings S, which are supplied from the respective roving bobbins S, to the group of draft parts 30 which are alternate draft parts 30 of the alignment of the draft parts 30 at each side of the spinning frame, and with roving guide grooves 76a for guiding the rovings S1 to the group of the draft parts 30 which are other alternate draft parts 30 of the alignment of the draft parts 30, and these roving guide grooves 75a and the roving guide grooves 76a are formed in a condition such that the angular phase difference between each roving guide groove 75a and each roving guide groove 76a is 180 degrees about the axial center of the line shaft 71.
  • the cutting shaft 81 is provided with a group of cutting members 82, which are planted on the cutting shaft 81 vertical to the axis thereof, and another group of cutting members 83 which are planted on the cutting shaft 81 vertical to the axis thereof.
  • the cutting members 82 can be inserted to the corresponding roving guide grooves 75a respectively, and the cutting members 83 can be inserted into the corresponding roving guide grooves 76a respectively.
  • One end portion of the cutting shaft 81 is connected to a shaft of a drive pulley 84a driven by a drive motor 84 rigidly mounted on a machine frame 2 of the spinning frame, by way of a drive system 85 such as an endless chain drive system, and the cutting shaft 81 is able to be turned 180 degrees about the axis thereof once when required.
  • a drive system 85 such as an endless chain drive system
  • the rovings S1 are introduced to the respective trumpets 39 of the corresponding draft parts 30 after passing through the respective passages above the cutting shaft 81 and below the line shaft 71.
  • the rovings S1 are introduced into the respective roving grooves 75a of the line shaft 71, because these guide grooves 75a face downward. Since the cutting shaft 81 is able to be rotated in a direction which is opposite to the rotating direction of the back roller 34 of the draft parts 30, when the cutting members 82 (83) are inserted to the corresponding roving guide grooves 75a (76a) while turning, the rovings S1 can be easily cut by the cutting members 82 (83) and the corresponding roving guide grooves 75a (76a).
  • the supplemental rovings S2 are taken from the respective full packaged roving bobbins F and introduced to the respective nip rollers 44b of the corresponding draft parts 30, and held there in a condition such that these supplemental roving S2 are nipped between the corresponding nip rollers 44b and the supplemental roving feeding shaft 40.
  • the motor 84 is actuated automatically or by a manual operation of a switch, so that the cutting shaft 81 is turned by 180 degrees about the axis thereof toward the direction indicated by an arrow in Fig. 18.
  • the rovings S1 which are supplied from the almost exhausted rovings of the bobbin carriage 9, are cut by gripping between the respective cutting members and the corresponding roving guide grooves 75a.
  • Each roving S1 which is cut and continuously fed to the corresponding draft part 30 remains a certain length in the region upstream of the trumpet 39 of the corresponding draft part 30, and the above-mentioned remaining portion of the roving S1 is eliminated when this portion is introduced to the corresponding draft part 30.
  • the clutch 42 is temporarily actuated to connect the component shafts thereof so that the supplemental rovings S2 are synchronously fed to the respective trumpets 39 of the corresponding draft parts 30.
  • the line shaft 71 is synchronously displaced towards a direction along the axis thereof so that the supplemental rovings S2 are released from the nipping action by the corresponding nip roller 44 and the supplemental roving feed roller 40.
  • the above-mentioned displacement of the line shaft 71 is carried out towards the left-hand side in Fig. 16.
