DE102007043562A1 - Building e.g. movable building, construction for e.g. exhibition, has primary construction designed as frame and secondary construction designed as infill, where construction is assembled and dismantled in perpendicular direction - Google Patents
Building e.g. movable building, construction for e.g. exhibition, has primary construction designed as frame and secondary construction designed as infill, where construction is assembled and dismantled in perpendicular direction Download PDFInfo
- Publication number
- DE102007043562A1 DE102007043562A1 DE102007043562A DE102007043562A DE102007043562A1 DE 102007043562 A1 DE102007043562 A1 DE 102007043562A1 DE 102007043562 A DE102007043562 A DE 102007043562A DE 102007043562 A DE102007043562 A DE 102007043562A DE 102007043562 A1 DE102007043562 A1 DE 102007043562A1
- Authority
- DE
- Germany
- Prior art keywords
- construction
- receiving part
- hook
- building
- primary
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Ceased
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/005—Modulation co-ordination
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/18—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
- E04B1/26—Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of wood
- E04B1/2604—Connections specially adapted therefor
- E04B2001/2628—Interlocking connectors, e.g. with hooks or dovetails, added to the elongated wooden members
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B3/00—Window sashes, door leaves, or like elements for closing wall or like openings; Layout of fixed or moving closures, e.g. windows in wall or like openings; Features of rigidly-mounted outer frames relating to the mounting of wing frames
- E06B3/54—Fixing of glass panes or like plates
- E06B3/5427—Fixing of glass panes or like plates the panes mounted flush with the surrounding frame or with the surrounding panes
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
Description
Die Erfindung betrifft eine Bauwerkskonstruktion nach dem Oberbegriff des Patentanspruchs 1.The The invention relates to a building construction according to the preamble of claim 1
Stand der TechnikState of the art
Das Bauen ist regelmäßig auf die Herstellung dauerhafter, fest mit dem Boden verbundener Immobilien gerichtet. Nur für befristete Ereignisse wie Messen, Markt- und Festveranstaltungen, Ausstellungen und Notfälle kommen mobile Konstruktionen zum Einsatz („fliegende Bauten"). Aufgrund des zeitlich begrenzten Einsatzes werden die Anforderungen an Leichtigkeit und Mobilität höher bewertet, als die an Dauerhaftigkeit, Klimatik und Gestaltung. Für viele Nutzungen könnte aber die gleichwertige Erfüllung aller Anforderungen zweckmäßig sein.The Building is regular on making permanent, directed to the ground connected real estate. Only for temporary events such as trade fairs, market and festive events, Exhibitions and emergencies come mobile constructions used ("flying buildings"). Due to the time limited use, the requirements for ease and Mobility is rated higher than durability, Climate and design. For many uses could but the equivalent fulfillment of all requirements appropriate be.
Zu beobachten ist eine zaghafte Zunahme der Vorfertigung im Bauwesen. Sie beschränkt sich aber auf wenige Bauelemente und ist immer in einen konventionellen Bauablauf integriert. Eine vollständige Trennung von Vorfertigung und Montage hat sich bis heute nicht durchgesetzt. Am weitesten entwickelt ist die Trennung in Vorfertigung und Montage beim Holzbau, weil sich dieser am besten für die Elementierung eignet. Die Bauelemente sind leicht transportierbar, die Verbindungsmittel leicht wieder lösbar. Schon immer sind Bauwerke in Holz auf dem Platz oder in der Halle beim Zimmerer hergestellt, wieder auseinandergenommen, auf die Baustelle transportiert und dort endgültig aufgebaut worden.To Watch is a tentative increase in prefabrication in construction. It is limited to a few components and is always integrated in a conventional construction process. A complete Separation of prefabrication and assembly has not yet prevailed. The most developed is the separation in prefabrication and assembly at Timber construction, because this is best for elementation suitable. The components are easy to transport, the connecting means easily detachable. There are always buildings in wood made in the square or in the hall by the carpenter, again taken apart, transported to the construction site and finally there been built.
