CN203034334U - Crack repairing structure for asphalt concrete pavement - Google Patents

Crack repairing structure for asphalt concrete pavement Download PDF

Info

Publication number
CN203034334U
CN203034334U CN 201220648892 CN201220648892U CN203034334U CN 203034334 U CN203034334 U CN 203034334U CN 201220648892 CN201220648892 CN 201220648892 CN 201220648892 U CN201220648892 U CN 201220648892U CN 203034334 U CN203034334 U CN 203034334U
Authority
CN
China
Prior art keywords
layer
crack
surface layer
shaped groove
asphalt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201220648892
Other languages
Chinese (zh)
Inventor
吴建中
段谟新
徐建光
徐亮
徐伟伟
胡月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG SUNBO URBAN CONSTRUCTION CO Ltd
Original Assignee
ZHEJIANG SUNBO URBAN CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG SUNBO URBAN CONSTRUCTION CO Ltd filed Critical ZHEJIANG SUNBO URBAN CONSTRUCTION CO Ltd
Priority to CN 201220648892 priority Critical patent/CN203034334U/en
Application granted granted Critical
Publication of CN203034334U publication Critical patent/CN203034334U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Abstract

The utility model relates to a crack repairing structure for an asphalt concrete pavement, which is characterized in that a stepped groove is formed in an upper surface layer, a middle surface layer and a lower surface layer from the top down in the length direction of a pavement crack; a V-shaped groove is formed in a base layer and a subbase layer along the crack; asphalt mastic is filled in the V-shaped groove to form an asphalt mastic filling crack; emulsified asphalt is sprayed at the bottom of the stepped groove to form an oil permeable layer; a perforated groove top steel plate is mounted at the top of the V-shaped groove and fixed by rivets; after thick oil layers are sprayed on internal walls of the formed grooves and the oil permeable layer, a lower surface layer repairing layer, a reinforcement mesh, a middle surface layer repairing layer, geotextile and an upper surface layer repairing layer are laid in sequence; and then the emulsified asphalt is adopted for edge sealing. According to the structure, an effective crack-resistant layer and a sealing layer can be formed around the crack, the reflection effect of the bottom crack can be effectively prevented, damages by water can be avoided, and the structure has better technical and economic benefits.

