DE1031703B
DE1031703B DEJ12697A DEJ0012697A DE1031703B DE 1031703 B DE1031703 B DE 1031703B DE J12697 A DEJ12697 A DE J12697A DE J0012697 A DEJ0012697 A DE J0012697A DE 1031703 B DE1031703 B DE 1031703B
Authority
DE
Germany
Prior art keywords
lever
bricks
sandpit
sand
brick
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
DEJ12697A
Other languages
German (de)
Inventor
John Alexander Johnson
Frederick Valentine Wi Sedgley
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FREDERICK VALENTINE WILLIAM SE
Original Assignee
FREDERICK VALENTINE WILLIAM SE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FREDERICK VALENTINE WILLIAM SE filed Critical FREDERICK VALENTINE WILLIAM SE
Publication of DE1031703B publication Critical patent/DE1031703B/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B11/00Apparatus or processes for treating or working the shaped or preshaped articles
    • B28B11/04Apparatus or processes for treating or working the shaped or preshaped articles for coating or applying engobing layers
    • B28B11/06Apparatus or processes for treating or working the shaped or preshaped articles for coating or applying engobing layers with powdered or granular material, e.g. sanding of shaped articles

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
  • Jigging Conveyors (AREA)

Description

Vorrichtung zum Aufbringen von Sand oder anderem körnigen Material auf Ziegelsteine Gegenstand der Erfindung ist eine Vorrichtung, um Sand oder anderes körniges Material auf die Oberfläche von Ziegelsteinen, Mauersteinen od. dgl. aufzubringen, wobei der Sand oder das andere Material aufgebracht werden, um die Oberfläche der Steine zu verändern, wobei beispielsweise Sand den Steinen ein warmes und weiches Aussehen gibt.Device for applying sand or other granular material on bricks the subject of the invention is a device to sand or other to apply granular material to the surface of bricks, bricks or the like, wherein the sand or other material is applied to the surface of the To change stones, for example sand making the stones a warm and soft one Appearance there.

Es ist 1@ereits ein. Verfahren und eine Vorrichtung, um Sand oder ähnliches Material auf Ziegelsteine od. dgl. aufzubringen, bekannt. Die bekannte Anlage enthält eine Fördervorrichtung, die die Ziegelsteine in horizontaler Richtung durch einen Sandkasten führt. Diese Anlage ist in ihrer Wirkung sehr zufriedenstellend, aber sie beansprucht eine große Grundfläche, was aus wirtschaftlichen Gründen unerwünscht ist.It's 1 @ already a. Method and device to sand or To apply similar material to bricks or the like is known. The well-known Plant contains a conveyor that moves the bricks in a horizontal direction leads through a sandpit. This system is very satisfactory in its effect, but it takes up a large area, which is undesirable for economic reasons is.

Es ist auch bekannt, den Sandkasten, der die Steine besandet, zu rütteln.It is also known to shake the sandpit that sanded the stones.

Gegenstand der Erfindung ist eine Vorrichtung, die ebenso zufriedenstellend arbeit wie die bekannten Anlagen, während aber die neue Vorrichtung eine viel kleinere Grundfläche in Anspruch nimmt.The invention is a device that is just as satisfactory work like the known systems, but the new device is much smaller Takes up floor space.

Die Erfindung verfolgt ferner noch den Zweck, eine Vorrichtung zii schaffen, die geeignet ist, die Oberfläche solcher Ziegelsteine od. dgl. zu überziehen, bei denen es auf Grund ihres Herstellungsverfahrens zu Unzuträglichkeiten führt oder unerwünscht ist, sie beim Überziehen in horizontaler Richtung zu bewegen.The invention also has the purpose of providing a device zii create that is suitable for covering the surface of such bricks or the like, in which it leads to inconveniences due to their manufacturing process or it is undesirable to move it in the horizontal direction when pulling it over.

Die Erfindung betrifft eine Vorrichtung zum Aufbringen von Sand oder anderem körnigen Material auf die Oberfläche -von Ziegelsteinen, Bausteinen od. dgl. mittels eines gerüttelten Sandkastens, bei der erfindungsgemäß ein senkrechter, den Steindurchtritt gestattender Schacht innerhalb des Sandkastens vorgesehen ist, mit einer unteren Steinzuführung und oberen Steinausstoßvorrichtung, Öffnungen im Schacht für den Sanddurchtritt und einer Hebevorrichtung zum Transport der Steine von der Zuführung zur Ausstoßvorrichtung. Der senkrechte Schacht bestellt dabei zweckmäßig aus mit dem gerüttelten Sandkasten fest verbundenen senkrechten Platten, welche an ihren Innenseiten Aussparungen aufweisen, die durch Öffnungen mit den dem Sandkasten zugekehrten Rückseiten der Platten in Verbindung stehen. Die Hehevorrichtun.g ist mit einem nur aufwärts wirkenden Antriebsmechanismus verbunden und kehrt durch die Schwerkraft in ihre Ausgangslage zurück. Zur Betätigung der Hebevorrichtung dient zweckmäßig ein schwenkbarer Hebel, der auf den Tisch der Hebevorrichtung über ein zweiteiliges Zugglied wirkt, dessen Teile mit einer Entriegelungsvorrichtung versehen sind, welche durch Entriegelung in einer bestimmten Stellung des Hebels eine derartige Verlängerung des Zuggliedes gestattet, daß der Hebel eine weitere Schwenkbewegung ausführen kann., unabhängig von der Bewegung des Hebetisches, der in seine Ausgangsstellung zurückkehrt. Die Ausstoßvorrichtung für den Ziegelstein, der besandet ist, weist zweckmäßig einen Anschlag auf, gegen den der Hebel bei weiterer Schwenkung zum Betätigen der Ausstoßvorrichtung anliegt. Vorteilhaft kann die Vorrichtung angetrieben werden durch die Ausstoßvorrichtung einer Ziegelpresse, von der aus die Ziegel der Besandungsvorrichtung zugeführt werden.The invention relates to a device for applying sand or other granular material on the surface of bricks, building blocks or like. by means of a vibrated sandpit, in which according to the invention a vertical, the shaft allowing the stone passage is provided within the sandpit, with a lower stone feed and upper stone ejection device, openings in the Chute for the passage of sand and a lifting device for transporting the stones from the feed to the ejector. The vertical shaft orders expediently made of vertical slabs firmly connected to the vibrated sandpit, which have recesses on their insides through openings with the the back sides of the slabs facing the sandpit are connected. The lifting device is connected to an upwardly acting drive mechanism and reverses gravity returns to its original position. To operate the lifting device It is useful to use a pivoting lever that is placed on the table of the lifting device a two-part tension member acts, the parts of which with an unlocking device are provided, which by unlocking in a certain position of the lever Such an extension of the tension member allows that the lever a further Can perform swivel movement., Regardless of the movement of the lifting table, the returns to its original position. The brick ejector, which is sanded, expediently has a stop against which the lever at further Pivoting for actuating the ejector is present. The device can advantageously are driven by the ejector of a brick press, from which the bricks are fed to the sanding device.

