DE3644818A1 - Verfahren zur beseitigung von abraum - Google Patents
Verfahren zur beseitigung von abraumInfo
- Publication number
- DE3644818A1 DE3644818A1 DE19863644818 DE3644818A DE3644818A1 DE 3644818 A1 DE3644818 A1 DE 3644818A1 DE 19863644818 DE19863644818 DE 19863644818 DE 3644818 A DE3644818 A DE 3644818A DE 3644818 A1 DE3644818 A1 DE 3644818A1
- Authority
- DE
- Germany
- Prior art keywords
- overburden
- tunnel
- pumped
- pumps
- tunnels
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
- 238000000034 method Methods 0.000 title claims description 9
- 238000010276 construction Methods 0.000 claims description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 3
- 239000007788 liquid Substances 0.000 claims description 2
- 235000011837 pasties Nutrition 0.000 claims 1
- 239000002689 soil Substances 0.000 claims 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/12—Devices for removing or hauling away excavated material or spoil; Working or loading platforms
- E21D9/13—Devices for removing or hauling away excavated material or spoil; Working or loading platforms using hydraulic or pneumatic conveying means
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D29/00—Independent underground or underwater structures; Retaining walls
- E02D29/045—Underground structures, e.g. tunnels or galleries, built in the open air or by methods involving disturbance of the ground surface all along the location line; Methods of making them
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Geochemistry & Mineralogy (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Lining And Supports For Tunnels (AREA)
Description
Die Erfindung betrifft ein Verfahren zur Beseitigung von
beim Bau von Tunneln anfallendem Abraum mittels Pumpen,
das insbesondere beim Bau von unterhalb von Wasserläufen
auszuschachtenden Tunneln Anwendung findet.
Die Beseitigung der Berge mittels Fahrzeugen hat sich wegen
des zeitraubenden Beladens von Fördergeräten und der damit
verbundenen Gefahr der Staubentwicklung in vielen Fällen
gegenüber einer Beseitigung der Berge mittels Pumpen als
unwirtschaftlich und nachteilig erwiesen.
Besondere Schwierigkeiten bereitet die Schutterung, wenn
die Berge nicht auf einer im wesentlichen waagerechten
Sohle weggefahren werden können. Das Wegräumen der Berge
im Pumpverfahren kann andererseits aus wirtschaftlichen
Gründen nicht über beliebig lange Strecken erfolgen.
Der Erfindung liegt die Aufgabe zugrunde, auch beim Bau
sehr langer Tunnel und insbesondere bei der Untertunnelung
von Wasserläufen, Meeresarmen und dergleichen die Berge
auf wirtschaftliche Weise und ohne Veränderung der tunnel
nahen Landschaft wegräumen zu können.
Diese Aufgabe wird gemäß der Erfindung mit den Mitteln
gelöst, die die kennzeichnenden Merkmale des Patentan
spruchs 1 bilden. Vorteilhafte Ausgestaltungen des Verfah
rens ergeben sich aus den Unteransprüchen.
Beim Bau von Tunneln, deren Decke nur wenig unterhalb des
Meeresbodens verläuft, werden die Kanäle, durch die der
Abraum weggepumpt wird, vorteilhafterweise im wesentlichen
in horizontaler Richtung gebohrt. Auf diese Weise wird
der Abraum in Zonen gefördert, von denen kein Druck auf
die Tunnelwandung ausgeübt wird und aus denen der Abraum
auch nicht zurückfließen kann bzw. ein Zurückfließen leicht
verhindert werden kann. Vorteilhafterweise werden die Ka
näle in Bereiche mit trockenem, standfestem Gebirge gebohrt,
was das Verlegen von Rohren erleichtert.
Um den Reibungswiderstand von vorwiegend aus trockenem
Gestein, Erde und Sand bestehenden Abraum zu veringern,
wird dem Abraum im Ansaugbereich der Pumpen Wasser oder
eine ölige Flüssigkeit zugesetzt, und so das Gleiten des
in einem teigigen Zustand befindlichen Abraums an den glat
ten Rohrwänden ermöglicht.
Werden die zur Förderung des Abraums dienenden Rohre bis
zur Wasseroberfläche geführt, so kann der durch die Rohre
geförderte Abraum auf Wasserfahrzeuge verladen werden.
Claims (5)
1. Verfahren zur Beseitigung von Abraum mittels Pumpen
beim Bau von Tunneln, insbesondere beim Bau von Tunneln
unterhalb von Wasserläufen, dadurch gekennzeichnet,
daß der Abraum durch von der Tunnelwand ausgehende,
in das den Tunnel umgebende Erdreich gebohrte Kanäle
gepumpt und in den den Tunnel umgebenden Bereich ge
fördert wird.