Description

A kind of asphalt concrete pavement crack preparing structure
Technical field
The utility model relates to a kind of pavement crack preparing structure, and particularly a kind of asphalt concrete pavement crack preparing structure belongs to maintenance of surface engineering field.
Background technology
Under factor affecting such as differential settlement, frost heave, ground surface material contraction, heavy traffic, overload, asphalt concrete pavement easily produces in length and breadth to the crack, after the asphalt concrete pavement crack produces, should in time be handled, hazardous substancess such as anti-sealing are invaded, and influence the normal use of road and application life.In many diseases of asphalt concrete pavement, the crack is the most general, the topmost disease form of asphalt concrete pavement, and is comparatively remarkable to durability, the globality influence of flexible pavement.
Origin cause of formation difference according to the crack, the asphalt concrete pavement crack can be divided into three types: (1) load type crack mainly is under the vehicular load effect, and the tensile stress of semi-rigid type base bottom is during greater than the tensile strength of structure, to ftracture in the basic unit bottom, and progressively reflex to upper layer; (2) non-load type crack mainly is low temperature shrinkage crack and the temperature fatigue crack based on thermal cracking, and because construction technology is improper or the crack of the defective generation of material; (3) settlement crack, mainly the differential settlement by embankment, roadbed behind the worker causes.The form of pavement crack is usually expressed as transverse crack, longitudinal crack, check crack and reflection crack etc.
The globality of road structure not only can be destroyed in the asphalt concrete pavement crack, and can reduce the performance of ground surface material, and the crack becomes the rainwater infiltration passage simultaneously, easily causes the vicious circle of pavement disease, shortens the application life on road surface.Therefore, engineering circle is attached great importance to the punishment problem of asphalt pavement crack, has some punishment methods at present, and wherein using the most general punishment method is joint filling method and cementation of fissures method.The joint filling method is to utilize slot-cutting machine earlier with pitch crack grooving, pours into enclosed material again, generally is applicable to and repairs width less than the crack of 20mm.Cementation of fissures method and joint filling method major different are the preparation before the cementation of fissures and use the material of the cementation of fissures different, be mainly used in crack more serious road surface, particularly width greater than the crack of 20mm., crack irregular road surface serious for road surface breakage, usually adopt methods such as adding after heat mending, shop layer cover or the milling machine milling heavily the shop to repair, but because these punishment measures are difficult to effectively solve problems such as deep layer crack reflection, ground open fire infiltration, repair the possibility that primary fissure seam place, road surface ftractures again after finishing and surpass 85%.
In sum, existing asphalt pavement crack punishment method remains problems such as recovery technique crash rate height, structure durability difference, needs at present that a kind of impermeability of invention is good, durability is strong, validity is remarkable, original road is influenced little crack, novel asphalt rigid pavement preparing structure badly.
Summary of the invention
It is convenient, impervious good that the purpose of this utility model is to invent a kind of construction, can effectively stop the crack further to be carried out, and has the asphalt concrete pavement crack preparing structure of better economic technology benefit.
In order to realize above-mentioned technical purpose, the utility model has adopted following technical scheme:
A kind of asphalt concrete pavement crack preparing structure is characterized in that along the pavement crack length direction, excavates step slot, and opens V-shaped groove along fracture strike in basic unit and subbase at top-down upper layer, middle surface layer, following surface layer; Asphalt reperfusion glue forms the pitch glue cementation of fissures in the V-shaped groove; At the bottom of step slot, spray mulseal and form oil reservoir; On the V-shaped groove top seam with holes top steel plate is installed, and is adopted rivet to fix; After box cut inwall, saturating oil reservoir spray sticking oil reservoir, lay surface layer repair layer, reinforcement net sheet, middle surface layer repair layer, geotextiles, upper layer repair layer down successively, and adopt the mulseal edge sealing.
Aforesaid asphalt concrete pavement crack preparing structure is characterized in that rivet is quincunx or square even interval at seam top steel plate and arranges that rivet embeds basic unit's length and is no less than 1/2 of groundwork thickness.
Aforesaid asphalt concrete pavement crack preparing structure is characterized in that reinforcement net sheet places down surface layer repair layer top, surface layer repair layer top in the middle of geotextiles is positioned at, and reinforcement net sheet and geotextiles are all laid at the full width of cloth of bottom land.
The utlity model has following characteristics and beneficial effect:
(1) in basic unit and subbase, excavate V-shaped groove and asphalt reperfusion glue along fractuer direction after, adopt seam top steel plate to bind, and adopt rivet to fix, further carrying out and occurring repeatedly of crack can be effectively avoided in crack joint filling and punish effectively.
(2) setting of reinforcement net sheet and geotextiles, for the crack preparing structure is provided with 2 road anticracking reinforcement measures, the design of collaborative mulseal edge sealing can effectively improve the globality, durability, impermeability of crack preparing structure etc.
(3) setting of each surface layer step slot is aided with sticking oil reservoir and saturating oil reservoir, both can effectively strengthen the globality of preparing structure, can stop the reflection of basal crack again, has strengthened the globality of preparing structure etc. simultaneously.
Description of drawings
Fig. 1 is the utility model asphalt concrete pavement crack preparing structure profile.
Among the figure: surface layer in the middle of the 1-upper layer, 2-, surface layer under the 3-, 4-basic unit, 5-subbase, 6-embankment fill material, 7-V shape groove, the 8-pitch glue cementation of fissures, the saturating oil reservoir of 9-, 10-seam with holes top steel plate, 11-rivet, surface layer repair layer under the 12-, 13-reinforcement net sheet, surface layer repair layer in the middle of the 14-, 15-geotextiles, 16-upper layer repair layer.
Specific embodiment
Be not repeated in the present embodiments such as the requirement of step slot excavation technology, each repair layer asphalt concrete construction requirement, sticking oil reservoir and geotextile laying technical requirements, the technical requirements of mulseal edge sealing, specifically set forth the embodiment that the utility model relates to structure.
Fig. 1 is the utility model asphalt concrete pavement crack preparing structure.With reference to shown in Figure 1, a kind of asphalt concrete pavement crack preparing structure, required processing road structure is the three-layer type asphalt concrete pavement, upper layer 1 material is 4cm particulate formula SBS modified bitumen bituminous concrete (AC-13C type), middle surface layer 2 materials are grain formula SBS modified asphalt concrete (AC-20C type) among the 6cm, and following surface layer 3 materials are 8cm coarse grain formula bituminous concrete (AC-25C type); Basic unit 4 is the cement stabilized macadam of the thick degree of compaction of 200mm 〉=98%, and subbase 5 is the cement stabilized macadam of the thick degree of compaction of 340mm 〉=97%.
Along the pavement crack length direction, at top-down upper layer 1, middle surface layer 2, following surface layer 3 excavation step slots, it is respectively 1500mm, 1000mm, 500mm that each layer plane digs wide, and its length is 4000mm, widely reduce step by step because plane digs, thereby form step slot.
Fracture length 4000mm opens V-shaped groove 7 along fracture strike in basic unit 4 and subbase 5, V-shaped groove 7 top width 100mm, the degree of depth are that 540mm, length are 4000mm; Asphalt reperfusion glue forms the pitch glue cementation of fissures 8 in the V-shaped groove 7; At the bottom of step slot, spray PC-2 cut oil pitch and form oil reservoir 9; On V-shaped groove 7 tops seam with holes top steel plate 10 is installed, and is adopted rivet 11 fixing.
After box cut inwall, saturating oil reservoir spray the sticking oil reservoir of PC-3 cut oil pitch, lay surface layer repair layer 12, reinforcement net sheet 13, middle surface layer repair layer 14, geotextiles 15, upper layer repair layer 16 down successively, and adopt the mulseal edge sealing.Following surface layer repair layer 12, middle surface layer repair layer 14 and upper layer repair layer 16 adopt and following surface layer 3, middle surface layer 2, upper layer 1 identical materials and proportioning reparation respectively.
Seam with holes top steel plate 10 adopts the Q235 steel plate, and thickness 5mm, width 300mm, length are 4000mm; It is that 10mm, length are the stainless steel snap rivet of 200mm that rivet 11 adopts diameter; Rivet 11 is square at seam top steel plate 10 and arranges at interval that evenly spacing is 50mm.
Reinforcement net sheet 13 is connected into net for diameter 4mm steel wire welded, and mesh size 50mm * 50mm, width are 1000mm, and length is 4000mm, and reinforcement net sheet 13 places down surface layer repair layer 12 tops.
Geotextiles 15 is the long filament non-woven geotextile, and width is 1500mm, and length is 4000mm, and corresponding code requirement is satisfied in overlap joint and stitching; All lay at the full width of cloth of bottom land at surface layer repair layer 14 tops in the middle of geotextiles 15 is positioned at, reinforcement net sheet 13 and geotextiles 12.

