DE102005010495B4 - Device, dam formed therefrom and method for producing a dam - Google Patents
Device, dam formed therefrom and method for producing a dam Download PDFInfo
- Publication number
- DE102005010495B4 DE102005010495B4 DE200510010495 DE102005010495A DE102005010495B4 DE 102005010495 B4 DE102005010495 B4 DE 102005010495B4 DE 200510010495 DE200510010495 DE 200510010495 DE 102005010495 A DE102005010495 A DE 102005010495A DE 102005010495 B4 DE102005010495 B4 DE 102005010495B4
- Authority
- DE
- Germany
- Prior art keywords
- container
- dam
- containers
- ground
- opening
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000004519 manufacturing process Methods 0.000 title claims description 6
- 238000004873 anchoring Methods 0.000 claims abstract description 8
- 239000003223 protective agent Substances 0.000 claims abstract 3
- 239000000758 substrate Substances 0.000 claims abstract 2
- 239000000463 material Substances 0.000 claims description 11
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 10
- 239000002184 metal Substances 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 claims description 5
- 239000010959 steel Substances 0.000 claims description 5
- 238000000034 method Methods 0.000 claims description 3
- 230000001681 protective effect Effects 0.000 claims description 3
- 239000010426 asphalt Substances 0.000 claims description 2
- 239000004567 concrete Substances 0.000 claims description 2
- 239000000945 filler Substances 0.000 claims description 2
- 229920003002 synthetic resin Polymers 0.000 claims 1
- 239000000057 synthetic resin Substances 0.000 claims 1
- 239000002689 soil Substances 0.000 description 4
- 241001136792 Alle Species 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000005755 formation reaction Methods 0.000 description 2
- -1 gravel Substances 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 239000004566 building material Substances 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000009993 protective function Effects 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 239000011347 resin Substances 0.000 description 1
- 229920005989 resin Polymers 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/10—Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
- E02B3/106—Temporary dykes
- E02B3/108—Temporary dykes with a filling, e.g. filled by water or sand
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B3/00—Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
- E02B3/04—Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
- E02B3/06—Moles; Piers; Quays; Quay walls; Groynes; Breakwaters ; Wave dissipating walls; Quay equipment
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Environmental & Geological Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
Abstract
Vorrichtung
zur Herstellung eines Dammes oder dergleichen, bestehend aus einem
vorgefertigten, hohlen und druckfesten Behälter (1, 1'), mit
– einer
verschließbaren
oberen Füllöffnung (10),
– Verbindungsmitteln
(20, 21) an zwei sich gegenüberliegenden
Seiten, mit deren Hilfe gleichartige Behälter (1, 1') miteinander verbindbar
sind,
– Verankerungsmitteln
(14), mit deren Hilfe der Behälter
(1, 1') am Untergrund befestigbar ist,
dadurch gekennzeichnet,
dass
– der
Behälter
(1, 1') doppelwandig ist,
– der
Zwischenraum (8) zwischen den beiden Wänden durch zumindest eine verschließbare obere
Füllöffnung (9) befüllbar ist,
– der Zwischenraum
(8) mit einem Schutzmittel gefüllt
ist und
– plattenförmige Mittel
(22) unterhalb des Bodens (2) angeordnet sind, mit deren Hilfe ein
Unterspülen
des Behälters (1,
1') vermieden ist.Apparatus for producing a dam or the like, consisting of a prefabricated, hollow and pressure-resistant container (1, 1 '), with
A closable upper filling opening (10),
- connecting means (20, 21) on two opposite sides, by means of which similar containers (1, 1 ') are connectable to each other,
Anchoring means (14) by means of which the container (1, 1 ') can be fastened to the substrate,
characterized in that
- The container (1, 1 ') is double-walled,
- The intermediate space (8) between the two walls by at least one closable upper filling opening (9) can be filled,
- The intermediate space (8) is filled with a protective agent and
- Plate-shaped means (22) below the bottom (2) are arranged, with the aid of a Unterspülen the container (1, 1 ') is avoided.