Einen zunehmenden Marktanteil erobern sich in jüngster Zeit auch in Deutschland Fertighäuser in Holz und Holzwerkstoffen. Angeboten wird eine Vielzahl von Haustypen. Auch Bausätze zum Bauen in Eigenleistung können bezogen werden. Grundlage für die meisten Fertighäuser oder Fertighausbausätze ist die Holzrahmenbauweise, die sich in den 1970-er Jahren mit dem Vertrieb amerikanischer Holzwerkstoffplatten in Europa ausgebreitet hat. Aber auch Holzständerwerke und Fachwerkbauten kommen zur Anwendung. Meist handelt es sich um weitgehend vorgefertigte Häuser oder Hausteile aber immer muß vorher ein Haustyp aus einem Katalog ausgewählt werden. Die fortgeschrittene Entwicklung elektronischer Hilfsmittel bei Planung und Ausführung ermöglicht nun auch die Herstellung vorgefertigter Häuser nach individueller Planung. Nicht bekannt sind aber Systeme für den wiederholbaren Aufbau und Abbau von Bauwerkskonstruktionen mit hohen Ansprüchen an Leichtigkeit und Mobilität aber auch an Dauerhaftigkeit, Gestaltung und Klimatik.a increasing market share conquer also in the recent time prefabricated houses in wood and wood-based materials in Germany. A variety of house types is offered. Also kits to build in own contribution can be obtained. basis for most prefabricated houses or prefabricated house kits is the timber frame construction, which in the 1970-s with the Distribution of American wood-based panels spread throughout Europe Has. But also timber stands and half-timbered buildings come for use. Most are largely prefabricated Houses or house parts but always have to be in before House type can be selected from a catalog. The advanced Development of electronic aids in planning and execution now also allows the production of prefabricated houses according to individual planning. But not known are systems for the repeatable construction and dismantling of building structures with high standards of lightness and mobility but also in durability, design and climatic.
So genannte „Starterhäuser" oder „wachsende Häuser” sind kleine Häuser, die durch spätere An-, Um- oder Ausbauten vervollständigt werden. Sie erreichen damit ein vorher definiertes Endstadium, erlauben aber kein Wachstum in Baustufen bis zu einer beliebigen Größe. Sie sind auch nicht auf Mobilität im Sinne einer zeitlichen, räumlichen und qualitativen Beweglichkeit gerichtet.So called "starter houses" or "growing Houses "are small houses that through later additions, conversions or completions completed become. They thus achieve a previously defined end stage, allow but no growth in construction stages up to any size. They are not based on mobility in the sense of a temporal, spatial and qualitative mobility.
Mobilitätsanforderungen in diesem Sinne sind nutzungsneutral. Sie beziehen sich auf sogenannte „fliegende Bauten" aber auch auf Wohnhäuser und Gewerbebauten. Leicht verständlich ist die Forderung nach Mobilität bei den fliegenden Bauten wie Unterstände, Verkaufsstände, Baubuden, Lagerhallen, Festhallen, Notunterkünfte, Schulklassen- und Kindergartengruppenräume. Auch Sonderformen des Wohnens wie Ferien- und Wochenendhäuser sowie Alten- und Studentenheime unterliegen Veränderungen aufgrund eines variierenden Bedarfs. Aber auch für Wohnhäuser wäre es vorteilhaft, wenn sie mit der Entwicklung der Familie aufgebaut, verändert und wieder abgebaut werden könnten. Ebenso würden Gewerbebetriebe von einer solchen Bauweise profitieren, wenn sie damit beim Wachsen, Schrumpfen oder der Änderung ihrer Produktions- und Organisationsform reagieren könnten.mobility requirements in this sense, are neutral in use. They refer to so-called "flying Buildings "but also on residential buildings and commercial buildings understandable is the demand for mobility in the flying constructions such as shelters, stalls, Building dwellings, warehouses, festival halls, emergency shelters, school classes and Kindergarten class rooms. Also special forms of living such as holiday homes and weekend houses as well as old people's homes and student dormitories are subject to change due to varying needs. But even for residential buildings it would be advantageous when built up with the development of the family, changed and could be dismantled again. Likewise Businesses benefit from such construction if they so when growing, shrinking or changing their Production and organization.
Wesentliche Voraussetzung für den wiederholbaren Aufbau und Abbau von Bauwerkskonstruktionen ist die konsequente Trennung in tragendes Gerüst und nicht tragende Ausfachung. Nur aufgrund dessen sind bauliche Veränderungen, wie das Versetzen der Außen- und Innenwände ohne Schädigung möglich. Ungeeignet sind dagegen Massivbauweisen aber auch die Holzrahmenbauweise, weil die Wandelemente zum Teil außer ihrer raumbegrenzenden auch eine tragende und aussteifende Funktion erfüllen.basics Prerequisite for the repeatable construction and dismantling of Structural constructions is the consistent separation into supporting framework and not bearing infill. Only because of that are structural Changes, like putting the outside and Inner walls without damage possible. Not suitable are solid construction but also the timber frame construction, because the wall elements partly except their raumbegrenzenden also perform a supporting and stiffening function.
