EP0097195A1 - Prefabricated concrete reinforcement element and method for making reinforcement joints - Google Patents

Prefabricated concrete reinforcement element and method for making reinforcement joints

Info

Publication number
EP0097195A1
EP0097195A1 EP19830900037 EP83900037A EP0097195A1 EP 0097195 A1 EP0097195 A1 EP 0097195A1 EP 19830900037 EP19830900037 EP 19830900037 EP 83900037 A EP83900037 A EP 83900037A EP 0097195 A1 EP0097195 A1 EP 0097195A1
Authority
EP
European Patent Office
Prior art keywords
components
grip
concrete
cassette
reinforcement element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19830900037
Other languages
German (de)
English (en)
French (fr)
Inventor
Pekka JÄRVINEN
Kari Avellan
Martti Majasalo
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
RAKE Oy
Original Assignee
RAKE Oy
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by RAKE Oy filed Critical RAKE Oy
Publication of EP0097195A1 publication Critical patent/EP0097195A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/12Mounting of reinforcing inserts; Prestressing
    • E04G21/125Reinforcement continuity box
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C5/00Reinforcing elements, e.g. for concrete; Auxiliary elements therefor
    • E04C5/01Reinforcing elements of metal, e.g. with non-structural coatings
    • E04C5/06Reinforcing elements of metal, e.g. with non-structural coatings of high bending resistance, i.e. of essentially three-dimensional extent, e.g. lattice girders
    • E04C5/065Light-weight girders, e.g. with precast parts

