CN205502070U - A dual -purpose underground gallery structure - Google Patents

A dual -purpose underground gallery structure Download PDF

Info

Publication number
CN205502070U
CN205502070U CN201620232551.5U CN201620232551U CN205502070U CN 205502070 U CN205502070 U CN 205502070U CN 201620232551 U CN201620232551 U CN 201620232551U CN 205502070 U CN205502070 U CN 205502070U
Authority
CN
China
Prior art keywords
foundation
dual
underground gallery
pile foundation
gallery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620232551.5U
Other languages
Chinese (zh)
Inventor
张迈
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wenzhou Water Resources And Electric Power Survey And Design Institute Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201620232551.5U priority Critical patent/CN205502070U/en
Application granted granted Critical
Publication of CN205502070U publication Critical patent/CN205502070U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The utility model discloses a dual -purpose underground gallery structure, pile foundation, setting including two rows of relative settings are in cap in the pile foundation, two rows foundation ditch between the pile foundation is in with the setting underground gallery in the foundation ditch, every row double -phase neighbour interval between the pile foundation is 100~200mm, and the underground gallery is pour by the reinforced concrete box culvert and is formed. The utility model discloses, combine the dado pile foundation of underground gallery basic processing 's pile foundation and corridor foundation ditch excavation, reach a dual -purpose purpose, have the structure of improvement safety, reduce road surface excavation scope, the reinforcing foundation ditch is stable, accelerate the construction progress, save characteristics such as construction investment, be applicable to very much current soft basic road city underground gallery construction down.