  • the supplemental rovings S2 are continuously fed to the respective trumpets 39 of the corresponding draft parts 30 through the intervening space between the corresponding nip roller 44b and the top arm 38 thereof, so that the synchronous roving piecing operation applied to half the number of draft parts at each side of the spinning frame is completed.
  • the line shaft 71 is turned 180 degrees about the axis thereof so that the supplemental rovings S2 are nipped by the nip rollers 44a of each pair of nip rollers 44a and 44b and the supplemental roving feed roller 40.
  • the supplemental rovings S2 are introduced to the respective nip rollers 44a of the corresponding draft parts 30 so that the supplemental rovings S2 are nipped by the respective nip rollers 44a of the corresponding draft parts 30 and the supplemental roving feed roller 40, respectively.
  • the cutting roller 81 is turned by 180 degrees about the axis thereof, and the cutting members 83 are inserted to the respective roving guide grooves 76b facing the corresponding draft units 30 respectively, so that the rovings S1 from the respective roving bobbins S of the bobbin carriage 9 are respectively cut.
  • the supplemental roving feed roller 40 is temporarily rotated by actuating the clutch 42 and the brake 42a, whereby the supplemental rovings S2 are synchronously introduced to the trumpets 39 of the corresponding draft parts 30, and the supplemental rovings S2 are released from the nipping action by the respective nip rollers 44a and the supplemental roving feed roller 40 by displacing the line shaft 71 in the direction towards the right-hand side in Fig. 16.
  • the synchronous roving piecing operation applied to the other all draft parts concerned at each side of the roving frame is completed according to the above-mentioned stepped operation.
  • the cutting means 80 comprising the cutting shaft 81 and the cutting members 82, 83 is utilized, but instead of the cutting means 80, a mechanism for separating rovings into two portions by applying a tensile force thereto can be applied.
  • a pair of roving guide rods 51A and 51B are mounted on the respective guide grooves (not shown) of supporting members (not shown) rigidly mounted on the roller stands 31, in a condition such that these rods 51A and 51B are reciprocally slidable along the lengthwise direction of the spinning frame.
  • These roving guide rods 51A and 51B have a rectangular cross section.
  • the roving guide rod 51A extends along the entire length of the spindle alignment of each side of the spinning frame, and is provided with a plurality of pairs of guide pins 51Ab and 51Ac planted at positions facing each draft part 30, with a predetermined intervening space therebetween.
  • the roving guide rod 51B also extends along the entire length of the spindle alignment at each side of the spinning frame, and a plurality of roving guide pins 51Bd are planted on the rod 51B facing each draft part 30.
  • the above-mentioned roving cutting means is provided with a function such that, when the roving guide rods 51Ab, 51Ac are relatively displaced along the lengthwise direction thereof and cause the guide pins 51Ab, 51Ac of the guide rod 51A to approach the corresponding guide pins 51Bd of the guide rod 51B, the rovings S1 which are supplied from the respective roving bobbins S of the bobbin carriage 9 supported by the transporting rail 5 (Fig. 9) are gripped by the corresponding guide pins 51Ab, 51Ac and the guide pins 51Bd of the corresponding draft parts 30, respectively. Accordingly, when the rod 51B is displaced in the left-hand direction in Fig.
  • each roving S1 is gripped by the respective pins 51Ab and the pins 51Bd, and thus the rovings S1, which are continuously introduced to the corresponding draft parts 30 by the continuous rotation of the draft rollers of each draft part, are separated from the gripped portion of the corresponding rovings S1.
