CN205804083U - A kind of assembling steel plate temporary pavement structure - Google Patents

A kind of assembling steel plate temporary pavement structure Download PDF

Info

Publication number
CN205804083U
CN205804083U CN201620587354.5U CN201620587354U CN205804083U CN 205804083 U CN205804083 U CN 205804083U CN 201620587354 U CN201620587354 U CN 201620587354U CN 205804083 U CN205804083 U CN 205804083U
Authority
CN
China
Prior art keywords
steel
steel plate
surface layer
pavement structure
plate surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620587354.5U
Other languages
Chinese (zh)
Inventor
程强强
陈年和
孙武
曹洪吉
王玮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Institute of Architectural Technology
Jiangsu Jianzhu Institute
Original Assignee
Jiangsu Institute of Architectural Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Institute of Architectural Technology filed Critical Jiangsu Institute of Architectural Technology
Priority to CN201620587354.5U priority Critical patent/CN205804083U/en
Application granted granted Critical
Publication of CN205804083U publication Critical patent/CN205804083U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

A kind of assembling steel plate temporary pavement structure, including steel plate surface layer, I-steel basic unit, granular cushion and soil matrix layer, the bottom is soil matrix layer, top is steel plate surface layer, steel plate surface layer be plurality of steel plates fix connection and steel plate connect gap between filling rubber sheet gasket, steel plate surface layer is provided with hole for hoist, the side of steel plate surface layer is provided with connecting hole, it is equipped with granular cushion on soil matrix layer, I-steel basic unit is made up of many I-steel I and the I-steel II being positioned at I-steel both sides, place with 90 degree of angles between I-steel I with I-steel II and I-steel I is fixed with I-steel II and is connected.Assembling steel plate temporary pavement structure of the present utility model, reasonable in design, compare with tradition cast-in-place concrete interim hard surface structure, pavement structure and I-steel basic unit use prefabricated construction, easy construction, construction quality are prone to ensure, reusable, it is achieved green, economy, the construction effect of environmental protection.

