DE2225206A1 - Device on climbing poles for climbing jacks - Google Patents
Device on climbing poles for climbing jacksInfo
- Publication number
- DE2225206A1 DE2225206A1 DE19722225206 DE2225206A DE2225206A1 DE 2225206 A1 DE2225206 A1 DE 2225206A1 DE 19722225206 DE19722225206 DE 19722225206 DE 2225206 A DE2225206 A DE 2225206A DE 2225206 A1 DE2225206 A1 DE 2225206A1
- Authority
- DE
- Germany
- Prior art keywords
- mast
- climbing
- rod
- pole
- projections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B17/00—Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
- E02B17/04—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
- E02B17/08—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
- E02B17/0836—Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Jib Cranes (AREA)
Description
Paul Anderson Industrier AB,Paul Anderson Industrier AB,
Västeräs, SchwedenVasteräs, Sweden
Vorrichtung an Kletterstangen für KletterheberDevice on climbing poles for climbing jacks
Die Erfindung betrifft eine mit einem Stützmast verbundene ' Kletterstange für Kletterheber.The invention relates to a ' climbing pole for climbing jacks connected to a supporting mast.
Die Forderungen der Industrie schwere Lasten heben zu können nehmen in raschem Takt zu. Die übliche Methode ist, oberhalb des zu hebenden Gegenstandes einen festen Punkt anzuordnen und an diesem ein Hebeseil zu hängen, das einfach oder über mehrscheibige Blöcke gelegt sein kann und das zu einer Winde läuft, die die erforderliche Hebekraft liefert. In den Fällen wo auch ein Horizontaltransport erforderlich ist, wird dieser feste Punkt beweglich gemacht, z.B. in Form einer Laufkatze oder dergleichen. Bei oft vorkommenden Bedarf eines Hebezeuges in einem begrenzten Raum, z.B. einer Werkstadt, ist dies immer noch die natürlichste Lösung, aber in solchen Fällen, wo es sich um die Installation einer Arbeitsmasihine, eines grossen Druckbehälters oder eines anderen schweren Gegenstandes handelt, der dann an der betreffenden Stelle verbleiben soll, hat es sich gezeigt, dass Traversen, die bisher zur Ausführung der Hebearbeit installiert wurden, eine ausserordentlich kostspielige Lösung bilden, die in vielen Fällen selten mehr als je einmal in zehn Jahren verwendet wird. Es sind deshalb Lösungen gesucht worden, die den momentanen Aufbau von Hebegeräten gestabten, welche nach vollbrachter Arbeit wieder entfernt werden können um an einer anderen Stelle wieder aufgebaut zu werden. Eine erste Lösung dieser Aufgabe bestand darin,The demands of the industry to be able to lift heavy loads increase rapidly. The usual method is to place a fixed point above the object to be lifted and to hang a lifting rope on this, single or multi-sheave Blocks can be laid and that runs to a winch that provides the necessary lifting force. In those cases where too a horizontal transport is required, this fixed point is made movable, e.g. in the form of a trolley or like that. If a hoist is often required in a limited space, e.g. a workshop, this is still the most natural solution, but in cases where there is the installation of a work machine, a large pressure vessel or another heavy object, which should then remain at the relevant point, it has been shown that trusses, which were previously used to carry out the Lifting work installed constitute an extremely costly solution, which in many cases seldom exceeds is used once every ten years. It is therefore Solutions have been sought that stabten the current construction of lifting devices, which removed again after the work was done can be rebuilt at another location. A first solution to this problem was to
209851/0738209851/0738
dass man zwei Hebemaste aufstellte, zwischen diesen eine Querbalke anbrachte und am Querbalken entweder eine Hebewinde oder einen Seilzug anordnete, von dem die Hebekraft mittels Seile an einer am Boden angebrachte Hebewinde geleitet wurde. Es mussten die Maste zur Aufnahme sowohl des Gewichtes des zu hebenden Gegenstandes als auch für das Gewicht der vom Balken getragenen Winde oder für die Zugkraft im Seil zwischen Winde und Querbalken bemessen werden. Der Querbalken muss eine solche Länge haben, dass die Maste zentriash belastet werden, weshalb , die Balkenlänge dem notwendigen freien Abstand zwischen den Masten plus den Abständen zwischen den freien Seiten der Maste und deren senkrechten Schwerachse entsprechen musste. Diese Vorrichtung hatte ausserdem den Nachteil, dass wenn es sich um das Heben eines sehr langen Gegenstandes handelte, musste der Querbalken so hoch verlegt werden, dass er das vollständige Aufrichten des Gegenstandes, z.B. einer Essenicht hinderte.that two lifting masts were set up with a crossbeam between them and arranged either a winch or a cable pull on the crossbeam, from which the lifting force by means of ropes at a windlass attached to the floor. The masts had to be able to carry both the weight of the lifting object as well as for the weight of the winch carried by the beam or for the tensile force in the rope between winches and crossbeams are dimensioned. The crossbeam must be of such a length that the masts are loaded centrically, which is why, the beam length is the necessary free space between the masts plus the distances between the free sides of the masts and their vertical axis of gravity had to correspond. This device also had the disadvantage that when it comes to When lifting a very long object, the transom had to be placed high enough to cover the whole Raising the object, e.g. did not prevent a meal.
