US6853921B2
(en)
|
1999-07-20 |
2005-02-08 |
Halliburton Energy Services, Inc. |
System and method for real time reservoir management
|
US6980940B1
(en)
*
|
2000-02-22 |
2005-12-27 |
Schlumberger Technology Corp. |
Intergrated reservoir optimization
|
US6560501B1
(en)
*
|
2000-03-07 |
2003-05-06 |
I2 Technologies Us, Inc. |
System and method for collaborative batch aggregation and scheduling
|
WO2001071455A2
(en)
*
|
2000-03-17 |
2001-09-27 |
Optim, L.L.C. |
Optimization apparatus, system, and method of use doing business
|
US6978210B1
(en)
*
|
2000-10-26 |
2005-12-20 |
Conocophillips Company |
Method for automated management of hydrocarbon gathering systems
|
KR100624298B1
(ko)
*
|
2000-12-22 |
2006-09-13 |
주식회사 하이닉스반도체 |
플래쉬 메모리 셀의 센싱 회로
|
US7761270B2
(en)
*
|
2000-12-29 |
2010-07-20 |
Exxonmobil Upstream Research Co. |
Computer system and method having a facility management logic architecture
|
US7277836B2
(en)
*
|
2000-12-29 |
2007-10-02 |
Exxonmobil Upstream Research Company |
Computer system and method having a facility network architecture
|
FR2842321B1
(fr)
*
|
2002-07-11 |
2008-12-05 |
Inst Francais Du Petrole |
Methode pour contraindre un champ de permeabilite heterogene representant un reservoir souterrain par des donnees dynamiques
|
US7317989B2
(en)
*
|
2001-05-15 |
2008-01-08 |
Baker Hughes Incorporated |
Method and apparatus for chemometric estimations of fluid density, viscosity, dielectric constant, and resistivity from mechanical resonator data
|
FR2831917B1
(fr)
*
|
2001-11-08 |
2004-01-02 |
Schlumberger Services Petrol |
Procede de determination de la variation de la permeabilite relative a au moins un fluide d'un reservoir contenant des fluides en fonction de la saturation en l'un d'entre eux
|
US7283941B2
(en)
*
|
2001-11-13 |
2007-10-16 |
Swanson Consulting Services, Inc. |
Computer system and method for modeling fluid depletion
|
US7584165B2
(en)
*
|
2003-01-30 |
2009-09-01 |
Landmark Graphics Corporation |
Support apparatus, method and system for real time operations and maintenance
|
US7096172B2
(en)
*
|
2003-01-31 |
2006-08-22 |
Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. |
System and method for automated reservoir targeting
|
US6810332B2
(en)
*
|
2003-01-31 |
2004-10-26 |
Chevron U.S.A. Inc. |
Method for computing complexity, confidence and technical maturity indices for reservoir evaluations
|
US7200540B2
(en)
*
|
2003-01-31 |
2007-04-03 |
Landmark Graphics Corporation |
System and method for automated platform generation
|
FR2852710B1
(fr)
*
|
2003-03-18 |
2005-04-29 |
Inst Francais Du Petrole |
Methode pour former rapidement un modele stochastique representatif de la distribution d'une grandeur physique dans un milieu heterogene par une selection appropriee de realisations geostatistiques
|
WO2004104637A1
(en)
*
|
2003-05-22 |
2004-12-02 |
Schlumberger Canada Limited |
Method for prospect identification in asset evaluation
|
WO2005033739A2
(en)
*
|
2003-09-30 |
2005-04-14 |
Exxonmobil Upstream Research Company Corp-Urc-Sw348 |
Characterizing connectivity in reservoir models using paths of least resistance
|
NL1024444C2
(nl)
*
|
2003-10-03 |
2005-04-08 |
J O A Beheer B V |
Werkwijze, inrichting, computerprogramma en gegevensdrager voor het met een digitale verwerkingseenheid modelleren van een meerdimensionale heterogene structuur.
