CN211689728U - Assembled temporary road - Google Patents
Assembled temporary road Download PDFInfo
- Publication number
- CN211689728U CN211689728U CN201921882599.0U CN201921882599U CN211689728U CN 211689728 U CN211689728 U CN 211689728U CN 201921882599 U CN201921882599 U CN 201921882599U CN 211689728 U CN211689728 U CN 211689728U
- Authority
- CN
- China
- Prior art keywords
- noise reduction
- temporary road
- layer
- steel plate
- prefabricated steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Road Paving Structures (AREA)
Abstract
An assembled temporary road comprises a steel plate surface layer, a honeycomb noise reduction layer, a gravel cushion layer and a soil layer which are sequentially arranged from top to bottom; the steel plate surface layer comprises a plurality of prefabricated steel plates, and the adjacent prefabricated steel plates are connected through connecting pieces; the honeycomb noise reduction layer comprises a precast block, noise reduction holes which penetrate through the precast block in the thickness direction are distributed in the precast block, a drainage channel is connected between the adjacent noise reduction holes, and the drainage channel is arranged inside the precast block. The utility model discloses an assembled temporary road, this road simple structure, construction convenience, but reuse, energy-concerving and environment-protective in job site temporary road of the same type, has extensive using value and market prospect.
Description
Technical Field
The utility model belongs to assembled road field especially relates to an assembled temporary road.
Background
In the construction process of modern buildings, temporary roads in project sites are often hardened in order to meet the traffic needs and the purposes of preventing and controlling dust in the project sites and meet the requirements of construction civilization and construction specifications.
At present, temporary road hardening is commonly adopted as follows: after the cast-in-place concrete structure and the cast-in-place concrete pavement structure are poured, long-time moisture preservation and maintenance are needed, the construction period is prolonged, and the construction progress is influenced. Meanwhile, after rolling of a large truck on a construction site, a pavement structure is easy to damage, and pavement repair is time-consuming and labor-consuming. In addition, after the construction is finished, the temporary road of the construction site is generally subjected to removal treatment, so that a great deal of waste of manpower, material resources and financial resources is caused, a great deal of construction waste is generated, the environment is harmed, and the requirements of green construction, energy conservation and environmental protection advocated by the state are not met.
In recent years, with the improvement of enterprise cost saving consciousness and energy-saving and environment-friendly consciousness, some cities and construction units begin the research of prefabricated assembled modular roads.
The assembled steel plate temporary road has the advantages of high structural strength, high construction speed, low maintenance cost, reusability and the like, and is popularized and applied in part of domestic construction units at present.
However, as the application becomes widespread, the assembled steel plate pavement gradually exposes some disadvantages:
1, when rolling by a vehicle, the steel plate can vibrate to generate larger noise;
2 the vehicle is when business turn over job site, all need wash, and the sewage after washing can't in time be discharged, can cause the large tracts of land ponding on job site road surface, and can cause the road surface to skid, influences driving safety, can pollute the job site in addition.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing an implement convenient, excellent in use effect's assembled temporary road.
In order to solve the technical problem, the utility model provides a following technical scheme: an assembled temporary road comprises a steel plate surface layer, a honeycomb noise reduction layer, a gravel cushion layer and a soil layer which are sequentially arranged from top to bottom; the steel plate surface layer comprises a plurality of prefabricated steel plates, and the adjacent prefabricated steel plates are connected through connecting pieces; the honeycomb noise reduction layer comprises precast blocks, noise reduction holes penetrating in the thickness direction of the precast blocks are distributed in the precast blocks, a drainage channel is connected between every two adjacent noise reduction holes, and the width and the height of each drainage channel are 30-50 mm; the drainage channel is arranged inside the precast block.
The connecting piece comprises a connecting plate, wherein 4 connecting holes are distributed in the connecting plate, and the connecting line of the 4 connecting holes is rectangular; 4 prefabricated holes are distributed on the prefabricated steel plate and are arranged close to the included angle of the prefabricated steel plate; 4 connecting holes on the same connecting plate are respectively connected with the prefabricated holes of 4 prefabricated steel plates.