Description

A kind of assembling steel plate temporary pavement structure
Technical field
This utility model relates to a kind of pavement structure, specifically a kind of assembling steel plate temporary pavement structure, belongs to building With building engineering construction field.
Background technology
Most buildings need to carry out levelling of the land and road surface cure process, at present with construction projects before going into operation The most universal road surface hardening process makes the mode of employing cast-in-place concrete, and this mode has following all many scarce Fall into:
(1) pour curing time longer, be unfavorable for shortening the construction period;
(2) job site car load is heavier, and after destruction, reparation is wasted time and energy expensive;
(3) difficulty is removed after construction;
(4) can not recycle, cause waste greatly, disagree with the construction concept of " green, energy-saving and environmental protection ".
If a kind of assembled energy-saving and environment friendly temporary pavement can be invented, current construction will be improved greatly interim The problem of road surface existence and defect.
Summary of the invention
For the problems referred to above, this utility model provides a kind of assembling steel plate temporary pavement structure, easy construction, construction matter Amount is prone to ensure, reusable, it is achieved green, economy, the construction effect of environmental protection.
This utility model is realized by techniques below scheme:
A kind of assembling steel plate temporary pavement structure, including steel plate surface layer, I-steel basic unit, granular cushion and soil matrix Layer, the bottom is soil matrix layer, and top is steel plate surface layer, and described steel plate surface layer is that plurality of steel plates fixes connection and steel plate connects Filling rubber sheet gasket between gap, described steel plate surface layer is provided with hole for hoist, and the side of described steel plate surface layer is provided with connecting hole, described Being equipped with granular cushion on soil matrix layer, described I-steel basic unit is by many I-steel I and the I-shaped being positioned at I-steel I both sides Steel II forms, and places with 90 degree of angles and I-steel I is fixed with I-steel II and is connected between described I-steel I and I-steel II.
Preferably, described I-steel I is parallel to vehicle heading spaced set, two ends closure with I-steel II with Vehicle heading is vertically arranged.
Preferably, described I-steel I is perpendicular to vehicle heading spaced set, two ends closure with I-steel II with Vehicle heading be arranged in parallel.
Preferably, described steel plate surface layer scribbles antirust agent.
Preferably, described I-steel I scribbles antirust agent with I-steel II surface.
Preferably, described granular cushion thickness is 10-30 centimetre, and the laying width ratio I-steel basic unit often surveyed is extremely Few the widest go out 25 centimetres.
This utility model beneficial effect:
(1) pavement structure and I-steel basic unit use prefabricated construction, substantially reduce the engineering time;
(2) steel plate road surface and I-steel basic unit are reusable, economy;
(3) after using, other job sites can be directly lifted into, it is to avoid because dismantling concrete hard surface produces Building waste, energy-saving and environment friendly.
This utility model dress one joins formula steel plate temporary pavement structure construction convenience, construction quality is prone to ensure, repeatable Use, it is achieved green, economy, the construction effect of environmental protection, there is commercial value and market prospect widely.
Accompanying drawing explanation
Fig. 1 is structural representation of the present utility model.
Fig. 2 is orthogonal view of the present utility model.
Fig. 3 is this utility model I-steel basic unit top view.
Fig. 4 is this utility model I-steel based structures schematic diagram
In figure: 1, steel plate surface layer, 2, I-steel basic unit, 2-1, I-steel I, 2-2 I-steel II, 3, granular cushion, 4, soil matrix layer, 5, hole for hoist, 6, connecting hole.
Detailed description of the invention
With embodiment, this utility model is described further below in conjunction with the accompanying drawings.
As shown in Figures 1 to 4, a kind of assembling steel plate temporary pavement structure, including steel plate surface layer 1, I-steel basic unit 2, Granular cushion 3 and soil matrix layer 4, the bottom is soil matrix layer 4, and top is steel plate surface layer 1, and steel plate surface layer 1 is plurality of steel plates Filling rubber sheet gasket between the gap that fixing connection and steel plate connect, reduces the friction of steel plate junction, and steel plate surface layer 1 is provided with and hangs Dress hole 5, facilitates lifting construction, the side of steel plate surface layer 1 to be provided with connecting hole 6, soil matrix layer 4 is equipped with granular cushion 3, work Word base steel layer 2 is made up of many I-steel I 2-1 and I-steel II 2-2 being positioned at I-steel I 2-1 both sides, I-steel I 2-1 and work Place with 90 degree of angles between word steel II 2-2 and I-steel I 2-1 and I-steel II 2-2 fixes and is connected.
I-steel I 2-1 is parallel to vehicle heading spaced set, two ends closure I-steel II 2-2 and vehicle row Sail direction to be vertically arranged or I-steel I 2-1 is perpendicular to vehicle heading spaced set, two ends closure I-steel II 2- 2 be arranged in parallel with vehicle heading, it is ensured that the power transmission effect of basic unit.
Antirust agent is scribbled in board finish 1.
I-steel I 2-1 and I-steel II 2-2 surface scribble antirust agent.
Granular cushion 3 thickness is 10-30 centimetre, the laying width ratio I-steel basic unit 2 that often surveys the widest go out 25 lis Rice;Guarantee the effectiveness of granular cushion.
Soil matrix layer 4 is compacting soil layer, if weak soil etc. should not use the soil layer that compacting processes, then takes to thicken grating broken Stone bed course carries out changing the mode filled out and processes;Guarantee the stability of soil matrix layer 4.
A kind of assembling steel plate temporary pavement structure, as a example by 6m width road surface, construction procedure is as follows:
Step one, surveying setting-out, mark width of roadway edge line with white lime.
Step 2, soil matrix layer 4 uses small-sized tamping machine to tamp 2-3 time, and every side exceeds width of roadway edge line at least 20cm;As Fruit is that the Subgrade soils such as weak soil directly lay granular cushion 3.
Step 3, thoroughly does away with job site practical situation, lays granular cushion 10-30cm, lays the every side of width and compares work Word base steel layer 2 the widest go out 25cm, uniformly tamp by small-sized tamping machine.
Step 4, I-steel brushing preservative, lay I-steel;Along vehicle heading I-steel I 2-1 spacing 30- 50cm parallel laid, two plug I-steel II 2-2 connection side fixing with vehicle heading I-steel vertical runs and employing Formula.
Step 5, starts to lay steel plate road surface from marginal position, and steel plate uses the size of 2m*2m, thickness 10-20mm, is coated with Brush preservative;Width of roadway direction lays three pieces, and adjacent connecting hole pin is fixed, and splicing seams rubber blanket stoppers;Along long Degree direction is laid successively.

Claims (6)

1. an assembling steel plate temporary pavement structure, including steel plate surface layer (1), I-steel basic unit (2), granular cushion And soil matrix layer (4) (3), it is characterised in that: the bottom is soil matrix layer (4), and top is steel plate surface layer (1), described steel plate surface layer (1) be plurality of steel plates fix connection and steel plate connect gap between filling rubber sheet gasket, described steel plate surface layer (1) is provided with lifting Hole (5), the side of described steel plate surface layer (1) is provided with connecting hole (6), described soil matrix layer (4) is equipped with granular cushion (3), described I-steel basic unit (2) is by many I-steel I (2-1) and the I-steel II (2-2) that is positioned at I-steel I (2-1) both sides Composition, places and I-steel I (2-1) and I-steel with 90 degree of angles between described I-steel I (2-1) and I-steel II (2-2) II (2-2) is fixing to be connected.
A kind of assembling steel plate temporary pavement structure the most according to claim 1, it is characterised in that: described I-steel I (2- 1) being parallel to vehicle heading spaced set, two ends closure I-steel II (2-2) is vertically arranged with vehicle heading.
A kind of assembling steel plate temporary pavement structure the most according to claim 1, it is characterised in that: described I-steel I (2- 1) being perpendicular to vehicle heading spaced set, two ends closure I-steel II (2-2) be arranged in parallel with vehicle heading.
A kind of assembling steel plate temporary pavement structure the most according to claim 1, it is characterised in that: described steel plate surface layer (1) antirust agent is scribbled on.
A kind of assembling steel plate temporary pavement structure the most according to claim 1, it is characterised in that: described I-steel I (2- 1) antirust agent is scribbled with I-steel II (2-2) surface.
A kind of assembling steel plate temporary pavement structure the most according to claim 1, it is characterised in that: described graded broken stone pad Layer (3) thickness is 10-30 centimetre, laying width ratio I-steel basic unit (2) often surveyed the widest go out 25 centimetres.
CN201620587354.5U 2016-06-17 2016-06-17 A kind of assembling steel plate temporary pavement structure Expired - Fee Related CN205804083U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620587354.5U CN205804083U (en) 2016-06-17 2016-06-17 A kind of assembling steel plate temporary pavement structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620587354.5U CN205804083U (en) 2016-06-17 2016-06-17 A kind of assembling steel plate temporary pavement structure