Weitere Voraussetzung für den wiederholbaren Aufbau und Abbau von Bauwerkskonstruktionen ist die schadensfreie Demontierbarkeit und Wiederverwendbarkeit der Bauelemente. Bekannt sind Holzverbinder für Pfosten-/Riegelkonstruktionen im Fassadenbau. Sie haben eine für diesen Zweck begrenzte Leistungsfähigkeit, sind aber nicht geeignet, größere Lasten zu übernehmen. Sie dienen auch nicht eigentlich dem wiederholbaren Aufbau und Abbau sondern haben nur den Zweck, den Teilbereich des Fassadenbaus durch die Vorfertigung von Bauelementen wetterunabhängig, schneller und leichter zu machen.Further Prerequisite for the repeatable construction and dismantling of Structural designs is the damage-free disassembly and Reusability of the components. Wood connectors are known for post / transom constructions in facade construction. They have a limited capacity for this purpose, but are not suitable to take on larger loads. They also do not actually serve the repeatable construction and dismantling but only have the purpose of the subsection of the facade construction through the prefabrication of components weather independent, faster and easier to do.
Die
Offenlegungsschrift
Die
Gebrauchsmusterschrift
Die
Patentschrift
Die
Offenlegungsschrift
Aufgabenstellungtask
Der Erfindung liegt die Aufgabe zugrunde, eine durch den Stand der Technik noch nicht bekannte Bauwerkskonstruktion zu schaffen, die vielfachen Anwendungsmöglichkeiten gerecht wird.Of the Invention is based on the object, a by the prior art not yet known building construction to create, the multiple applications does justice.
Die Lösung der Aufgabe erfolgt nach dem kennzeichnenden Teil des Anspruchs 1 durch eine Bauwerkskonstruktion, die in waagerechter und in senkrechter Richtung beliebig weit und beliebig oft aufgebaut und abgebaut werden kann. Weiterbildungen der Erfindung sind in den Unteransprüchen gekennzeichnet.The The task is solved according to the characterizing part of claim 1 by a building structure, in horizontal and in the vertical direction arbitrarily far and as often as desired and can be dismantled. Further developments of the invention are in characterized the dependent claims.
Ausführungsbeispieleembodiments
Im folgenden werden die Erfindung und deren Ausgestaltung im Zusammenhang mit den Figuren näher erläutert. Es zeigen in schematischer Darstellung:in the The following are the invention and its embodiment in connection explained in more detail with the figures. It show in schematic representation:
Die
Erweiterung des Erdgeschoßgrundrisses nach
Die
Erweiterung des Obergeschoßgrundrisses nach
Die
Erweiterung des Dachgeschoßgrundrisses nach
Die
Erweiterung des Erdgeshoßgrundrisses nach
Die
erfindungsgemäße Erweiterung des Obergeschoßgrundrisses
nach
In
gleicher Weise, wie bei
Die
erfindungsgemäße Erweiterung des Erdgeschoßgrundrisses
nach
Die
erfindungsgemäße Erweiterung des Obergeschoßgrundrisses
nach
Die
erfindungsgemäße Erweiterung des Dachgeschoßgrundrisses
nach
Bei den beispielhaften erfindungsgemäßen Baukonstruktionen wurden pultförmige Dächer gewählt, die sich bei der Erweiterung zum Satteldach ergänzen. Es liegt im Rahmen der Erfindung, auch andere Dachformen, z. B. Flachdach oder Grabendach zu wählen.at the exemplary building structures according to the invention were chosen desk-shaped roofs, the complement each other with the extension to the pitched roof. It lies in the context of the invention, other roof forms, such. B. flat roof or to choose a burial roof.