  • the following modification can be made. Namely, as a modification of the above embodiments, after the supplemental rovings S2 are introduced into the corresponding draft parts 30 respectively, together with the corresponding rovings S1, the spinning operation of the spinning frame is temporarily stopped and the rovings S1 are synchronously cut at the respective positions close upstream of the respective trumpets 39 of the corresponding draft parts 30, by a manual operation, and the spinning operation of the spinning frame is restarted after the completion of the manual operation.
  • the spinning operation of the spinning frame can be automatically stopped by a signal indicating the most preferable time for stopping the drive of the spinning frame, or the drive of the spinning frame is topped by a manual switching. Therefore, in the above modification, the brake 42a, or the combination of the brake 42a and the roving cutting means 80 can be omitted.
  • the modification applied to the first, second and third embodiments mentioned above can be also applied to the fourth embodiment. That is, in this modification for cutting the rovings S1 which are supplied to the corresponding draft parts 30, the spinning operation of the spinning frame is temporarily stopped and the rovings S1 are successively cut at the respective positions upstream of the corresponding draft parts 30 by a manual operation, while the drive of the spinning frame is stopped, and after the completion of the above operation, the drive of the spinning frame is restarted so that the cut portions thereof, which remained at the side of the corresponding draft parts, are introduced to the corresponding draft parts.
  • the clutch 42 is actuated to introduce the respective supplemental rovings S2 into the corresponding draft parts 30 together with the corresponding free ends of the above-mentioned cut portions of the corresponding rovings S1, and after the free ends of the rovings S1 are completely introduced into the corresponding draft parts 30, the reciprocal pneumatic cylinder 52 is actuated so that the line shaft 71 is displaced towards the left hand side in Fig. 1, and consequently, the guide pins 51b displace the corresponding supplemental rovings S2 towards the left hand direction in Fig.
  • the roving piecing operation at the time of changing almost exhausted roving bobbins for the full packaged roving bobbins can be carried out within a very short time due to the application of the synchronous roving piecing method according to the present invention. Therefore, the roving piecing operation can be completed during the formation of a chase in a condition such that the ring rail takes a position close to the uppermost position of each chase formation where the spinning condition is stable, whereby possible yarn breakages are effectively prevented.
  • the time required to complete the roving piecing operation when changing the almost exhausted roving bobbins for the full packaged roving bobbins can be remarkably reduced, i.e., the above roving bobbin exchange operation can be carried out within a remarkably shorter time than in the conventional method, the working efficiency of the spinning frame can be remarkably improved. This is very advantageous when producing a coarse yarn.
  • the supplemental rovings S2 are taken from the respective full packaged roving bobbins F of a bobbin carriage supported by a transporting rail of the spinning frame and held at the respective positions close to the corresponding rovings S1, which are supplied to the corresponding draft parts 30, before the roving bobbins S reach an almost exhausted condition, and accordingly, the time necessary to complete the operation of taking the supplemental rovings S2 from the respective full packaged roving bobbins F and carrying out the roving piecing operation is variable, and thus the roving bobbin exchange operation can be carried out under very free conditions in comparison with the conventional method.

