CN106758637A - A kind of road and its construction method for having enough to meet the need quick-assembling - Google Patents

A kind of road and its construction method for having enough to meet the need quick-assembling Download PDF

Info

Publication number
CN106758637A
CN106758637A CN201611264899.3A CN201611264899A CN106758637A CN 106758637 A CN106758637 A CN 106758637A CN 201611264899 A CN201611264899 A CN 201611264899A CN 106758637 A CN106758637 A CN 106758637A
Authority
CN
China
Prior art keywords
road
layer
eyelet
lifting hole
meet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201611264899.3A
Other languages
Chinese (zh)
Inventor
李众
韩旭
张海
李应心
李伟
段崇宝
张道超
赵灿振
李爱国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical First Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN201611264899.3A priority Critical patent/CN106758637A/en
Publication of CN106758637A publication Critical patent/CN106758637A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/06Pavings made of prefabricated single units made of units with cement or like binders
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C11/00Details of pavings
    • E01C11/22Gutters; Kerbs ; Surface drainage of streets, roads or like traffic areas
    • E01C11/224Surface drainage of streets
    • E01C11/227Gutters; Channels ; Roof drainage discharge ducts set in sidewalks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

A kind of road and its construction method for having enough to meet the need quick-assembling, including plain soil layer, it is sequentially provided with 37 lime earth layer, metalling, fine sand layer and concrete precast block layer from the bottom to top on plain soil layer, the concrete precast block layer is made up of some adjacent concrete precast blocks, some lifting hole(eyelet)s are respectively equipped with the edge of concrete precast block, the lifting hole(eyelet) of adjacent concrete prefabricated section is equipped with, and adjacent lifting hole(eyelet) is connected by square connection fastener.The road structure rationally, is difficult to be crushed, and installation process is easy.