Description
Die Erfindung bezieht sich auf eine Vorrichtung zur Herstellung eines Dammes oder dergleichen, auf einen daraus gebildeten Damm, sowie auf ein Verfahren zur Herstellung eines Dammes.The The invention relates to a device for producing a Dam or the like, on a dam formed from it, as well to a method of making a dam.
Die Erfindung kann sehr vielseitig eingesetzt werden: Ein bevorzugtes Einsatzgebiet ist zwar der Dammbau, bei Flüssen zum Schutz gegen Hochwasser oder an der Meeresküste zum Schutz gegen eine Sturmflut, jedoch kann sie auch für andere ähnliche Aufgaben eingesetzt werden, z. B. um künstliche Inseln zu schaffen, wie z. B. Bohrinseln, oder um an der Meeresküste Land zu gewinnen, das z. B. als Start- und Landebahn für Flugzeuge genutzt werden kann. Sie kann des weiteren auch zum Schutz von flachen Inseln gegen Wellenerosion eingesetzt werden, wie sie beim Inselstaat Tuvalu bekannt geworden ist, womit ihre Einsatzmöglichkeiten sicher noch nicht erschöpfend aufgezählt sind.The Invention can be used very versatile: A preferred Field of application is the dam construction, in rivers for protection against flood or on the seashore To protect against a storm surge, however, it can also be used for other similar tasks be used, for. B. artificial To create islands, such as As drilling rigs, or to land on the seashore to win, the z. B. as start and Runway for Airplanes can be used. It can also be used for protection used by shallow islands against wave erosion, as they are has become known in the island nation of Tuvalu, so their possible uses certainly not exhaustive enumerated are.
Aus dem Stand der Technik sind verschiedene Bauarten von Dämmen bekannt. Der Damm kann in einer ersten Bauart im Wesentlichen aus Erdreich bestehen. Dieses muß jedoch herbeigeschafft, aufgeschüttet und zumindest zur Wasserseite hin bewehrt werden, um ein Wegspülen und Unterspülen des aufgeschütteten Erdreichs zu vermeiden. Dies erfordert einen hohen Arbeitsaufwand. In einer zweiten Bauart besteht der Damm im Wesentlichen aus mit Stahl armiertem Beton. Diese Bauart ist noch arbeitsaufwendiger und teurer; denn auch hier müssen hochwertige Materialien, wie Kies, Zement und Stahlarmierung, herangeschafft und unter Einsatz von Maschinen und Menschen vor Ort verbaut werden.Out the prior art, various types of dams are known. The dam can be made in a first type essentially of soil. This must, however brought in, heaped up and at least reinforced to the water side, to a Wegspülen and Submerge the heaped To avoid soil. This requires a lot of work. In a second type, the dam essentially consists of Steel reinforced concrete. This design is even more labor intensive and more expensive; because here too high quality Materials, such as gravel, cement and Stahlarmierung, brought and be installed on site using machines and people.
Die
Erfindung geht z. B. aus von der
Der Erfindung liegt das Bestreben zu Grunde, eine Vorrichtung aufzuzeigen, mit deren Hilfe mit relativ geringem Aufwand an Arbeit und Maschinen vor Ort ein dauerhafter Damm und dergleichen herstellbar ist.Of the Invention is based on the endeavor to show a device with their help with relatively little effort on work and machines Place a permanent dam and the like can be produced.
Hierzu schlägt die Erfindung zunächst eine Ausbildung nach Patentanspruch 1 vor.For this beats the invention first an education according to claim 1 before.
Vorteilhafte Ausbildungen des Behälters sind in den Unteransprüchen zu finden, des weiteren ein daraus gebildeter Damm und ein Verfahren zur Herstellung eines Dammes oder dergleichen.advantageous Formations of the container are in the subclaims to find, furthermore, an educated dam and a method for producing a dam or the like.