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Textile Engineering (AREA)
  • Spinning Or Twisting Of Yarns (AREA)

Claims (14)

  1. Procédé de rattache synchrone de mèches sur un métier à filer à anneaux (2) muni d'une pluralité de broches alignées de chaque côté de celui-ci, d'une portion de cantre, de deux groupes d'éléments d'étirage (30) se composant d'un nombre identique d'éléments d'étirage (30) disposés alternativement sur toute sa longueur, en combinaison avec l'utilisation d'un système de transport de bobines de mèches comprenant une pluralité de rails de transport de bobines de mèches (5, 6, 5a, 5b, 5c) disposés parallèlement à ladite portion de cantre sur toute la longueur dudit métier à filer à anneaux (2), chacun desdits rails de transport (5, 6, 5a, 5b, 5c) étant capable de supporter temporairement un porte-bobines (9) supportant une pluralité de bobines de mèches (S) desquelles des mèches (51) sont fournies aux éléments d'étirage correspondants (30) dudit métier à filer à anneaux (2), tandis que d'autres desdits rails de transport (5, 6, 5a, 5b, 5c) sont capables de supporter temporairement un autre porte-bobines (9) portant une pluralité de bobines de mèches pleines (F), plusieurs desdits porte-bobines (9) étant identiques, selon lequel, lorsque lesdites bobines de mèches (S) tenues par ledit porte-bobine (9) supporté par un desdits rails de transport atteint un stade presque vide, lesdites mèches (S1) étant alimentées à partir desdites bobines de mèches presque vide (S) sont rattachées avec des mèches correspondantes (S2) prises à partir de bobines de mèches pleines (F) respectivement, caractérisé par
    une étape de mise en réserve de façon synchrone des bouts libres desdites bobines de mèches pleines (F) à des positions respectives situées vis-à-vis des mèches correspondantes (S1) amenées depuis lesdites bobines de mèches (S) à des positions correspondantes en amont desdits éléments d'étirage (30) d'un groupe correspondant, après la prise desdites mèches (S2) desdites bobines de mèches pleines (F),
    une étape de création d'un bout desdites mèches (S1) depuis chacune desdites bobines de mèches presque vides (S) au moment de mettre en oeuvre ladite opération synchrone de rattache de mèches,
    une étape d'introduction synchrone desdites portions de bouts libres réservées desdites mèches (S2) prises sur lesdites bobines de mèches pleines (F) dans lesdits éléments d'étirage correspondants (30) dans une situation où lesdits bouts libres réservés desdites mèches (S2) sont doublés avec ceux correspondants dudit bout desdites mèches (S1).
  2. Procédé de rattache synchrone de mèches sur un métier à filer à anneaux selon la revendication 1, selon lequel ladite étape de création d'un bout desdites mèches (S1) de chacune desdites bobines de mèches presque vides (S) est mis en oeuvre par une coupe synchrone desdites mèches (S1) desdites bobines de mèches (S) à des positions correspondantes en amont desdits éléments d'étirage (30) desdits groupes correspondants, lorsque lesdites bobines de mèches (S) atteignent un état presque vide, de sorte que les bouts libres desdites mèches (S1) sont créés à ladite position correspondante de celles-ci.
  3. Procédé de rattache synchrone de mèches sur un métier à filer à anneaux selon la revendication 2, selon lequel ladite opération de rattache synchrone est exécutée pendant qu'une opération de filage dudit métier à filer à anneaux (2)se poursuit.
  4. Procédé de rattache synchrone de mèches sur un métier à filer à anneaux selon la revendication 1,
       selon lequel ladite étape de création d'un bout desdites mèches (S1) depuis chacune desdites bobines de mèches presque vide (S) est exécuté, après l'arrêt d'une opération de filage dudit métier à filer à anneaux (2), puis le redémarrage de ladite opération de filage, et ladite étape d'introduction des bouts libres réservés respectifs desdites mèches (S2) est exécutée à un moment où chaque bout desdites mèches (S1) desdites bobines de mèches presque vide (S) arrive à ladite position réservée respective desdits bouts libres desdites mèches (S2) pris sur les bobines de mèches pleines (F).