2. Verfahren nach Anspruch 1, dadurch gekennzeichnet,
daß der Abraum im Ansaugbereich der Pumpen durch Flüs
sigkeitszugabe in einen pastösen Zustand gebracht wird.
3. Verfahren nach Anspruch 1, dadurch gekennzeichnet,
daß der Abraum über einen im wesentlichen senkrechten
Kanal in den Wasserlauf gepumpt, z.B. auf dem Meeres
grund gelagert wird.
4. Verfahren nach Anspruch 1, dadurch gekennzeichnet,
daß der Abraum durch in den Kanälen verlegte Rohre
gepumpt wird.
5. Verfahren nach den Ansprüchen 1 und 4, dadurch gekenn
zeichnet, daß der Abraum durch bis an die Wasserober
fläche sich erstreckende Rohre gefördert wird.
Priority Applications (5)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863644818 DE3644818A1 (de) | 1986-12-31 | 1986-12-31 | Verfahren zur beseitigung von abraum |
JP62324182A JPS63176595A (ja) | 1986-12-31 | 1987-12-23 | 排除物の除去方法 |
US07/138,560 US4900191A (en) | 1986-12-31 | 1987-12-24 | Method for removal of broken ground |
DE8787119301T DE3770602D1 (de) | 1986-12-31 | 1987-12-29 | Verfahren zur beseitigung von abraum. |
EP87119301A EP0273441B1 (de) | 1986-12-31 | 1987-12-29 | Verfahren zur Beseitigung von Abraum |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19863644818 DE3644818A1 (de) | 1986-12-31 | 1986-12-31 | Verfahren zur beseitigung von abraum |
Publications (1)
Publication Number | Publication Date |
---|---|
DE3644818A1 true DE3644818A1 (de) | 1988-07-14 |
Family
ID=6317439
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE19863644818 Ceased DE3644818A1 (de) | 1986-12-31 | 1986-12-31 | Verfahren zur beseitigung von abraum |
DE8787119301T Expired - Lifetime DE3770602D1 (de) | 1986-12-31 | 1987-12-29 | Verfahren zur beseitigung von abraum. |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE8787119301T Expired - Lifetime DE3770602D1 (de) | 1986-12-31 | 1987-12-29 | Verfahren zur beseitigung von abraum. |
Country Status (4)
Country | Link |
---|---|
US (1) | US4900191A (de) |
EP (1) | EP0273441B1 (de) |
JP (1) | JPS63176595A (de) |
DE (2) | DE3644818A1 (de) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0130668D0 (en) * | 2001-12-21 | 2002-02-06 | Mmd Design & Consult | Apparatus and process for mining of minerals |
US7013937B2 (en) * | 2002-12-20 | 2006-03-21 | Mmd Design And Consultancy | Apparatus and process for mining of minerals |
CN1307348C (zh) * | 2004-03-15 | 2007-03-28 | 中国第二十冶金建设公司 | 地下结构半逆作法反向连接施工方法 |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3125644A1 (de) * | 1981-06-30 | 1983-01-13 | Wayss & Freytag Ag, 6000 Frankfurt | Verfahren zum vortreiben eines tunnels unter verwendung eines schildes mit fluessigkeitsgefuellter arbeitskammer |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2233872A (en) * | 1936-07-27 | 1941-03-04 | California Talc Company | Means and method for solidifying underground structures |
GB1083322A (en) * | 1964-03-21 | 1967-09-13 | Mott Hay & Anderson | Improvements in or relating to tunnelling apparatus and methods of tunnelling |
US3386251A (en) * | 1966-05-23 | 1968-06-04 | Griffin Wellpoint Corp | Method of strengthening and stabilizing compressible soils |
US3616855A (en) * | 1970-07-23 | 1971-11-02 | New Mexico Tech Res Found | Method of bulking or caving a volume of subsurface material |
US4072018A (en) * | 1975-04-30 | 1978-02-07 | Alvarez Calderon Alberto | Tunnel support structure and method |
US4101333A (en) * | 1976-08-19 | 1978-07-18 | Joy Manufacturing Company | Method of mine backfilling and material therefor |
DE2644319A1 (de) * | 1976-10-01 | 1978-04-06 | Gewerk Eisenhuette Westfalia | Hydraulische foerdereinrichtung fuer den abraumtransport beim auffahren unterirdischer hohlraeume, wie tunnel, stollen u.dgl. |