Description

A kind of road and its construction method for having enough to meet the need quick-assembling
Technical field:
The present invention relates to a kind of road and its construction method for having enough to meet the need quick-assembling.
Background technology:
The construction road in existing building site uses concrete cast-in-situ road mostly, and it has the disadvantage that it is disposable, and fragile to use Damage, using needing to be crushed after finishing, produce substantial amounts of construction rubbish, cause environmental pollution, it is impossible to reuse;Therefore there is work Cheng Caiyong precast concrete blocks as construction road, but in the prior art, the structure design and concrete of concrete block Basic unit's design under block is all unreasonable, thus results in concrete block and is easily crushed destruction, and settlement of foundation also results in road Uneven, loses as the effect of construction road;And precast concrete block assembling is more complicated, takes time and effort.
The content of the invention:
The present invention is in order to make up the deficiencies in the prior art, there is provided a kind of road and its construction party for having enough to meet the need quick-assembling Method, it is rational in infrastructure, is difficult to be crushed, and installation process is easy, solves problems of the prior art.
The present invention is for the solution technical scheme that is used of above-mentioned technical problem:
A kind of road for having enough to meet the need quick-assembling, including plain soil layer, are sequentially provided with pseudo-ginseng ash from the bottom to top on plain soil layer Soil layer, metalling, fine sand layer and concrete precast block layer, the concrete precast block layer is by some adjacent concrete precast blocks Composition, some lifting hole(eyelet)s are respectively equipped with the edge of concrete precast block, and the lifting hole(eyelet) of adjacent concrete prefabricated section is equipped with, Adjacent lifting hole(eyelet) is connected by square connection fastener.
Preferably, the thickness of the 37 lime earth layer is 400-600mm, and the thickness of the metalling is 100-200mm, institute The thickness of fine sand layer is stated for 8-12mm, the thickness of the concrete precast block is 150-250mm.
Preferably, curb is provided with both sides of the road, gutter is provided with the outside of curb, be provided with and draining in the bottom of curb The drainpipe of ditch connection.
Preferably, the lifting hole(eyelet) includes suspension hook, suspension hook in advance in the groove of concrete precast block, the suspension hook and groove Surrounding groove walls between be provided with gap.
Preferably, the square connection fastener size dimension lifting hole(eyelet) adjacent with two is equipped with, a side opening and spiral-lock In adjacent lifting hole(eyelet).
Preferably, the metalling is the stabilizing cement metalling being made up of stabilizing cement rubble.
Preferably, some reinforcing bars of parallel arrangement are provided with along its length in concrete precast block.
A kind of construction method of the road for having enough to meet the need quick-assembling, comprises the following steps:
S1, by rammed earth, formin soil layer;
S2, lays 37 lime earth, then grinding compacting on plain soil layer, forms 37 lime earth layer;
S3, stabilizing cement rubble is laid on 37 lime earth layer, is then rolled, and maintenance of sprinkling water, hardened rear formation Stabilizing cement metalling;
S4, sand is laid on stabilizing cement metalling, carries out levelling rear formation fine sand layer;
S5, curb is respectively provided with the one side of road or both sides, and gutter is set on the outside of curb, is buried in curb bottom If with gutter and the drainpipe of road;
S6, is provided with the concrete precast block of lifting hole(eyelet) on fine sand layer;
S7, the adjacent lifting hole(eyelet) on different concrete precast blocks is connected by square connection fastener.
Preferably, in S6, truck crane carries out installation laying after lifting hole(eyelet) slings concrete precast block.
The present invention uses such scheme, and construction road is repeatable to be utilized, and dismounting is quick, good economy performance;
Road quality structure reliability, it is survivable;Road of the present invention can need bearing capacity point load to enter according to construction road Row design and use are economical good;Each level way designs solid reliability, can ensure that top Prefabricated road is consolidated, indeformable.
Brief description of the drawings:
Fig. 1 is structural representation of the invention.
Fig. 2 is the structural representation of concrete precast block.
Fig. 3 is the structural representation of square connection fastener.
In figure, 1, plain soil layer, 2,37 lime earth layer, 3, metalling, 4, fine sand layer, 5, concrete precast block layer, 6, coagulation Native prefabricated section, 7, lifting hole(eyelet), 8, square connection fastener, 9, curb, 10, gutter, 11, drainpipe, 12, reinforcing bar.
Specific embodiment:
For the technical characterstic for illustrating this programme can be understood, below by specific embodiment, and its accompanying drawing is combined, to this hair It is bright to be described in detail.
As Figure 1-3, a kind of road for having enough to meet the need quick-assembling, including plain soil layer 1, on plain soil layer 1 from the bottom to top Be sequentially provided with 37 lime earth layer 2, metalling 3, fine sand layer 4 and concrete precast block layer 5, if the concrete precast block layer 5 by Do adjacent concrete precast block 6 to constitute, some lifting hole(eyelet)s 7, adjacent coagulation are respectively equipped with the edge of concrete precast block 6 The lifting hole(eyelet) 7 of native prefabricated section 6 is equipped with, and adjacent lifting hole(eyelet) 7 is connected by square connection fastener 8.
The thickness of the 37 lime earth layer 2 is 400-600mm, and the thickness of the metalling 3 is 100-200mm, described thin The thickness of layer of sand 4 is 8-12mm, and the thickness of the concrete precast block 6 is 150-250mm.
Curb 9 is provided with both sides of the road, gutter 10 is provided with the outside of curb 9, be provided with and gutter in the bottom of curb 9 The drainpipe 11 of 10 connections.Being provided with drainpipe 11 can accelerate draining.
The lifting hole(eyelet) 7 includes suspension hook, and suspension hook is mounted in the groove of concrete precast block 6 in advance, the suspension hook and the four of groove Gap is provided between all groove walls.Suspension hook is located in groove, the smooth of ground is can guarantee that, and beneficial to square connection fastener 8 combination.
The size dimension of square connection fastener 8 lifting hole(eyelet) 7 adjacent with two is equipped with, and a side opening and spiral-lock are adjacent Lifting hole(eyelet) 7 in.Square connection fastener spiral-lock primarily serves ground grading, protection suspension hook, connection adjacent concrete pre- in groove The effect of clamp dog 6.
The metalling 3 is the stabilizing cement metalling 3 being made up of stabilizing cement rubble.Stabilizing cement rubble is located at coagulation Native prefabricated section can as far as possible protect 6 times stability on basis of concrete precast block for 6 times.
It is provided with some reinforcing bars 12 of parallel arrangement along its length in concrete precast block 6.
A kind of construction method of the road for having enough to meet the need quick-assembling, comprises the following steps:
S1, by rammed earth, formin soil layer 1;
S2, lays 37 lime earth, then grinding compacting on plain soil layer 1, forms 37 lime earth layer 2;
S3, stabilizing cement rubble is laid on 37 lime earth layer 2, is then rolled, and maintenance of sprinkling water, hardened rear formation Stabilizing cement metalling 3;
S4, sand is laid on stabilizing cement metalling 3, carries out levelling rear formation fine sand layer 4;
S5, curb 9 is respectively provided with the one side of road or both sides, gutter 10 is set in the outside of curb 9, in curb 9 The embedded drainpipe 11 connected with gutter 10 in bottom;
S6, is provided with the concrete precast block 6 of lifting hole(eyelet) 7 on fine sand layer 4;
S7, the adjacent lifting hole(eyelet) 7 on different concrete precast blocks 6 is connected by square connection fastener 8.
In S6, truck crane is sling by lifting hole(eyelet) 7 and carry out installation laying after concrete precast block 6.Simple installation, expends people Power is less.
Above-mentioned specific embodiment cannot function as limiting the scope of the invention, for the technology people of the art For member, any alternate modification or conversion made to embodiment of the present invention are all fallen within protection scope of the present invention.
The present invention does not describe part in detail, is the known technology of those skilled in the art of the present technique.