Description

One dual-purpose underground gallery structure
Technical field
This utility model relates to Urban Underground gallery construction, is specifically related to a dual-purpose underground gallery structure.
Background technology
National Ministry of Finance, house town and country construction portion were distributed " about carrying out state revenue support in 2014 The notice of underground pipe gallery pilot work " after (wealth builds (2014) No. 839), rise ground, city The new upsurge that lower gallery is built.
Being mud or soft soil foundation oozy for urban road basis, foundation soil has water content The features such as height, low bearing capacity, deformation are big.Under existing urban road, build the comprehensive gallery in underground exist Person's techniques below difficult point not yet has been resolved:
1. construction site is limited by road traffic, and construction pavement excavation scope can not be the biggest;
2. excavation of foundation pit is big to the built effect on building in road both sides, pattern foundation pit supporting structure intractability is big, Cost is high, there is certain security risk;
3. gallery soft base based process is complicated, invests big, long in time limit.
As can be seen here, under current urban road, gallery construction exists that excavation scope is relatively big, security risk Problem higher, that construction investment cost is high and long in time limit.
Utility model content
Technical problem to be solved in the utility model is that under current urban road, gallery exists excavation model Enclose the problem relatively big, security risk is higher, construction investment cost is high and long in time limit.
In order to solve above-mentioned technical problem, this utility model be employed technical scheme comprise that to provide one One dual-purpose underground gallery structure, the pile foundation being oppositely arranged including two rows, is arranged in described pile foundation Foundation ditch between pile foundation described in cap, two rows and the underground gallery being arranged in described foundation ditch, often arrange Being spaced apart 100~200mm between two adjacent described pile foundations, described underground gallery is by armored concrete Box culvert pours and forms.
In an above-mentioned dual-purpose underground gallery structure, described pile foundation is Φ 600mm~Φ 1000mm Reinforcing bar form with concreting.
In an above-mentioned dual-purpose underground gallery structure, the bottom of described foundation ditch is provided with slabstone from top to bottom Fill sand compacting layer and C15 concrete cushion.
In an above-mentioned dual-purpose underground gallery structure, often arrange described pile foundation and use stirrup of putting more energy into fix.
In an above-mentioned dual-purpose underground gallery structure, described pile foundation is in part following bottom foundation ditch It is provided with 6 first reinforcing bars, is in part above bottom foundation ditch and is provided with 12 second reinforcing bars.
In an above-mentioned dual-purpose underground gallery structure, between described cap, it is provided with horizontal temporary support.
In an above-mentioned dual-purpose underground gallery structure, described underground gallery is divided into multistage, adjacent two sections Between arrange measures of preventing water.
This utility model, by pile foundation and the retaining wall pile foundation of gallery excavation of foundation pit of underground gallery based process Combine, pile foundation when excavation of foundation pit as foundation pit supporting pile, to undertake horizontal bearing capacity, As the basic pile foundation of superstructure after the construction of underground gallery, to undertake vertical bearing capacity, reach One dual-purpose purpose, have raising structural safety, reduce pavement excavation scope, strengthen foundation ditch stable, The feature such as accelerating construction progress, cost saving, is readily applicable to the city under existing soft base road Underground gallery is built, and has good promotional value and application prospect.
Accompanying drawing explanation
Fig. 1 is construction procedure schematic diagram of the present utility model;
Fig. 2 is the structural representation after construction of the present utility model completes;
Fig. 3 is side structure schematic diagram of the present utility model;
Fig. 4 is the structural representation of pile foundation of the present utility model.
Detailed description of the invention
Below in conjunction with specific embodiment and Figure of description, this utility model is described in detail.
As depicted in figs. 1 and 2, the dual-purpose underground gallery structure that this utility model provides, including Foundation ditch 3 between the pile foundation 1 that two rows are oppositely arranged, the cap being arranged in pile foundation 1, two campshed bases 1 With the underground gallery being arranged in foundation ditch 3, between the two adjacent pile foundations 1 often arranged be spaced apart 100~ 200mm, underground gallery is poured by reinforced concrete box culvert 4 and forms.Its construction method includes following step Rapid:
Based process: cleaning old road base, and construction site is done cast-in-situ bored pile process, pile foundation 1 is close Arrangement is set to two rows being oppositely arranged, and the adjacent pile foundation 1 often arranged is spaced 100~200mm, pile foundation 1 Length according to when gallery vertical bearing capacity and excavation of foundation pit retaining wall horizontal bearing capacity require maximum true Fixed;
Foundation ditch 3 excavates: pour cap 2 at the top of each pile foundation 1, each pile foundation 1 is unified, digs Foundation ditch 3, section construction;
Gallery pours: dispose reinforced concrete box culvert 4, segmentation to pour formation ground between two campshed bases 1 Lower gallery, arranges measures of preventing water between each section of underground gallery;
Pavement construction: after underground gallery has poured, forms new road surface 5 to top pavement construction.
Preferably, pile foundation 1 uses the reinforcing bar of Φ 600mm~Φ 1000mm to form with concreting, May be used without other prefabricated pile foundation.
Preferably, after foundation ditch 3 has excavated, bottom foundation ditch 3, lay slabstone fill sand compacting layer 31, Then C15 concrete cushion 32 is re-layed.The bottom of foundation ditch 3 is provided with slabstone from top to bottom and fills sand compacting Layer 31 and C15 concrete cushion 32.
Preferably, as it is shown on figure 3, every campshed base 1 uses stirrup 11 of putting more energy into fix.
Preferably, as shown in Figure 4, pile foundation 1 is in bottom foundation ditch 3 following part and is provided with 6 pieces the One reinforcing bar 12, is in part above bottom foundation ditch 3 and is provided with 12 second reinforcing bars 13.Due to foundation ditch 3 Can bear bigger horizontal bearing capacity with the adjacent of reinforced concrete box culvert 4, therefore reinforcing bar number is more Many, beneficially the stablizing of pile foundation 1.
Preferably, between cap 2, horizontal temporary support is arranged.
Preferably, backacter or hydraulicking foundation ditch 3 are used.
Preferably, underground gallery is divided into multistage, arranges measures of preventing water between adjacent two sections.
Comparing with traditional soft base gallery structure, this utility model has the advantage that
1) structural safety: use the reinforced concrete bored pile of solid matter to carry out pattern foundation pit supporting structure process, Pile foundation is resistant to by bigger horizontal force, and foundation pit deformation is little, i.e. ensure that the construction safety of excavation of foundation pit, Also the construction period impact on Nearby Structure is reduced;
2) construction is quickly: the pile foundation of gallery based process and the lagging pile base junction of gallery excavation of foundation pit are closed Get up, decrease the based process construction workload of underground gallery after excavation of foundation pit, accelerate construct into Degree;
3) excavation scope is little: owing to being complete pile foundation construction before excavation of foundation pit, excavation of foundation pit no longer needs Constructing in slope to be put, can reduce the opening range of excavation face, simultaneously directly along interior pile lining vertical cut Decrease the traffic conflict of road;
4) construction costs is low: owing to the pile foundation of gallery based process and the pile foundation of foundation ditch retaining wall combine, Permanent based process pile foundation and interim supporting are processed the two-in-one process of pile foundation, reaches a dual-purpose Purpose, reduce pile foundation engineering amount, reduce construction investment, compare according to the same condition of built engineering and set Meter, reduces architectural engineering investment about 15~20%.
This utility model, by underground gallery based process pile foundation and the lagging pile base junction of gallery excavation of foundation pit Altogether, pile foundation when excavation of foundation pit as foundation pit supporting pile, to undertake horizontal bearing capacity, ground As the basic pile foundation of superstructure after the construction of lower gallery, to undertake vertical bearing capacity, reach one Stake dual-purpose purpose, has raising structural safety, reduces pavement excavation scope, strengthens that foundation ditch is stable, adds The fast feature such as construction speed, cost saving, ground, the city being readily applicable under existing soft base road Lower gallery construction, has good promotional value and application prospect.
This utility model is not limited to above-mentioned preferred forms, and anyone should learn in this practicality new The structure change made under the enlightenment of type, every have same or like technical side with this utility model Case, within each falling within protection domain of the present utility model.