Eine Vorrichtung nach der Erfindung kann fabrikmäßig vorgefertigt werden und dann vor Ort mit mehreren aneinandergereiht und zu einem Damm zusammengebaut werden. Besonders vielseitig ist die Vorrichtung, da sie mit den unterschiedlichsten Materialien gefüllt werden kann. Das Füllmaterial kann einerseits vor Ort schon vorhandenes Erdreich, Sand, Kies, Fels oder Geröll sein. Es kann aber auch aus bloßem Abfall oder sogar gefährlichen Abfall bestehen, da es vollkommen und dauerhaft in den Behälter eingeschlossen wird.A Device according to the invention can be prefabricated factory and then strung together on site with several and assembled to a dam become. Especially versatile is the device, as it with the different materials can be filled. The filling material can on the one hand on the ground already existing soil, sand, gravel, rock or scree be. But it can also be from mere Waste or even dangerous Waste exist as it is completely and permanently trapped in the container becomes.
Der vorgefertigte Behälter kann sehr unterschiedlich ausgebildet sein, insbesondere ist er doppelwandig. Somit können kleinere Wandstärken eingesetzt werden. In den Zwischenraum kann durch zumindest eine verschließbare obere Füllöffnung ein Schutzmittel, wie z. B. ein Beton, Kunstharz oder Bitumen eingefüllt werden, das die Haltbarkeit des Behälters wesentlich verbessert.Of the prefabricated containers can be designed very differently, in particular he is double-walled. Thus, you can smaller wall thicknesses be used. Into the intermediate space can by at least one lockable upper filling opening a protective means, such as As a concrete, resin or bitumen are filled, that the durability of the container significantly improved.
Der Behälter kann im Wesentlichen quader- oder blockförmig ausgebildet sein und aus einem Boden, zwei Längswänden, zwei Querwänden und einer Deckenwand bestehen. Im Querschnitt kann er im Wesentlichen trapezförmig ausgebildet sein.Of the container may be formed substantially parallelepiped or block-shaped and made a floor, two longitudinal walls, two transverse walls and a ceiling wall. In cross-section he can essentially trapezoidal be educated.
Als dauerhaftes Material wird ein Metall gewählt, z. B. ein Stahl oder ein Leichtmetall, das an der Außenseite zum Schutz auch beschichtet oder behandelt sein kann. Die Dicke des für den Behälter verwendeten plattenförmigen Materials kann z. B. 10 bis 20 Millimeter betragen.When durable material is a metal chosen, for. As a steel or a Light metal on the outside may also be coated or treated for protection. The fat of for used the container disc-shaped Material can z. B. be 10 to 20 millimeters.
Um die Wanddicke gering halten zu können, kann vorgesehen werden, dass innerhalb des Behälters Stützen angeordnet sind, die sich seitlich, also zumindest einerseits an der die Innenseite des Dammes bildenden Wand und andererseits an der die Außenseite des Dammes bildenden Wand, abstützen. Solche Stützen oder Streben können sich jedoch auch an der Deckenwand des Behälters abstützen, um diese höher belastbar zu machen. Hierzu kann innerhalb des Behälters ein aus Stützen bestehendes Gerüst angeordnet sein. Solche Stützen oder Streben können aus Metallprofilen, wie z. B. Doppel-T-Profilen, gebildet sein.Around can keep the wall thickness low, can provided that within the container supports are arranged, which is laterally, so at least on the one hand on the inside of the dam forming wall and on the other hand at the outside of the dam forming Wall, support. Such Support or striving can but also be supported on the top wall of the container to this higher load capacity close. For this purpose, a framework consisting of columns can be arranged inside the container be. Such supports or striving can made of metal profiles, such. B. double T-profiles, be formed.
Die plattenförmigen Mittel unterhalb des Bodens können aus einer Platte bestehen, die sich zumindest etwa senkrecht vom Boden weg erstreckt und deren unteres freies Ende kamm- oder zackenförmig ausgebildet ist. In dieser Ausbildung kann sie gut in den jeweiligen Untergrund eindringen und ein Unterspülen des Behälters vermeiden.The disc-shaped Means below the ground can consist of a plate that is at least approximately perpendicular to the Floor away extends and formed the lower free end of a comb or jagged is. In this training she can be good in the respective underground penetrate and a rinse of the container avoid.