|
US7725302B2
(en)
*
|
2003-12-02 |
2010-05-25 |
Schlumberger Technology Corporation |
Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
|
GB2410550B8
(en)
*
|
2003-12-04 |
2008-10-01 |
Schlumberger Holdings |
Fluids chain-of-custody
|
US7672818B2
(en)
*
|
2004-06-07 |
2010-03-02 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
WO2006036389A2
(en)
*
|
2004-09-10 |
2006-04-06 |
Exxonmobil Upstream Research Company |
Numerical modeling evaluation of basin sedimentation properities
|
WO2006065915A2
(en)
*
|
2004-12-14 |
2006-06-22 |
Services Petroliers Schlumberger |
Geometrical optimization of multi-well trajectories
|
US7526930B2
(en)
*
|
2005-04-22 |
2009-05-05 |
Schlumberger Technology Corporation |
Method system and program storage device for synchronizing displays relative to a point in time
|
AU2006249641B2
(en)
*
|
2005-05-26 |
2010-12-23 |
Exxonmobil Upstream Research Company |
A rapid method for reservoir connectivity analysis using a fast marching method
|
EA200800436A1
(ru)
*
|
2005-07-27 |
2008-08-29 |
Эксонмобил Апстрим Рисерч Компани |
Моделирование скважины, связанное с добычей углеводородов из подземных формаций
|
EP1922669A2
(de)
*
|
2005-07-27 |
2008-05-21 |
ExxonMobil Upstream Research Company |
Mit der extraktion von kohlenwasserstoffen aus unteroberflächenformationen assoziierte bohrlochmodellierung
|
EP1922663A4
(de)
|
2005-07-27 |
2015-11-04 |
Exxonmobil Upstream Res Co |
Bohrlochmodellierung im zusammenhang mit der extraktion von kohlenwasserstoffen aus oberflächenformationen
|
US8195401B2
(en)
*
|
2006-01-20 |
2012-06-05 |
Landmark Graphics Corporation |
Dynamic production system management
|
US9043188B2
(en)
*
|
2006-09-01 |
2015-05-26 |
Chevron U.S.A. Inc. |
System and method for forecasting production from a hydrocarbon reservoir
|
WO2008028122A2
(en)
*
|
2006-09-01 |
2008-03-06 |
Chevron U.S.A. Inc. |
History matching and forecasting in the production of hydrocarbons
|
AU2007339997A1
(en)
*
|
2006-12-28 |
2008-07-10 |
Chevron U.S.A. Inc. |
History matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions
|
US8005658B2
(en)
*
|
2007-05-31 |
2011-08-23 |
Schlumberger Technology Corporation |
Automated field development planning of well and drainage locations
|
US8046314B2
(en)
*
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
US20100191516A1
(en)
*
|
2007-09-07 |
2010-07-29 |
Benish Timothy G |
Well Performance Modeling In A Collaborative Well Planning Environment
|
US8139062B2
(en)
*
|
2007-09-12 |
2012-03-20 |
Schlumberger Technology Corporation |
Method and system for displaying a map using a projected coordinate system
|
CN101896690B
(zh)
*
|
2007-12-13 |
2015-02-18 |
埃克森美孚上游研究公司 |
使用非结构化网格的储层模拟上的并行自适应数据分区
|
EP2223157A4
(de)
|
2007-12-13 |
2016-12-07 |
Exxonmobil Upstream Res Co |
Iterative reservoir-überwachung
|
AU2008338833B2
(en)
*
|
2007-12-18 |
2013-08-29 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-D and 3-D heterogeneous data
|
CA2705893A1
(en)
*
|
2007-12-20 |
2009-07-02 |
Shell Internationale Research Maatschappij B.V. |
Method for producing hydrocarbons through a well or well cluster of which the trajectory is optimized by a trajectory optimisation algorithm
|
CA2705340C
(en)
|
2007-12-21 |
2016-09-27 |
Exxonmobil Upstream Research Company |
Method and apparatus for analyzing three-dimensional data
|
US20110087471A1
(en)
*
|
2007-12-31 |
2011-04-14 |
Exxonmobil Upstream Research Company |
Methods and Systems For Determining Near-Wellbore Characteristics and Reservoir Properties
|
US7894991B2
(en)
*
|
2008-02-01 |