Claims (7)

1. a dual-purpose underground gallery structure, it is characterised in that include pile foundation that two rows are oppositely arranged, The foundation ditch that is arranged on described in the cap in described pile foundation, two rows between pile foundation and being arranged in described foundation ditch Underground gallery, be spaced apart 100~200mm, describedly between the two adjacent described pile foundations often arranged Lower gallery is poured by reinforced concrete box culvert and forms.
A dual-purpose underground gallery structure the most as claimed in claim 1, it is characterised in that described stake Base is that the reinforcing bar of Φ 600mm~Φ 1000mm forms with concreting.
A dual-purpose underground gallery structure the most as claimed in claim 1, it is characterised in that described base The bottom in hole is provided with slabstone from top to bottom and fills sand compacting layer and C15 concrete cushion.
A dual-purpose underground gallery structure the most as claimed in claim 1, it is characterised in that often arrange institute Stating pile foundation uses stirrup of putting more energy into fix.
A dual-purpose underground gallery structure the most as claimed in claim 1, it is characterised in that described stake Base is in bottom foundation ditch following part and is provided with the first reinforcing bar, is in the part more than at the bottom of foundation ditch and is provided with the Two reinforcing bars.
A dual-purpose underground gallery structure the most as claimed in claim 1, it is characterised in that described cap Horizontal temporary support it is provided with between beam.
A dual-purpose underground gallery structure the most as claimed in claim 1, it is characterised in that describedly Lower gallery is divided into multistage, arranges measures of preventing water between adjacent two sections.
CN201620232551.5U 2016-03-24 2016-03-24 A dual -purpose underground gallery structure Active CN205502070U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620232551.5U CN205502070U (en) 2016-03-24 2016-03-24 A dual -purpose underground gallery structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620232551.5U CN205502070U (en) 2016-03-24 2016-03-24 A dual -purpose underground gallery structure

Publications (1)