Die Verankerungsmittel können aus einem Pfahl bestehen, der eine Öffnung im Boden durchdringt und in den Untergrund eindringt. Zu seiner Montage wird vorgesehen, dass der Pfahl im Prinzip aus einem äußeren Rohr und einem darin gleitbar gelagerten Bolzen besteht und in der Befestigungsendstellung der Bolzen verformbare oder bewegliche Endabschnitte des Rohrs als Spreizvorrichtung nach außen spreizt. Des weiteren kann/können das Rohr und/oder der Bolzen einen verbreiterten Kopf haben, auf den z. B. ein Hammer- oder Rammwerkzeug einwirken kann. Zum festen Verankern des Pfahls mit dem Behälter kann vorgesehen werden, dass der Boden um die Öffnung herum mit einer Ankerplatte verstärkt ist.The Anchoring means can consist of a pile penetrating an opening in the ground and penetrates the underground. For its assembly is provided that the pile in principle consists of an outer tube and one inside slidably mounted bolt and in the mounting end position the bolt deformable or movable end portions of the pipe as Spreading device to the outside spreads. Furthermore, can / can the pipe and / or the bolt have a widened head the z. B. a hammer or ram tool can act. To firm Anchoring the pile with the container may be provided that the bottom around the opening with an anchor plate reinforced is.
Zweckmäßigerweise besteht die obere Füllöffnung aus einem abnehmbaren mittleren Teil der Deckenwand; dann bleibt der Randbereich z. B. für Füllfahrzeuge befahrbar. Ergänzend kann vorgesehen werden, daß die Deckenwand und/oder eine Seitenwand Verbindungsmittel für ein Geländer und/oder eine zusätzliche senkrechte Schutzwand aufweist.Conveniently, consists of the upper filling opening a removable central part of the ceiling wall; then he stays Border area z. B. for filling vehicles passable. additional can be provided that the Ceiling wall and / or a side wall connecting means for a railing and / or an additional vertical protective wall.
In Fortbildung der Erfindung kann vorgesehen sein, dass der Behälter eine Öffnung zur Durchfahrt eines Fahrzeugs im Notfall aufweist, die von abnehmbaren und abgedichteten Platten verschlossen und durch diese wieder verschließbar ist.In Training of the invention may be provided that the container has an opening for Transit of a vehicle in an emergency, which has removable and sealed plates closed and closed by this again.
Soll, wie schon angedeutet wurde, der Behälter befahrbar sein, so kann seitlich eines Behälters ein zusätzlicher und im Prinzip gleicher oder zumindest ähnlicher Behälter angeordnet sein, der ähnlich einer Rampe eine Auffahrt von Fahrzeugen auf die Deckenwand eines befestigten Behälters erlaubt.Should, As already indicated, the container may be passable, so can side of a container additional and arranged in principle the same or at least similar container be similar to one Ramp up a driveway of vehicles to the ceiling wall of a fortified container allowed.
Ein Verfahren zur Herstellung eines Dammes oder dergleichen mit Hilfe von erfindungsgemäßen Vorrichtungen kann vorsehen, dass
- – ein erster Behälter an seinen Bestimmungsort gebracht wird,
- – der erste Behälter mit dem Untergrund verankert wird,
- – weitere Behälter seitlich angereiht und mit dem ersten und allen weiteren Behältern verbunden werden,
- – die weiteren Behälter mit dem Untergrund verankert werden und
- – alle Behälter und wahlweise auch vorhandene Zwischenräume mit einem Füllmaterial gefüllt werden.
- - a first container is brought to its destination,
- - the first container is anchored to the ground,
- - further containers are lined up laterally and connected to the first and all other containers,
- - The other containers are anchored to the ground and
- - All containers and optionally also existing gaps are filled with a filler.