Claims (9)

1. a kind of road for having enough to meet the need quick-assembling, it is characterised in that:Including plain soil layer, set successively from the bottom to top on plain soil layer There are 37 lime earth layer, metalling, fine sand layer and concrete precast block layer, the concrete precast block layer is by some adjacent coagulations Native prefabricated section composition, some lifting hole(eyelet)s, the lifting hole(eyelet) of adjacent concrete prefabricated section are respectively equipped with the edge of concrete precast block It is equipped with, adjacent lifting hole(eyelet) is connected by square connection fastener.
2. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The 37 lime earth layer Thickness is 400-600mm, and the thickness of the metalling is 100-200mm, and the thickness of the fine sand layer is 8-12mm, the coagulation The thickness of native prefabricated section is 150-250mm.
3. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:It is provided with both sides of the road Tooth, is provided with gutter on the outside of curb, and the drainpipe connected with gutter is provided with the bottom of curb.
4. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The lifting hole(eyelet) includes hanging Hook, suspension hook in the groove of concrete precast block, gap is provided between the surrounding groove walls of the suspension hook and groove in advance.
5. a kind of road for having enough to meet the need quick-assembling according to claim 4, it is characterised in that:The square connection fastener The size dimension lifting hole(eyelet) adjacent with two is equipped with, and a side opening and spiral-lock are in adjacent lifting hole(eyelet).
6. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:The metalling is by steady Determine the stabilizing cement metalling that cement stabilized macadam is made.
7. a kind of road for having enough to meet the need quick-assembling according to claim 1, it is characterised in that:In concrete precast block The some reinforcing bars of parallel arrangement are provided with along its length.
8. a kind of construction method of the road for having enough to meet the need quick-assembling, it is characterised in that:Comprise the following steps:
S1, by rammed earth, formin soil layer;
S2, lays 37 lime earth, then grinding compacting on plain soil layer, forms 37 lime earth layer;
S3, stabilizing cement rubble is laid on 37 lime earth layer, is then rolled, and maintenance of sprinkling water, hardened rear formation stabilization Cement stabilized macadam layer;
S4, sand is laid on stabilizing cement metalling, carries out levelling rear formation fine sand layer;
S5, curb is respectively provided with the one side of road or both sides, and gutter is set on the outside of curb, curb bottom it is embedded with The drainpipe of gutter connection;
S6, is provided with the concrete precast block of lifting hole(eyelet) on fine sand layer;
S7, the adjacent lifting hole(eyelet) on different concrete precast blocks is connected by square connection fastener.
9. the construction method of a kind of road for having enough to meet the need quick-assembling according to claim 8, it is characterised in that:In S6 In, truck crane carries out installation laying after lifting hole(eyelet) slings concrete precast block.
CN201611264899.3A 2016-12-30 2016-12-30 A kind of road and its construction method for having enough to meet the need quick-assembling Pending CN106758637A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611264899.3A CN106758637A (en) 2016-12-30 2016-12-30 A kind of road and its construction method for having enough to meet the need quick-assembling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611264899.3A CN106758637A (en) 2016-12-30 2016-12-30 A kind of road and its construction method for having enough to meet the need quick-assembling

Publications (1)

Publication Number Publication Date
CN106758637A true CN106758637A (en) 2017-05-31

Family

ID=58952390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611264899.3A Pending CN106758637A (en) 2016-12-30 2016-12-30 A kind of road and its construction method for having enough to meet the need quick-assembling

Country Status (1)