Publications (1)

Publication Number Publication Date
CN205804083U true CN205804083U (en) 2016-12-14

Family

ID=58142773

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620587354.5U Expired - Fee Related CN205804083U (en) 2016-06-17 2016-06-17 A kind of assembling steel plate temporary pavement structure

Country Status (1)

Country Link
CN (1) CN205804083U (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620239A (en) * 2017-10-10 2018-01-23 储君 A kind of cement road laying method
CN107740318A (en) * 2017-10-10 2018-02-27 储君 A kind of laying method of cement road
CN109518559A (en) * 2019-01-08 2019-03-26 哈尔滨理工大学 A kind of ground level compensation device that is open to traffic suitable for a variety of intervals
CN110747711A (en) * 2019-11-04 2020-02-04 河南省交通规划设计研究院股份有限公司 Assembled temporary road and manufacturing method thereof
CN111877679A (en) * 2020-07-29 2020-11-03 广州市柏舍装饰设计有限公司 Construction process of high-strength floor in subway space
CN113152240A (en) * 2021-04-23 2021-07-23 九江职业技术学院 Automatic robot that spouts of road surface
CN113481771A (en) * 2021-08-05 2021-10-08 常熟市第二市政路桥建设工程有限公司 Permanent-temporary combined construction structure for municipal road and construction method thereof

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107620239A (en) * 2017-10-10 2018-01-23 储君 A kind of cement road laying method
CN107740318A (en) * 2017-10-10 2018-02-27 储君 A kind of laying method of cement road
CN109518559A (en) * 2019-01-08 2019-03-26 哈尔滨理工大学 A kind of ground level compensation device that is open to traffic suitable for a variety of intervals
CN110747711A (en) * 2019-11-04 2020-02-04 河南省交通规划设计研究院股份有限公司 Assembled temporary road and manufacturing method thereof
CN111877679A (en) * 2020-07-29 2020-11-03 广州市柏舍装饰设计有限公司 Construction process of high-strength floor in subway space
CN111877679B (en) * 2020-07-29 2021-09-28 广州市柏舍装饰设计有限公司 Construction process of high-strength floor in subway space
CN113152240A (en) * 2021-04-23 2021-07-23 九江职业技术学院 Automatic robot that spouts of road surface
CN113152240B (en) * 2021-04-23 2022-10-18 九江职业技术学院 Automatic robot that spouts of road surface
CN113481771A (en) * 2021-08-05 2021-10-08 常熟市第二市政路桥建设工程有限公司 Permanent-temporary combined construction structure for municipal road and construction method thereof

Similar Documents

Publication Publication Date Title
CN205804083U (en) A kind of assembling steel plate temporary pavement structure
CN205741828U (en) A kind of fabricated permeable pavement structure
CN203034334U (en) Crack repairing structure for asphalt concrete pavement
CN202718022U (en) Fabricated type prestressed concrete pavement
CN204435153U (en) A kind of assembled steel plate construction road
CN105421188A (en) Construction method of assembly type temporary road
CN106758637A (en) A kind of road and its construction method for having enough to meet the need quick-assembling
CN103306439A (en) Pouring technology for implanting high anti-leakage and anti-crack protective layer into roof structure layer
CN203700898U (en) Assembled road device
CN203213148U (en) Basement drainage ditch construction structure
CN211689728U (en) Assembled temporary road
CN203795460U (en) Basic structure of ballasting tower crane
CN216237943U (en) Rural highway cement concrete pavement assembled structure of small traffic
CN206428547U (en) A kind of road for having enough to meet the need quick-assembling
CN204849813U (en) Ballast formula grit basis
CN210529395U (en) Highway subgrade settlement-preventing structure
CN102979022A (en) Semi-prefabricated structure road and paving method thereof
CN208650454U (en) A kind of assembled architecture floor tile connection structure
CN208455407U (en) Heavy concrete road surface can be had enough to meet the need
CN208346577U (en) A kind of interim road plate of fast disassembly type
CN113026469A (en) Stress relieving pavement
CN207160053U (en) A kind of foundation structure of corrugated steel arch culvert
CN202170460U (en) Load-carrying structural layer and geogrids
CN206666971U (en) A kind of assembled road
CN206529668U (en) The recyclable assembled pavement structure of no-dig technique

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20161214

Termination date: 20170617

CF01 Termination of patent right due to non-payment of annual fee