A drainage ditch is reserved between the adjacent prefabricated steel plates.
The cross section of the noise reduction hole is hexagonal.
The gravel cushion layer is composed of stones, and the particle size of the stones is 5-30 mm.
The thickness of the gravel cushion layer is 100-300 mm.
The aperture of the noise reduction hole is 80-100 mm.
And anti-rust layers are arranged on the surfaces of the prefabricated steel plate and the honeycomb noise reduction layer.
The prefabricated steel plate is 1000mm multiplied by 1000mm in size and 15 mm-25 mm in thickness.
Through the technical scheme, the beneficial effects of the utility model are that: (1) the steel plate surface layer and the honeycomb noise reduction layer can be prefabricated, the construction period is shortened, and the traffic is opened quickly. (2) Set up drainage channel between the hole of making an uproar falls in the honeycomb, can effectively improve drainage efficiency, prevent that temporary road surface ponding is too much, guarantee driving safety. (3) The noise reduction holes can effectively reduce the automobile noise and achieve the aim of civilized construction. (4) The prefabricated steel plates are connected through the connecting pieces, so that the size between the adjacent prefabricated steel plates can be effectively controlled, and the purposes of attractiveness and practicability are achieved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic structural diagram of a steel plate surface layer;
FIG. 3 is an enlarged view of portion A of FIG. 2;
fig. 4 is a schematic diagram of a honeycomb noise reduction layer structure.
Detailed Description
An assembled temporary road comprises a steel plate surface layer 1, a honeycomb noise reduction layer 2, a gravel cushion layer 3 and a soil layer 4 which are sequentially arranged from top to bottom as shown in figure 1.
The soil layer 4 is positioned at the bottommost part and is used as a foundation of the whole temporary road; the soil layer 4 is here tamped.
The gravel cushion layer 3 is located on the soil layer 4, waste stones can be directly used on the construction site and serve as secondary support, and the thickness of the gravel cushion layer 3 is 100-300 mm. In the embodiment, the broken stone cushion layer 3 consists of stones, wherein the particle size of the stones is 5-30 mm; the stones with the particle size range are convenient to implement, the road stability is higher, and meanwhile, the effects of noise reduction and drainage can be achieved to a certain extent.
The honeycomb noise reduction layer 2 is used for reducing noise and simultaneously realizing drainage. Wherein, the honeycomb noise reduction layer 2 comprises precast blocks, and the construction period can be shortened by selecting the precast blocks, so that the traffic is opened rapidly. The precast block is also made of steel. An anti-rust layer is arranged on the outer surface of the precast block, so that the service time of the temporary road is prolonged. Evenly distributed has the hole 9 of making an uproar that falls that runs through the setting along prefabricated section thickness direction on the prefabricated section, and the cross section of the hole 9 of making an uproar that falls is personally submitted the hexagon, and the aperture of the hole 9 of making an uproar that falls is 80~100mm, and heavy road surface aperture can set up a little more, and medium-sized road surface is inferior, and light road surface aperture can set up a little to satisfy the intensity requirement. The noise reduction holes 9 can effectively reduce the noise of the automobile and achieve the aim of civilized construction.
And a drainage channel 10 is connected between the adjacent noise reduction holes 9, the drainage channel 10 is arranged in parallel to the precast block, and in addition, the drainage channel 10 is arranged inside the precast block. Size of cross section of the drain passage 10: the width and the height are both 30-50 mm. The size of the drainage channel 10 is limited because the too narrow noise reduction holes 9 are likely to cause clogging of sand and mud during drainage, which affects the drainage effect. The drainage channel 10 can effectively improve drainage efficiency, prevent that temporary road surface ponding is too much, guarantee driving safety.