2011-02-22 |
Schlumberger Technology Corp. |
Statistical determination of historical oilfield data
|
EP2252903A4
(de)
*
|
2008-03-10 |
2018-01-03 |
Exxonmobil Upstream Research Company |
Verfahren zur bestimmung verschiedener alternativer pfade zwischen zwei objektsätzen in heterogenen 2d- und 3d-daten
|
CN101266299B
(zh)
*
|
2008-04-14 |
2011-03-30 |
林昌荣 |
利用地震数据体结构特征预测油气的方法
|
US8884964B2
(en)
*
|
2008-04-22 |
2014-11-11 |
Exxonmobil Upstream Research Company |
Functional-based knowledge analysis in a 2D and 3D visual environment
|
CA2717514C
(en)
|
2008-05-05 |
2016-07-26 |
Exxonmobil Upstream Research Company |
Systems and methods for connectivity analysis using functional objects
|
EP2350915A4
(de)
*
|
2008-09-30 |
2013-06-05 |
Exxonmobil Upstream Res Co |
Verfahren zur lösung einer lagerstättensimulationsmatrixgleichung unter verwendung paralleler unvollständiger multilevel-faktorisierung
|
EP2350810A4
(de)
*
|
2008-09-30 |
2013-06-05 |
Exxonmobil Upstream Res Co |
Selbstanpassender iterlativer löser
|
WO2010039317A1
(en)
*
|
2008-10-01 |
2010-04-08 |
Exxonmobil Upstream Research Company |
Robust well trajectory planning
|
CA2733729C
(en)
|
2008-10-24 |
2017-01-17 |
Exxonmobil Upstream Research Company |
Tracking geologic object and detecting geologic anomalies in exploration seismic data volume
|
EP2356611B1
(de)
*
|
2008-11-06 |
2018-08-29 |
Exxonmobil Upstream Research Company |
System und verfahren zum planen einer bohroperation
|
US8301426B2
(en)
*
|
2008-11-17 |
2012-10-30 |
Landmark Graphics Corporation |
Systems and methods for dynamically developing wellbore plans with a reservoir simulator
|
AU2015268702B2
(en)
*
|
2008-11-17 |
2016-02-11 |
Landmark Graphics Corporation |
Systems and methods for dynamically developing wellbore plans with a reservoir simulator
|
CN102282562B
(zh)
|
2009-01-13 |
2015-09-23 |
埃克森美孚上游研究公司 |
优化井作业计划
|
US8301382B2
(en)
*
|
2009-03-27 |
2012-10-30 |
Schlumberger Technology Corporation |
Continuous geomechanically stable wellbore trajectories
|
US10332219B2
(en)
*
|
2009-03-30 |
2019-06-25 |
Landmark Graphics Corporation |
Systems and methods for determining optimum platform count and position
|
US20100299123A1
(en)
*
|
2009-05-21 |
2010-11-25 |
Schlumberger Technology Corporation |
Well placement in a volume
|
AU2010290068B2
(en)
*
|
2009-09-01 |
2015-04-30 |
Exxonmobil Upstream Research Company |
Method of using human physiological responses as inputs to hydrocarbon management decisions
|
US8949173B2
(en)
*
|
2009-10-28 |
2015-02-03 |
Schlumberger Technology Corporation |
Pay zone prediction
|
EP2531694B1
(de)
|
2010-02-03 |
2018-06-06 |
Exxonmobil Upstream Research Company |
Verfahren zur verwendung einer dynamischen zielregion für optimierte brunnenweg/-bohrungszentrierung
|
US8731872B2
(en)
|
2010-03-08 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
AU2010348348B2
(en)
*
|
2010-03-15 |
2015-02-26 |
Landmark Graphics Corporation |
Systems and methods for positioning horizontal wells within boundaries
|
US8731887B2
(en)
|
2010-04-12 |
2014-05-20 |
Exxonmobile Upstream Research Company |
System and method for obtaining a model of data describing a physical structure
|
US8727017B2
(en)
|
2010-04-22 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for obtaining data on an unstructured grid
|
US8731873B2
(en)
|
2010-04-26 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8532968B2
(en)
*
|
2010-06-16 |
2013-09-10 |
Foroil |
Method of improving the production of a mature gas or oil field
|
CA2801382C
(en)
|
2010-06-29 |