  5. Procédé selon la revendication 1, selon lequel ladite introduction des bouts libres réservés respectifs desdites mèches (S2), desdites bobines de mèches pleines (F) dans les éléments d'étirage (3) correspondants est exécutée immédiatement après la coupe desdites mèches (S1) desdites bobines de mèches (S) de manière à créer ledit bout avec lesdites mèches (S1) desdites bobines de mèches (S).
  6. Procédé selon la revendication 1, selon lequel ladite étape d'introduction synchrone desdites portions de bouts libres réservées desdites mèches (S2) desdites bobines de mèches pleines (F) avec lesdites mèches (S1) des bobines de mèches correspondantes (S) est exécutée (i)en amenant ladite portion de bout libre réservée desdites mèches (S2) de chacune desdites bobines de mèches pleines (F) avec celle correspondante desdites mèches (S1) des bobines de mèches respectives (S) dans celui correspondant desdits éléments d'étirage, lorsque lesdites bobines de mèches dont presque vides, et (ii) en coupant ladite mèche (S1) de chacune desdites bobines de mèches (S) à une position juste en amont dudit élément d'étirage, sensiblement au même moment que ladite portion de bout libre de ladite mèche (S2) de chacune desdites bobines de mèche pleine (F) atteint ledit élément d'étirage correspondant (30).
  7. Procédé de rattache synchrone de mèches sur un métier à filer à anneaux selon la revendication 1,
       selon lequel le nombre desdits rails de transport est de deux, et chacun desdits porte-bobines (9) est muni d'un pluralité d'organes de suspension de bobines (16) disposés sur deux lignes dans sa direction longitudinale, le nombre d'organes de suspension (16) de chaque ligne étant identique au nombre d'éléments d'étirage (30) de chacun desdits groupes d'éléments d'étirage, à savoir, la moitié du nombre de broches de chaque côté dudit métier à filer à anneaux (2), de sorte que l'un desdits porte-bobines (9) porte des bobines de mèches (S) desquelles des mèches (S1) sont fournies à tous les éléments d'étirage (30) de chaque côté dudit métier à filer à anneaux (2), tandis que l'autre desdits porte-bobines (9) porte des bobines de mèches pleines (F).
  8. Procédé de rattache synchrone de mèches sur un métier à filer à anneaux selon la revendication 1,
       selon lequel ledit nombre de rails de transport est de trois (5a, 5b, 5c) chacun desdits porte-bobines (9) est muni d'une pluralité d'organes de suspension (16) disposés sur une seule ligne selon sa direction longitudinale, ledit nombre desdits organes de suspension (16) de chaque porte-bobine (9) étant identique au nombre d'éléments d'étirage (30) de chacun desdits groupes d'éléments d'étirage, à savoir, la moitié du nombre de broches de chaque côté dudit métier à filer à anneaux (2) de sorte qu'une disposition des bobines de mèches à épuisement déphasé à deux étapes est mise en oeuvre sur ledit métier à filer à anneaux (2) selon quoi un desdits rails de transport (5a, 5b, 5c) est utilisé pour supporter ledit porte-bobines (9) portant lesdites bobines pleines (F) et ladite opération de rattache de mèches synchrone est mise en oeuvre seulement auxdites bobines de mèches (S) d'un des deux autres porte-bobines (9) qui porte des bobines de mèches (S) présentant une dimension plus petite que les autres.
  9. Appareil pour une opération de rattache synchrone de mèches destiné à un métier à filer à anneaux muni d'une pluralité de broches disposées en un alignement de chaque côté de celui-ci, d'une portion de cantre (1), de deux groupes d'éléments d'étirage (30) composés d'un nombre identique d'éléments d'étirage disposés alternativement sur toute sa longueur, en combinaison avec un système de transport de bobines de mèches comprenant une pluralité de rails de transport de bobines de mèches (5, 6, 5a, 5b, 5c) disposés parallèlement à ladite portion de cantre (1) sur toute la longueur dudit métier à filer à anneaux (2) chacun desdits rails de transport (5, 6, 5a, 5b, 5c) pouvant porter temporairement un porte-bobines (9) portant une pluralité de bobines de mèches (S) desquelles des mèches (S1) sont fournies auxdits éléments d'étirage correspondants (30) dudit métier à filer à anneaux (2), tandis que