The steel plate surface course 1 has a certain strength, and a vehicle can run on the steel plate surface course.
The steel plate surface layer 1 comprises a plurality of prefabricated steel plates 5, the construction period can be shortened through the prefabricated steel plates 5, the size of each prefabricated steel plate 5 is 1000mm multiplied by 1000mm, and the thickness of each prefabricated steel plate is 15 mm-25 mm. An anti-rust layer is arranged on the surface of the prefabricated steel plate 5, so that the service time of the steel plate surface layer 1 is prolonged.
A drainage ditch 8 is reserved between the adjacent prefabricated steel plates 5, so that water on the road surface can be drained in time, and the construction environment is prevented from being influenced by accumulated water.
The adjacent prefabricated steel plates 5 are connected through a connecting piece, wherein the connecting piece comprises a connecting plate 7, 4 connecting holes are distributed in the connecting plate 7, and connecting lines of the 4 connecting holes are rectangular. 4 prefabricated holes 6 are distributed on the prefabricated steel plate 5, and the prefabricated holes 6 are arranged close to the included angle of the prefabricated steel plate 5; the 4 connecting holes on the same connecting plate 7 are respectively connected with the prefabricated holes 6 of the 4 prefabricated steel plates 5, so that the 4 prefabricated steel plates 5 are connected through the 4 connecting holes. The connecting mode of the connecting hole and the prefabricated hole 6 is in threaded connection, and the connecting mode is simple to install and convenient to detach.
In this embodiment, couple together adjacent prefabricated steel sheet 5 through the connecting piece can be better control the clearance between the adjacent prefabricated steel sheet 5, 8 width unanimity in the escape canal groove of whole steel sheet surface course 1, improve road quality.
The installation steps of this embodiment are:
(1) the prefabricated steel plate of the steel plate surface layer is manufactured in advance, and the prefabricated block of the honeycomb layer is also manufactured;
(2) marking the edge line of the width of the pavement with lime;
(3) tamping the soil foundation, then paving a gravel cushion layer on the soil foundation, paving the gravel cushion layer to a thickness of 100-300 mm according to the specific situation on site, and then uniformly tamping the gravel cushion layer by using a small tamper;
(4) laying a noise reduction layer on the gravel cushion layer;
(5) and (3) paving prefabricated steel plates from the edge of the road, connecting the adjacent prefabricated steel plates with the help of a connecting plate and a bolt, and paving the prefabricated steel plates in sequence until the whole road is paved.
The utility model discloses an assembled temporary road, this road simple structure, construction convenience, but reuse, energy-concerving and environment-protective has the better noise reduction and drainage effect, in the temporary road of job site of the same type, has extensive using value and market prospect.
Claims (9)
1. An assembled temporary road, characterized in that: the honeycomb noise reduction structure comprises a steel plate surface layer, a honeycomb noise reduction layer, a gravel cushion layer and a soil layer which are sequentially arranged from top to bottom; the steel plate surface layer comprises a plurality of prefabricated steel plates, and the adjacent prefabricated steel plates are connected through connecting pieces; the honeycomb noise reduction layer comprises precast blocks, noise reduction holes penetrating in the thickness direction of the precast blocks are distributed in the precast blocks, a drainage channel is connected between every two adjacent noise reduction holes, and the width and the height of each drainage channel are 30-50 mm; the drainage channel is arranged inside the precast block.
2. The fabricated temporary road of claim 1, wherein: the connecting piece comprises a connecting plate, wherein 4 connecting holes are distributed in the connecting plate, and the connecting line of the 4 connecting holes is rectangular; 4 prefabricated holes are distributed on the prefabricated steel plate and are arranged close to the included angle of the prefabricated steel plate; 4 connecting holes on the same connecting plate are respectively connected with the prefabricated holes of 4 prefabricated steel plates.
3. The fabricated temporary road of claim 2, wherein: a drainage ditch is reserved between the adjacent prefabricated steel plates.