Ein Ausführungsbeispiel einer Vorrichtung gemäß der Erfindung ist in den Figuren der Zeichnungen dargestellt. Es zeigt Fig. 1 eine perspektivische Ansicht einer Ausführungsform einer Vorrichtung gemäß der Erfindung, Fig. 2 eine aufgeschnittene Seitenansicht der Vorrichtung nach Fig. 1, Fig.3 einen senkrechten Schnitt nach der Linie III-III in Fig. 2, Fig.4 einen horizontalen Schnitt nach der Linie IV-IV in Fig. 2, Fig. 5 einen horizontalen Schnitt nach der Linie V-V in Fig. 2, Fig.6 einen Schnitt durch das teilbare Verbindungsglied zum Antrieb der Hebevorrichtung in einem größeren Malistab als die Fig. 2 bis 5, Fig. 7 eine vergrößerte Darstellung der Sicherheitsvorrichtung, die ein Zurückgleiten der Ziegelsteine verhindert, Fig. 8 eine perspektivische Ansicht, die als Ausfüh: rungsbeispiel den Antrieb der Vorrichtung durch eine Ziegelpresse zeigt.An embodiment of a device according to the invention is shown in the figures of the drawings. 1 shows a perspective View of an embodiment of a device according to the invention, FIG. 2 a Cutaway side view of the device according to FIG. 1, FIG. 3 a vertical one Section along the line III-III in Fig. 2, Fig.4 shows a horizontal section the line IV-IV in Fig. 2, Fig. 5 is a horizontal section according to the line V-V in Fig. 2, Fig.6 shows a section through the divisible connecting member to drive the lifting device in a larger Malistab than Figs. 2 to 5, 7 shows an enlarged illustration of the safety device which is sliding back of the bricks prevents, Fig. 8 is a perspective view showing as an execution: example shows the drive of the device by a brick press.

In der Figurenbeschreibung werden die zu überziehenden Körper als Ziegelsteine und das aufzubringende Material als Sand bezeichnet. Die Vorrichtung kann jedoch gegebenenfalls unter entsprechender Änderung auch benutzt werden, um andere Bauelementa zu behandeln und um anderes körniges Material auf die Oberflächen aufzubringen.In the description of the figures, the bodies to be coated are identified as Bricks and the material to be applied are referred to as sand. The device can, however, also be used with appropriate modification to other components to treat and other granular material on the surfaces to raise.

Die in den Fig. 1 bis 6 dargestellte Vorrichtung enthält ein Hauptgestell 10 mit rechteckiger Grundfläche, das aus vier aufrecht stehenden Winkeleisen 11, jedes an einer Ecke, und Querverbindungen dieser Teile besteht. Ein Paar 12 dieser am oberen Ende des Gestelles trägt Blöcke 13 aus elastischem Material, und ein, Paar Querverbindungen 14 in der Mitte des Gestelles trägt ein Paar U-Schienen 15, die ihrerseits weitere Blöcke 16 aus elastischem Material tragen. Diese beiden Gruppen von elastischen Blöcken, 13 und 16 tragen gemeinsam den Sandkasten 17, der, wie in Fig. 3 dargestellt, sich nach. unten in einer Richtung verjüngt. Mit dem oberen Teil des Sandkastens 17 ist eine Vibrationsvo:rrichtung 18 bekannter Art, beispielsweise ein Elektromotor mit Unwucht, fest verbunden.The apparatus shown in Figs. 1 to 6 includes a main frame 10 with a rectangular base, which consists of four upright angle irons 11, each at a corner, and there are cross-connections between these parts. A pair of 12 of these at the upper end of the frame carries blocks 13 made of elastic material, and a, Pair of cross connections 14 in the middle of the frame carries a pair of U-rails 15, which in turn carry further blocks 16 made of elastic material. These two groups of elastic blocks, 13 and 16 jointly support the sandpit 17, which, like shown in Fig. 3, according to. tapered at the bottom in one direction. With the upper one Part of the sandpit 17 is a vibration device 18 of a known type, for example an unbalanced electric motor, firmly connected.