d'autres desdits rails de transport (5, 6, 5a, 55b, 5c) peuvent supporter temporairement d'autres porte-bobines (9) portant une pluralité de bobines de mèches pleines 1(F), le nombre des bobines de mèches (S) desdits porte-bobines (9) étant identique, d'une pluralité de bras supérieurs (38) disposés le long dudit agencement desdits deux groupes d'éléments d'étirage (30), chacun desdits bras supérieurs (38) correspondant à deux éléments d'étirage adjacents (30) dudit alignement desdits éléments d'étirage (30), dans lequel lorsque lesdites bobines de mèches (S) tenues par ledit porte-bobines (9) supporté par l'un desdits rails de transport (5, 5a, 5b, 5c) atteint un état presque vide, lesdites mèches (S1) étant amenées desdites bobines de mèches (S) presque vides sont rattachées avec des mèches correspondantes (S2) prises sur les bobines de mèches pleines respectivement, caractérisé par
    un rouleau d'alimentation de mèche (40) supplémentaire, disposé en amont de l'alignement desdits éléments d'étirage (30), chacun présentant un entonnoir (39) le long dudit alignement de broches,
    des moyens (41) pour faire tourner et arrêter temporairement ledit rouleau d'alimentation de mèche supplémentaire (40),
    une pluralité de paires de rouleaux de pincement (44a, 44b) disposées de façon rotative et déplaçable à des positions respectives vis-à-vis des éléments d'étirage correspondants (30) dans un état tel que chaque mèche (S1) fournie à un élément d'étirage correspondant (30) traverse un espace intermédiaire entre lesdits deux rouleaux de pincement (44a, 44b) d'un élément d'étirage correspondant (30),
    des dispositifs (43, 44, 45) pour supporter chaque paire de rouleaux de pincement (44a, 44b),
    chacun desdits dispositifs (43, 44, 45) étant disposé vers ledit élément d'étirage correspondant (30) tout en pressant sélectivement lesdits rouleaux de pincement (44a, 44b) contre ledit rouleau d'alimentation de mèche supplémentaire (40), et alternativement, interrompant ledit contact desdits rouleaux de pincement (44a, 44b) avec ledit rouleau d'alimentation de mèche supplémentaire (40),
    des moyens (51; 51A, 51B; 61, 62; 71) pour guides les portions en mouvement desdites mèches (S1) amenées aux éléments d'étirage correspondants (30) et desdites mèches (S2) prises sur les bobines de mèches pleines correspondantes (F) vers chacun desdits éléments d'étirage (30), ces moyens de guidage (51; 51A, 51B; 61, 62; 71) étant agencés dans une position en amont dudit rouleau d'alimentation de mèche supplémentaire (40) et en parallèle à celui-ci,
    des moyens (52, 52a; 63, 64; 72, 73, 74) pour déplacer en va-et-vient lesdits moyens de guidage le long dudit alignement de broches.
  10. Appareil pour rattacher des mèches de manière synchrone utilisé sur un métier à filer à anneaux selon la revendication 9,
       dans lequel lesdits éléments d'étirage (30) sont munis d'un rouleau postérieur commun (34) et ledit rouleau d'alimentation de mèches supplémentaire (40) est relié audit rouleau postérieur (34) par l'intermédiaire desdits moyens pour faire tourner et arrêter temporairement, comprenant un embrayage (42) et un frein (42a).
  11. Appareil pour rattacher des mèches de manière synchrone, destiné à un métier à filer à anneaux selon la revendication 9,
       dans lequel un levier (43) est monté sur chacun desdits bras supérieurs (38) et peut osciller vers le haut et le bas, un arbre de support (44) est disposé à une portion d'extrémité libre dudit levier (43) tout en faisant saillie des deux côtés extérieurs dudit levier (43) et lesdits rouleaux de pincement (44a, 44b) sont montés rotativement sur ledit arbre de support (44) des deux côtés de celui-ci.
  12. Appareil pour rattacher des mèches de manières synchrone, destiné à un métier à filer à anneaux selon la revendication 9,