Sind die Behälter befahrbar, so können sie nach ihrer Verankerung nacheinander befüllt werden, wobei das Füllmaterial durch geeignete Mittel zugeführt werden kann. Hierzu können z. B. LKWs, Waggons, Loren, aber auch Förderbänder dienen.are the containers passable, so can they are filled sequentially after their anchoring, with the filling material supplied by suitable means can be. You can do this z. As trucks, wagons, lorries, but also serve conveyor belts.
Ein Verfahren zur Herstellung eines Dammes, einer Insel oder dergleichen in einem offenen Gewässer mit Hilfe von insbesondere sehr voluminös ausgebildeten Vorrichtungen nach der Erfindung kann vorsehen, dass
- – ein erster Behälter an seinen Bestimmungsort gebracht wird,
- – der erste Behälter geflutet und mit dem Untergrund verankert wird,
- – weitere Behälter zu dem ersten Behälter gebracht werden,
- – die weiteren Behälter geflutet, seitlich aneinander gereiht und dabei mit dem ersten und allen weiteren Behältern fest verbunden werden,
- – die weiteren Behälter mit dem Untergrund verankert werden und
- – alle Behälter mit einem Füllmaterial gefüllt werden, wobei das Flutwasser aus den Behältern zumindest zum Teil verdrängt wird.
- - a first container is brought to its destination,
- - the first container is flooded and anchored to the ground,
- - more containers are brought to the first container,
- - flooded the other containers, laterally lined up and are firmly connected to the first and all other containers,
- - The other containers are anchored to the ground and
- - All containers are filled with a filling material, wherein the flood water is displaced from the containers, at least in part.
Eine solche Möglichkeit der Errichtung eines Damms im Wasser, in der offenen See, oder auch um eine flache Insel herum, oder sogar die Bildung einer künstlichen Insel vermag der Stand der Technik nicht zu bieten.A such possibility the construction of a dam in the water, in the open sea, or even around a flat island, or even the formation of an artificial island Island can not offer the state of the art.
Die hohlen, zum Einsatz kommenden Behälter können in einer seewärts gelegenen Werft vorgefertigt, ungefüllt und schwimmend zu ihrem Einsatzort geschleppt werden, um dann dort verankert und befüllt zu werden. Ihre Befüllung kann dann auch mit Hilfe von Ballast heranbringenden Schiffen über Füllschläuche erfolgen. In diesem Falle können Behälter von z. B. 50 bis 60 Meter Kantenlänge zum Einsatz kommen, so daß mit einem solchen Verfahren sehr großvolumige Behälter zu einem außerordentlich großvolumigen Damm, Insel oder dergleichen zusammengebaut werden können.The Hollow, deployed containers may be located in a seaward location Shipyard prefabricated, unfilled and be dragged to their place of work to swim, and then there anchored and filled to become. Your filling can then be done with the help of ballast approaching ships on filling hoses. In this case you can Container of z. B. 50 to 60 meters edge length be used, so that with To such a method very large-volume container an extraordinarily large volume Dam, island or the like can be assembled.
Soll ein sehr hoher Damm errichtet werden, so kann auch vorgesehen werden, dass auf einen unteren breiten trapezförmigen Behälter mindestens ein schmalerer oberer trapezförmiger Körper aufgesetzt wird. Dann sind entweder die unteren Behälter zuerst zu befüllen, oder es sind entsprechende senkrechte Verbindungsöffnungen zwischen den Behältern für das Füllgut vorzusehen.Should a very high dam can be built, it can also be provided that on a lower broad trapezoidal container at least one narrower upper trapezoidal body is put on. Then either the lower containers are closed first fill, or they are corresponding vertical connection openings between the containers for the filling provided.
In der Zeichnung ist ein Ausführungsbeispiel der Erfindung anhand eines Behälters dargestellt, das nun näher beschrieben wird.In the drawing is an embodiment of Invention based on a container shown, now closer is described.