Publication Number Publication Date
CN205502070U true CN205502070U (en) 2016-08-24

Family

ID=56733548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620232551.5U Active CN205502070U (en) 2016-03-24 2016-03-24 A dual -purpose underground gallery structure

Country Status (1)

Country Link
CN (1) CN205502070U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804119A (en) * 2016-03-24 2016-07-27 张迈 Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN109577121A (en) * 2018-12-12 2019-04-05 广州市市政工程设计研究总院有限公司 A kind of assembled self-balancing channel design system and its rapid constructing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105804119A (en) * 2016-03-24 2016-07-27 张迈 Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN109577121A (en) * 2018-12-12 2019-04-05 广州市市政工程设计研究总院有限公司 A kind of assembled self-balancing channel design system and its rapid constructing method

Similar Documents

Publication Publication Date Title
CN105804119A (en) Underground corridor structure with dual-purpose pile foundations and construction method of underground corridor structure
CN101560770B (en) Novel deep building foundation pit supporting system
CN106013171B (en) A kind of semi-rigid supporting construction semi-flexible and method of deep-foundation side wall
CN105064397A (en) Open excavation construction method for expanding excavation of station on metro interzone shield tunnel foundation
CN103410152B (en) A kind of construction method for long and narrow deep foundation pit earthwork digging
CN102691302B (en) Concrete structure for supporting deep foundation pit
CN105736001A (en) Construction method for building subway station through precast parts
CN111236241B (en) Weak water-rich stratum subway foundation pit reinforcing excavation method based on half-cover excavation method
CN105926391B (en) A kind of curb method for widening of existing railway roadbed
CN111677515B (en) Construction method for breaking open cut foundation pit wall into hole from pile support supporting system by adopting shallow-buried underground excavation method
CN101838957B (en) Integral type T-shaped outer cantilever roads and construction method thereof
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN108149696A (en) The composite supporting construction and construction method that a kind of gib soil nail wall is combined with permanent anti-float anchor rod
CN205502070U (en) A dual -purpose underground gallery structure
CN107326928A (en) A kind of part is related to the construction method in the deeper subsurface garage of basement
CN204662494U (en) A kind of Road Retaining Walls ruggedized construction
CN204282399U (en) A kind of subway space enclosing structure
CN203729311U (en) Cable-stayed concrete pile fixing slope protection structure
CN109487748A (en) Nearby Structure depth riverbed quaywall supporting construction and construction method
CN107700434A (en) A kind of dome grating formula armored concrete mud-rock flow blocking dam and its construction process
CN109681212B (en) Excavation construction method of small-section loess tunnel
CN103334451A (en) Underneath-passing channel formed between high-speed rail piers through secant pile walls and method thereof
Slyusarenko et al. Solution of the geotechnical problems of the Poshtova Square reconstruction in Kiev
CN209816896U (en) Collapsible loess area utility tunnel foundation structure
CN205557535U (en) Compound retaining wall of arch campshed formula

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20210428

Address after: 325000 no.890, Feixia South Road, Lucheng District, Wenzhou City, Zhejiang Province

Patentee after: WENZHOU WATER CONSERVANCY AND HYDRO-ELECTRIC POWER SURVEY AND DESIGN INSTITUTE

Address before: Lucheng District of Wenzhou city Zhejiang province 325000 lotus streets Jiao Xiang Xiang No. 132

Patentee before: Zhang Mai

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: 325000 no.890, Feixia South Road, Lucheng District, Wenzhou City, Zhejiang Province

Patentee after: Wenzhou water resources and Electric Power Survey and Design Institute Co.,Ltd.

Address before: 325000 no.890, Feixia South Road, Lucheng District, Wenzhou City, Zhejiang Province

Patentee before: WENZHOU WATER CONSERVANCY AND HYDRO-ELECTRIC POWER SURVEY AND DESIGN INSTITUTE

CP01 Change in the name or title of a patent holder