Im Boden des Sandkastens 17 ist eine rechteckige Öffnung 19 vorgesehen, die etwas größer ist als der größte Umriß eines Ziegelsteines, und um diese Öffnung 19 ist eine Lippe 21 aus biegsamem Material vorgesehen, die nach innen und oben gebogen ist, wobei die durch die Lippe 21 frei gelassene Öffnung so groß ist, daß beim Durchtreten eines Ziegelsteines die Lippe etwas umgebogen wird. Im Sandkasten 17 sind vier senkrechte Platten in: zwei einander gegenüberstehenden Paaren so angeordnet, daß ihre Unterkanten einen geringen Abstand von dar Lippe 21 haben. Das eine Paar 22 wirkt mit den Querseiten, das andere Paar 23 wirkt mit den Längsseiten der Ziegelsteine zusammen, und die Platten beider Paare haben an ihren Innenseiten Ausnehmungen 24 und haben ferner Öffnungen 25, die von den Außenseiten der Platten in die Ausnehmungen, einmünden, so daß der im Sandkasten enthaltene Sand in die Ausne ,-mungen. 24 fließen kann, um so auf die Oberflächen der Ziegelsteine aufgebracht zu werden. Die Platten 22 und 23 werden von den Wänden des Sandkastens durch Stangen 26 getragen, die in den Platten, drehbar befestigt sind und Gewindeteile haben, auf denen Gewindemuttern 27 laufen, die an den. Wänden des Sandkastens befestigt sind. Kontermuttern 28 sind auf die Stangen 26 aufgeschraubt. Die Platten 22 und 23 haben T-förmigen Umriß, wobei die breiteren Teile dar Platten 22 nach oben, die breiteren Teile der Platten 23 nach unten. liegen, und die breiteren Teile jedes Plattenpaares sich über die Ebenen des anderen Plattenpaares hinaus erstrecken, Die Platten werden so justiert, daß sie einen Schacht bilden, bei dem rings um den Ziegelstein ein bestimmter schmaler Zwischenraum bleibt, durch den die Dicke der aufzubringenden Sandschicht bestimmt werden kann. Die Ziegelsteine treten in die Maschine durch die Zuführrinne 29 ein., die am Gestell der Vorrichtung befestigt ist. Sie rücken in dieser Rinne schrittweise vor und gelangen nacheinander auf den Hebetisch 31, der in einer Öffnung des Bodens der Rinne 29 liegt, und zwar direkt unter der Öffnung 19 des Sandkastens. Eine Querwand 32 in der Rinne 29 dient als Anschlag, damit sich, die Ziegelsteine stets genau auf dem Hebetisch 31 befinden. Der Hebetisch entspricht in Länge und Breite genau der Länge und Breite eines Ziegelsteines und wird von. zwei senkrechten Stangen 33 getragen, die in Führungen 34 geführt sind, die an einer Grundplatte 35 befestigt sind. Die Stangen 33 sind an ihren unteren Enden durch eine Querstrebe 36 miteinander verbunden, und der Hebetisch wird durch Federn 37, die; zwischen den Führungen 34 und der Querstrebe 36 über die Stangen 33 geschoben sind, nach abwärts bewegt.A rectangular opening 19 is provided in the bottom of the sandpit 17, which is slightly larger than the largest outline of a brick, and around this opening 19 is a lip 21 of flexible material is provided, which is inwardly and upwardly is bent, the opening left free by the lip 21 being so large that when stepping through a brick the lip is bent slightly. In the sandbox 17 are four vertical plates in: two opposing pairs arranged in such a way that their lower edges have a small distance from the lip 21. The one pair 22 works with the transverse sides, the other pair 23 works with the long sides of the bricks together, and the plates of both pairs have recesses 24 on their inner sides and furthermore have openings 25 which extend from the outer sides of the plates into the recesses, open, so that the sand contained in the sandpit in the recess. 24 flow can so as to be applied to the surfaces of the bricks. The plates 22 and 23 are supported from the walls of the sandpit by rods 26 inserted into the plates, are rotatably mounted and have threaded parts on which threaded nuts 27 run to the. Walls of the sandpit are attached. Lock nuts 28 are screwed onto the rods 26. The plates 22 and 23 have a T-shaped outline, the wider parts of the panels 22 facing upwards, the wider parts of the panels 23 down. and the wider parts of each pair of plates extend over the Extend the planes of the other pair of plates, the plates are adjusted so that that they form a shaft with a certain narrow one around the brick Gap remains, which determines the thickness of the sand layer to be applied can be. The bricks enter the machine through the feed chute 29., which is attached to the frame of the device. You move gradually in this channel before and arrive one after the other on the lifting table 31, which is in an opening in the floor the channel 29 is located directly under the opening 19 of the sandpit. A bulkhead 32 in the channel 29 serves as a stop so that the bricks are always accurate are on the lifting table 31. The lifting table corresponds exactly in length and width the length and width of a brick and is made of. two vertical bars 33 which are guided in guides 34 which are attached to a base plate 35 are. The rods 33 are connected to one another at their lower ends by a cross strut 36 connected, and the lifting table is supported by springs 37, the; between the guides 34 and the cross brace 36 are pushed over the rods 33, moved downwards.

Eine Welle 38 ist waagerecht in den Lagern 39 im unteren Teil des Gestelles 10 gelagert, und auf dieser Welle ist ein gerader Hebel 41, der von zwei Metallbändern mit Zwischenraum gebildet wird, angebracht. Der Hebel 41 hat einen nach oben gerichteten längeren Arm 42 und einen nach unten gerichteten kürzeren Arm 43. Eine Zugfeder 44 ist zwischen dem Arm 43 und einer festen Verankerung am Gestell 10 bei 45 angebracht und versucht, den Hebel 41 entgegen denn Uhrzeigersinn um die Welle 38 zu drehen, wie aus Fig. 2 ersichtlich, und diese Drehung gegen den Uhrzeigersinn ist begrenzt durch einen elastischen Anschlag 46. Ein gegabelter Arm 47 ist ebenfalls um die Welle 38 drehbar und durch eine Schubstange 48 mit einem Gabelkopf 49 an der Querstrebe 36 verbunden, so daß eine Aufwärtsbewegung des gabelförmig Armes 47 die Querstrebe 36 und den Hebetisch 31 nach oben bewegt.A shaft 38 is horizontal in the bearings 39 in the lower part of the Frames 10 mounted, and on this shaft is a straight lever 41, which of two Metal bands formed with a gap are attached. The lever 41 has one upward longer arm 42 and a downward shorter arm Arm 43. A tension spring 44 is between the arm 43 and a fixed anchorage on the Stand 10 attached at 45 and tried to move the lever 41 counterclockwise to rotate the shaft 38, as can be seen from Fig. 2, and this rotation against the The clockwise direction is limited by an elastic stop 46. A forked arm 47 is also rotatable about the shaft 38 and by a push rod 48 with a Clevis 49 connected to the cross strut 36, so that an upward movement of the fork-shaped Arm 47, the cross strut 36 and the lifting table 31 moved upwards.