Der
Aufbau des Daches erfolgt durch Verlängerung der Stützen
Mit
den
Die Erweiterungen erfolgen jeweils durch Herausnehmen nicht tragender Bauelemente der vorausgehenden Baustufe, die in der nachfolgenden Baustufe an dieser Stelle nicht mehr benötigt werden. Die Bauelemente der Primärkonstruktion bleiben als tragendes Gerüst stehen und werden um die Bauelemente ergänzt, die für die nachfolgende Baustufe benötigt werden. Die Bauelemente der Sekundärkonstruktion aus der vorausgehenden Baustufe werden bei der nachfolgenden Baustufe wiederverwendet und soweit erforderlich ergänzt.The extensions are made in each case by removing non-load-bearing components of the previous construction stage, which are no longer needed in the following construction stage at this point. The components of the primary structure remain as a supporting framework and are supplemented by the components that are required for the subsequent construction stage. The components of the secondary construction from the previous construction stage become reused at the subsequent construction stage and supplemented as necessary.
Das erfindungsgemäße Haus besteht aus standardisierten, vorgefertigten Bauelementen, vorzugsweise in schichtverleimtem Holz, Holzwerkstoffen, Isolierungen und Dämmstoffen, vorzugsweise aus nachwachsenden Rohstoffen, Blechen und Glas.The house according to the invention consists of standardized, prefabricated construction elements, preferably in layer-glued wood, Wood materials, insulation and insulating materials, preferably made of Renewable raw materials, sheets and glass.
Die
Bauwerkskonstruktion untergliedert sich in eine Primärkonstruktion
mit den Bauelementen Schwelle
Die Bauelemente sind eingefügt in das modulare Maßsystem eines Bandrasters, unterschieden in Konstruktions- und Ausbauraster. Sie sind dementsprechend addierbar, austauschbar, wiederverwendbar und für die Lagerhaltung geeignet.The Components are inserted in the modular measuring system a bandraster, distinguished in construction and development grid. They are accordingly summable, interchangeable, reusable and suitable for storage.
In
In
In
In
In
In
In
In
In
In
In
in
In
in
Ein nach der erfindungsgemäßen Bauwerkskonstruktion erstelltes Haus wird auf einem Keller in Massivbauweise, Streifenfundamenten, Punktfundamenten oder einer Bodenplatte erstellt.A built according to the building structure of the invention house is on a basement in solid construction, strip foundations, Punktfunda ments or a floor plate.
Die
Verbindung der Bauelemente erfolgt entsprechend den
Die
Montage der Primärkonstruktion erfolgt, wie in den
Die
Demontage kann, wie in den
Bei
der Sekundärkonstruktion besteht, wie in den
Die
Montage erfolgt durch Drücken des Einschubteils
Die
Demontage kann, wie in den
Als
Stützenfüße werden, wie in
Auf
die Stützenfüße werden die Stützen
Für
den Anschluß Stütze
Ein
für die horizontale Aussteifung der Bauwerkskonstruktion
erforderliches Band
Die Anschlüsse der Bauelemente werden nacheinander hergestellt, wie folgt:
- a) Primärkonstruktion EG,
wie in
1 ,4 ,7 ,10 ,13 und14 dargestellt: – Stützen2 auf die Stützenfüße23 aufschieben und an diesen anschrauben, – Schwellen1 zwischen Stützen2 waagerecht einschieben und senkrecht einstecken, – Streben3 an zweiteiligen Hauptträgern4 waagerecht einstecken, – Hauptträgerhälften4a ,4b mit den Streben3a und3b waagerecht von zwei Seiten zwischen Stützen2 einschieben und senkrecht einstecken. (gleichzeitiger Anschluß Streben3 und Hauptträger4 an Stützen2 ) – Nebenträger9 zwischen Hauptträger4 senkrecht einstecken, – Pfosten7 an Stützen2 und zwischen Schwellen1 , Hauptträger4 und Fußpfetten5 waagerecht einstecken, – Riegel8 zwischen Pfosten7 waagerecht einstecken, - b) Primärkonstruktion OG, wie in
2 ,5 ,8 ,11 ,13 und14 dargestellt: – Stützen2 OG auf Stützen2 EG aufschieben und mit Bändern für Horizontalaussteifung26 an diesen anschrauben, – Hauptträgerhälften4a ,4b mit Strebenhälften3a ,3b waagerecht von zwei Seiten zwischen Stützen2 einschieben und senkrecht einstecken. (gleichzeitiger Anschluß Streben3 und Hauptträger4 an Stützen2 ) – Nebenträger9 zwischen Hauptträger4 senkrecht einstecken, – Pfosten7 an Stützen2 und zwischen Schwellen1 , Hauptträger4 und Fußpfetten5 waagerecht einstecken, – Riegel8 zwischen Pfosten7 waagerecht einstecken, - c) Primärkonstruktion DG, wie in