Country Link
CN (1) CN106758637A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149552A (en) * 2018-02-02 2018-06-12 中建八局第建设有限公司 A kind of earth shoulder constructing device
CN108457309A (en) * 2018-04-09 2018-08-28 天津中铁建业集团有限公司 A kind of novel sprinkling structure and its construction method
CN109082994A (en) * 2017-07-07 2018-12-25 渠承明 Town road Rapid-Repair structure and its construction method
CN109423941A (en) * 2017-08-29 2019-03-05 金梅 A kind of pavement permeable terrace
CN109667206A (en) * 2017-10-14 2019-04-23 廖志琳 A kind of concrete floor layer of structure can effectively reduce shrinking cracks rate
CN109778986A (en) * 2017-11-15 2019-05-21 北京建工路桥集团有限公司 A kind of prestressed concrete pipe road preventing differential settlement and its construction method
CN111118996A (en) * 2020-01-15 2020-05-08 成都城投远大建筑科技有限公司 Assembled parking lot and paving method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20060082832A (en) * 2006-06-15 2006-07-19 한국유지관리 주식회사 Precast concrete panel using height-controller and its road repairing method
CN2893020Y (en) * 2006-05-19 2007-04-25 贵阳铝镁设计研究院 Road sewage apparatus
CN204212023U (en) * 2014-11-04 2015-03-18 中建四局第三建筑工程有限公司 A kind of spliced steel concrete temporary pavement
CN204435153U (en) * 2015-01-14 2015-07-01 中建八局第一建设有限公司 A kind of assembled steel plate construction road
CN105220595A (en) * 2015-10-23 2016-01-06 中建四局第一建筑工程有限公司 A kind of construction work temporary road structure and construction method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2893020Y (en) * 2006-05-19 2007-04-25 贵阳铝镁设计研究院 Road sewage apparatus
KR20060082832A (en) * 2006-06-15 2006-07-19 한국유지관리 주식회사 Precast concrete panel using height-controller and its road repairing method
CN204212023U (en) * 2014-11-04 2015-03-18 中建四局第三建筑工程有限公司 A kind of spliced steel concrete temporary pavement
CN204435153U (en) * 2015-01-14 2015-07-01 中建八局第一建设有限公司 A kind of assembled steel plate construction road
CN105220595A (en) * 2015-10-23 2016-01-06 中建四局第一建筑工程有限公司 A kind of construction work temporary road structure and construction method thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李清富等: "《大型桥梁绿色施工组织与管理》", 黄河水利出版社 , pages: 47 *

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109082994A (en) * 2017-07-07 2018-12-25 渠承明 Town road Rapid-Repair structure and its construction method
CN109082994B (en) * 2017-07-07 2020-11-17 博信达建设集团有限公司 Municipal road rapid repairing structure and construction method thereof
CN109423941A (en) * 2017-08-29 2019-03-05 金梅 A kind of pavement permeable terrace
CN109667206A (en) * 2017-10-14 2019-04-23 廖志琳 A kind of concrete floor layer of structure can effectively reduce shrinking cracks rate
CN109778986A (en) * 2017-11-15 2019-05-21 北京建工路桥集团有限公司 A kind of prestressed concrete pipe road preventing differential settlement and its construction method
CN108149552A (en) * 2018-02-02 2018-06-12 中建八局第建设有限公司 A kind of earth shoulder constructing device
CN108149552B (en) * 2018-02-02 2023-08-11 中建八局第一建设有限公司 Soil shoulder construction device
CN108457309A (en) * 2018-04-09 2018-08-28 天津中铁建业集团有限公司 A kind of novel sprinkling structure and its construction method
CN111118996A (en) * 2020-01-15 2020-05-08 成都城投远大建筑科技有限公司 Assembled parking lot and paving method thereof

Similar Documents

Publication Publication Date Title
CN106758637A (en) A kind of road and its construction method for having enough to meet the need quick-assembling
CN104480963B (en) The constructional method of a kind of precast module type panel geo-grid reinforced tailing sand barricade
CN105421188B (en) The construction method of assembled temporary road
CN108035376B (en) Anti-deformation rectification foundation applicable to goaf site wind turbine generator and construction method thereof
CN204435153U (en) A kind of assembled steel plate construction road
CN204000523U (en) The prefabricated road surface of a kind of Novel reinforced concrete
CN202730579U (en) Recyclable prefabricated concrete block for hardening construction plant
CN206428547U (en) A kind of road for having enough to meet the need quick-assembling
CN103215950B (en) Pile foundation extension construction method in backfilling area
CN107165020A (en) A kind of pin-connected panel faces the construction method for building terrace
CN106801384A (en) Assembled steel reinforced concrete aliform type culvert opening and construction method
CN203729311U (en) Cable-stayed concrete pile fixing slope protection structure
CN206512619U (en) The assembled steel reinforced concrete cover culvert of U-shaped
CN109577121A (en) A kind of assembled self-balancing channel design system and its rapid constructing method
CN106758658A (en) A kind of construction method of precast rc slab block and the heavily loaded temporary road of laying
CN110438859A (en) Precast concrete road capable of collecting and draining water and construction method thereof
CN216075134U (en) Rich water district faces lake sandy soil deep basal pit hillside top construction road structure
CN212000674U (en) Novel reverse construction method assembly type non-pressure culvert
CN209636588U (en) A kind of inside has the reinforcement subgrade and pavement of geotechnological water-permeable pipe
CN210636251U (en) Highway subgrade reinforced structure
CN209636573U (en) A kind of assembled self-balancing channel design system
CN206722300U (en) A kind of pin-connected panel, which is faced, builds terrace
CN206666971U (en) A kind of assembled road
CN112376351A (en) Construction method of prefabricated beam road related to mountain knife back beam terrain
CN207314077U (en) A kind of precast rc slab block

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20170531

RJ01 Rejection of invention patent application after publication