Der Hebel 41 wird im Uhrzeigersinn gedreht durch Mittel, die im folgenden noch beschrieben werden, um den Hebetisch 31 anzuheben, wobei die Bewegung von dem Hebel 41 auf den. gabelförmigen Arm 47 durch ein zweiteiliges Zugglied übertragen wird, dessen unterer Teil 52 drehbar mit dem Arm 47 verbunden ist und dessen oberer Teil 53 drehbar mit dem Hebel 41 verbunden ist. Wie in Fig. 6 dargestellt, hat der untere Teil 52 dieses Zuggliedes einen Kopf 54, von dem eine Stange 55 ausgeht, die in, einer Längsbohrung des oberen Teiles 53 gleitet, wobei dieser obere; Teil im unteren Teil einen rechteckigen Querschnitt hat und seine Breite im oberen Teil vermindert ist, so daß zwei nach oben gerichtete Schultern 56 entstehen. Ein Paar Federbänder 57 sind an einander gegenüberliegenden, Seiten am Kopf 54 befestigt und liegen am oberen Teil 53 an. An diesen Federbändern sind Anschlagstücke 58 so befestigt, daß sie in die Federn 56 eingreifen können und auf diese Weise das Verbindungsglied Zugkräfte übertragen kann. Es sind ferner Mittel vorgesehen, um die Verbindung zwischen den beiden Teilen, 52 und 53 des Verbindungsgliedes zu lösen, wenn der Hebel 41 eine bestimmte Stellung erreicht hat. Diese Mittel bestehen aus einer Nockenscheibe 59, die auf einer Welle 61 angebracht ist, die quer durch einen Schlitz 62 in dem oberen Teil 53 verläuft, und die ferner verbunden ist mit den unteren Enden der beiden Glieder 63, zwischen deren. oberen Enden sich eine Rolle 64 befindet, die sich zwischen den senkrechten Führungsschienen 65 bewegen kann. Solange sich der Hebel 41 in seiner senkrechten Stellung befindet, befindet sich das Verbindungsglied 52, 53 in der Stellung, die in Fig. 6 in ausgezogenen Linien gezeichnet ist, und die Nockenscheibe 59 berührt die Federblätter 57 noch nicht, so daß die Anschlagstücke 58 mit den Schultern 56 im Eingriff stehen. Eine Bewegung des Hebels 41 im Uhrzeigersinn bewirkt, daß sich die Glieder 63 um die Nockenscheibe 59 relativ zu dem Glied 52, 53 drehen, und das Profil der Nocken ist so gewählt, daß beim Erreichen einer vorbestimmten Winkelstellung des Hebels die Nocken die in Fig. 6 in strichpunktierten Linien gezeichnete Stellung einnehmen, wobei sie die Federblätter 57 so weit auseinanderdrücken, daß die Anschlagstücke 58 mit den Schultern 56 nicht mehr im Eingriff stehen, so daß derHebel 41 seine Bewegung unabhängig von dem gegabelten Arm 47 fortsetzen kann, während letzterer zusammen, mit dem Hebetisch 31 in seine Ausgangsstellung zurückkehren kann.The lever 41 is rotated clockwise by means hereinafter will be described later to raise the lifting table 31 with the movement of the Lever 41 on the. Transfer fork-shaped arm 47 through a two-part tension member is, the lower part 52 is rotatably connected to the arm 47 and the upper Part 53 is rotatably connected to the lever 41. As shown in Fig. 6, the lower part 52 of this tension member has a head 54 from which a rod 55 extends, which slides in a longitudinal bore of the upper part 53, this upper; part has a rectangular cross-section in the lower part and its width in the upper part is reduced, so that two upwardly directed shoulders 56 arise. A couple Spring straps 57 are attached to the head 54 on opposite sides and rest on the upper part 53. Stop pieces 58 are on these spring straps attached so that they can engage the springs 56 and in this way the connecting member Can transmit tensile forces. Means are also provided for the connection between the two parts, 52 and 53 of the connecting link to be released when the lever 41 has reached a certain position. These means consist of a cam disc 59 mounted on a shaft 61 cut across a slot 62 in the upper part 53 extends, and which is also connected to the lower ends of the two members 63, between the. upper ends there is a roller 64, the can move between the vertical guide rails 65. As long as the Lever 41 is in its vertical position, the link is located 52, 53 in the position which is drawn in solid lines in FIG. 6, and the cam 59 does not yet touch the spring leaves 57, so that the stop pieces 58 with the shoulders 56 are in engagement. A movement of the lever 41 clockwise causes the links 63 to revolve around the cam 59 rotate relative to the member 52, 53, and the profile of the cams is chosen so that when reaching a predetermined angular position of the lever, the cam the in Fig. 6 assume position drawn in dash-dotted lines, where they the spring leaves 57 press so far apart that the stop pieces 58 with the Shoulders 56 are no longer engaged, so that the lever 41 can move independently can continue from the forked arm 47, while the latter is together with the lifting table 31 can return to its original position.

Bei einer weiteren Drehung des Hebels 41 im Uhrzeigersinn kommt dieser in Berührung mit der Rolle 66, die zwischen zwei senkrechten Stangen 67 angeordnet ist, die ihrerseits wieder bei 68 und 69 in senkrechter Richtung verschiebbar am Gestell 10 geführt sind und durch Federn 71 nach oben gezogen werden. Zwischen den oberen Enden der Stangen. 67 ist drehbar der eine Arm eines Winkelhebels 72 befestigt. Dieser ist um eine Welle 73 drehbar, die von einem Auslegearm 74 am Gestell 10 getragen wird. Der andere- Arm des Winkelhebels 72 ist über eine Schubstange 75 mit einem Kreuzkopf 76 verbunden, der an den horizontalen Führungen 77, die am Gestell 10 befestigt sind, gleitet und der sich im Sandkasten 17 oberhalb der Platten 22 und 23 bewegt. An dem Kreuzkopf 76 ist die Ausstoßplatte 78 befestigt, die in senkrechter Richtung durch eine Schraube 79 einstellbar ist. Beim letzten Teil der Drehung des Hebels 41 im Uhrzeigersinn bewegen sich die Stangen 67 nach abwärts, wodurch der Winkelhebel 72 gedreht und der Kreuzkopf 76 mit der Ausstoßplatte nach innen bewegt wird, wobei die Ausstoßplatte 78 einen Ziegelstein, der nach oben zwischen den Plattenpaaren 22 und 23 hindurchgeführt wurde, erfaßt und ihn auf eine Rollenbahn 81 schiebt, über die er aus der Vorrichtung herausgeführt wird.With a further rotation of the lever 41 clockwise this comes in contact with the roller 66, which is arranged between two vertical rods 67 is, which in turn can be displaced again at 68 and 69 in the vertical direction on Frame 10 are guided and pulled up by springs 71. Between upper ends of the rods. 67 one arm of an angle lever 72 is rotatably attached. This is rotatable about a shaft 73 which is carried by an extension arm 74 on the frame 10 will. The other arm of the angle lever 72 is via a push rod 75 with a Cross head 76 connected to the horizontal guides 77 on the frame 10 are attached, slides and in the sandpit 17 above the plates 22 and 23 moves. On the cross head 76, the ejection plate 78 is attached, which in the vertical Direction is adjustable by a screw 79. The last part of the rotation of the Lever 41 clockwise move the rods 67 downwards, whereby the Angle lever 72 rotated and the cross head 76 moved with the ejection plate inward is, the ejector plate 78 is a brick, which is up between the pairs of plates 22 and 23 was passed through, detected and pushed it onto a roller conveyor 81, through which it is led out of the device.