Definitions

  • the present invention is concerned with a prefabricated concrete reinforcement element, which is intended for making such reinforcement joints in which a concrete cast provided with the said reinforcement element is joined together with another concrete cast portion or with any other structure and possibly with its reinforcement parts, the said reinforcement element comprising several grip components placed in the rein ⁇ forcement element, preferably as uniformly spaced, which grip components are attached to the base part, the objective of the said base, part being to keep the connecting grip portions of the grip components free from the first-stage concrete cast and to keep the said grip components at a certain distance from each other.
  • the invention is additionally concerned with a method for making reinforcement joints, in which method two concrete cast portions to be cast as different steps are joined together and in which method a particular prefabricated concrete reinforcement element is connected to the concrete cast portion to be cast, the grip steel components provided therein fixing the concrete reinforcement element to the cast portion to be made first and the said concrete rein ⁇ forcement element being provided with a component that prevents the connecting grip portions, constituting extensions ' of the grip steel components, or their coupling components from being covered in the concrete cast to be made first.
  • a typical example of a situation similar to that described above at a construction site is the casting of a wall: to the reinforced concrete wall portion concerned, a second wall portion must be con ⁇ nected by casting af erwards, but the casting of the latter wall can be performed only maybe even several days later.
  • the installation and protection of the reinforcement strands permitting subsequent reinforce ⁇ ment joint, in order that they should not be included in the former casting is very difficult and time-con ⁇ suming.
  • various provisional auxiliary structures are used, such as boards or equivalent, which prevent the reinforcement steel portions con ⁇ cerned, to be used later as joining steels, from being covered by and from adhering to the concrete casting to be performed.
  • the concrete reinforcement element in accord ⁇ ance with the invention is mainly characterized in that the said base part consists of a sheet profile cassette made of steel sheet or equivalent and that the said cassette is provided with openings through which the grip components are attached to the sheet profile cassette.
  • the reinforcement element in accord ⁇ ance with the invention consists of concrete steels, or of any other steel components supposed to constitute grip portions, and of such supporting components as may remain in the concrete permanently as structural
  • the method in accordance with the invention for making reinforcement elements is mainly characterized in that, as the said concrete reinforcement element, a sheet profile cassette is used which is provided with fold planes connected to its side edges, the said fold planes, protecting the con- necting grip portions or their fastening parts during the first concreting step, and that the said, fold planes of the sheet profile cassette are bent so as to become substantially parallel to the edge folds of the sheet profile cassette, and hereupon the connecting grip portions of the grip steel components are bent so as to become substantially perpendicular to the wall of the sheet profile cassette, and are possibly connected to the steel components of the subsequent concreting, or that, after the bending of the fold planes, separate connecting grip components are fixed to the connecting portions.
  • an object of the present invention is also to provide concrete reinforcement elements for other types of concreting work except concreting taking place at the construction site.
  • manufacture of prefabricated concrete elements at an element factory by means of the formwork technique should be mentioned manufacture of prefabricated concrete elements at an element factory by means of the formwork technique.
  • Figure 1 is an axonometric view of a concrete reinforcement element in accordance with the invention.
  • Figure 2 is an axonometric view of onereinforce ⁇ ment steel component of the reinforcement element in accordance with the invention and of the attachement of the said component to the supporting component of the element concerned.
  • Figure 3 is a view corresponding to that shown in Fig. 2, but with a different attachment between the., reinforcement steel component and the supporting component.
  • Figure 4 is an axonometric view of an end construction of the reinforcement element in accordance with the invention.
  • Figure 5 shows a reinforcement element in accordance with the. invention as placed in a concreting formwork, wherein it is, in a known way, connected to the rest of the reinforcement components in the formwork.
  • Figure 6 shows the same as Fig. 5 does, but as viewed from above.
  • Figure 7 shows the same as Fig. 6, but at a later point of time, after the formwork boards have been removed and the connecting components of the reinforcement element in accordance with the invention have been bent out for further connecting.
  • Figure 8 shows the same as Fig. 7, but as a side view.
  • Figure 9 shows the same as Fig. 7, at a later point of time, when the formwork boards of the con ⁇ tinued concreting are installed in position and the reinforcement steels of the continued concreting have been connected to the connecting steels of the element in accordance with the invention.
  • Figure 10 shows the attachment of a rein ⁇ forcement steel component contained in the reinforce ⁇ ment element in accordance with the invention, to the supporting structural component.
  • Figure 11 shows the same as Fig. 10, as viewed from above.
  • Figure 12 shows a second reinforcement ele ⁇ ment in accordance with the invention as an axonometric view, the reinforcement steel components in the said element being asymmetric reinforcing steels.
  • Figure 13 is a cross-sectional view of a reinforcement element in accordance with the invention in the concrete.
  • Figure 14 shows the reinforcement element in accordance with the invention in the concrete as viewed from above.
  • Figure 15 shows one possibility of fixing of the reinforcement element in accordance with the inven ⁇ tion to the concrete casting formwork.
  • Figure 16 shows the same as Fig. 15, as viewed from inside the formwork.
  • Figure 17 shows a reinforcement element in accordance with the invention in the position shown in Fig. 7, in which element the connecting steel portions have been replaced by connecting sleeves.
  • Figure 18 shows the same as Fig. 17, as a side view.
  • Figure 19 shows the same as Fig. 17, at a later stage, after gripping components have been con- nected to the sleeve components by known methods, the gripping components being further, in known ways, con ⁇ nected to the reinforcement of the further concreting portion.
