US6853921B2
(en)
|
1999-07-20 |
2005-02-08 |
Halliburton Energy Services, Inc. |
System and method for real time reservoir management
|
US6980940B1
(en)
*
|
2000-02-22 |
2005-12-27 |
Schlumberger Technology Corp. |
Intergrated reservoir optimization
|
US6560501B1
(en)
*
|
2000-03-07 |
2003-05-06 |
I2 Technologies Us, Inc. |
System and method for collaborative batch aggregation and scheduling
|
US20020082811A1
(en)
*
|
2000-03-17 |
2002-06-27 |
Honjas William A. |
Optimization apparatus, system, and method of use and doing business
|
US6978210B1
(en)
*
|
2000-10-26 |
2005-12-20 |
Conocophillips Company |
Method for automated management of hydrocarbon gathering systems
|
KR100624298B1
(ko)
*
|
2000-12-22 |
2006-09-13 |
주식회사 하이닉스반도체 |
플래쉬 메모리 셀의 센싱 회로
|
US7761270B2
(en)
*
|
2000-12-29 |
2010-07-20 |
Exxonmobil Upstream Research Co. |
Computer system and method having a facility management logic architecture
|
US7277836B2
(en)
*
|
2000-12-29 |
2007-10-02 |
Exxonmobil Upstream Research Company |
Computer system and method having a facility network architecture
|
FR2842321B1
(fr)
*
|
2002-07-11 |
2008-12-05 |
Inst Francais Du Petrole |
Methode pour contraindre un champ de permeabilite heterogene representant un reservoir souterrain par des donnees dynamiques
|
US7317989B2
(en)
*
|
2001-05-15 |
2008-01-08 |
Baker Hughes Incorporated |
Method and apparatus for chemometric estimations of fluid density, viscosity, dielectric constant, and resistivity from mechanical resonator data
|
FR2831917B1
(fr)
*
|
2001-11-08 |
2004-01-02 |
Schlumberger Services Petrol |
Procede de determination de la variation de la permeabilite relative a au moins un fluide d'un reservoir contenant des fluides en fonction de la saturation en l'un d'entre eux
|
US7283941B2
(en)
*
|
2001-11-13 |
2007-10-16 |
Swanson Consulting Services, Inc. |
Computer system and method for modeling fluid depletion
|
US7584165B2
(en)
*
|
2003-01-30 |
2009-09-01 |
Landmark Graphics Corporation |
Support apparatus, method and system for real time operations and maintenance
|
US7200540B2
(en)
*
|
2003-01-31 |
2007-04-03 |
Landmark Graphics Corporation |
System and method for automated platform generation
|
US7096172B2
(en)
*
|
2003-01-31 |
2006-08-22 |
Landmark Graphics Corporation, A Division Of Halliburton Energy Services, Inc. |
System and method for automated reservoir targeting
|
US6810332B2
(en)
*
|
2003-01-31 |
2004-10-26 |
Chevron U.S.A. Inc. |
Method for computing complexity, confidence and technical maturity indices for reservoir evaluations
|
FR2852710B1
(fr)
*
|
2003-03-18 |
2005-04-29 |
Inst Francais Du Petrole |
Methode pour former rapidement un modele stochastique representatif de la distribution d'une grandeur physique dans un milieu heterogene par une selection appropriee de realisations geostatistiques
|
CA2526576A1
(en)
*
|
2003-05-22 |
2004-12-02 |
Schlumberger Canada Limited |
Method for prospect identification in asset evaluation
|
US7584086B2
(en)
|
2003-09-30 |
2009-09-01 |
Exxonmobil Upstream Research Company |
Characterizing connectivity in reservoir models using paths of least resistance
|
NL1024444C2
(nl)
*
|
2003-10-03 |
2005-04-08 |
J O A Beheer B V |
Werkwijze, inrichting, computerprogramma en gegevensdrager voor het met een digitale verwerkingseenheid modelleren van een meerdimensionale heterogene structuur.