3 ,6 ,9 ,12 ,13 und14 dargestellt: – Stützen2 DG auf Stützen2 OG aufschieben und mit Bändern für Horizontalaussteifung26 an diesen anschrauben, – Fußpfetten5 zwischen Stützen2 senkrecht einstecken, – Firstpfetten6 zwischen Stützen2 senkrecht einstecken, – Pfosten7 an Stützen2 und zwischen Hauptträger4 und Fußpfetten5 waagerecht einstecken, – Riegel8 zwischen Pfosten7 waagerecht einstecken, – Sparren10 zwischen Fuß- und Firstpfetten5 und6 senkrecht einstecken, - b) Sekundärkonstruktion EG, wie in
1 ,4 ,7 ,10 ,13 und14 dargestellt: – Wandausfachungen (11 –20 ) an Pfosten7 waagerecht einstecken, – Platten17 der Untersicht Decke über EG an Nebenträger9 senkrecht einstecken, – Dämmstoffblöcke19 auf Deckenuntersicht legen, – Platten (16 ) des Fußbodens Decke über EG an Nebenträger9 senkrecht einstecken, - c) Sekundärkonstruktion OG, wie in
2 ,5 ,8 ,11 ,13 und14 dargestellt: – Wandausfachungen (11 –20 ) waagerecht an Pfosten7 einstecken, – Platten17 der Untersicht Decke über OG an Nebenträger9 senkrecht einstecken, – Dämmstoffblöcke19 auf Deckenuntersicht legen, – Platten16 des Fußbodens Decke über OG an Nebenträger9 senkrecht einstecken, - d) Sekundärkonstruktion DG, wie in
3 ,6 ,9 ,12 ,13 und14 dargestellt: – Wandausfachungen (11 –20 ) an Pfosten7 waagerecht einstecken, – Dachplatten18 , Fotovoltaikplatten und Isolierglasscheiben24 als Dacheindeckung an Sparren10 senkrecht einstecken,
- a) primary construction EG, as in
1 .4 .7 .10 .13 and14 shown: - supports2 on the column feet23 postpone and screw on these, - sleepers1 between supports2 insert horizontally and insert vertically - struts3 on two-piece main girders4 Insert horizontally, - main carrier halves4a .4b with the struts3a and3b horizontally from two sides between columns2 insert and insert vertically. (simultaneous connection struts3 and main vehicle4 on supports2 ) - secondary beam9 between main carrier4 Insert vertically, - post7 on supports2 and between thresholds1 , Main vehicle4 and foot purlins5 insert horizontally, - latch8th between posts7 plug in horizontally, - b) Primary construction OG, as in
2 .5 .8th .11 .13 and14 shown: - supports2 OG on supports2 EG postpone and with straps for horizontal reinforcement26 screw on to these, - main beam halves4a .4b with strut halves3a .3b horizontally from two sides between columns2 insert and insert vertically. (simultaneous connection struts3 and main vehicle4 on supports2 ) - secondary beam9 between main carrier4 Insert vertically, - post7 on supports2 and between thresholds1 , Main vehicle4 and foot purlins5 insert horizontally, - latch8th between posts7 plug in horizontally, - c) primary construction DG, as in
3 .6 .9 .12 .13 and14 shown: - supports2 DG on supports2 Slide on top and with straps for horizontal stiffening26 screw on these, - foot purlins5 between supports2 insert vertically, - ridge purlins6 between supports2 Insert vertically, - post7 on supports2 and between main beams4 and foot purlins5 insert horizontally, - latch8th between posts7 Insert horizontally, - rafters10 between foot and ridge purlins5 and6 plug in vertically, - b) Secondary construction EG, as in
1 .4 .7 .10 .13 and14 shown: - wall infills (11 -20 ) at posts7 insert horizontally, - plates17 the underside ceiling over ground to secondary beams9 Insert vertically, - Insulation blocks19 laying on ceiling underside, - panels (16 ) of the floor Ceiling over ground to secondary beams9 plug in vertically, - c) secondary construction OG, as in
2 .5 .8th .11 .13 and14 shown: - wall infills (11 -20 ) horizontally at posts7 plug in, - plates17 the underside ceiling above floor to secondary beams9 Insert vertically, - Insulation blocks19 laying on ceiling underside, - panels16 of the floor Ceiling above floor to secondary beams9 plug in vertically, - d) secondary construction DG, as in
3 .6 .9 .12 .13 and14 shown: - wall infills (11 -20 ) at posts7 insert horizontally, - roof panels18 , Photovoltaic panels and insulating glass panes24 as roofing on rafters10 plug in vertically,
Es folgen die Abschlußarbeiten wie Sanitär-, Belüftungs- und Elektroinstallationen, das Herstellen der Sichtflächen von Böden und Wänden und die Verblechungen.It follow the completion works such as sanitary, ventilation and electrical installations, making visible surfaces of floors and walls and the stains.
