CN206428547U - A kind of road for having enough to meet the need quick-assembling - Google Patents

A kind of road for having enough to meet the need quick-assembling Download PDF

Info

Publication number
CN206428547U
CN206428547U CN201621494127.4U CN201621494127U CN206428547U CN 206428547 U CN206428547 U CN 206428547U CN 201621494127 U CN201621494127 U CN 201621494127U CN 206428547 U CN206428547 U CN 206428547U
Authority
CN
China
Prior art keywords
road
eyelet
layer
meet
enough
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621494127.4U
Other languages
Chinese (zh)
Inventor
李众
韩旭
张海
李应心
李伟
段崇宝
张道超
赵灿振
李爱国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201621494127.4U priority Critical patent/CN206428547U/en
Application granted granted Critical
Publication of CN206428547U publication Critical patent/CN206428547U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of road for having enough to meet the need quick-assembling, including plain soil layer, it is sequentially provided with 37 lime earth layer, metalling, fine sand layer and concrete precast block layer from the bottom to top on plain soil layer, the concrete precast block layer is made up of some adjacent concrete precast blocks, some lifting hole(eyelet)s are respectively equipped with the edge of concrete precast block, the lifting hole(eyelet) of adjacent concrete prefabricated section is equipped with, and adjacent lifting hole(eyelet) is connected by square connection fastener.The road structure rationally, is difficult to be crushed, and installation process is easy.