|
US7725302B2
(en)
*
|
2003-12-02 |
2010-05-25 |
Schlumberger Technology Corporation |
Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model
|
GB2410550B8
(en)
*
|
2003-12-04 |
2008-10-01 |
Schlumberger Holdings |
Fluids chain-of-custody
|
US7672818B2
(en)
*
|
2004-06-07 |
2010-03-02 |
Exxonmobil Upstream Research Company |
Method for solving implicit reservoir simulation matrix equation
|
WO2006036389A2
(en)
*
|
2004-09-10 |
2006-04-06 |
Exxonmobil Upstream Research Company |
Numerical modeling evaluation of basin sedimentation properities
|
WO2006065915A2
(en)
*
|
2004-12-14 |
2006-06-22 |
Services Petroliers Schlumberger |
Geometrical optimization of multi-well trajectories
|
US7526930B2
(en)
*
|
2005-04-22 |
2009-05-05 |
Schlumberger Technology Corporation |
Method system and program storage device for synchronizing displays relative to a point in time
|
US7565243B2
(en)
|
2005-05-26 |
2009-07-21 |
Exxonmobil Upstream Research Company |
Rapid method for reservoir connectivity analysis using a fast marching method
|
EA200800434A1
(ru)
*
|
2005-07-27 |
2008-10-30 |
Эксонмобил Апстрим Рисерч Компани |
Моделирование скважины, связанное с добычей углеводородов из подземных формаций
|
EP1922669A2
(en)
*
|
2005-07-27 |
2008-05-21 |
ExxonMobil Upstream Research Company |
Well modeling associated with extraction of hydrocarbons from subsurface formations
|
MX2007016574A
(es)
*
|
2005-07-27 |
2008-03-04 |
Exxonmobil Upstream Res Co |
Modelaje de pozo asociado con extraccion de hidrocarburos a partir de yacimientos subterraneos.
|
EP1999492A4
(en)
*
|
2006-01-20 |
2011-05-18 |
Landmark Graphics Corp |
DYNAMIC PRODUCTION MANAGEMENT SYSTEM
|
WO2008028122A2
(en)
*
|
2006-09-01 |
2008-03-06 |
Chevron U.S.A. Inc. |
History matching and forecasting in the production of hydrocarbons
|
US9043188B2
(en)
*
|
2006-09-01 |
2015-05-26 |
Chevron U.S.A. Inc. |
System and method for forecasting production from a hydrocarbon reservoir
|
WO2008083004A2
(en)
*
|
2006-12-28 |
2008-07-10 |
Chevron U.S.A. Inc. |
History matching and forecasting of hydrocarbon-bearing reservoirs utilizing proxies for likelihood functions
|
US8005658B2
(en)
*
|
2007-05-31 |
2011-08-23 |
Schlumberger Technology Corporation |
Automated field development planning of well and drainage locations
|
US8046314B2
(en)
*
|
2007-07-20 |
2011-10-25 |
Schlumberger Technology Corporation |
Apparatus, method and system for stochastic workflow in oilfield operations
|
WO2009032416A1
(en)
*
|
2007-09-07 |
2009-03-12 |
Exxonmobill Upstream Research Company |
Well performance modeling in a collaborative well planning environment
|
US8139062B2
(en)
*
|
2007-09-12 |
2012-03-20 |
Schlumberger Technology Corporation |
Method and system for displaying a map using a projected coordinate system
|
WO2009075945A1
(en)
|
2007-12-13 |
2009-06-18 |
Exxonmobil Upstream Research Company |
Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid
|
EP2223157A4
(en)
|
2007-12-13 |
2016-12-07 |
Exxonmobil Upstream Res Co |
ITERATIVE TANK SURVEILLANCE
|
CA2705277C
(en)
*
|
2007-12-18 |
2017-01-17 |
Exxonmobil Upstream Research Company |
Determining connectivity architecture in 2-d and 3-d heterogeneous data
|
US8751208B2
(en)
*
|
2007-12-20 |
2014-06-10 |
Shell Oil Company |
Method for producing hydrocarbons through a well or well cluster of which the trajectory is optimized by a trajectory optimisation algorithm
|
AU2008340399B2
(en)
|
2007-12-21 |
2013-09-26 |
Exxonmobil Upstream Research Company |
Method and apparatus for analyzing three-dimensional data
|
WO2009085395A1
(en)
*
|
2007-12-31 |
2009-07-09 |
Exxonmobil Upstream Research Company |
Methods and systems for determining near-wellbore characteristics and reservoir properties
|
US7894991B2
(en)
*
|
2008-02-01 |
2011-02-22 |
Schlumberger Technology Corp. |
Statistical determination of historical oilfield data
|
CA2710809C
(en)
*
|
2008-03-10 |
2017-06-13 |
Exxonmobil Upstream Research Company |
Method for determining distinct alternative paths between two object sets in 2-d and 3-d heterogeneous data
|
CN101266299B