  • FIGs 20, 21 and 22 show the same as Figures 17, 18 and 19, with different components for further connecting.
  • the characteristic and essential components of the reinforcement element in accordance with the invention are the main components shown in Figures 1 and 12, viz. the grip steel components 1, whose number in the reinforcement element may be arbitrary and whose objective is to join the concreting and any reinforcement contained in the concreting in whose formwork the reinforcement element concerned is placed; and the steel profile cassette 2,4,6 made out of steel sheet by known methods, the said cassette, by means of its shape, supporting the grip steel components 1 and sufficiently efficiently preventing access of the first-stage concreting to the interior of the rein ⁇ forcement element, where the connecting grip portions 3 are located.
  • the connecting grip portions 3 are integral extension portions of the grip steel components 1 or grip steels to be connected to same later in known methods in accordance with Figures 17 to 22.
  • the grip steel components 1 and the connecting grip portions 3 are made, e.g., out of corrugated steel bars by bending, as has been done in Figures 1 and 12.
  • the bent unit 1 , 3 of corrugated steel bar can be placed in the cassette 2,4,6 of the reinforce ⁇ ment element in the way shown in Fig. 2 as follows.
  • the cassette 2,4,6 is made of thin steel sheet, either ordinary or zinc-coated, by known methods and shaped as a profile which is sufficiently rigid in its longi ⁇ tudinal direction. This rigidity is ensured by means of fold planes 4 and 6 connected to its main wall 2.
  • an opening 5 1 has been made by known methods, in accordance with Fig. 2, the said opening being bordered by pressing folds 5.
  • the unit of corrugated steel bar 1,3 can be pushed through the opening 5' bordered by the pressing folds 5 far enough so that the fold planes 4 can return to their original normal position shown in Fig. 2.
  • the connecting grip portions 3 support themselves against the fold planes 4, and the pressing fold parts 5 keep the grip steel components 1 in their position.
  • the grip steel components 1 can be placed into the cassette 2 as follows.
  • the unit 1 ,3 of corrugated steel bar is, regarding its connecting grip portions 3,inserted through the holes 7 made to the cassette 2,4,6.
  • the holes 7 are placed at a distance a., in accordance with Fig.
  • the connecting grip portions 3 are supported against the cassette 2,4,6 frame, e.g., by spot welding, the fold planes 4 may be omitted out of the cassette entirely, or folded in the opposite direction, over 180 from the position shown in Fig. 2.
  • a reinforcement element of the sort described above is placed in the concrete casting mould, e.g., in the way shown in Figures 5 and 6, whereat the fold planes 4 rest against the formwork board 8 of the concrete formwork boards 8,9 in whose direction the continued concreting will be performed afterwards.
  • one end or both ends of the cassette 2,4,6 may be closed in the way shown in Fig. 4 by means of a plug 10 made of steel plate or sheet, so as to prevent access of concrete into the cassette 2,4,6.
  • the reinforcement element shown in Figures 5 and 6 is connected to the reinforcement steels 11, 12, if any, contained in the formwork 8,9.
  • the fixing of the reinforcement element. in accordance with the inven ⁇ tion to the formwork board 8 may take place, e.g., in the way shown in Figures 15 and 16 by nailing, whereat holes 13 may be punched into the face of the cassette 2,4,6 in known ways, through which holes 13 the cassette 2,4,6 is fixed by means of nails 15 to the formwork board 8, a washer 14 preventing the nail 15 from passing totally through the cassette 2,4,6.
  • OMP grip portions 3 are grasped and bent out of the interior of the cassette 2,4,6. According to Fig. 9, the form ⁇ work walls 17 and 18 required by the continued con ⁇ creting have been installed, and the connecting grip portions 3 have been connected to the other concrete reinforcement 20, 21, if any, required by the continued concreting. Hereupon, the said continued concreting is performed.
  • Figure 14 illustrates the situation after the two completed steps of concreting.
  • the reinforce ⁇ ment element with all of its essential parts is placed inside the concrete casts 16 and 22 as joined with the other steel-strength structural components 11 ,12,20,21 of the concrete casts, the cassette 2,4,6 functioning as a component increasing the strength of the working joint in the concrete.
  • Figure 10 is a detailed view of the relative position of the pressing folds 5 and of the grip steel component 1 contained in the cassette 2,4,6.
  • Fig. 11 shows the same as Fig. 10, as viewed from above.
  • the pressing folds 5 may be provided with relief openings 23 at the grip steel components 1 , the said openings permitting a position of the pressing folds 5 closer to the face of the cassette 2,4,6. This is of signi- ficance when grip steel components of large dimensions are used, whereat particular attention must be directed at preventing the access of concrete into the cassette 2,4,6. In stead of the relief openings 23 shown in Fig.
  • FIG. 11 is a sectional view of a concrete work joint and of the work joint profile produced by the pressing folds 5 contained in the cassette 2,4,6,
  • Figures 17 to 22 show a reinforcement element in accordance with the invention at different casting stages.
  • the grip steel components 1* are of threaded-bar material, which are, in accordance with Figures 17 and 20, supported against the cassette 2,4,6 either by means of nuts 24 or of threaded sleeve components 26.
  • the connecting grip portions 3' also consist of threaded-bar components, which are coupled by means of sleeves 25 or 26 so as to constitute struc ⁇ tural parts of the reinforcement element, the said coupling not taking place until after the first casting 16 has been performed and the formwork been subsequently removed.
  • a reinforcement element of simple construction suitable for manufacture in the factory has been provided, whose cassette used at the transportation and installation stages can be utilized in the performance of the concreting work itself and as a structural component in the calculations of the shear capacity of the concrete work joint.
  • the reinforcement element in accordance with the invention may also be accomplished as provided with grip steel components 1 and connecting grip portions 3 made of other usable steel materials, except corrugated steel bars or threaded-bar material.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
EP19830900037 1981-12-15 1982-12-13 Prefabricated concrete reinforcement element and method for making reinforcement joints Withdrawn EP0097195A1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FI814018A FI62888C (fi) 1981-12-15 1981-12-15 Foertillverkat betongarmeringselement och foerfarande vid tillverkning av armeringsanslutningar
FI814018 1981-12-15

