CN2553351Y - 钢筋混凝土轨枕组合框架基础 - Google Patents

钢筋混凝土轨枕组合框架基础 Download PDF

Info

Publication number
CN2553351Y
CN2553351Y CN 02243281 CN02243281U CN2553351Y CN 2553351 Y CN2553351 Y CN 2553351Y CN 02243281 CN02243281 CN 02243281 CN 02243281 U CN02243281 U CN 02243281U CN 2553351 Y CN2553351 Y CN 2553351Y
Authority
CN
China
Prior art keywords
sleeper
sleepers
reinforced concrete
concrete sleeper
sensor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 02243281
Other languages
English (en)
Inventor
徐海贤
蒋漪泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Scientific & Technological Inst Liuzhou Railway Bureau
Original Assignee
Scientific & Technological Inst Liuzhou Railway Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Scientific & Technological Inst Liuzhou Railway Bureau filed Critical Scientific & Technological Inst Liuzhou Railway Bureau
Priority to CN 02243281 priority Critical patent/CN2553351Y/zh
Application granted granted Critical
Publication of CN2553351Y publication Critical patent/CN2553351Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

钢筋混凝土轨枕组合框架基础,是在设置称量检测装置的轨道范围内,将特制混凝土轨枕和装传感器板轨枕按设计间距交替平行放置,三根连接杆分别装于相邻两轨枕之间的中部和两端,连接杆两端分别与轨枕上的连接座相连,传感器安装板预埋在钢轨下面装传感器板轨枕上的预制槽内,该种钢筋混凝土轨枕框架基础,用于铁路动、静态轨道衡,货车超载、偏载检测系统的承载基础中,具有施工简单,稳定性、绝缘性和防腐性能优良且造价低的优点。

Description

钢筋混凝土轨枕组合框架基础
技术领域
本实用新型涉及铁路动、静态轨道衡,货车超载、偏载检测系统的一种钢筋混凝土轨枕组合框架基础,属框架基础技术领域。
背景技术
目前,在铁路动、静态轨道衡,货车超载、偏载检测中,对于检测装置基础的处理大体有以下几种方法:
(1)采用混凝土整体道床,其优点是基础稳定性好,缺点是施工复杂,周期长、造价高,并需要中断行车;
(2)采用普通碎石道床,虽然施工周期短、不需中断行车、造价低;但其稳定性不好,称量精度难以提高。
(3)采用钢结框架承载基础、其优点是施工周期短,不需中断行车,造价适中,缺点是防锈、防腐性能差、钢框架与钢轨的绝缘要特殊处理,否则会严重影响轨道电路的可靠性。
发明内容
本实用新型的目的是提供一种稳定性好,施工简便、不中断行车,造价低,确保称量精度的钢筋混凝土轨枕组合框架基础。
本实用新型是以特制的钢筋混凝土轨枕和装传感器板轨枕为基本构件,在轨枕的两端及中间部分预埋钢制连接座,在设置称量检测装置的范围内,按设计间距将特制轨枕和装传感器板轨枕交替平行放置,三根连接杆分别安装在两相邻轨枕之间的两端和中部,而每根连接杆的两端分别与轨枕上预埋的连接座相连接,这便组合成一个稳固的框架基础,在其框架上以通用技术铺设钢轨和检测装置,而传感器安装板预埋在钢轨下面装传感器板轨枕上的预制槽内。
附图说明
图1为本实用新型的结构组装示意图;
图2为本实用新型特制混凝土轨枕的主视示意图;
图3是图2的俯视示意图;
图4是本实用新型装传感器板混凝土轨枕的主视示意图;
图5是图4的俯视示意图;
具体实施方式
如图1所示,本实用新型由特制混凝土轨枕1、装传感器板轨枕2、连接杆3、连接座4、传感器安装板5构成。在设置称量检测装置的轨道范围内,将特制混凝土轨枕1和装传感器板轨枕2按设计间距交替平行放置,三根连接杆3分别安装在轨枕1与轨枕2之间的两端和中部,而每根连接杆3的两端分别与轨枕上预埋的连接座4相连接,传感器安装板5预埋在轨枕2的预留槽内,这便组合成一个稳固的框架基础,在其框架上以通用技术铺设两条钢轨和检测装置。
如图2、3所示,在特制混凝土轨枕1纵向两侧的中部和两端部均预埋有连接座4。
如图4、5所示,在装传感器板轨枕2纵向两侧的中部和两端部均预埋有连接座4,而在与钢轨连接处的轨枕面上预制成传感器安装板槽,板槽底部预埋有传感器安装板5。

Claims (3)