US4370077A (en) * | 1980-08-04 | 1983-01-25 | Colgate Stirling A | Method of pressurizing and stabilizing rock by periodic and repeated injections of a settable fluid of finite gel strength |
GB2117817B (en) * | 1982-03-23 | 1985-11-13 | Frank P Davidson | Improved tunnelling method |
US4666346A (en) * | 1986-03-24 | 1987-05-19 | Hanna-Beric Systems, Inc. | Rotatable fill pipe with collapsible backfill elbow and method of employing same to blind-fill underground voids |
-
1986
- 1986-12-31 DE DE19863644818 patent/DE3644818A1/de not_active Ceased
-
1987
- 1987-12-23 JP JP62324182A patent/JPS63176595A/ja active Pending
- 1987-12-24 US US07/138,560 patent/US4900191A/en not_active Expired - Fee Related
- 1987-12-29 EP EP87119301A patent/EP0273441B1/de not_active Expired - Lifetime
- 1987-12-29 DE DE8787119301T patent/DE3770602D1/de not_active Expired - Lifetime
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3125644A1 (de) * | 1981-06-30 | 1983-01-13 | Wayss & Freytag Ag, 6000 Frankfurt | Verfahren zum vortreiben eines tunnels unter verwendung eines schildes mit fluessigkeitsgefuellter arbeitskammer |
Also Published As
Publication number | Publication date |
---|---|
EP0273441A3 (en) | 1989-03-15 |
EP0273441A2 (de) | 1988-07-06 |
US4900191A (en) | 1990-02-13 |
DE3770602D1 (de) | 1991-07-11 |
EP0273441B1 (de) | 1991-06-05 |
JPS63176595A (ja) | 1988-07-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0002877B1 (de) | Verfahren zur Gewinnung von Methan | |
DE1902137A1 (de) | Verfahren und Vorrichtung zum Anlegen von Draenage-Dichtungsschuerzen im Boden | |
DE2211390A1 (de) | Verfahren und Vorrichtung zum Verhindern oder Herabsetzen der Erosion eines Strandes und dabei oder anderweitig verwendbares, rohrförmiges Bauelement für Leitungen und Tunnels | |
DE3047803C2 (de) | Verfahren zur Gewinnung von Erdöl aus einer erdölführenden Schicht, die im unteren Teil wasserführend ist | |
DE2452696A1 (de) | Untertage gelegener kohlenschlammanreiche.rungssumpf | |
DE3644818A1 (de) | Verfahren zur beseitigung von abraum | |
DE3751705D1 (de) | Verfahren und Vorrichtung zum Herstellen eines Brunnens | |
DE4332422C1 (de) | Verfahren zur Horizontalentwässerung von überkippten Böschungen | |
DE3424981A1 (de) | Verfahren zur sohlabdichtung von ausgedehnten deponien gegenueber grundwasser | |
DE620764C (de) | Vortriebsschild zur Herstellung von Tunneln oder Stollen in weichem oder wasserfuehrendem Boden | |
DE3512709A1 (de) | Verfahren zum herstellen und abdichten eines brunnens sowie vorrichtung zur durchfuehrung des verfahrens und brunnen | |
DE3521434A1 (de) | Injektionsverfahren und -vorrichtung zur bodenverbesserung | |
DE1249191B (de) | Verfahren zur sekundären Gewinnung von Öl durch Fluten mit einer Flüssigkeit hoher Dichte | |
DE105825C (de) | ||
DE4039016A1 (de) | Gefrierdamm-wasserzufuhrschutz fuer tagebaue | |
DE3542313A1 (de) | Verfahren und vorrichtung zum formen einer abdichtenden wand im erdboden | |
DE936561C (de) | Verfahren fuer das Abteufen von Schaechten | |
CH402925A (de) | Einrichtung zur Stützung einer Tunnelbrust | |
DE102004017648B4 (de) | Verfahren zum Bau von Tunneln unter dem Meeresgrund | |
DE2052184A1 (de) | Verfahren zum Herstellen eines Tiefgründungskörpers | |
DE3405069A1 (de) | Verfahren zum vortrieb eines vortriebsschildes | |
DE616707C (de) | Senkkasten und Verfahren zum Niederbringen desselben | |
DE102020121528A1 (de) | Verfahren zum Herstellen einer geologischen Bohrung in einem Boden | |
DE638744C (de) | Zweiteiliger, saugrohrloser Filterbrunnen und Verfahren zu seiner Herstellung | |
DE2313824A1 (de) | Verfahren zum bauen eines tunnels und tunnel gebaut nach diesem verfahren |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8131 | Rejection |