Publications (1)

Publication Number Publication Date
EP0097195A1 true EP0097195A1 (en) 1984-01-04

Family

ID=8514956

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19830900037 Withdrawn EP0097195A1 (en) 1981-12-15 1982-12-13 Prefabricated concrete reinforcement element and method for making reinforcement joints

Country Status (3)

Country Link
EP (1) EP0097195A1 (fi)
FI (1) FI62888C (fi)
WO (1) WO1983002128A1 (fi)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FI824194L (fi) * 1982-12-07 1984-06-08 Rake Oy Foertillverkat betongarmeringselement.
DE3404837C2 (de) * 1984-02-10 1986-09-25 Rolf Dipl.-Ing. Innsbruck Blasy Vorrichtung zur Verwahrung von Bewehrungsstählen
SE447404B (sv) * 1985-03-29 1986-11-10 Kabe Ind Ab Anordning vid betongkonstruktioner
FR2657105B1 (fr) * 1990-01-12 1993-10-15 Mur Exp Ets Armacentre Armature metallique pour la construction de poutre en beton arme.
DE9203037U1 (de) * 1992-03-06 1992-07-30 Meyers, Claude, Brüssel/Bruxelles Bewehrungsanschluß
FR2694954B1 (fr) * 1992-08-18 1994-11-04 Mure Ets Caisson pour la mise en attente d'armatures de liaison entre deux parties d'ouvrage en béton contigues et coulées l'une après l'autre.
DE10228083A1 (de) * 2002-06-18 2004-01-08 Gebr. Philipp Gmbh Verschlussstopfen

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1715743A (en) * 1928-02-17 1929-06-04 James J Duggan Furring construction
SE421719B (sv) * 1974-02-27 1982-01-25 Pebea Nv Anordning for anbringande e en form till en betongbyggdel for att forvara forbindningsorgan, som er avsedda att forankras i betongbyggdelen samt sett for framstellning av anordningen
CH627811A5 (de) * 1978-12-18 1982-01-29 Brechbuehler Fritz Armierungseisenhalter zur verwendung bei anschlussbetonierungen.
CH626676A5 (fi) * 1979-05-01 1981-11-30 Witschi H
US4325533A (en) * 1979-08-23 1982-04-20 Sigma Bauelemente Gmbh Housing device for isolating connecting reinforcements at joints between first and subsequently poured concrete structures
DE2964428D1 (en) * 1979-10-03 1983-02-03 Losinger Ag Construction joint shuttering comprising a former for supporting connecting bars
ATE12282T1 (de) * 1980-12-29 1985-04-15 Losinger Ag Halter von verbindungsstaeben zur schaffung einer kraftschluessigen verbindung von zwei bauteilen.

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO8302128A1 *

Also Published As

Publication number Publication date
FI62888C (fi) 1983-03-10
FI62888B (fi) 1982-11-30
WO1983002128A1 (en) 1983-06-23

Similar Documents

Publication Publication Date Title
EP1213399B1 (en) Truss spacer and brace
US4783935A (en) Monolithic foundation system for buildings and form therefor
US4742655A (en) Device in concrete structures
EP0097195A1 (en) Prefabricated concrete reinforcement element and method for making reinforcement joints
JPH04505039A (ja) コネクタビームとコネクタプレートから成る構造体
JP3579167B2 (ja) 路面用床版およびその敷設工法
US5535562A (en) Saddle anchorage and mounting method thereof
EP0365580A1 (en) Shear connectors
US2705886A (en) Prefabricated, reinforced floor structure
JP4312623B2 (ja) 段差を有するコンクリート床の構築方法及びその構造並びにその構築方法に用いられる段差を有するコンクリート板
JPH05339984A (ja) トラス筋付き押出し成形セメント板
KR0178690B1 (ko) 철근 콘크리트 슬래브의 데크 거어더 및 데크 패널
JP2522708B2 (ja) 型枠付鉄筋先組梁及び型枠付鉄筋先組工法
JPH06158765A (ja) ハンチ付きコンクリートスラブ施工用型枠
JPH0868113A (ja) 鉄骨梁と鉄筋コンクリート梁との接合構造
KR200368256Y1 (ko) 플랫 슬래브/플랫 플레이트 슬래브용 데크 플레이트 및이것의 연결구조
JP2942370B2 (ja) 鉄筋コンクリート造の梁、壁などの鉛直方向打継ぎ部の型枠工法およびこの工法に用いるガイド金具
JPH03281855A (ja) 建築物の床組工法
JPS6119777B2 (fi)
JPH0122837Y2 (fi)
KR200234547Y1 (ko) 철근콘크리트 슬래브의 데크 패널
JP3110009B2 (ja) 網目部材および網目部材用接続金具ならびにそれを用いた建築用型枠材および建築用型枠
JP2562021Y2 (ja) 建築用コンクリート打継仕切材
JPH0443526Y2 (fi)
JPH0612134Y2 (ja) 建築用布基礎形成型枠保持金具

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Designated state(s): AT BE CH DE FR GB LI NL SE

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19840215

RIN1 Information on inventor provided before grant (corrected)

Inventor name: AVELLAN, KARI

Inventor name: JAERVINEN, PEKKA

Inventor name: MAJASALO, MARTTI