2018-12-18 |
Exxonmobil Upstream Research Company |
Method and system for parallel simulation models
|
US8731875B2
(en)
|
2010-08-13 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
AU2011293804B2
(en)
|
2010-08-24 |
2016-08-11 |
Exxonmobil Upstream Research Company |
System and method for planning a well path
|
US9229129B2
(en)
*
|
2010-12-10 |
2016-01-05 |
Conocophillips Company |
Reservoir geobody calculation
|
CA2823017A1
(en)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
CA2822890A1
(en)
|
2011-02-21 |
2012-08-30 |
Exxonmobil Upstream Research Company |
Reservoir connectivity analysis in a 3d earth model
|
BR112013013692A2
(pt)
*
|
2011-05-09 |
2019-09-24 |
Chevron Usa Inc |
sistema e método para determinar propriedades de um reservatório de hidrocarbonetos com base em dados de produção
|
FR2979724B1
(fr)
*
|
2011-09-06 |
2018-11-23 |
Ifp Energies Now |
Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer
|
US9223594B2
(en)
|
2011-07-01 |
2015-12-29 |
Exxonmobil Upstream Research Company |
Plug-in installer framework
|
US8731891B2
(en)
*
|
2011-07-28 |
2014-05-20 |
Saudi Arabian Oil Company |
Cluster 3D petrophysical uncertainty modeling
|
US20130231901A1
(en)
*
|
2011-09-15 |
2013-09-05 |
Zhengang Lu |
Well pad placement
|
FR2987149B1
(fr)
*
|
2012-02-16 |
2014-10-31 |
IFP Energies Nouvelles |
Procede d'exploitation d'un gisement a partir d'une technique de selection des positions de puits a forer
|
FR2989200B1
(fr)
*
|
2012-04-10 |
2020-07-17 |
IFP Energies Nouvelles |
Procede de selection des positions de puits a forer pour l'exploitation d'un gisement petrolier
|
US9595129B2
(en)
|
2012-05-08 |
2017-03-14 |
Exxonmobil Upstream Research Company |
Canvas control for 3D data volume processing
|
US10287857B2
(en)
|
2012-05-30 |
2019-05-14 |
Landmark Graphics Corporation |
System and method for reservoir simulation optimization
|
CN104411911B
(zh)
*
|
2012-05-31 |
2016-08-17 |
界标制图有限公司 |
钻井台的优化定位的系统和方法
|
BR112014031922B1
(pt)
*
|
2012-06-18 |
2022-03-15 |
Technological Resources Pty. Limited |
Sistemas e métodos para processar dados geofísicos
|
US20140005996A1
(en)
*
|
2012-06-28 |
2014-01-02 |
Schlumberger Technology Corporation |
Interactive and three-dimensional well path design
|
US9970284B2
(en)
*
|
2012-08-14 |
2018-05-15 |
Schlumberger Technology Corporation |
Downlink path finding for controlling the trajectory while drilling a well
|
US9183182B2
(en)
*
|
2012-08-31 |
2015-11-10 |
Chevron U.S.A. Inc. |
System and method for determining a probability of well success using stochastic inversion
|
US9229910B2
(en)
*
|
2012-10-26 |
2016-01-05 |
Schlumberger Technology Corporation |
Predicting three dimensional distribution of reservoir production capacity
|
US20140129296A1
(en)
*
|
2012-11-07 |
2014-05-08 |
Schlumberger Technology Corporation |
Method and system for offering and procuring well services
|
US9417256B2
(en)
*
|
2012-12-12 |
2016-08-16 |
Repsol, S. A. |
System, method and program product for automatically matching new members of a population with analogous members
|
WO2014092713A2
(en)
|
2012-12-13 |
2014-06-19 |
Landmark Graphics Corporation |
System, method and computer program product for evaluating and ranking geobodies using a euler characteristic
|
CA2890817C
(en)
|
2012-12-13 |
2017-10-17 |
Landmark Graphics Corporation |
System, method and computer program product for determining placement of perforation intervals using facies, fluid boundaries, geobodies and dynamic fluid properties
|
US20140214387A1
(en)
*
|
2013-01-25 |
2014-07-31 |