Wenn dann die sogenannten Kletterheber bekannt wurden, konnte eine andere Lösung ausgebildet werden. Nach dieser wurden zwei oder mehrere Türme oder Maste mit Kletterstangen versehen, an denen Kletterheber emporklettern konnten. Kletterstangen haben aber den Nachteil, dass sie die Stützmaste exzentrisch belasten, so dass man ausser den von der Last ausgeübten Normalkräften auch Biegemomente in den Stangen und den damit verbundenen Masten erhielt. Es ist wichtig, dass die Maste während des Hubes einen genauen und konstanten Abstand zwischeneinander beibehalten, denn sonst können auch Sonderbeanspruchungen im Querbalken entstehen, die die Kletterheber miteinander verbinden und die zu hebende Last tragen.When the so-called climbing jacks became known, another solution could be developed. After this there were two or provide several towers or masts with climbing poles on which climbing jacks could climb. Have climbing poles but the disadvantage that they load the support masts eccentrically, so that besides the normal forces exerted by the load also received bending moments in the rods and associated masts. It is important that the masts are maintained during the Hubes maintain an exact and constant distance between each other, otherwise special loads can also occur in the Cross beams are created that connect the climbing jacks and carry the load to be lifted.
Eine steife Verbindung zwischen der Kletterstange und dem diese stützenden Mast würde zur Folge haben, dass die die Kletterstange beanspruchenden Kräfte den Mast exzentrischen Beanspruchungen aussetzen würden. Diese würden bedeutend erhöhte Bemessungen der Verbände zwischen Mast und Stange sowie der Glieder und Verbände des Mastes selbst benötigen.. Es handelt sich hier um so grosse Kräfte, dass der Mast selbstA rigid connection between the climbing pole and the mast supporting it would result in the Climbing pole stressing forces would expose the mast to eccentric loads. These would significantly increase the dimensions of the associations between mast and pole as well of the members and associations of the mast itself. The forces involved here are so great that the mast itself
209851/0718209851/0718
und die Verbände zwischen diesem und der Kletterstange so gross wurden, dass grosse Schwierigkeiten .beim Aufbau und beim .Auseinandernehmen sowie beim Transport entstehen wurden was von besonderer Bedeutungen bei Vorrichtungen der hier in-Frage stehenden Art ist, die von einer Stelle zur anderen transportiert werden müssen um dort eine Hubarbeit auszuführen.and the associations between this and the climbing pole became so large that great difficulties during assembly and disassembly as well as during transport which were of particular importance in the devices of the here in question standing type that have to be transported from one place to another in order to carry out lifting work there.
Damit Längenveränderungen der Kletterstange frei stattfinden können ohne dass die Kräfte'dem Mast übertragen werden, muss die Kletterstange längsverschiebbar am Mast geführt sein, so dass dieser nur die waagerechten Kräfte aufnimmt, die auf die KMt er stange wirken.So that changes in length of the climbing pole take place freely can be transferred to the mast without the forces, the climbing pole must be longitudinally displaceable on the mast, see above that this only absorbs the horizontal forces that act on the KMt he rod.
Es ist früher vorgeschlagen worden Führungsstangen für Aufzüge mit den dieselben stützenden Bauelementen längsverschiebbar zu verbinden. Führungsstangen für Aufzüge sind aber nur sehr unbedeutenden Längsbeanspruchungen ausgesetzt, weshalb die Führungsglieder aus Stützführungen ausgebildet werden konnten, die durch in der Führungsstange eingeschraubte Bolzen in. Anliegung an diese gehalten werden.Guide bars for elevators have previously been proposed longitudinally displaceable with the same supporting structural elements connect to. Guide rods for elevators are only very exposed to insignificant longitudinal loads, which is why the guide links could be formed from support guides, which by bolts screwed into the guide rod in. abutment to be adhered to.