       dans lequel lesdits moyens de guidage comportent une tige (51) s'étendant sur toute la longueur dudit métier à filer et des moyens (52, 52a) pour déplacer en va-et-vient ladite tige (51) d'une distance prédéterminée selon sa direction longitudinale, cette tige (51) étant munie d'une pluralité de jeux de trois chevilles de guidage (51b, 51c, 51d) plantées sur elle à des positions respectives vis-à-vis des éléments d'étirage correspondants (30), lesdites positions desdites trois chevilles (51b, 51c, 5d) de chaque jeu de celles-ci étant situées de manière que deux espaces intermédiaires pour guider une seule mèche (S1, S2) séparément à travers elles sont formés entre chaque deux chevilles adjacentes desdits jeux de chevilles (51b, 51c, 51d) et lorsqu'un desdits espaces intermédiaire est vis-à-vis d'une position intermédiaire entre les deux dits rouleaux de pincement (44a, 44b).
  13. Appareil pour rattacher des mèches de manière synchrone destiné à un métier à filer à anneaux selon la revendication 9,
       dans lequel lesdits moyens de guidage comportent une paire de tiges (61, 62) s'étendant dans sa direction longitudinale, des moyens (63, 64) pour déplacer séparément ces tiges (61, 62) en va-et-vient d'une distance prédéterminée dans sa direction longitudinale, une desdites tiges (61, 62) étant munie d'une pluralité de jeux de trois chevilles (61b, 61c, 61d) plantées sur elle à des positions respectives vis-à-vis desdits éléments d'étirage correspondants d'un groupe d'éléments d'étirage desdits deux groupes d'éléments d'étirage (30), tandis que l'autre desdites tiges (61, 62) est munie d'une pluralité de jeux de trois chevilles de guidage (62b, 62c, 62d) plantées sur elle dans des positions respectives, vis-à-vis des éléments d'étirage correspondants de l'autre groupe d'éléments d'étirage des deux groupes d'éléments d'étirage (30), les positions desdites trois chevilles (61b, 61c, 61d; 62b, 62c, 62d) de chaque jeu planté sur chacune desdites tiges (61, 62) étant situées de sorte que deux espaces intermédiaires pour guides des mèches individuelles (S1, S2) séparément à travers elles sont formés entre chaque deux chevilles adjacentes dudit jeu de chevilles (61b, 61c, 61d; 62b, 62c, 62d) et lorsque un desdits espaces intermédiaires est vis-à-vis de l'un des deux rouleaux de pincement (44a, 44b) par rapport à l'élément d'étirage correspondant (30), l'autre desdits espaces intermédiaires est vis-à-vis d'une position intermédiaire entre les deux dits rouleaux de pincement (44a, 44b).
  14. Appareil pour rattacher des mèches de manière synchrone destiné à un métier à filer à anneaux selon la revendication 9,
       dans lequel lesdits moyens de guidage comportent un arbre de transmission (71) disposé en amont dudit alignement desdits éléments d'étirage (30) parallèlement à eux, des moyens (52, 52a, 72, 73, 74) pour faire tourner ledit arbre de transmission (71) autour de son axe tout en étant déplacé en va-et-vient d'une distance prédéterminée dans sa direction longitudinale, ledit arbre de transmission (71) étant muni de deux groupes de gorges de guidage de mèches (75a, 75b) formées sur lui de manière qu'une différence de phase angulaire entre ladite gorge de guidage de mèche de l'un desdits groupes et ladite gorge de guidage de mèche de l'autre desdits groupes est 180 degrés, lesdites gorges de guidage de mèches (75a, 75b) de l'un desdits deux groupes sont vis-à-vis des éléments d'étirage correspondants de l'un desdits groupes d'éléments d'étirage (30), lesdites gorges de guidage de mèches (75a, 75b) de l'autre desdits deux groupes sont vis-à-vis des éléments d'étirage correspondants de l'autre groupe desdits éléments d'étirage (30), de sorte que, lorsque l'un desdits deux groupes de gorges de guidage de mèches (75a, 75b) est vis-à-vis des éléments d'étirage correspondants de l'un desdits deux groupes desdits éléments d'étirage (30), lesdites gorges de guidage (75a, 75b) de l'autre de ces deux groupes est vis-à-vis d'un espace intermédiaire formé entre ladite paire desdits rouleaux de pincement (44a, 44b) vis-à-vis des éléments d'étirage correspondants de l'autre desdits deux groupes desdits éléments d'étirage.
EP19910810184 1990-03-22 1991-03-20 Procédé et appareil pour rattacher des mèches d'une manière synchrone pour l'alimentation continue de celles-ci à un métier à filer à anneaux Expired - Lifetime EP0448518B1 (fr)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
JP2073133A JP2784078B2 (ja) 1990-03-22 1990-03-22 精紡機における一斉篠継方法と装置
JP73133/90 1990-03-22