ZITATE ENTHALTEN IN DER BESCHREIBUNGQUOTES INCLUDE IN THE DESCRIPTION
Diese Liste der vom Anmelder aufgeführten Dokumente wurde automatisiert erzeugt und ist ausschließlich zur besseren Information des Lesers aufgenommen. Die Liste ist nicht Bestandteil der deutschen Patent- bzw. Gebrauchsmusteranmeldung. Das DPMA übernimmt keinerlei Haftung für etwaige Fehler oder Auslassungen.This list The documents listed by the applicant have been automated generated and is solely for better information recorded by the reader. The list is not part of the German Patent or utility model application. The DPMA takes over no liability for any errors or omissions.
Zitierte PatentliteraturCited patent literature
- - DE 19832410 A1 [0009] - DE 19832410 A1 [0009]
- - DE 29713151 U1 [0010] - DE 29713151 U1 [0010]
- - DE 102004020023 B4 [0011] - DE 102004020023 B4 [0011]
- - DE 10348429 A1 [0012] DE 10348429 A1 [0012]
Claims (12)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102007043562A DE102007043562A1 (en) | 2007-09-13 | 2007-09-13 | Building e.g. movable building, construction for e.g. exhibition, has primary construction designed as frame and secondary construction designed as infill, where construction is assembled and dismantled in perpendicular direction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102007043562A DE102007043562A1 (en) | 2007-09-13 | 2007-09-13 | Building e.g. movable building, construction for e.g. exhibition, has primary construction designed as frame and secondary construction designed as infill, where construction is assembled and dismantled in perpendicular direction |
Publications (1)
Publication Number | Publication Date |
---|---|
DE102007043562A1 true DE102007043562A1 (en) | 2009-03-26 |
Family
ID=40365465
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE102007043562A Ceased DE102007043562A1 (en) | 2007-09-13 | 2007-09-13 | Building e.g. movable building, construction for e.g. exhibition, has primary construction designed as frame and secondary construction designed as infill, where construction is assembled and dismantled in perpendicular direction |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102007043562A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111305593A (en) * | 2020-03-31 | 2020-06-19 | 南京地下空间高技术产业研究院有限公司 | High-strength translation equipment for house translation |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8121134U1 (en) * | 1981-07-18 | 1981-11-26 | August Vormann Kg, 5828 Ennepetal | DEVICE FOR CONNECTING THE NODES OF WOODEN FRAMEWORK ROD |
DE29601696U1 (en) * | 1996-02-01 | 1996-04-04 | Rusch, Franz, 85123 Karlskron | Fastener |
DE29713151U1 (en) | 1997-07-24 | 1997-10-23 | Müller, Hans-Werner, Dipl.-Ing., 66679 Losheim | Modular wall construction system |
DE19832410A1 (en) | 1998-07-18 | 2000-01-27 | Wolfgang Petry | Self-build house wall components have three or more, but seldom two vertical support timbers preferably impregnated against damp, fungus and insects and lath thickness dependent upon static loading preferably of 7 cm |
DE10348429A1 (en) | 2003-10-14 | 2005-05-19 | Helbach, Dieter, Dipl.-Ing. (FH) | Prefabricated timber house is supplied in kit form including walls, floors, ceilings and roof with prefabricated assembly joints |
EP1643045A2 (en) * | 2004-09-29 | 2006-04-05 | BB-Baubeschlag Produktions-& Handels GmbH | Invisible beam connector |
DE102004020023B4 (en) | 2004-04-23 | 2006-12-07 | Az.Immocon Gmbh | Wooden building and method for its assembly |
EP1764447A2 (en) * | 2005-09-20 | 2007-03-21 | Hermann Gutmann Werke Gmbh | Butt joint connector for wood/aluminium facades |
-
2007
- 2007-09-13 DE DE102007043562A patent/DE102007043562A1/en not_active Ceased
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE8121134U1 (en) * | 1981-07-18 | 1981-11-26 | August Vormann Kg, 5828 Ennepetal | DEVICE FOR CONNECTING THE NODES OF WOODEN FRAMEWORK ROD |
DE29601696U1 (en) * | 1996-02-01 | 1996-04-04 | Rusch, Franz, 85123 Karlskron | Fastener |
DE29713151U1 (en) | 1997-07-24 | 1997-10-23 | Müller, Hans-Werner, Dipl.-Ing., 66679 Losheim | Modular wall construction system |