Die Ziegelsteine, die in den Schacht zwischen den Platten 22 und 23 gehoben wurden, werden normalerweise zwischen diesen Platten gegen eine Abwärtsbewegung festgehalten durch die Reibung des Sandes zwischen den Platten und den Ziegelsteinen. Für den Fall, daß die Reibung einmal nicht ausreichen sollte, eine Abwärtsbewegung der Ziegelsteine zu verhindern, ist noch eine Sicherheitsvorrichtung vorgesehen, die eine Abwärtsbewegung verhindert. Diese Sicherheitsvorrichtung enthält ein Paar schwenkbare Hebel 82, die zu beiden Seiten des Hebetisches 3.1 angeordnet sind und von denen jeder an seinem oberen Ende eine Platte 83 trägt, die dicht unter der Öffnung 19 liegt und die seitlichen Ränder dieser Öffnung etwas überragt. An den unteren Enden der Hebel 82 sind Gegengewichte 84 angeordnet, so daß die Hebel stets bestrebt sind, in senkrechter Lage zu hängen. Die Seitenteile der Hebel 82 sind oberhalb der Drehpunkte so verbreitert, daß die verbreiterten Teile, wie bei 85 gezeigt, nach innen ragen.The bricks which have been lifted into the shaft between the plates 22 and 23 are normally held in place between these plates against downward movement by the friction of the sand between the plates and the bricks. In the event that the friction should not be sufficient to prevent a downward movement of the bricks, a safety device is provided which prevents a downward movement. This safety device contains a pair of pivotable levers 82 which are arranged on both sides of the lifting table 3.1 and each of which carries at its upper end a plate 83 which lies just below the opening 19 and projects slightly beyond the lateral edges of this opening. Counterweights 84 are arranged at the lower ends of the levers 82 so that the levers always endeavor to hang in a vertical position. The side parts of the levers 82 are widened above the pivot points so that the widened parts, as shown at 85, protrude inward.

Der Hebetisch 31 hat an seiner Unterseite vier Konsolen 86, und an jeder Konsole ist drehbar eine Klinke 87 angebracht, die durch ihr eigenes Gewicht in die in Fig. 7 dargestellte Lage gebracht wird. Bei der Aufwärtsbewegung des Tisches kommen die Klinken 87 in Berührung mit den verbreiterten Teilen 85 der Hebel und bewegen diese nach außen in die in Fig. 7 in strichpunktierten Linien dargestellte Lage, so daß der auf dem Tisch 31 liegende Ziegelstein zwischen den Platten 83 hindurchgehen kann. Wenn der Hebetisch 31 seine oberste Stellung erreicht, so gleiten die Klinken von den Verbreiterungen 85 herunter, und die Hebel 82 können in ihre in Fig. 7 in ausgezogenen Linien dargestellte Ausgangslage zurückkehren. In dieser Stellung greifen die Platten 83 unter den Ziegelstein. Bei der Abwärtsbewegung des Hebetisches 31 können sich die Klinken 87 nach oben drehen, so daß die Hebel 82 nicht auseinanderbewegt werden. Der Hebetisch 31 hat, wie aus Fig. 5 ersichtlich, an beiden Seiten Ausschnitte 88, durch die die Platten 83 bei der Abwärtsbewegung des Tisches hindurchtreten.The lifting table 31 has four consoles 86, and on on its underside a pawl 87 is rotatably attached to each console by its own weight is brought into the position shown in FIG. When moving the table upwards come the pawls 87 in contact with the widened parts 85 of the levers and move this outward into the one shown in phantom lines in FIG. 7 Position, so that the brick lying on the table 31 pass between the plates 83 can. When the lifting table 31 reaches its uppermost position, the pawls slide from the widenings 85 down, and the levers 82 can be in their in Fig. 7 in Return to the starting position shown in solid lines. Grasp in this position the plates 83 under the brick. During the downward movement of the lifting table 31 the pawls 87 can rotate upward so that the levers 82 do not move apart will. As can be seen from FIG. 5, the lifting table 31 has cutouts on both sides 88 through which the plates 83 pass when the table moves downwards.