Der
etwa quaderförmige
Behälter
In
der Deckenwand
Zur
Aufnahme in dem Befestigungspfahl
An
den sich gegenüber
liegenden senkrechten Wänden
Unterhalb
des Bodens
Wenn
der Behälter
- 11
- Behältercontainer
- 1'1'
- Behältercontainer
- 22
- Bodenground
- 33
- Wandwall
- 44
- Wandwall
- 55
- Wandwall
- 66
- Wandwall
- 77
- Deckenwandceiling wall
- 88th
- Zwischenraumgap
- 99
- obere Öffnungupper opening
- 1010
- mittige Öffnungcentral opening
- 1111
- Hohlraumcavity
- 1212
- untere Öffnunglower opening
- 1313
- Verstärkungsplattereinforcing plate
- 1414
- Befestigungspfahlmounting pole
- 1515
- Kopfhead
- 1616
- Spreizvorrichtungspreading
- 1717
- Bolzenbolt
- 1818
- Kopfhead
- 1919
- EndeThe End
- 2020
- Hakenhook
- 2121
- Öseeyelet
- 2222
- Platteplate
- 2323
- Zinke, SpitzeProng, top
Claims (23)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200510010495 DE102005010495B4 (en) | 2005-03-08 | 2005-03-08 | Device, dam formed therefrom and method for producing a dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE200510010495 DE102005010495B4 (en) | 2005-03-08 | 2005-03-08 | Device, dam formed therefrom and method for producing a dam |
Publications (2)
Publication Number | Publication Date |
---|---|
DE102005010495A1 DE102005010495A1 (en) | 2006-09-14 |
DE102005010495B4 true DE102005010495B4 (en) | 2009-04-02 |
Family
ID=36914597
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DE200510010495 Expired - Fee Related DE102005010495B4 (en) | 2005-03-08 | 2005-03-08 | Device, dam formed therefrom and method for producing a dam |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE102005010495B4 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102007010832B4 (en) * | 2007-03-03 | 2009-05-20 | Nehlsen Gmbh & Co. Kg | Method and device for preparing a disposal of temporary waste in the physical state of a liquid waste and means for conditioning waste to be disposed of |
US8939681B2 (en) | 2007-09-17 | 2015-01-27 | Timrite (Pty) Ltd | Particulate material retaining bag for wall construction and erosion control |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0952259A2 (en) * | 1998-04-24 | 1999-10-27 | WU-Umwelttechnik AG | Device for preventing flood and erosion damage |
US6164870A (en) * | 1998-04-24 | 2000-12-26 | Baruh; Bradford G. | Portable dike having air inflatable reinforcement |
DE19951624A1 (en) * | 1999-10-26 | 2001-05-03 | Christian Ploppa | Hollow bodies for construction of flood protection structures consists of collapsible small-volume hoses filled with water via pumps and valves |
DE19955155C2 (en) * | 1999-11-17 | 2002-06-13 | Joachim Augthun | Method and device for creating an auxiliary dam |
DE10212399A1 (en) * | 2002-03-15 | 2003-09-25 | Huesker Synthetic Gmbh | Water-fillable component |
DE10211705A1 (en) * | 2002-03-16 | 2003-10-02 | Kolchmeier Juergen | Device for constructing a protective wall against floodwater comprises a hollow body made of high tear-resistant foil in which longitudinal bars of different lengths are welded to form a hollow body wall |
DE10247491A1 (en) * | 2002-10-11 | 2004-06-09 | Heinz-Oskar Seiler | Temporary flood water barrier is a flexible cube-shaped water container, where a number of them are locked together at their ends to form a barrier wall |
DE10326802A1 (en) * | 2003-06-13 | 2005-01-27 | Sembritzky, Ute | Mobile flood protection system for dams, roads, and buildings consists of folded flexible container with inner honeycomb structure of parallel engaging chambers filled with liquid/gaseous medium |
-
2005
- 2005-03-08 DE DE200510010495 patent/DE102005010495B4/en not_active Expired - Fee Related
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0952259A2 (en) * | 1998-04-24 | 1999-10-27 | WU-Umwelttechnik AG | Device for preventing flood and erosion damage |
US6164870A (en) * | 1998-04-24 | 2000-12-26 | Baruh; Bradford G. | Portable dike having air inflatable reinforcement |