(zh)
*
|
2008-04-14 |
2011-03-30 |
林昌荣 |
利用地震数据体结构特征预测油气的方法
|
AU2009238481B2
(en)
*
|
2008-04-22 |
2014-01-30 |
Exxonmobil Upstream Research Company |
Functional-based knowledge analysis in a 2D and 3D visual environment
|
CA2717514C
(en)
|
2008-05-05 |
2016-07-26 |
Exxonmobil Upstream Research Company |
Systems and methods for connectivity analysis using functional objects
|
US20100082509A1
(en)
*
|
2008-09-30 |
2010-04-01 |
Ilya Mishev |
Self-Adapting Iterative Solver
|
CN102138146A
(zh)
*
|
2008-09-30 |
2011-07-27 |
埃克森美孚上游研究公司 |
使用并行多级不完全因式分解求解储层模拟矩阵方程的方法
|
WO2010039317A1
(en)
*
|
2008-10-01 |
2010-04-08 |
Exxonmobil Upstream Research Company |
Robust well trajectory planning
|
CA2733729C
(en)
|
2008-10-24 |
2017-01-17 |
Exxonmobil Upstream Research Company |
Tracking geologic object and detecting geologic anomalies in exploration seismic data volume
|
AU2009311619B2
(en)
*
|
2008-11-06 |
2015-10-01 |
Exxonmobil Upstream Research Company |
System and method for planning a drilling operation
|
AU2015268702B2
(en)
*
|
2008-11-17 |
2016-02-11 |
Landmark Graphics Corporation |
Systems and methods for dynamically developing wellbore plans with a reservoir simulator
|
US8301426B2
(en)
|
2008-11-17 |
2012-10-30 |
Landmark Graphics Corporation |
Systems and methods for dynamically developing wellbore plans with a reservoir simulator
|
BRPI1006862B1
(pt)
*
|
2009-01-13 |
2020-03-17 |
Exxonmobil Upstream Research Company |
Método e sistema para otimização de tomada de decisão para um poço de hidrocarbonetos, e, sistema associado com a produção de hidrocarbonetos
|
US8301382B2
(en)
*
|
2009-03-27 |
2012-10-30 |
Schlumberger Technology Corporation |
Continuous geomechanically stable wellbore trajectories
|
US10332219B2
(en)
*
|
2009-03-30 |
2019-06-25 |
Landmark Graphics Corporation |
Systems and methods for determining optimum platform count and position
|
US20100299123A1
(en)
*
|
2009-05-21 |
2010-11-25 |
Schlumberger Technology Corporation |
Well placement in a volume
|
AU2010290068B2
(en)
|
2009-09-01 |
2015-04-30 |
Exxonmobil Upstream Research Company |
Method of using human physiological responses as inputs to hydrocarbon management decisions
|
US8949173B2
(en)
*
|
2009-10-28 |
2015-02-03 |
Schlumberger Technology Corporation |
Pay zone prediction
|
US8931580B2
(en)
|
2010-02-03 |
2015-01-13 |
Exxonmobil Upstream Research Company |
Method for using dynamic target region for well path/drill center optimization
|
US8731872B2
(en)
|
2010-03-08 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
EA201201285A1
(ru)
|
2010-03-15 |
2013-05-30 |
Лэндмарк Грэфикс Корпорейшн |
Системы и способы для определения местоположения горизонтальных скважин в пределах заданных границ
|
US8731887B2
(en)
|
2010-04-12 |
2014-05-20 |
Exxonmobile Upstream Research Company |
System and method for obtaining a model of data describing a physical structure
|
US8727017B2
(en)
|
2010-04-22 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for obtaining data on an unstructured grid
|
US8731873B2
(en)
|
2010-04-26 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US8532968B2
(en)
*
|
2010-06-16 |
2013-09-10 |
Foroil |
Method of improving the production of a mature gas or oil field
|
CA2801382C
(en)
|
2010-06-29 |
2018-12-18 |
Exxonmobil Upstream Research Company |
Method and system for parallel simulation models
|
US8731875B2
(en)
|
2010-08-13 |
2014-05-20 |
Exxonmobil Upstream Research Company |
System and method for providing data corresponding to physical objects
|
US9593558B2
(en)
|
2010-08-24 |
2017-03-14 |
Exxonmobil Upstream Research Company |
System and method for planning a well path
|
US9229129B2
(en)
*
|
2010-12-10 |
2016-01-05 |
Conocophillips Company |
Reservoir geobody calculation
|
CA2823017A1
(en)
|
2011-01-26 |
2012-08-02 |
Exxonmobil Upstream Research Company |
Method of reservoir compartment analysis using topological structure in 3d earth model
|
AU2011360212B2
(en)
|
2011-02-21 |
2017-02-02 |
Exxonmobil Upstream Research Company |
Reservoir connectivity analysis in a 3D earth model
|
CA2823263A1