Description

A kind of road for having enough to meet the need quick-assembling
Technical field:
The utility model is related to a kind of road for having enough to meet the need quick-assembling.
Background technology:
The construction road in existing building site uses concrete cast-in-situ road mostly, and it has the disadvantage that it is disposable, and fragile to use Damage, using needing to be crushed after finishing, produce substantial amounts of construction rubbish, cause environmental pollution, it is impossible to reuse;Therefore there is work Cheng Caiyong precast concrete blocks are as construction road, but in the prior art, the structure design and concrete of concrete block Basic unit's design under block is all unreasonable, therefore causes concrete block to be easily crushed destruction, and settlement of foundation also results in road Uneven, loses the effect as construction road;And precast concrete block assembling is more complicated, takes time and effort.
Utility model content:
The utility model is in order to make up the deficiencies in the prior art there is provided a kind of road for having enough to meet the need quick-assembling, and it is tied Structure rationally, is difficult to be crushed, and installation process is easy, solves problems of the prior art.
The utility model is to solve the technical scheme that is used of above-mentioned technical problem:
A kind of road for having enough to meet the need quick-assembling, including plain soil layer, are sequentially provided with pseudo-ginseng ash from the bottom to top on plain soil layer Soil layer, metalling, fine sand layer and concrete precast block layer, the concrete precast block layer is by some adjacent concrete precast blocks Composition, some lifting hole(eyelet)s is respectively equipped with the edge of concrete precast block, the lifting hole(eyelet) of adjacent concrete prefabricated section is equipped with, Adjacent lifting hole(eyelet) is connected by square connection fastener.
It is preferred that, the thickness of the 37 lime earth layer is 400-600mm, and the thickness of the metalling is 100-200mm, institute The thickness for stating fine sand layer is 8-12mm, and the thickness of the concrete precast block is 150-250mm.
It is preferred that, curb is provided with both sides of the road, gutter is provided with the outside of curb, is provided with and draining in the bottom of curb The drainpipe of ditch connection.
It is preferred that, the lifting hole(eyelet) includes suspension hook, and suspension hook is mounted in the groove of concrete precast block in advance, the suspension hook and groove Surrounding groove walls between be provided with gap.
It is preferred that, the square connection fastener size dimension lifting hole(eyelet) adjacent with two is equipped with, a side opening and spiral-lock In adjacent lifting hole(eyelet).
It is preferred that, the metalling is the stabilizing cement metalling being made up of stabilizing cement rubble.
It is preferred that, the reinforcing bar in concrete precast block along its length provided with some parallel arrangements.
A kind of construction method for the road for having enough to meet the need quick-assembling, comprises the following steps:
S1, by rammed earth, formin soil layer;
S2, lays 37 lime earth, then grinding compacting on plain soil layer, forms 37 lime earth layer;
S3, lays stabilizing cement rubble on 37 lime earth layer, is then rolled, and maintenance of sprinkling water, hardened rear formation Stabilizing cement metalling;
S4, lays sand on stabilizing cement metalling, carries out levelling rear formation fine sand layer;
S5, sets curb in the one side of road or both sides, gutter is set on the outside of curb, is buried in curb bottom respectively If with gutter and the drainpipe of road;
S6, concrete precast block of the laying provided with lifting hole(eyelet) on fine sand layer;
S7, the adjacent lifting hole(eyelet) on different concrete precast blocks is connected by square connection fastener.
It is preferred that, in S6, truck crane slings progress installation laying after concrete precast block by lifting hole(eyelet).
The utility model uses such scheme, and construction road is repeatable to be utilized, and dismounting is quick, good economy performance;Road matter Measure structure reliable, it is survivable;The utility model road can need bearing capacity point load to be designed and make according to construction road With economical good;The design of each level way is solid reliable, can ensure that top Prefabricated road is consolidated, indeformable.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of concrete precast block.
Fig. 3 is the structural representation of square connection fastener.
In figure, 1, plain soil layer, 2,37 lime earth layer, 3, metalling, 4, fine sand layer, 5, concrete precast block layer, 6, coagulation Native prefabricated section, 7, lifting hole(eyelet), 8, square connection fastener, 9, curb, 10, gutter, 11, drainpipe, 12, reinforcing bar.
Embodiment:
For the technical characterstic for illustrating this programme can be understood, below by embodiment, and its accompanying drawing is combined, to this reality It is described in detail with new.
As Figure 1-3, a kind of road for having enough to meet the need quick-assembling, including plain soil layer 1, on plain soil layer 1 from the bottom to top Be sequentially provided with 37 lime earth layer 2, metalling 3, fine sand layer 4 and concrete precast block layer 5, if the concrete precast block layer 5 by Do adjacent concrete precast block 6 to constitute, some lifting hole(eyelet)s 7, adjacent coagulation are respectively equipped with the edge of concrete precast block 6 The lifting hole(eyelet) 7 of native prefabricated section 6 is equipped with, and adjacent lifting hole(eyelet) 7 is connected by square connection fastener 8.
The thickness of the 37 lime earth layer 2 is 400-600mm, and the thickness of the metalling 3 is 100-200mm, described thin The thickness of layer of sand 4 is 8-12mm, and the thickness of the concrete precast block 6 is 150-250mm.
Curb 9 is provided with both sides of the road, gutter 10 is provided with the outside of curb 9, is provided with and gutter in the bottom of curb 9 The drainpipe 11 of 10 connections.It can accelerate draining provided with drainpipe 11.
The lifting hole(eyelet) 7 includes suspension hook, and suspension hook is mounted in the groove of concrete precast block 6 in advance, and the four of the suspension hook and groove Gap is provided between all groove walls.Suspension hook is located in groove, the smooth of ground is can guarantee that, and be beneficial to and square connection fastener 8 combination.
The size dimension of square connection fastener 8 lifting hole(eyelet) 7 adjacent with two is equipped with, and a side opening and spiral-lock are adjacent Lifting hole(eyelet) 7 in.Square connection fastener spiral-lock primarily serves ground grading, protection suspension hook, connection adjacent concrete pre- in groove The effect of clamp dog 6.
The metalling 3 is the stabilizing cement metalling 3 being made up of stabilizing cement rubble.Stabilizing cement rubble is located at coagulation Native prefabricated section can protect the stability on 6 times bases of concrete precast block as far as possible 6 times.
Reinforcing bar 12 in concrete precast block 6 along its length provided with some parallel arrangements.
A kind of construction method for the road for having enough to meet the need quick-assembling, comprises the following steps:
S1, by rammed earth, formin soil layer 1;
S2, lays 37 lime earth, then grinding compacting on plain soil layer 1, forms 37 lime earth layer 2;
S3, lays stabilizing cement rubble on 37 lime earth layer 2, is then rolled, and maintenance of sprinkling water, hardened rear formation Stabilizing cement metalling 3;
S4, lays sand on stabilizing cement metalling 3, carries out levelling rear formation fine sand layer 4;
S5, curb 9 is set in the one side of road or both sides respectively, gutter 10 is set in the outside of curb 9, in curb 9 The embedded drainpipe 11 connected with gutter 10 in bottom;
S6, concrete precast block 6 of the laying provided with lifting hole(eyelet) 7 on fine sand layer 4;
S7, the adjacent lifting hole(eyelet) 7 on different concrete precast blocks 6 is connected by square connection fastener 8.
In S6, truck crane slings progress installation laying after concrete precast block 6 by lifting hole(eyelet) 7.Simple installation, expends people Power is less.
Above-mentioned embodiment cannot function as the limitation to the utility model protection domain, for the skill of the art For art personnel, any alternate modification or conversion made to the utility model embodiment all fall within guarantor of the present utility model In the range of shield.
Part is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.

Claims (7)

1. a kind of road for having enough to meet the need quick-assembling, it is characterised in that:Including plain soil layer, set successively from the bottom to top on plain soil layer There are 37 lime earth layer, metalling, fine sand layer and concrete precast block layer, the concrete precast block layer is by some adjacent coagulations Native prefabricated section composition, some lifting hole(eyelet)s, the lifting hole(eyelet) of adjacent concrete prefabricated section are respectively equipped with the edge of concrete precast block It is equipped with, adjacent lifting hole(eyelet) is connected by square connection fastener.
2. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The 37 lime earth layer Thickness is 400-600mm, and the thickness of the metalling is 100-200mm, and the thickness of the fine sand layer is 8-12mm, the coagulation The thickness of native prefabricated section is 150-250mm.
3. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:Road is provided with both sides of the road Tooth, is provided with gutter on the outside of curb, and the drainpipe connected with gutter is provided with the bottom of curb.
4. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The lifting hole(eyelet) includes hanging Hook, suspension hook in the groove of concrete precast block, is provided with gap in advance between the surrounding groove walls of the suspension hook and groove.
5. a kind of road for having enough to meet the need quick-assembling according to claim 4, it is characterised in that:The square connection fastener The size dimension lifting hole(eyelet) adjacent with two is equipped with, and a side opening and spiral-lock are in adjacent lifting hole(eyelet).
6. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The metalling is by steady Determine the stabilizing cement metalling that cement stabilized macadam is made.
7. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:In concrete precast block Reinforcing bar along its length provided with some parallel arrangements.
CN201621494127.4U 2016-12-30 2016-12-30 A kind of road for having enough to meet the need quick-assembling Expired - Fee Related CN206428547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621494127.4U CN206428547U (en) 2016-12-30 2016-12-30 A kind of road for having enough to meet the need quick-assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621494127.4U CN206428547U (en) 2016-12-30 2016-12-30 A kind of road for having enough to meet the need quick-assembling

Publications (1)

Publication Number Publication Date
CN206428547U true CN206428547U (en) 2017-08-22

Family

ID=59585462

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621494127.4U Expired - Fee Related CN206428547U (en) 2016-12-30 2016-12-30 A kind of road for having enough to meet the need quick-assembling

Country Status (1)

Country Link
CN (1) CN206428547U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108004866A (en) * 2017-12-04 2018-05-08 马晓鹤 A kind of precast concrete road system and construction method
CN111118995A (en) * 2019-11-13 2020-05-08 中冶天工集团有限公司 Cement stabilized macadam modularized stabilizing device and construction method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108004866A (en) * 2017-12-04 2018-05-08 马晓鹤 A kind of precast concrete road system and construction method
CN108004866B (en) * 2017-12-04 2020-01-10 马晓鹤 Precast concrete road system and construction method
CN111118995A (en) * 2019-11-13 2020-05-08 中冶天工集团有限公司 Cement stabilized macadam modularized stabilizing device and construction method

Similar Documents

Publication Publication Date Title
CN106758637A (en) A kind of road and its construction method for having enough to meet the need quick-assembling
CN104480963B (en) The constructional method of a kind of precast module type panel geo-grid reinforced tailing sand barricade
CN105421188B (en) The construction method of assembled temporary road
CN108035376B (en) Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof
CN103758084A (en) Ecological river interlocking type building blocks and construction method for building protection ridge through building blocks
CN204435153U (en) A kind of assembled steel plate construction road
CN106567410A (en) New construction method of municipal road inspection well
CN108677638A (en) Express highway roadbed dam filling construction based on building waste
CN204000523U (en) The prefabricated road surface of a kind of Novel reinforced concrete
CN206428547U (en) A kind of road for having enough to meet the need quick-assembling
CN109706952A (en) Large-scale well-sinking construction method
CN104762956B (en) Method for forming pile based on construction waste recycled aggregate
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN107165020A (en) A kind of pin-connected panel faces the construction method for building terrace
CN206800094U (en) A kind of big particle diameter building waste roadbed
CN214271530U (en) Soft basic district road structure based on building rubbish is laid
CN203808105U (en) Prefabricated member-combined circular mouth inspection well
CN203729311U (en) Cable-stayed concrete pile fixing slope protection structure
CN207944429U (en) Prefabricated interlock block for slope protection
CN110438859A (en) A kind of the precast concrete road and its construction method of draining of catchmenting
CN216075134U (en) Rich water district faces lake sandy soil deep basal pit hillside top construction road structure
CN205502070U (en) A dual -purpose underground gallery structure
CN106758658A (en) A kind of construction method of precast rc slab block and the heavily loaded temporary road of laying
CN203096758U (en) Hard concrete smooth foundation pit for installing drainage pipeline
CN207347861U (en) Prefabricated reinforced concrete roadbed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170822