Claims (3)

1. an asphalt concrete pavement crack preparing structure is characterized in that along the pavement crack length direction, excavates step slot, and opens V-shaped groove along fracture strike in basic unit and subbase at top-down upper layer, middle surface layer, following surface layer; Asphalt reperfusion glue forms the pitch glue cementation of fissures in the V-shaped groove; At the bottom of step slot, spray mulseal and form oil reservoir; On the V-shaped groove top seam with holes top steel plate is installed, and fixing; After box cut inwall, saturating oil reservoir spray sticking oil reservoir, lay surface layer repair layer, reinforcement net sheet, middle surface layer repair layer, geotextiles, upper layer repair layer down successively, and adopt the mulseal edge sealing.
2. asphalt concrete pavement according to claim 1 crack preparing structure, it is characterized in that seam with holes top steel plate adopts rivet to fix, and rivet is quincunx or square even interval at seam top steel plate and arranges that rivet embeds basic unit's length and is no less than 1/2 of groundwork thickness.
3. asphalt concrete pavement according to claim 1 crack preparing structure is characterized in that reinforcement net sheet places down surface layer repair layer top, surface layer repair layer top in the middle of geotextiles is positioned at, and reinforcement net sheet and geotextiles are all laid at the full width of cloth of bottom land.
CN 201220648892 2012-11-30 2012-11-30 Crack repairing structure for asphalt concrete pavement Expired - Fee Related CN203034334U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220648892 CN203034334U (en) 2012-11-30 2012-11-30 Crack repairing structure for asphalt concrete pavement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220648892 CN203034334U (en) 2012-11-30 2012-11-30 Crack repairing structure for asphalt concrete pavement