(en)
*
|
2011-05-09 |
2012-11-15 |
Chevron U.S.A. Inc. |
System and method for determining properties of a hydrocarbon reservoir based on production data
|
FR2979724B1
(fr)
|
2011-09-06 |
2018-11-23 |
Ifp Energies Now |
Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer
|
US9223594B2
(en)
|
2011-07-01 |
2015-12-29 |
Exxonmobil Upstream Research Company |
Plug-in installer framework
|
US8731891B2
(en)
*
|
2011-07-28 |
2014-05-20 |
Saudi Arabian Oil Company |
Cluster 3D petrophysical uncertainty modeling
|
US20130231901A1
(en)
*
|
2011-09-15 |
2013-09-05 |
Zhengang Lu |
Well pad placement
|
FR2987149B1
(fr)
*
|
2012-02-16 |
2014-10-31 |
IFP Energies Nouvelles |
Procede d'exploitation d'un gisement a partir d'une technique de selection des positions de puits a forer
|
FR2989200B1
(fr)
*
|
2012-04-10 |
2020-07-17 |
IFP Energies Nouvelles |
Procede de selection des positions de puits a forer pour l'exploitation d'un gisement petrolier
|
WO2013169429A1
(en)
|
2012-05-08 |
2013-11-14 |
Exxonmobile Upstream Research Company |
Canvas control for 3d data volume processing
|
EP2856387B1
(en)
|
2012-05-30 |
2023-03-08 |
Landmark Graphics Corporation |
System and method for reservoir simulation optimization
|
MX2014014438A
(es)
*
|
2012-05-31 |
2015-05-11 |
Landmark Graphics Corp |
Sistemas y metodos para el optimo posicionado de plataformas de perforacion.
|
BR112014031922B1
(pt)
|
2012-06-18 |
2022-03-15 |
Technological Resources Pty. Limited |
Sistemas e métodos para processar dados geofísicos
|
US20140005996A1
(en)
*
|
2012-06-28 |
2014-01-02 |
Schlumberger Technology Corporation |
Interactive and three-dimensional well path design
|
US9970284B2
(en)
|
2012-08-14 |
2018-05-15 |
Schlumberger Technology Corporation |
Downlink path finding for controlling the trajectory while drilling a well
|
US9183182B2
(en)
*
|
2012-08-31 |
2015-11-10 |
Chevron U.S.A. Inc. |
System and method for determining a probability of well success using stochastic inversion
|
US9229910B2
(en)
*
|
2012-10-26 |
2016-01-05 |
Schlumberger Technology Corporation |
Predicting three dimensional distribution of reservoir production capacity
|
US20140129296A1
(en)
*
|
2012-11-07 |
2014-05-08 |
Schlumberger Technology Corporation |
Method and system for offering and procuring well services
|
US9417256B2
(en)
*
|
2012-12-12 |
2016-08-16 |
Repsol, S. A. |
System, method and program product for automatically matching new members of a population with analogous members
|
EP2904530B1
(en)
*
|
2012-12-13 |
2018-10-10 |
Landmark Graphics Corporation |
System, method and computer program product for determining placement of perforation intervals using facies, fluid boundaries, geobodies and dynamic fluid properties
|
US10429545B2
(en)
|
2012-12-13 |
2019-10-01 |
Landmark Graphics Corporation |
System, method and computer program product for evaluating and ranking geobodies using a euler characteristic
|
US20140214387A1
(en)
*
|
2013-01-25 |
2014-07-31 |
Schlumberger Technology Corporation |
Constrained optimization for well placement planning
|
US10048396B2
(en)
|
2013-03-14 |
2018-08-14 |
Exxonmobil Upstream Research Company |
Method for region delineation and optimal rendering transform of seismic attributes
|
ES2660432T3
(es)
|
2013-06-06 |
2018-03-22 |
Repsol, S.A. |
Método para evaluar planes de estrategia de producción
|
WO2014200685A2
(en)
|
2013-06-10 |
2014-12-18 |
Exxonmobil Upstream Research Company |
Interactively planning a well site
|
SG11201510115UA
(en)
|
2013-07-02 |
2016-01-28 |
Landmark Graphics Corp |
3d stadia algorithm for discrete network meshing
|
US10689965B2
(en)
*
|
2013-08-26 |
2020-06-23 |
Repsol, S.A. |
Field development plan selection system, method and program product
|
US11181662B2
(en)
|
2013-08-28 |
2021-11-23 |
Landmark Graphics Corporation |
Static earth model grid cell scaling and property re-sampling methods and systems
|
MX2016002396A
(es)
*
|
2013-08-29 |
2016-12-14 |
Landmark Graphics Corp |
Metodos y sistemas de calibración de modelo terrestre estático mediante el uso de evaluaciones de turtuosidad.