Schlumberger Technology Corporation |
Constrained optimization for well placement planning
|
US10048396B2
(en)
|
2013-03-14 |
2018-08-14 |
Exxonmobil Upstream Research Company |
Method for region delineation and optimal rendering transform of seismic attributes
|
ES2660432T3
(es)
|
2013-06-06 |
2018-03-22 |
Repsol, S.A. |
Método para evaluar planes de estrategia de producción
|
WO2014200685A2
(en)
|
2013-06-10 |
2014-12-18 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
US9715762B2
(en)
|
2013-07-02 |
2017-07-25 |
Landmark Graphics Corporation |
3D stadia algorithm for discrete network meshing
|
US10689965B2
(en)
*
|
2013-08-26 |
2020-06-23 |
Repsol, S.A. |
Field development plan selection system, method and program product
|
AU2013399193B2
(en)
*
|
2013-08-28 |
2017-02-02 |
Landmark Graphics Corporation |
Static earth model grid cell scaling and property re-sampling methods and systems
|
BR112016003986A2
(pt)
*
|
2013-08-29 |
2017-09-12 |
Landmark Graphics Corp |
métodos e sistemas de calibração de modelo de terra estático
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
US10054712B2
(en)
|
2013-12-30 |
2018-08-21 |
Saudi Arabian Oil Company |
Computer-implemented methods for reservoir simulation with automated well completions and reservoir grid data quality assurance
|
CA2935421A1
(en)
*
|
2014-01-06 |
2015-07-09 |
Schlumberger Canada Limited |
Multistage oilfield design optimization under uncertainty
|
CN106170823A
(zh)
*
|
2014-03-10 |
2016-11-30 |
兰德马克绘图国际公司 |
使用来自地层层序中的邻近表面的单侧非节点约束而对地质表面建模
|
US9957781B2
(en)
|
2014-03-31 |
2018-05-01 |
Hitachi, Ltd. |
Oil and gas rig data aggregation and modeling system
|
US10062044B2
(en)
*
|
2014-04-12 |
2018-08-28 |
Schlumberger Technology Corporation |
Method and system for prioritizing and allocating well operating tasks
|
CN105093308B
(zh)
*
|
2014-05-19 |
2017-11-21 |
中国石油化工股份有限公司 |
一种井轨迹设计方法和系统
|
US10192182B2
(en)
*
|
2014-06-10 |
2019-01-29 |
Wellaware Holdings, Inc. |
Aerial drone for well-site and signal survey
|
FR3023316B1
(fr)
*
|
2014-07-04 |
2016-08-19 |
Ifp Energies Now |
Procede d'exploitation d'un gisement petrolier a partir d'une technique de positionnement des puits a forer
|
US9816366B2
(en)
*
|
2014-07-14 |
2017-11-14 |
Saudi Arabian Oil Company |
Methods, systems, and computer medium having computer programs stored thereon to optimize reservoir management decisions
|
US11414975B2
(en)
|
2014-07-14 |
2022-08-16 |
Saudi Arabian Oil Company |
Quantifying well productivity and near wellbore flow conditions in gas reservoirs
|
CN104331537A
(zh)
*
|
2014-09-28 |
2015-02-04 |
长江大学 |
基于储层静态因子的井位优化设计方法
|
US10221659B2
(en)
|
2014-10-08 |
2019-03-05 |
Chevron U.S.A. Inc. |
Automated well placement for reservoir evaluation
|
CN104360412B
(zh)
*
|
2014-11-14 |
2017-12-26 |
中国石油大学(北京) |
致密深盆气成藏预测方法和装置
|
US9858484B2
(en)
|
2014-12-30 |
2018-01-02 |
Facebook, Inc. |
Systems and methods for determining video feature descriptors based on convolutional neural networks
|
CN104895550B
(zh)
*
|
2015-06-04 |
2018-03-13 |
中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 |
一种致密气压裂水平井数值试井模型建立求解方法
|
CN105257252A
(zh)
*
|
2015-06-08 |
2016-01-20 |
中国石油集团川庆钻探工程有限公司 |
利用测井资料优选页岩气水平井分簇射孔井段的方法
|
US10502047B2
(en)
*
|
2015-06-30 |
2019-12-10 |
Magnetic Variation Services LLC |
Reservoir recovery simulation process and system
|
CA2993300A1
(en)
*
|
2015-07-21 |
2017-01-26 |
Schlumberger Canada Limited |
Well placement plan optimization
|
US9754351B2
(en)
*
|
2015-11-05 |
2017-09-05 |
Facebook, Inc. |