In Fig.8 ist dargestellt, wie eine Vorrichtung gemäß der Erfindung mit einer Ziegelpresse, aus der der Vorrichtung die Ziegel zugeführt werden, verbunden. werden kann. Die Ziegelsteine werden nacheinander in dem rotierenden Preßblock 91 in bekannter Weise geformt. Nach dem Formen werden sie durch den Schwingarm 92 in die Rinne 29 ausgestoßen. Der Arm 92 ist durch ein Kabel 93, das über Rollen 94, 95 geführt ist, mit dem Hebel 41 der Vorrichtung gemäß der Erfindung verbunden, so daß dieser Hebel 41 bei jeder Rückwärtsbewegung des Armes 92 bewegt wird und auf diese Weise das Anheben des Tisches 31 und die Betätigung der Ausstoßerpla.tte 78 bewirkt. Das Kabel 93 ist zwischen den. Rollen 94 und 95 durch ein Rohr 96 geführt. Die Rollen 94, 95 und das Rohr 96 sind angeeigneten, nicht dargestellten Tragvorrichtungen befestigt. Der Zwischenraum zwischen der Vorrichtung und der Presse kann jeweils den örtlichen Verhältnissen entsprechend gewählt werden, doch muß er so bemessen. werden, daß das Ausstoßorgan 97 am Arm 92, wenn es sich am Ende des Arbeitshubes befindet, von der Querwand 32 im Kanal 29 so weit entfernt ist, daß diese Entfernung ein ganzzahliges Vielfaches der Länge eines Ziegelsteines ist, so daß bei jedem Arbeitshub ein Ziegelstein in die richtige Lage auf dem Hebetisch 31 kommt.In Fig.8 it is shown how a device according to the invention connected to a brick press from which the bricks are fed to the device. can be. The bricks are placed one after the other in the rotating press block 91 shaped in a known manner. Once formed, they are supported by the swing arm 92 in the channel 29 ejected. The arm 92 is through a cable 93, which over rollers 94, 95 is guided, connected to the lever 41 of the device according to the invention, so that this lever 41 is moved with each backward movement of the arm 92 and in this way the lifting of the table 31 and the actuation of the ejector plate 78 causes. The cable 93 is between the. Rollers 94 and 95 guided through a tube 96. The rollers 94, 95 and the tube 96 are suitable support devices, not shown attached. The space between the device and the press can each be chosen according to the local conditions, but it must be measured accordingly. be that the ejector 97 on the arm 92 when it is at the end of the working stroke is so far removed from the transverse wall 32 in the channel 29 that this distance is an integral multiple of the length of a brick, so that at each Working stroke, a brick comes into the correct position on the lifting table 31.

Die Wirkungsweise der Vorrichtung ist folgende: Die in der Presse hergestellten Ziegelsteine werden nacheinander in die Rinne 29 geschoben, und sobald diese Rinne vollständig gefüllt ist, bewirkt die Zuführung jedes Ziegelsteines, daß der vorderste Ziegelstein in der Rinne auf den Hebetisch 31 geschoben, wird. Diese Bewegung erfolgt während des Arbeitshubes des Schwingarmes 92. Beim Zurückschwingen des Armes 92 zieht dieser am Kabel 93, und der Hebel 41 wird aus seiner senkrechten Stellung herausgeschwenkt. Während des ersten Teiles der Bewegung des Hebels 41, solange die Teile des Gliedes 52, 53, wie vorstehend beschrieben, miteinander in Verbindung stehen, bewegt sich der Arm 47 in gleicher Weise wie der Hebel 41 und hebt über die Schubstange 48 den Hebetisch 31 mit dem Baraufliegenden Ziegelstein an, so daß der Ziegelstein, durch die Öffnung 19 in den Sandkasten 17 geschoben wird und in den unteren Teil des Schachtes zwischen den Plattenpaaren 22, 23 gelangt. Bei dieser Einführung des Ziegelsteines sind, die Sicherungsplatten 83, wie beschrieben, zur Seite bewegt.The mode of operation of the device is as follows: The one in the press Bricks produced are pushed one after the other into the channel 29, and as soon as this channel is completely filled, causes the feeding of each brick, that the foremost brick in the channel is pushed onto the lifting table 31. This movement takes place during the working stroke of the swing arm 92. When swinging back of the arm 92 pulls this on the cable 93, and the lever 41 is from its vertical Swiveled out position. During the first part of the movement of the lever 41, as long as the parts of the member 52, 53, as described above, with each other in Are connected, the arm 47 moves in the same way as the lever 41 and lifts the lifting table 31 with the brick resting on the bar via the push rod 48 so that the brick is pushed through the opening 19 into the sandpit 17 and reaches the lower part of the shaft between the plate pairs 22, 23. In this introduction of the brick, the locking plates 83, as described, moved to the side.

Während dieser Bewegung des Hebels 41 drehen sich die Glieder 63 um die Achse der Rolle 64 und verdrehen die Nockenscheibe 59 gegenüber dem Zugglied 52, 53. Wenn der Hebel 41 eine bestimmte Stellung erreicht, wie in den Fig. 2 und 6 strichpunktiert gezeichnet ist, heben die Nocken die beiden Federblätter 57 so weit ab, daß die Anschlagstücke 58 von den Schultern. 56 freikommen, und die Federn 37 bewegen nun, unterstützt vom Gewicht des Tisches, diesen wieder in seine untere Stellung, während sich der Hebel 41 ungehindert weiter im Uhrzeigersinn drehen kann. Während dieser weiteren Bewegung stößt der Hebel 41 gegen die Rollen 66 und drückt die senkrechten Stangen 67 nach unten, dreht dadurch den Winkelhebel 72, so daß die Ausstoßplatte 78 in den Sandkasten hineinbewegt wird. Der Ziegelstein, der bei seiner Aufwärtsbewegung durch den Schacht zwischen den Plattenpaaren 22, 23 hindurchgetreten ist, kommt in eine Stellung, in der er von der ausstoßenden Platte erfaßt und auf die Rollenbahn, 81 geschoben wird. Die an der Ausstoßplatte 78 vorgesehene senkrechte Einstellschraube ermöglicht es, die Ausstoßplatte für verschieden dicke Ziegelsteine jeweils in die richtige Lage zu bringen.During this movement of the lever 41, the links 63 rotate the axis of the roller 64 and rotate the cam disk 59 relative to the tension member 52, 53. When the lever 41 reaches a certain position, as in Figs 6 is shown in phantom, the cams lift the two spring leaves 57 so far from that the stop pieces 58 from the shoulders. 56 free and the springs 37 now move the table again, supported by the weight of the table in its lower position, while the lever 41 continues unhindered in a clockwise direction can turn. During this further movement, the lever 41 strikes the rollers 66 and presses the vertical rods 67 downwards, thereby turning the angle lever 72 so that the ejector plate 78 is moved into the sandpit. The brick, which during its upward movement through the shaft between the plate pairs 22, 23 has passed through, comes into a position in which he is from the expelling The plate is detected and pushed onto the roller conveyor 81. The one on the ejector plate 78 provided vertical adjustment screw enables the ejection plate for Bring bricks of different thicknesses into the correct position.