Eine solche Verbindung ist nicht drehsteif und wirkt nicht den. Knickbeanspruchungen entgegen, die in Kletterstangen auftreten, die die gesamte Last aufnehmen und deshalb den grösstmöglichen Druckbelastungen ausgesetzt werden können müssen, welche der Stangenquerschnitt zulässt.Such a connection is not torsionally rigid and does not work. Counteracts buckling loads that occur in climbing poles that take the entire load and therefore the greatest possible Must be able to be exposed to pressure loads, which the rod cross-section allows.
Durch die Erfindung sollten die obengenannten Nachteile beseitigt werden« Dies wird erfindungsgemäss dadurch erreicht, dass die Kletterstange einen seiner Länge entlang kontinuierlichen, unveränderlichen Profil mit zwei entgegengesetzten, mit den Klemmbackenpaaren des Kletterhebers zusammenwirkenden, gleichmassigen Flächen und von der Kletterstange gegen den Mast hin herausragenden Vorsprüngen aufweist, die parallel mit der Längsrichtung der Stange im Mast verschiebbar geführt sind. Dieso Vorsprünge bestehen zweckmässig aus in gleichmässigen Abständen der Slango entlang von dieser herausragendenThe invention is intended to eliminate the above-mentioned disadvantages. According to the invention, this is achieved by that the climbing pole is continuous along its length, unchangeable profile with two opposing profiles interacting with the pairs of clamping jaws of the climbing jack, uniform surfaces and protruding projections from the climbing pole towards the mast, which are parallel with are guided displaceably in the longitudinal direction of the rod in the mast. These projections expediently consist of uniform Distances the slango along from this outstanding one
2098 51/07382098 51/0738
schmalen Stegen, die an ihren freien Enden mit einem mit dem Steg zusammenhängenden Flansch versehen sind, der längsverschiebbar und drehsteif in mit dem Mast verbundenen Führungen geführt sind. Die Erfindung kann weiter eines oder mehrere der in den beigefügten Unteransprüchen 3~7 angegebenen Merkmale aufweisen.narrow webs, which at their free ends with a with the Web-related flange are provided, the longitudinally displaceable and torsionally rigid in guides connected to the mast are led. The invention may further include one or more of the features specified in the appended subclaims 3-7 exhibit.
Einige Ausführungsformen der Erfindung sind auf der beiliegenden Zeichnung veranschaulicht.Some embodiments of the invention are illustrated on the accompanying drawing.
Fig. 1 ist eine Seitenansich einer Hebevorrichtung mit zwei Stützmasten 1 mit je einer Kletterstange 2 und an diesen Stangen emporkletternden Kletterheben 3? die zwischen sich die zu hebende Last k tragen. Mit 5 sind schematisch im Abstand von den unteren Enden der Maste in den Füssen 6 derselben angeordnete Stellschrauben für die Einstellung der Neigung der Maste bezeichnet.Fig. 1 is a side view of a lifting device with two support masts 1, each with a climbing pole 2 and climbing lifts 3? carrying the load k to be lifted between them. With 5 are schematically indicated at a distance from the lower ends of the masts in the feet 6 of the same arranged adjusting screws for adjusting the inclination of the masts.
Fig. 2 zeigt im Querschnitt und Fig. 3 in Seitenansicht die verschiebbare Verbindung der Kletterstange mit dem Mast. 7 bezeichnet ein Glied des Mastes und S eine am Mast befestigte Führungsschiene. Die Kletterstange 9 hat im Querschnitt gesehen einen die Belastung aufnehmenden Kopfteil und eine Anzahl durch Stege mit dem Kopfteil verbundene Fussflanschen, die durch Ueberfallsglieder 10 der Führungsschiene 8 entlang geführt sind.Fig. 2 shows in cross section and Fig. 3 in side view sliding connection of the climbing pole with the mast. 7 denotes a link of the mast and S one attached to the mast Guide rail. The climbing pole 9, seen in cross section, has a load-absorbing head part and a number Foot flanges connected to the head part by webs, which are guided along the guide rail 8 by overflow members 10 are.
Fig. *-!· zeigt im Grundriss eine Vorrichtung, bei der zwei mit je einer Kletterstange 11 zusammenwirkende Kletterheber 12 durch einen Querteil 13 miteinander verbunden sind. Dieser Querteil 13 ist an den Enden durch Arme I1+ mit Führungsvorsprüngen verbunden, die in am Mast befestigten Führungsschienen 15 eingreifen, durch welche auf die Klettervorrichtung' einwirkende, quergehende Kräfte direkt an den Mast übertragen werden.Fig. * -! · Shows in plan a device in which two climbing jacks 12, each cooperating with a climbing pole 11, are connected to one another by a transverse part 13. This transverse part 13 is connected at the ends by arms I 1 + with guide projections which engage in guide rails 15 attached to the mast, through which transverse forces acting on the climbing device are transmitted directly to the mast.