Systems and methods for processing content using convolutional neural networks
|
CN105545275B
(zh)
*
|
2015-12-31 |
2018-04-06 |
中国石油天然气股份有限公司 |
气田气井部署方法和装置
|
US20170200103A1
(en)
*
|
2016-01-08 |
2017-07-13 |
Nature Conservancy, The |
Techniques for positioning energy infrastructure
|
FR3046810B1
(fr)
*
|
2016-01-15 |
2018-01-26 |
IFP Energies Nouvelles |
Procede de production d'hydrocarbures comportant un index de productivite des puits sous effet thermique
|
US10167703B2
(en)
*
|
2016-03-31 |
2019-01-01 |
Saudi Arabian Oil Company |
Optimal well placement under constraints
|
US10941635B1
(en)
|
2016-06-27 |
2021-03-09 |
East Daley Capital Advisors, Inc |
Optimization computer program and method
|
US10482202B2
(en)
|
2016-06-30 |
2019-11-19 |
The Procter & Gamble Company |
Method for modeling a manufacturing process for a product
|
US10060227B2
(en)
|
2016-08-02 |
2018-08-28 |
Saudi Arabian Oil Company |
Systems and methods for developing hydrocarbon reservoirs
|
US10605055B2
(en)
|
2016-09-15 |
2020-03-31 |
Baker Hughes, A Ge Company, Llc |
Integrated hydrocarbon fluid distribution modeling
|
US10678967B2
(en)
*
|
2016-10-21 |
2020-06-09 |
International Business Machines Corporation |
Adaptive resource reservoir development
|
US11740384B2
(en)
|
2016-12-09 |
2023-08-29 |
Schlumberger Technology Corporation |
Field operations neural network heuristics
|
US10767471B2
(en)
*
|
2017-05-18 |
2020-09-08 |
Conocophillips Company |
Resource density screening tool
|
US20200249375A1
(en)
|
2017-09-26 |
2020-08-06 |
Total Sa |
Process for defining the locations of a plurality of wells in a field, related system and computer program product
|
CN111615625A
(zh)
|
2017-11-06 |
2020-09-01 |
哈里发科学技术大学 |
用于确定多孔介质的渗透率的方法和系统
|
WO2020010122A1
(en)
*
|
2018-07-03 |
2020-01-09 |
Baker Hughes, A Ge Company, Llc |
Drilling productive wells
|
FR3101660B1
(fr)
|
2019-10-03 |
2021-10-08 |
Ifp Energies Now |
Procédé pour déterminer une trajectoire d'un puits dans un réservoir pétrolier
|
US11715034B2
(en)
|
2020-01-16 |
2023-08-01 |
Saudi Arabian Oil Company |
Training of machine learning algorithms for generating a reservoir digital twin
|
US11586790B2
(en)
|
2020-05-06 |
2023-02-21 |
Saudi Arabian Oil Company |
Determining hydrocarbon production sweet spots
|
US11708754B2
(en)
|
2020-05-11 |
2023-07-25 |
Saudi Arabian Oil Company |
Systems and methods for generating a drainage radius log
|
US11608734B2
(en)
|
2020-05-11 |
2023-03-21 |
Saudi Arabian Oil Company |
Systems and methods for creating hydrocarbon wells
|
US20230195952A1
(en)
*
|
2020-05-20 |
2023-06-22 |
Schlumberger Technology Corporation |
Well planning based on hazard predictive models
|
RU2747019C1
(ru)
*
|
2020-06-18 |
2021-04-23 |
Общество с ограниченной ответственностью "Тюменский нефтяной научный центр" (ООО "ТННЦ") |
Способ обоснования технологического режима промысла
|
CN112580851B
(zh)
*
|
2020-11-17 |
2024-06-18 |
西安中控天地科技开发有限公司 |
丛式井场抽油机井群错峰开井间抽运行调度方法
|
US11859472B2
(en)
|
2021-03-22 |
2024-01-02 |
Saudi Arabian Oil Company |
Apparatus and method for milling openings in an uncemented blank pipe
|
CN113269879B
(zh)
*
|
2021-05-27 |
2021-11-26 |
广东省地震局 |
一种地质体三维模型自动构建方法及装置
|
US11788377B2
(en)
|
2021-11-08 |
2023-10-17 |
Saudi Arabian Oil Company |
Downhole inflow control
|
US12024985B2
(en)
|
2022-03-24 |
2024-07-02 |
Saudi Arabian Oil Company |
Selective inflow control device, system, and method
|
WO2024064077A1
(en)
*
|
2022-09-19 |
2024-03-28 |
Schlumberger Technology Corporation |
Training of machine learning models for well target recommendation
|