4. The fabricated temporary road of claim 3, wherein: the cross section of the noise reduction hole is hexagonal.
5. The fabricated temporary road of any one of claims 1 to 4, wherein: the gravel cushion layer is composed of stones, and the particle size of the stones is 5-30 mm.
6. The fabricated temporary road of claim 5, wherein: the thickness of the gravel cushion layer is 100-300 mm.
7. The fabricated temporary road of claim 1 or 6, wherein: the aperture of the noise reduction hole is 80-100 mm.
8. The fabricated temporary road of claim 7, wherein: and anti-rust layers are arranged on the surfaces of the prefabricated steel plate and the honeycomb noise reduction layer.
9. The fabricated temporary road of claim 8, wherein: the prefabricated steel plate is 1000mm multiplied by 1000mm in size and 15 mm-25 mm in thickness.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921882599.0U CN211689728U (en) | 2019-11-04 | 2019-11-04 | Assembled temporary road |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921882599.0U CN211689728U (en) | 2019-11-04 | 2019-11-04 | Assembled temporary road |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211689728U true CN211689728U (en) | 2020-10-16 |
Family
ID=72786203
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921882599.0U Active CN211689728U (en) | 2019-11-04 | 2019-11-04 | Assembled temporary road |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211689728U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114086443A (en) * | 2021-11-30 | 2022-02-25 | 二十二冶集团天津建设有限公司 | Prefabricated temporary road |
CN114622454A (en) * | 2022-02-15 | 2022-06-14 | 中国一冶集团有限公司 | Heavy-load steel plate combined construction access road filled with waste pile heads and construction method |
-
2019
- 2019-11-04 CN CN201921882599.0U patent/CN211689728U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114086443A (en) * | 2021-11-30 | 2022-02-25 | 二十二冶集团天津建设有限公司 | Prefabricated temporary road |
CN114622454A (en) * | 2022-02-15 | 2022-06-14 | 中国一冶集团有限公司 | Heavy-load steel plate combined construction access road filled with waste pile heads and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110747711B (en) | Assembled temporary road and manufacturing method thereof | |
CN211689728U (en) | Assembled temporary road | |
CN205804083U (en) | A kind of assembling steel plate temporary pavement structure | |
CN106758637A (en) | A kind of road and its construction method for having enough to meet the need quick-assembling | |
CN105220595A (en) | A kind of construction work temporary road structure and construction method thereof | |
CN104763017A (en) | Ground permeating rainwater recovery system utilizing building waste materials and construction method of ground permeating rainwater recovery system | |
CN213417462U (en) | Novel assembled road | |
CN211734908U (en) | Assembled temporary concrete pavement slab | |
CN204491342U (en) | A kind of prefabricated concrete road plate | |
CN206428547U (en) | A kind of road for having enough to meet the need quick-assembling | |
CN109868702A (en) | Prefabricated Steel Fibre Concrete Pavements | |
CN214992802U (en) | Asphalt pavement pit repairing structure | |
CN213538588U (en) | Municipal works antidetonation road surface structure | |
CN211571230U (en) | Assembled parking area | |
CN110552546B (en) | Method for building underground parking lot waterproof facility by using tower crane | |
CN209602904U (en) | A kind of steel plate turnover road surface | |
CN203429528U (en) | Bridge-type precast-reinforced-concrete-trough-plate wear-resistant pavement structure system | |
CN209989660U (en) | Interim ground facility | |
CN203373635U (en) | Prefabricated hollow reinforced concrete wearproof pavement slab | |
CN217536556U (en) | Assembly type construction terrace capable of being recycled | |
CN216193749U (en) | Assembly type road structure for construction site | |
CN218147580U (en) | Solidified building muck road structure | |
CN212742062U (en) | Structure for removing interlayer water in cement pavement reconstruction and pavement applying same | |
CN215518289U (en) | Road and bridge crack reinforced structure | |
CN219297879U (en) | Permeable pavement structure |