Beim Anheben der nachfolgenden Ziegelsteine in dem Sandkasten werden die vorher angehobenen Ziegelsteine schrittweise weiter nach aufwärts geschoben.. bis sie oberhalb der Oberkanten der Blattpaare 22, 23 liegen und in die Stellung gelangen, in der sie von der Ausstoßplatte 78 erfaßt und ausgestoßen werden.When lifting the subsequent bricks in the sandpit will be the previously lifted bricks gradually pushed further upwards .. until they are above the upper edges of the pairs of blades 22, 23 and into the position arrive, in which they are detected by the ejector plate 78 and ejected.

Während sich die Ziegelsteine in dem Schacht zwischen den Plattenpaaren 22, 23 befinden, wird der Sand, der durch die Öffnungen 25 der Platten tritt. über die Oberflächen verteilt und bleibt an den Längs- und Quersaiten der Ziegelsteine hängen und wird durch die Vibration des Sandkastens und der Platte in die Oberflächen eingedrückt.While the bricks are in the shaft between the pairs of plates 22, 23 are located, the sand that passes through the openings 25 of the plates. above distributes the surfaces and stays on the main and cross strings of the bricks hang and is caused by the vibration of the sandpit and the plate in the surfaces depressed.

Der Hebetisch kann, statt ihn durch die beschriebene Vorrichtung zu bewegen, auch durch andere von. der Ziegelpresse oder von selbständigen Antriebsvorrichtungen angetriebene Vorrichtungen bewegt werden. Beispielsweise kann der Tisch durch eine rotierende Nockenscheibe bewegt werden, deren. Profil so gewählt ist, daß der Hebetisch rasch in seine Ausgangsstellung zurückkehrt oder durch eine pneumatische oder hydraulische Vorrichtung.The lifting table can instead of it by the device described move, even through others of. the brick press or independent drive devices powered devices are moved. For example, the table can be replaced by a rotating cam are moved whose. Profile is chosen so that the lifting table quickly returns to its original position or by a pneumatic or hydraulic Contraption.

Bei Vorrichtung gemäß der Erfindung, die zum Überziehen von Mauersteinen bestimmt sind, müssen natürlich die Abmessungen der Öffnung und der Platten den Abmessungen dieser Steine entsprechen,. Die Vorrichtung ist besonders geeignet zum Behandeln von Ziegelsteinen oder Blocksteinen, die in. einer Presse hergestellt sind, da solche Steine oder Blöcke schon vor dem Brennen genügend fest sind, um sie einer solchen Behandlung zu unterwerfen.In the device according to the invention for covering masonry stones are determined, the dimensions of the opening and the plates must of course Dimensions of these stones correspond. The device is particularly suitable for Handle bricks or blocks made in a press because such stones or blocks are sufficiently firm to be fired before they are fired to subject them to such treatment.

Der Sand, der in einer Vorrichtung gemäß der Erfindung benutzt wird, kann feucht sein, wodurch nicht nur die Kosten für das Trocknen des Sandes vermieden werden, das bisher notwendig war, sondern es wird auch, da der Sand nicht trocken ist, vermieden, daß er von Luftströmungen mitgeführt wird, und es entfällt damit die Notwendigkeit, Vorrichtungen zum Absaugen und Abtrennen des Staubes vorzusehen, um die Luft vom Sand frei zu machen.The sand used in a device according to the invention can be damp which not only avoids the cost of drying the sand that was previously necessary, but it will also, since the sand is not dry is avoided that it is carried along by air currents, and it is omitted the need to provide devices for extracting and separating the dust, to clear the air from the sand.

Claims (6)

PATENTANS P R i: c HE: 1. Vorrichtung zum Aufbringen von. Sand oder anderem körnigen Material auf die Oberflächen von Ziegelsteinen, Bausteinen od. dgl. mittels eines gerüttelten Sandkastens, gekennzeichnet durch einen senkrechten, den Steindurchtritt gestattenden Schacht innerhalb des Sandkastens mit einer unteren Steinzuführung und oberen Steinausstoßvorrichtung, Öffnungen im Schacht für den Sanddurchtritt und einer Hebevorrichtung zum Transport der Steine von der Zuführung zur Ausstoßvorrichtung. PATENTANS P R i: c HE: 1. Device for applying. Sand or other granular material on the surfaces of bricks, building blocks od. like. by means of a vibrated sandpit, characterized by a vertical, the shaft allowing the stone passage within the sandpit with a lower Stone feed and upper stone ejection device, openings in the shaft for the Sand passage and a lifting device for transporting the stones from the feeder to the ejector. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der senkrechte Schacht aus mit dem gerüttelten Sandkasten fest verbundenen senkrechten Platten besteht. welche an ihren Innenseiten Aussparungen aufweisen, die durch Öffnungen mit den dem Sandkasten zugekehrten Rückseiten der Platten in Verbindung stehen. 2. Device according to claim 1, characterized in that that the vertical shaft is made of vertical ones firmly connected to the vibrated sandpit Panels is made. which have recesses on their insides through openings are in connection with the backsides of the plates facing the sandpit. 3. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß die Hebevorrichtung mit einem nur aufwärts wirkenden Antriebsmechanismus verbunden ist und durch die Schwerkraft in ihre Ausgangslage zurückkehrt. 3. Apparatus according to claim 1, characterized in that the lifting device is connected to an only upwardly acting drive mechanism and through the Gravity returns to its original position. 4. Vorrichtung nach Anspruch 3, gekennzeichnet durch einen schwenkbaren Hebel (41), der auf den Tisch (31) der Hebevorrichtung über ein zweiteiliges Zugglied (52, 53) wirkt, dessen Teile mit einer En,triegelungsvorrichtung versehen sind, welche durch Entriegelung in einer bestimmten Stellung des Hebels (41) eine derartige Verlängerung des Zuggliedes (52, 53) gestattet, daß der Hebel (41) eine weitere Schwenkbewegung ausführen kann, unabhängig von der Bewegung des Hebetisches (31), der in seine Ausgangsstallung zurückkehrt. 4. Apparatus according to claim 3, characterized by means of a pivotable lever (41) which is placed on the table (31) of the lifting device A two-part tension member (52, 53) acts, the parts of which with a locking device are provided, which by unlocking in a certain position of the lever (41) such an extension of the tension member (52, 53) allows the lever (41) can perform a further pivoting movement, regardless of the movement of the Lifting table (31) that returns to its home stables. 5. Vorrichtung nach Anspruch 4, dadurch gekennzeichnet, da,ß die Ausstoßvorrichtung für den Ziegelstein, der besandet ist, einen Anschlag (Rolle 66) aufweist, gegen den der Hebel (41) bei weiterer Schwenkung zum Betätigen der Ausstoßvorrichtung anliegt. 5. Device according to Claim 4, characterized in that, ß the ejection device for the brick, which is sanded, has a stop (roller 66) against which the lever (41) at further pivoting for actuating the ejector is present. 6. Vorrichtung nach Anspruch 4 oder 5, gekennzeichnet durch ihren Antrieb durch die Ausstoßvorrichtung einer Ziegelpresse, von der aus die Ziegel der Besandungsvorrichtung zugeführt werden. In Betracht gezogene Druckschriften: Deutsche Patentschrift Nr. 69982. 6. Apparatus according to claim 4 or 5, characterized by its drive by the ejection device of a brick press, from which the bricks are fed to the sanding device. Documents considered: German Patent No. 69982.
DEJ12697A 1956-01-17 1957-01-15 Device for applying sand or other grainy material to bricks Pending DE1031703B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
GB1606/56A GB808288A (en) 1956-01-17 1956-01-17 Improvements in or relating to the application of granular material, for example sand, to the surfaces of bricks, building blocks and the like
GB1031703X 1956-01-17