DE19832410A1 (en) | 1998-07-18 | 2000-01-27 | Wolfgang Petry | Self-build house wall components have three or more, but seldom two vertical support timbers preferably impregnated against damp, fungus and insects and lath thickness dependent upon static loading preferably of 7 cm |
DE10348429A1 (en) | 2003-10-14 | 2005-05-19 | Helbach, Dieter, Dipl.-Ing. (FH) | Prefabricated timber house is supplied in kit form including walls, floors, ceilings and roof with prefabricated assembly joints |
DE102004020023B4 (en) | 2004-04-23 | 2006-12-07 | Az.Immocon Gmbh | Wooden building and method for its assembly |
EP1643045A2 (en) * | 2004-09-29 | 2006-04-05 | BB-Baubeschlag Produktions-& Handels GmbH | Invisible beam connector |
EP1764447A2 (en) * | 2005-09-20 | 2007-03-21 | Hermann Gutmann Werke Gmbh | Butt joint connector for wood/aluminium facades |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111305593A (en) * | 2020-03-31 | 2020-06-19 | 南京地下空间高技术产业研究院有限公司 | High-strength translation equipment for house translation |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2722451B1 (en) | Building system, in particular residential building | |
AT522516B1 (en) | Room module, building made from room modules, as well as a manufacturing process for this in each case | |
DE19836942B4 (en) | Room cell made of wood and wood-based materials | |
EP3051039A1 (en) | Building system, in particular for residential and professional purposes | |
DE10116652B4 (en) | Method of constructing a building and building made by this method | |
DE102007043562A1 (en) | Building e.g. movable building, construction for e.g. exhibition, has primary construction designed as frame and secondary construction designed as infill, where construction is assembled and dismantled in perpendicular direction | |
DE2428038A1 (en) | Flexible prefabricated-element building structural system - with connecting panel-shaped components between columns and overhead trusses | |
DE19820438C1 (en) | Frame body system for prefabricated buildings | |
WO2008074170A1 (en) | Wooden building element | |
DE4211435A1 (en) | Integration process and module for its implementation | |
DE102019102622A1 (en) | Dry-bolted / inserted building made of precast concrete parts | |
EP0717158B1 (en) | System of constructional volumes for the erection of buildings | |
DE19916247A1 (en) | Building block system for construction of prefabricated houses includes basic element consisting of three four-sided wooden glued boards with middle board glued to outer and inner boards with offset to form tongue and groove | |
DE1459901C3 (en) | Building that has a front with loggias | |
DE4229719A1 (en) | Structure for emergency building - is easily slotted together using beams with interlocking joints at corners | |
AT326877B (en) | BUILDING | |
EP0631022A2 (en) | Tridimensional element for building purposes and its manufacturing process | |
DE102008007315B4 (en) | Buildings, especially prefabricated steel-skeleton buildings | |
DE102006028752B3 (en) | Demountable building | |
DE10348455B4 (en) | Device in the form of a building and method for building such a structure | |
DE202005013829U1 (en) | House building system comprises corner supports and horizontal roof or ceiling bearings attached thereto with selective inside and outside walls | |
DE202022104793U1 (en) | Prefabricated reinforced concrete room element | |
DE3117182A1 (en) | Construction system for, in particular, multi-storey buildings | |
EP3067483B1 (en) | Wall structure for a building system, in particular residential dwelling | |
EP1531206A2 (en) | Wooden construction element and wooden construction |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8122 | Nonbinding interest in granting licences declared | ||
R016 | Response to examination communication | ||
R002 | Refusal decision in examination/registration proceedings | ||
R003 | Refusal decision now final | ||
R082 | Change of representative |
Representative=s name: 2S-IP SCHRAMM SCHNEIDER PATENTANWAELTE - RECHT, DE Representative=s name: 2S-IP SCHRAMM SCHNEIDER BERTAGNOLL PATENT- UND, DE |
|
R003 | Refusal decision now final |
Effective date: 20150213 |