DE19951624A1 (en) * | 1999-10-26 | 2001-05-03 | Christian Ploppa | Hollow bodies for construction of flood protection structures consists of collapsible small-volume hoses filled with water via pumps and valves |
DE19955155C2 (en) * | 1999-11-17 | 2002-06-13 | Joachim Augthun | Method and device for creating an auxiliary dam |
DE10212399A1 (en) * | 2002-03-15 | 2003-09-25 | Huesker Synthetic Gmbh | Water-fillable component |
DE10211705A1 (en) * | 2002-03-16 | 2003-10-02 | Kolchmeier Juergen | Device for constructing a protective wall against floodwater comprises a hollow body made of high tear-resistant foil in which longitudinal bars of different lengths are welded to form a hollow body wall |
DE10247491A1 (en) * | 2002-10-11 | 2004-06-09 | Heinz-Oskar Seiler | Temporary flood water barrier is a flexible cube-shaped water container, where a number of them are locked together at their ends to form a barrier wall |
DE10326802A1 (en) * | 2003-06-13 | 2005-01-27 | Sembritzky, Ute | Mobile flood protection system for dams, roads, and buildings consists of folded flexible container with inner honeycomb structure of parallel engaging chambers filled with liquid/gaseous medium |
Also Published As
Publication number | Publication date |
---|---|
DE102005010495A1 (en) | 2006-09-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE202021103023U1 (en) | A complete positioning and assembly structure for double-walled steel box dams and short groups of protective tubes | |
EP3441527B1 (en) | Shut-off device for preventing the passage of land vehicles | |
DE2628618C3 (en) | Process for building a quay wall in the water and structural element for carrying out the process | |
CH707671A2 (en) | Retaining element and retaining wall retaining wall elements. | |
DE19716472C2 (en) | Component, heavy weight wall made therefrom and method for manufacturing the heavy weight wall | |
DE102005010495B4 (en) | Device, dam formed therefrom and method for producing a dam | |
EP3696328B1 (en) | Method for installing vertical grids against burrowing animals | |
DE2062477A1 (en) | Method and device for protecting and / or stabilizing inclined surfaces | |
DE202015105518U1 (en) | Animal repellent device | |
DE68912648T2 (en) | Construction method. | |
DE102005013993B3 (en) | Foundation for a flood protection | |
DE102007003085B4 (en) | Process for producing a sealing wall with optimized precast concrete elements | |
EP3361005B1 (en) | Ditch installation | |
EP3112537B1 (en) | Water-permeable support structure | |
EP2803786B1 (en) | Assembly and repair device | |
DE19631275C1 (en) | Flood wall for building protection | |
DE2917994B1 (en) | Process for the production of a building pit lining or support wall from reinforced concrete for incisions in the terrain | |
DE102016004073A1 (en) | Sheet pile wall for the confinement of a body of interconnected sheet piles | |
DE10360267B4 (en) | Method for producing a combined sheet piling | |
EP1964978B1 (en) | Method for erecting a wharfage and wharfage | |
DE19820932C2 (en) | steel sheet piling | |
DE2614438A1 (en) | CONCRETE COMPONENT FOR CONSTRUCTION OF MOLES, QUARRY WALLS OR THE SAME AND METHOD OF MANUFACTURING THEM | |
DE1634390C (en) | Method for anchoring and supporting structures and device for carrying out this method | |
DE2747774B2 (en) | Holding device for support cheeks to support slope material on an embankment | |
DE102020109352A1 (en) | Support arrangement |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
OP8 | Request for examination as to paragraph 44 patent law | ||
8122 | Nonbinding interest in granting licenses declared | ||
8364 | No opposition during term of opposition | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee | ||
R119 | Application deemed withdrawn, or ip right lapsed, due to non-payment of renewal fee |
Effective date: 20141001 |