|
US9864098B2
(en)
|
2013-09-30 |
2018-01-09 |
Exxonmobil Upstream Research Company |
Method and system of interactive drill center and well planning evaluation and optimization
|
US9958571B2
(en)
|
2013-12-30 |
2018-05-01 |
Saudi Arabian Oil Company |
Machines for reservoir simulation with automated well completions and reservoir grid data quality assurance
|
RU2669948C2
(ru)
*
|
2014-01-06 |
2018-10-17 |
Геоквест Системз Б.В. |
Оптимизация многоступенчатого проекта нефтяного месторождения в условиях неопределенности
|
SG11201606390QA
(en)
*
|
2014-03-10 |
2016-09-29 |
Landmark Graphics Corp |
Modeling geologic surfaces using unilateral non-node constraints from neighboring surfaces in the stratigraphic sequence
|
US9957781B2
(en)
|
2014-03-31 |
2018-05-01 |
Hitachi, Ltd. |
Oil and gas rig data aggregation and modeling system
|
US10062044B2
(en)
*
|
2014-04-12 |
2018-08-28 |
Schlumberger Technology Corporation |
Method and system for prioritizing and allocating well operating tasks
|
CN105093308B
(zh)
*
|
2014-05-19 |
2017-11-21 |
中国石油化工股份有限公司 |
一种井轨迹设计方法和系统
|
US10192182B2
(en)
*
|
2014-06-10 |
2019-01-29 |
Wellaware Holdings, Inc. |
Aerial drone for well-site and signal survey
|
FR3023316B1
(fr)
*
|
2014-07-04 |
2016-08-19 |
Ifp Energies Now |
Procede d'exploitation d'un gisement petrolier a partir d'une technique de positionnement des puits a forer
|
US9816366B2
(en)
|
2014-07-14 |
2017-11-14 |
Saudi Arabian Oil Company |
Methods, systems, and computer medium having computer programs stored thereon to optimize reservoir management decisions
|
US11414975B2
(en)
|
2014-07-14 |
2022-08-16 |
Saudi Arabian Oil Company |
Quantifying well productivity and near wellbore flow conditions in gas reservoirs
|
CN104331537A
(zh)
*
|
2014-09-28 |
2015-02-04 |
长江大学 |
基于储层静态因子的井位优化设计方法
|
US10221659B2
(en)
*
|
2014-10-08 |
2019-03-05 |
Chevron U.S.A. Inc. |
Automated well placement for reservoir evaluation
|
CN104360412B
(zh)
*
|
2014-11-14 |
2017-12-26 |
中国石油大学(北京) |
致密深盆气成藏预测方法和装置
|
US9858484B2
(en)
*
|
2014-12-30 |
2018-01-02 |
Facebook, Inc. |
Systems and methods for determining video feature descriptors based on convolutional neural networks
|
CN104895550B
(zh)
*
|
2015-06-04 |
2018-03-13 |
中国石油集团川庆钻探工程有限公司长庆井下技术作业公司 |
一种致密气压裂水平井数值试井模型建立求解方法
|
CN105257252A
(zh)
*
|
2015-06-08 |
2016-01-20 |
中国石油集团川庆钻探工程有限公司 |
利用测井资料优选页岩气水平井分簇射孔井段的方法
|
US10502047B2
(en)
*
|
2015-06-30 |
2019-12-10 |
Magnetic Variation Services LLC |
Reservoir recovery simulation process and system
|
WO2017015317A1
(en)
*
|
2015-07-21 |
2017-01-26 |
Schlumberger Technology Corporation |
Well placement plan optimization
|
US9754351B2
(en)
*
|
2015-11-05 |
2017-09-05 |
Facebook, Inc. |
Systems and methods for processing content using convolutional neural networks
|
CN105545275B
(zh)
*
|
2015-12-31 |
2018-04-06 |
中国石油天然气股份有限公司 |
气田气井部署方法和装置
|
WO2017120447A1
(en)
*
|
2016-01-08 |
2017-07-13 |
Nature Conservancy, The |
Techniques for positioning energy infrastructure
|
FR3046810B1
(fr)
*
|
2016-01-15 |
2018-01-26 |
IFP Energies Nouvelles |
Procede de production d'hydrocarbures comportant un index de productivite des puits sous effet thermique