Fig. 5 zeigt eine Vorrichtung, bei der die Kletterstange 16 anFig. 5 shows a device in which the climbing pole 16 to
209851/0738209851/0738
der einen Ecke eines im Querschnitt dreieckigen Mastes befestigt ist, wobei der Mast an den beiden anderen Ecken seiner Base mit Einstellgliedern (Schrauben 17) für die Einstellung der Lotlage des Mastes versehen ist.one corner of a triangular pole in cross-section is, with the mast at the other two corners of its base with adjustment links (screws 17) for adjustment the vertical position of the mast is provided.
Die beschriebenen Einzelvorrichtungen können in verschiedener Weise miteinander verbunden werden.The individual devices described can be connected to one another in various ways.
2098 B1/07382098 B1 / 0738
Claims (7)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE693671 | 1971-05-28 | ||
SE06936/71A SE352323B (en) | 1971-05-28 | 1971-05-28 |
Publications (3)
Publication Number | Publication Date |
---|---|
DE2225206A1 true DE2225206A1 (en) | 1972-12-14 |
DE2225206B2 DE2225206B2 (en) | 1977-03-17 |
DE2225206C3 DE2225206C3 (en) | 1977-11-03 |
Family
ID=
Also Published As
Publication number | Publication date |
---|---|
NL7207052A (en) | 1972-11-30 |
SE352323B (en) | 1972-12-27 |
NL157870B (en) | 1978-09-15 |
GB1340996A (en) | 1973-12-19 |
US3845934A (en) | 1974-11-05 |
DE2225206B2 (en) | 1977-03-17 |
FR2147926B1 (en) | 1976-01-16 |
FR2147926A1 (en) | 1973-03-11 |
BE784101A (en) | 1972-09-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
LU86532A1 (en) | TELESCOPIC COLUMN | |
DE3390026T1 (en) | Arrangement for pouring prestressed concrete bridges in sections using the cantilever front-mounting method | |
EP0633214A2 (en) | Curveless rail system for a static inclined lift where the cart is pulled by a rope | |
DE1255902B (en) | Process for erecting buildings from prefabricated space boxes | |
DE3420737A1 (en) | Auxiliary apparatus for vertically adjustable scaffolding | |
DE2250428C3 (en) | Lifting device for vehicles, in particular motor vehicles | |
DE2225206A1 (en) | Device on climbing poles for climbing jacks | |
DE2629253C3 (en) | Device for conveying building material through an opening in a wall into a building | |
DE3042287A1 (en) | Heavy-duty telescopic crane jib - has fly jib attached by pivot pins to main jib and gantry | |
DE2157669A1 (en) | PROCEDURE AND DEVICE FOR ASSEMBLING A STRUCTURE, IN PARTICULAR A GENTLE CRANE | |
DE1556352C3 (en) | Moment-locking connection arrangement for the telescopic parts of a telescopic tower on a tower crane or the like | |
DE695045C (en) | en long length of fabric | |
DE3911044C2 (en) | ||
DE2365076C3 (en) | Assembly platform | |
DE827509C (en) | Lifting device for steel masts for the purpose of raising the electric transmission lines carried by the masts | |
DE29607823U1 (en) | Mast | |
DE1658602B1 (en) | Device for assembling the prefabricated components of a prestressed concrete bridge, each comprising a complete bridge section, in cantilevered cantilevered sections | |
AT327461B (en) | PROCEDURE FOR LIFTING A RECTANGULAR CEILING COMPONENT AND DEVICE FOR CARRYING OUT THIS PROCEDURE | |
DE2225206C3 (en) | Device on climbing poles used for climbing jacks | |
DE2306186C2 (en) | ||
DE24300C (en) | Innovations in sugar mills * | |
DE665427C (en) | Lifting bridge with a raised and lowered deck | |
DE7536753U (en) | LIFTING LIFT, IN PARTICULAR FOR BOARD STACKING SYSTEMS | |
DE1531324A1 (en) | Method and apparatus for transporting a heavy load, particularly a prefabricated house, to a foundation | |
DE102022110726A1 (en) | Crane jacking system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C3 | Grant after two publication steps (3rd publication) | ||
E77 | Valid patent as to the heymanns-index 1977 | ||
8339 | Ceased/non-payment of the annual fee |