Publications (3)

Publication Number Publication Date
EP0448518A2 EP0448518A2 (fr) 1991-09-25
EP0448518A3 EP0448518A3 (en) 1991-12-04
EP0448518B1 true EP0448518B1 (fr) 1996-05-22

Family

ID=13509398

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19910810184 Expired - Lifetime EP0448518B1 (fr) 1990-03-22 1991-03-20 Procédé et appareil pour rattacher des mèches d'une manière synchrone pour l'alimentation continue de celles-ci à un métier à filer à anneaux

Country Status (3)

Country Link
EP (1) EP0448518B1 (fr)
JP (1) JP2784078B2 (fr)
DE (1) DE69119635T2 (fr)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100296977B1 (ko) * 1996-01-30 2001-11-22 무라타 기카이 가부시키가이샤 방적기의피이싱방법

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0196127B1 (fr) * 1985-03-27 1989-06-07 S. BIGAGLI & C. SpA Procédé et dispositif pour changer des bobines de mèche avec raccordement automatique de mèche à des machines à filer de la laine cardée
DE3681233D1 (de) * 1985-09-04 1991-10-10 Howa Machinery Ltd Verfahren und vorrichtung zum verbinden von vorgarn in spinnmaschinen.
IT1218670B (it) * 1987-08-10 1990-04-19 Gaudino Di P Gaudino E C Sas O Dispositivo per il cambio automatico delle cannelle in un filatoio per fibre tessili
DE3734264A1 (de) * 1987-10-09 1989-04-20 Zinser Textilmaschinen Gmbh Verfahren und vorrichtung zum automatischen wechseln von vorgarnspulen an einer ringspinnmaschine

Also Published As

Publication number Publication date
DE69119635T2 (de) 1997-01-23
JP2784078B2 (ja) 1998-08-06
JPH03279427A (ja) 1991-12-10
EP0448518A3 (en) 1991-12-04
EP0448518A2 (fr) 1991-09-25
DE69119635D1 (de) 1996-06-27

Similar Documents

Publication Publication Date Title
EP0258188B1 (fr) Procédé pour rattacher des mèches et pour échanger des bobines de mèche dans un métier à filer à anneau et machine pour la mise en oeuvre de ce procédé
US5105614A (en) Method and apparatus for supplying reserve feed stock to a spinning machine
USRE34170E (en) Spinning unit piecing process for producing feed spools
US4170101A (en) Method and apparatus for piecing an entwined yarn
CN101265623A (zh) 自由端纺纱机中的自动纱线生头装置
US4543776A (en) Method for yarn piecing in fasciated yarn spinning unit
US5343689A (en) Method and apparatus for synchronously piecing roving for a continuous feeding thereof to a ring spinning frame
EP0448518B1 (fr) Procédé et appareil pour rattacher des mèches d'une manière synchrone pour l'alimentation continue de celles-ci à un métier à filer à anneaux
US5044148A (en) Yarn splicing method
DE4428780C1 (de) Verfahren und Vorrichtung zur Herstellung eines gezwirnten Fadens
US3391527A (en) Apparatus for forming cheeses by direct winding of full bobbins without doffing operation in fiber processing machines
EP0196127B1 (fr) Procédé et dispositif pour changer des bobines de mèche avec raccordement automatique de mèche à des machines à filer de la laine cardée
GB2118217A (en) Stopping and starting open end spinning machines
JPS5971429A (ja) 結束紡績装置における糸継ぎ方法
EP0481922B1 (fr) Procédé et dispositif pour rattacher des mèches
US4785619A (en) Apparatus for producing a staple fiber yarn
CN212669906U (zh) 一种纤维条自动接头和独立驱动的新型粗纱机
JP2830488B2 (ja) 精紡機における一斉篠継方法と装置
ITMI20010462A1 (it) Filatoio con dispositivo di scarico per stiratoio
GB2147621A (en) Apparatus for producing effect yarns
CN211734588U (zh) 一种须条自动接头装置
EP0026341B1 (fr) Procédé et appareil de relâchement de la tension des rubans sur des bancs à broche
US5203157A (en) Spinning machine for pneumatic false-twist spinning
JPH01139823A (ja) 粗紡糸またはスライバ状の繊維を紡績機上で延伸する装置
US6038845A (en) Method for changing the bobbins in a roving frame

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19910408

AK Designated contracting states

Kind code of ref document: A2

Designated state(s): CH DE IT LI

PUAL Search report despatched

Free format text: ORIGINAL CODE: 0009013

AK Designated contracting states

Kind code of ref document: A3

Designated state(s): CH DE IT LI

17Q First examination report despatched

Effective date: 19940520

GRAH Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOS IGRA

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): CH DE IT LI

REF Corresponds to:

Ref document number: 69119635

Country of ref document: DE

Date of ref document: 19960627

ITF It: translation for a ep patent filed
PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19990331

Year of fee payment: 9

Ref country code: CH

Payment date: 19990331

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20000331

Ref country code: CH

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20000331

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010103

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050320