Publications (1)

Publication Number Publication Date
DE1031703B true DE1031703B (en) 1958-06-04

Family

ID=78669074

Family Applications (1)

Application Number Title Priority Date Filing Date
DEJ12697A Pending DE1031703B (en) 1956-01-17 1957-01-15 Device for applying sand or other grainy material to bricks

Country Status (2)

Country Link
DE (1) DE1031703B (en)
GB (1) GB808288A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112428411A (en) * 2020-11-22 2021-03-02 禹州市金品建材有限公司 Forming device for producing building waste pressed brick and using method thereof
CN114482579A (en) * 2022-01-11 2022-05-13 谢新苟 Red brick mortar paints device for construction
CN114560315A (en) * 2022-03-25 2022-05-31 青海丽豪半导体材料有限公司 Silica flour transportation lifting device
CN115446961A (en) * 2022-09-29 2022-12-09 重庆市欧华陶瓷(集团)有限责任公司 Gold plating equipment and process for glazed ceramic tile
CN116674071A (en) * 2023-08-03 2023-09-01 邯郸市翰润达耐火材料有限公司 Automatic packing forming device for refractory bricks

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114753664B (en) * 2022-05-12 2023-05-05 重庆电子工程职业学院 Bricklaying robot

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69982C (en) * E. EPHRAIM in Birkwitz b. Pillnitz a. E Automatic spreading device for dry presses with rotating molding table

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE69982C (en) * E. EPHRAIM in Birkwitz b. Pillnitz a. E Automatic spreading device for dry presses with rotating molding table

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112428411A (en) * 2020-11-22 2021-03-02 禹州市金品建材有限公司 Forming device for producing building waste pressed brick and using method thereof
CN114482579A (en) * 2022-01-11 2022-05-13 谢新苟 Red brick mortar paints device for construction
CN114482579B (en) * 2022-01-11 2023-12-22 江西盛鼎环保科技有限公司 Red brick mortar smearing device for building construction
CN114560315A (en) * 2022-03-25 2022-05-31 青海丽豪半导体材料有限公司 Silica flour transportation lifting device
CN114560315B (en) * 2022-03-25 2024-03-26 青海丽豪半导体材料有限公司 Silica flour transportation lifting device
CN115446961A (en) * 2022-09-29 2022-12-09 重庆市欧华陶瓷(集团)有限责任公司 Gold plating equipment and process for glazed ceramic tile
CN115446961B (en) * 2022-09-29 2024-04-16 重庆市欧华陶瓷(集团)有限责任公司 Gold plating equipment and technology for glazed ceramic tile
CN116674071A (en) * 2023-08-03 2023-09-01 邯郸市翰润达耐火材料有限公司 Automatic packing forming device for refractory bricks
CN116674071B (en) * 2023-08-03 2023-09-26 邯郸市翰润达耐火材料有限公司 Automatic packing forming device for refractory bricks

Also Published As

Publication number Publication date
GB808288A (en) 1959-02-04

Similar Documents

Publication Publication Date Title
DE1994343U (en) DEVICE FOR SEPARATING STACKS OF DISC-SHAPED OBJECTS.
DE3015203C2 (en) Locking device for container conveyors
DE3331341C2 (en) Device for the transverse transport of a profile rod for profile rod processing lines with longitudinal transport roller table
DE2432770A1 (en) DEVICE FOR TRANSFER AND SIMULTANEOUS LIGHTWEIGHT SEPARATION IN ESSENTIAL PARALLELEPIPEDIC, STILL UNCURED PORE-LIGHT CONCRETE BODY
DE1031703B (en) Device for applying sand or other grainy material to bricks
DE2051227A1 (en) Goods paternoster with hangers attached to circulating chain strands
DE2049211C3 (en) Gripping device for components
DE7122510U (en) Crane collar magazine for machine tools such as sawing machines
DE917223C (en) Device for feeding round material of elongated shape to the rollers of a straightening bench
DE1584408C3 (en) Device for hardening concrete elements or similar objects in molds with a support table
DE599766C (en) Cable clamp effective in one direction
DE656190C (en) Belt conveyor
AT236871B (en) Device for aligning eggs
DE1935925C (en) Device for turning Kasehor the
AT232955B (en) Device for the orderly gathering of sheets
DE697370C (en) Release device for pit stamp
CH404541A (en) Device for receiving, storing and returning goods carriers for each workstation on a conveyor system
DE500747C (en) Machine for nailing strips onto boards or the like.
AT239050B (en) Grinding mill for the production of wood pulp
DE403423C (en) Automatic locking device for mobile transport boxes
DE1919205C (en) Device for arranging bottles in rows on a long conveyor
DE461373C (en) Depositing device for die setting and line casting machines
DE2723531A1 (en) FOERDER SYSTEM WITH FOER DOGS
DE1282896B (en) Automatic locking device for a clamping gripper
CH378009A (en) Hanging cable car