|
US10167703B2
(en)
*
|
2016-03-31 |
2019-01-01 |
Saudi Arabian Oil Company |
Optimal well placement under constraints
|
US10941635B1
(en)
|
2016-06-27 |
2021-03-09 |
East Daley Capital Advisors, Inc |
Optimization computer program and method
|
US10482202B2
(en)
|
2016-06-30 |
2019-11-19 |
The Procter & Gamble Company |
Method for modeling a manufacturing process for a product
|
US10060227B2
(en)
|
2016-08-02 |
2018-08-28 |
Saudi Arabian Oil Company |
Systems and methods for developing hydrocarbon reservoirs
|
US10605055B2
(en)
*
|
2016-09-15 |
2020-03-31 |
Baker Hughes, A Ge Company, Llc |
Integrated hydrocarbon fluid distribution modeling
|
US10678967B2
(en)
*
|
2016-10-21 |
2020-06-09 |
International Business Machines Corporation |
Adaptive resource reservoir development
|
US11740384B2
(en)
|
2016-12-09 |
2023-08-29 |
Schlumberger Technology Corporation |
Field operations neural network heuristics
|
WO2018213483A1
(en)
*
|
2017-05-18 |
2018-11-22 |
Conocophillips Company |
Resource density screening tool
|
WO2019064037A1
(en)
|
2017-09-26 |
2019-04-04 |
Total Sa |
METHOD FOR DEFINING LOCATIONS OF A PLURALITY OF WELLS IN A FIELD, ASSOCIATED SYSTEM AND COMPUTER PROGRAM PRODUCT
|
WO2019086938A1
(en)
*
|
2017-11-06 |
2019-05-09 |
Abu Dhabi National Oil Company |
Method and system for determining permeability of a porous medium
|
US11299964B2
(en)
*
|
2018-07-03 |
2022-04-12 |
Baker Hughes, A Ge Company, Llc |
Drilling productive wells
|
FR3101660B1
(fr)
|
2019-10-03 |
2021-10-08 |
Ifp Energies Now |
Procédé pour déterminer une trajectoire d'un puits dans un réservoir pétrolier
|
US11715034B2
(en)
|
2020-01-16 |
2023-08-01 |
Saudi Arabian Oil Company |
Training of machine learning algorithms for generating a reservoir digital twin
|
US11586790B2
(en)
|
2020-05-06 |
2023-02-21 |
Saudi Arabian Oil Company |
Determining hydrocarbon production sweet spots
|
US11608734B2
(en)
|
2020-05-11 |
2023-03-21 |
Saudi Arabian Oil Company |
Systems and methods for creating hydrocarbon wells
|
US11708754B2
(en)
|
2020-05-11 |
2023-07-25 |
Saudi Arabian Oil Company |
Systems and methods for generating a drainage radius log
|
WO2021236877A1
(en)
*
|
2020-05-20 |
2021-11-25 |
Schlumberger Technology Corporation |
Drilling trajectory and steering design optimization based on predicted tool performance
|
RU2747019C1
(ru)
*
|
2020-06-18 |
2021-04-23 |
Общество с ограниченной ответственностью "Тюменский нефтяной научный центр" (ООО "ТННЦ") |
Способ обоснования технологического режима промысла
|
CN112580851B
(zh)
*
|
2020-11-17 |
2024-06-18 |
西安中控天地科技开发有限公司 |
丛式井场抽油机井群错峰开井间抽运行调度方法
|
US11859472B2
(en)
|
2021-03-22 |
2024-01-02 |
Saudi Arabian Oil Company |
Apparatus and method for milling openings in an uncemented blank pipe
|
CN113269879B
(zh)
*
|
2021-05-27 |
2021-11-26 |
广东省地震局 |
一种地质体三维模型自动构建方法及装置
|
US11788377B2
(en)
|
2021-11-08 |
2023-10-17 |
Saudi Arabian Oil Company |
Downhole inflow control
|
WO2024064077A1
(en)
*
|
2022-09-19 |
2024-03-28 |
Schlumberger Technology Corporation |
Training of machine learning models for well target recommendation
|