1、钢筋混凝土轨枕组合框架基础,其特征是:在设置称量检测装置的轨道范围内,将特制混凝土轨枕和装传感器板轨枕按设计间距交替平行放置,三根连接杆分别安装在相邻两轨枕之间的两端和中部,而每根连接杆的两端分别与轨枕上预埋的连接座相连接,传感器安装板预埋在钢轨下面装传感器板轨枕上的预制槽内。
2、根据权利要求1所述的钢筋混凝土轨枕组合框架基础,其特征是:在特制混凝土轨枕和装传感器板轨枕纵向两侧的中部和两端部均预埋有连接座。
3、根据权利要求1所述的钢筋混凝土轨枕组合框架基础,其特征是:在装传感器板轨枕与钢轨连接处的轨枕面上预制成传感器安装板槽,板槽底部预埋有传感器安装板。
CN 02243281 2002-07-23 2002-07-23 钢筋混凝土轨枕组合框架基础 Expired - Fee Related CN2553351Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 02243281 CN2553351Y (zh) 2002-07-23 2002-07-23 钢筋混凝土轨枕组合框架基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 02243281 CN2553351Y (zh) 2002-07-23 2002-07-23 钢筋混凝土轨枕组合框架基础

Publications (1)

Publication Number Publication Date
CN2553351Y true CN2553351Y (zh) 2003-05-28

Family

ID=33715575

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 02243281 Expired - Fee Related CN2553351Y (zh) 2002-07-23 2002-07-23 钢筋混凝土轨枕组合框架基础

Country Status (1)

Country Link
CN (1) CN2553351Y (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010012022A1 (en) * 2008-07-31 2010-02-04 Bill Hartmann System for weighing an axle of a wagon
CN102782467A (zh) * 2010-03-01 2012-11-14 申克公司 用于支撑导轨的轨枕
CN110186542A (zh) * 2019-07-03 2019-08-30 成都货安计量技术中心有限公司 一种轨道秤体及其安装方法
CN113026439A (zh) * 2021-04-07 2021-06-25 中铁工程设计咨询集团有限公司 一种框架式轨枕单元及轨枕
CN113077636A (zh) * 2021-03-05 2021-07-06 长安大学 一种用于智能路面的交通感知装置及其铺装方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010012022A1 (en) * 2008-07-31 2010-02-04 Bill Hartmann System for weighing an axle of a wagon
CN102782467A (zh) * 2010-03-01 2012-11-14 申克公司 用于支撑导轨的轨枕
CN110186542A (zh) * 2019-07-03 2019-08-30 成都货安计量技术中心有限公司 一种轨道秤体及其安装方法
CN113077636A (zh) * 2021-03-05 2021-07-06 长安大学 一种用于智能路面的交通感知装置及其铺装方法
CN113077636B (zh) * 2021-03-05 2022-08-26 长安大学 一种用于智能路面的交通感知装置及其铺装方法
CN113026439A (zh) * 2021-04-07 2021-06-25 中铁工程设计咨询集团有限公司 一种框架式轨枕单元及轨枕

Similar Documents

Publication Publication Date Title
CN201843076U (zh) 一种高速铁路钢系杆拱桥的槽形钢桥面结构
CN209798444U (zh) 一种用于超大坡度齿轨铁路的桁架枕式无砟轨道
CN106758590B (zh) 用于不停运条件下更换铁路轨道的施工便梁及施工方法
CN2553351Y (zh) 钢筋混凝土轨枕组合框架基础
KR20110089991A (ko) 철도용 방진궤도 및 이의 시공방법
KR100744098B1 (ko) 자기부상철도 궤도 및 이를 구비한 교량
CN112941975A (zh) 一种组合式轨道板、预制板式轨道系统及其安装施工方法
CN104947566A (zh) 组装式平交道口
CN201172777Y (zh) 矿山铁道u型钢轨枕
CN1818213A (zh) 双块式无碴轨道
CN104562919B (zh) 一种站线分离的高架站结构
CN210031351U (zh) 一种预制式浮置板道床隔振系统
CN208830061U (zh) 一种装配式无砟轨道单元板及无砟轨道板
CN205012221U (zh) 一种适合中小跨度桥梁的嵌入式轨道结构
CN109235151A (zh) 一种铁路钢桁梁桥上弹性长枕埋入式无砟轨道构造
CN2637545Y (zh) 铁路与公路平面交叉道口的快速安装铺面
CN103835190A (zh) 安装辅助钢轨的双块式混轨枕
CN202945508U (zh) 一种可快速装配式整体道床的轨道结构
CN209066192U (zh) 一种铁路钢桁梁桥上弹性长枕埋入式无砟轨道构造
CN2788155Y (zh) 旁支式轨道衡称重台
CN217419727U (zh) 用于铁路检测设备的预制式基础结构
CN114717883B (zh) 用于铁路检测设备的预制式基础结构的快速安装方法
CN216378942U (zh) 一种板内限位的预制框架板式轨道结构
EA200900195A1 (ru) Рельсовое скрепление и подрельсовая прокладка
CN211922092U (zh) 一种安装快速弹条扣件的双块式轨枕

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee