CN206428547U - A kind of road for having enough to meet the need quick-assembling - Google Patents
A kind of road for having enough to meet the need quick-assembling Download PDFInfo
- Publication number
- CN206428547U CN206428547U CN201621494127.4U CN201621494127U CN206428547U CN 206428547 U CN206428547 U CN 206428547U CN 201621494127 U CN201621494127 U CN 201621494127U CN 206428547 U CN206428547 U CN 206428547U
- Authority
- CN
- China
- Prior art keywords
- road
- eyelet
- layer
- meet
- enough
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004567 concrete Substances 0.000 claims abstract description 40
- 239000004576 sand Substances 0.000 claims abstract description 14
- 239000002689 soil Substances 0.000 claims abstract description 14
- 235000008733 Citrus aurantifolia Nutrition 0.000 claims abstract description 13
- 235000011941 Tilia x europaea Nutrition 0.000 claims abstract description 13
- 239000004571 lime Substances 0.000 claims abstract description 13
- 239000004568 cement Substances 0.000 claims description 13
- 230000000087 stabilizing effect Effects 0.000 claims description 12
- 239000000725 suspension Substances 0.000 claims description 10
- 230000015271 coagulation Effects 0.000 claims description 5
- 238000005345 coagulation Methods 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 239000000203 mixture Substances 0.000 claims description 2
- 238000011900 installation process Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 8
- 230000015572 biosynthetic process Effects 0.000 description 4
- 238000009434 installation Methods 0.000 description 3
- 230000006378 damage Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- VKYKSIONXSXAKP-UHFFFAOYSA-N hexamethylenetetramine Chemical compound C1N(C2)CN3CN1CN2C3 VKYKSIONXSXAKP-UHFFFAOYSA-N 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000011178 precast concrete Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 235000003181 Panax pseudoginseng Nutrition 0.000 description 1
- 244000131316 Panax pseudoginseng Species 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000003912 environmental pollution Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Landscapes
- Road Paving Structures (AREA)
Abstract
A kind of road for having enough to meet the need quick-assembling, including plain soil layer, it is sequentially provided with 37 lime earth layer, metalling, fine sand layer and concrete precast block layer from the bottom to top on plain soil layer, the concrete precast block layer is made up of some adjacent concrete precast blocks, some lifting hole(eyelet)s are respectively equipped with the edge of concrete precast block, the lifting hole(eyelet) of adjacent concrete prefabricated section is equipped with, and adjacent lifting hole(eyelet) is connected by square connection fastener.The road structure rationally, is difficult to be crushed, and installation process is easy.
Description
Technical field:
The utility model is related to a kind of road for having enough to meet the need quick-assembling.
Background technology:
The construction road in existing building site uses concrete cast-in-situ road mostly, and it has the disadvantage that it is disposable, and fragile to use
Damage, using needing to be crushed after finishing, produce substantial amounts of construction rubbish, cause environmental pollution, it is impossible to reuse;Therefore there is work
Cheng Caiyong precast concrete blocks are as construction road, but in the prior art, the structure design and concrete of concrete block
Basic unit's design under block is all unreasonable, therefore causes concrete block to be easily crushed destruction, and settlement of foundation also results in road
Uneven, loses the effect as construction road;And precast concrete block assembling is more complicated, takes time and effort.
Utility model content:
The utility model is in order to make up the deficiencies in the prior art there is provided a kind of road for having enough to meet the need quick-assembling, and it is tied
Structure rationally, is difficult to be crushed, and installation process is easy, solves problems of the prior art.
The utility model is to solve the technical scheme that is used of above-mentioned technical problem:
A kind of road for having enough to meet the need quick-assembling, including plain soil layer, are sequentially provided with pseudo-ginseng ash from the bottom to top on plain soil layer
Soil layer, metalling, fine sand layer and concrete precast block layer, the concrete precast block layer is by some adjacent concrete precast blocks
Composition, some lifting hole(eyelet)s is respectively equipped with the edge of concrete precast block, the lifting hole(eyelet) of adjacent concrete prefabricated section is equipped with,
Adjacent lifting hole(eyelet) is connected by square connection fastener.
It is preferred that, the thickness of the 37 lime earth layer is 400-600mm, and the thickness of the metalling is 100-200mm, institute
The thickness for stating fine sand layer is 8-12mm, and the thickness of the concrete precast block is 150-250mm.
It is preferred that, curb is provided with both sides of the road, gutter is provided with the outside of curb, is provided with and draining in the bottom of curb
The drainpipe of ditch connection.
It is preferred that, the lifting hole(eyelet) includes suspension hook, and suspension hook is mounted in the groove of concrete precast block in advance, the suspension hook and groove
Surrounding groove walls between be provided with gap.
It is preferred that, the square connection fastener size dimension lifting hole(eyelet) adjacent with two is equipped with, a side opening and spiral-lock
In adjacent lifting hole(eyelet).
It is preferred that, the metalling is the stabilizing cement metalling being made up of stabilizing cement rubble.
It is preferred that, the reinforcing bar in concrete precast block along its length provided with some parallel arrangements.
A kind of construction method for the road for having enough to meet the need quick-assembling, comprises the following steps:
S1, by rammed earth, formin soil layer;
S2, lays 37 lime earth, then grinding compacting on plain soil layer, forms 37 lime earth layer;
S3, lays stabilizing cement rubble on 37 lime earth layer, is then rolled, and maintenance of sprinkling water, hardened rear formation
Stabilizing cement metalling;
S4, lays sand on stabilizing cement metalling, carries out levelling rear formation fine sand layer;
S5, sets curb in the one side of road or both sides, gutter is set on the outside of curb, is buried in curb bottom respectively
If with gutter and the drainpipe of road;
S6, concrete precast block of the laying provided with lifting hole(eyelet) on fine sand layer;
S7, the adjacent lifting hole(eyelet) on different concrete precast blocks is connected by square connection fastener.
It is preferred that, in S6, truck crane slings progress installation laying after concrete precast block by lifting hole(eyelet).
The utility model uses such scheme, and construction road is repeatable to be utilized, and dismounting is quick, good economy performance;Road matter
Measure structure reliable, it is survivable;The utility model road can need bearing capacity point load to be designed and make according to construction road
With economical good;The design of each level way is solid reliable, can ensure that top Prefabricated road is consolidated, indeformable.
Brief description of the drawings:
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the structural representation of concrete precast block.
Fig. 3 is the structural representation of square connection fastener.
In figure, 1, plain soil layer, 2,37 lime earth layer, 3, metalling, 4, fine sand layer, 5, concrete precast block layer, 6, coagulation
Native prefabricated section, 7, lifting hole(eyelet), 8, square connection fastener, 9, curb, 10, gutter, 11, drainpipe, 12, reinforcing bar.
Embodiment:
For the technical characterstic for illustrating this programme can be understood, below by embodiment, and its accompanying drawing is combined, to this reality
It is described in detail with new.
As Figure 1-3, a kind of road for having enough to meet the need quick-assembling, including plain soil layer 1, on plain soil layer 1 from the bottom to top
Be sequentially provided with 37 lime earth layer 2, metalling 3, fine sand layer 4 and concrete precast block layer 5, if the concrete precast block layer 5 by
Do adjacent concrete precast block 6 to constitute, some lifting hole(eyelet)s 7, adjacent coagulation are respectively equipped with the edge of concrete precast block 6
The lifting hole(eyelet) 7 of native prefabricated section 6 is equipped with, and adjacent lifting hole(eyelet) 7 is connected by square connection fastener 8.
The thickness of the 37 lime earth layer 2 is 400-600mm, and the thickness of the metalling 3 is 100-200mm, described thin
The thickness of layer of sand 4 is 8-12mm, and the thickness of the concrete precast block 6 is 150-250mm.
Curb 9 is provided with both sides of the road, gutter 10 is provided with the outside of curb 9, is provided with and gutter in the bottom of curb 9
The drainpipe 11 of 10 connections.It can accelerate draining provided with drainpipe 11.
The lifting hole(eyelet) 7 includes suspension hook, and suspension hook is mounted in the groove of concrete precast block 6 in advance, and the four of the suspension hook and groove
Gap is provided between all groove walls.Suspension hook is located in groove, the smooth of ground is can guarantee that, and be beneficial to and square connection fastener
8 combination.
The size dimension of square connection fastener 8 lifting hole(eyelet) 7 adjacent with two is equipped with, and a side opening and spiral-lock are adjacent
Lifting hole(eyelet) 7 in.Square connection fastener spiral-lock primarily serves ground grading, protection suspension hook, connection adjacent concrete pre- in groove
The effect of clamp dog 6.
The metalling 3 is the stabilizing cement metalling 3 being made up of stabilizing cement rubble.Stabilizing cement rubble is located at coagulation
Native prefabricated section can protect the stability on 6 times bases of concrete precast block as far as possible 6 times.
Reinforcing bar 12 in concrete precast block 6 along its length provided with some parallel arrangements.
A kind of construction method for the road for having enough to meet the need quick-assembling, comprises the following steps:
S1, by rammed earth, formin soil layer 1;
S2, lays 37 lime earth, then grinding compacting on plain soil layer 1, forms 37 lime earth layer 2;
S3, lays stabilizing cement rubble on 37 lime earth layer 2, is then rolled, and maintenance of sprinkling water, hardened rear formation
Stabilizing cement metalling 3;
S4, lays sand on stabilizing cement metalling 3, carries out levelling rear formation fine sand layer 4;
S5, curb 9 is set in the one side of road or both sides respectively, gutter 10 is set in the outside of curb 9, in curb 9
The embedded drainpipe 11 connected with gutter 10 in bottom;
S6, concrete precast block 6 of the laying provided with lifting hole(eyelet) 7 on fine sand layer 4;
S7, the adjacent lifting hole(eyelet) 7 on different concrete precast blocks 6 is connected by square connection fastener 8.
In S6, truck crane slings progress installation laying after concrete precast block 6 by lifting hole(eyelet) 7.Simple installation, expends people
Power is less.
Above-mentioned embodiment cannot function as the limitation to the utility model protection domain, for the skill of the art
For art personnel, any alternate modification or conversion made to the utility model embodiment all fall within guarantor of the present utility model
In the range of shield.
Part is not described in detail for the utility model, is the known technology of those skilled in the art of the present technique.
Claims (7)
1. a kind of road for having enough to meet the need quick-assembling, it is characterised in that:Including plain soil layer, set successively from the bottom to top on plain soil layer
There are 37 lime earth layer, metalling, fine sand layer and concrete precast block layer, the concrete precast block layer is by some adjacent coagulations
Native prefabricated section composition, some lifting hole(eyelet)s, the lifting hole(eyelet) of adjacent concrete prefabricated section are respectively equipped with the edge of concrete precast block
It is equipped with, adjacent lifting hole(eyelet) is connected by square connection fastener.
2. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The 37 lime earth layer
Thickness is 400-600mm, and the thickness of the metalling is 100-200mm, and the thickness of the fine sand layer is 8-12mm, the coagulation
The thickness of native prefabricated section is 150-250mm.
3. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:Road is provided with both sides of the road
Tooth, is provided with gutter on the outside of curb, and the drainpipe connected with gutter is provided with the bottom of curb.
4. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The lifting hole(eyelet) includes hanging
Hook, suspension hook in the groove of concrete precast block, is provided with gap in advance between the surrounding groove walls of the suspension hook and groove.
5. a kind of road for having enough to meet the need quick-assembling according to claim 4, it is characterised in that:The square connection fastener
The size dimension lifting hole(eyelet) adjacent with two is equipped with, and a side opening and spiral-lock are in adjacent lifting hole(eyelet).
6. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The metalling is by steady
Determine the stabilizing cement metalling that cement stabilized macadam is made.
7. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:In concrete precast block
Reinforcing bar along its length provided with some parallel arrangements.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621494127.4U CN206428547U (en) | 2016-12-30 | 2016-12-30 | A kind of road for having enough to meet the need quick-assembling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621494127.4U CN206428547U (en) | 2016-12-30 | 2016-12-30 | A kind of road for having enough to meet the need quick-assembling |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206428547U true CN206428547U (en) | 2017-08-22 |
Family
ID=59585462
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621494127.4U Expired - Fee Related CN206428547U (en) | 2016-12-30 | 2016-12-30 | A kind of road for having enough to meet the need quick-assembling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206428547U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108004866A (en) * | 2017-12-04 | 2018-05-08 | 马晓鹤 | A kind of precast concrete road system and construction method |
CN111118995A (en) * | 2019-11-13 | 2020-05-08 | 中冶天工集团有限公司 | Cement stabilized macadam modularized stabilizing device and construction method |
-
2016
- 2016-12-30 CN CN201621494127.4U patent/CN206428547U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108004866A (en) * | 2017-12-04 | 2018-05-08 | 马晓鹤 | A kind of precast concrete road system and construction method |
CN108004866B (en) * | 2017-12-04 | 2020-01-10 | 马晓鹤 | Precast concrete road system and construction method |
CN111118995A (en) * | 2019-11-13 | 2020-05-08 | 中冶天工集团有限公司 | Cement stabilized macadam modularized stabilizing device and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758637A (en) | A kind of road and its construction method for having enough to meet the need quick-assembling | |
CN104480963B (en) | The constructional method of a kind of precast module type panel geo-grid reinforced tailing sand barricade | |
CN105421188B (en) | The construction method of assembled temporary road | |
CN108035376B (en) | Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof | |
CN103758084A (en) | Ecological river interlocking type building blocks and construction method for building protection ridge through building blocks | |
CN204435153U (en) | A kind of assembled steel plate construction road | |
CN106567410A (en) | New construction method of municipal road inspection well | |
CN108677638A (en) | Express highway roadbed dam filling construction based on building waste | |
CN204000523U (en) | The prefabricated road surface of a kind of Novel reinforced concrete | |
CN206428547U (en) | A kind of road for having enough to meet the need quick-assembling | |
CN109706952A (en) | Large-scale well-sinking construction method | |
CN104762956B (en) | Method for forming pile based on construction waste recycled aggregate | |
CN103215950B (en) | Pile foundation extension construction method in backfilling area | |
CN107165020A (en) | A kind of pin-connected panel faces the construction method for building terrace | |
CN206800094U (en) | A kind of big particle diameter building waste roadbed | |
CN214271530U (en) | Soft basic district road structure based on building rubbish is laid | |
CN203808105U (en) | Prefabricated member-combined circular mouth inspection well | |
CN203729311U (en) | Cable-stayed concrete pile fixing slope protection structure | |
CN207944429U (en) | Prefabricated interlock block for slope protection | |
CN110438859A (en) | A kind of the precast concrete road and its construction method of draining of catchmenting | |
CN216075134U (en) | Rich water district faces lake sandy soil deep basal pit hillside top construction road structure | |
CN205502070U (en) | A dual -purpose underground gallery structure | |
CN106758658A (en) | A kind of construction method of precast rc slab block and the heavily loaded temporary road of laying | |
CN203096758U (en) | Hard concrete smooth foundation pit for installing drainage pipeline | |
CN207347861U (en) | Prefabricated reinforced concrete roadbed |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170822 |