Publications (1)

Publication Number Publication Date
CN203034334U true CN203034334U (en) 2013-07-03

Family

ID=48686470

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220648892 Expired - Fee Related CN203034334U (en) 2012-11-30 2012-11-30 Crack repairing structure for asphalt concrete pavement

Country Status (1)

Country Link
CN (1) CN203034334U (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758009A (en) * 2013-12-31 2014-04-30 山东省交通科学研究所 Asphalt pavement crack quick repairing method
CN103758008A (en) * 2013-12-24 2014-04-30 英达公路再生科技(集团)有限公司 Method for repairing bituminous pavement cracks with molding asphalt rubber
CN105332329A (en) * 2015-11-17 2016-02-17 江苏中路工程技术研究院有限公司 Pavement crack disposal structure and technology
CN105421227A (en) * 2015-12-23 2016-03-23 常熟市联动工程材料有限公司 High-strength expansion joint
CN107044080A (en) * 2016-12-07 2017-08-15 华南农业大学 A kind of concrete panel crack steel plate sewing method
CN108166348A (en) * 2017-12-27 2018-06-15 孔金河 A kind of asphalt pavement crack method for repairing and mending and repairing construction
CN108221537A (en) * 2018-01-16 2018-06-29 长沙理工大学 A kind of quick maintenance method of Rigid-flexible composite of the road seam crossing asphalt surface course
CN108221538A (en) * 2018-01-16 2018-06-29 长沙理工大学 The armored concrete plate method for maintaining of continuous reinforcement concrete composite bituminous paving
CN108824117A (en) * 2018-07-20 2018-11-16 四川瑞通工程建设集团有限公司 A kind of asphalt pavement pit repairing construction technology
CN109853346A (en) * 2019-01-14 2019-06-07 黑龙江省公路科学研究院 A kind of pavement crack T shape notch and fill slot method for blocking
CN110552281A (en) * 2019-09-02 2019-12-10 重庆工程职业技术学院 Asphalt pavement defect repairing method and reinforced workpiece
CN110565472A (en) * 2019-09-09 2019-12-13 浙江宁波甬台温高速公路有限公司 Side surface sticker for new and old road surface sealing of pit and construction method
CN111005283A (en) * 2019-12-24 2020-04-14 河北水熠木丰工程技术有限责任公司 Asphalt pavement damaged repairing structure and repairing process
CN111501510A (en) * 2020-06-03 2020-08-07 吴武基 Microcrack repairing process for bridge deck
CN112176817A (en) * 2020-08-20 2021-01-05 中冶天工集团有限公司 Method for treating cracks of base panel of road reconstruction project
CN113404326A (en) * 2021-08-04 2021-09-17 肖长程 Method for repairing floor cracks by using steel plates
CN113462177A (en) * 2021-07-08 2021-10-01 江苏聚科特新材料科技有限公司 Polymer composite modified asphalt and highway pavement structure thereof

Cited By (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103758008A (en) * 2013-12-24 2014-04-30 英达公路再生科技(集团)有限公司 Method for repairing bituminous pavement cracks with molding asphalt rubber
CN103758008B (en) * 2013-12-24 2016-07-06 英达公路再生科技(集团)有限公司 Asphalt pavement crack molding asphalt rubber is squeegeeed method
CN103758009A (en) * 2013-12-31 2014-04-30 山东省交通科学研究所 Asphalt pavement crack quick repairing method
CN103758009B (en) * 2013-12-31 2016-08-17 山东省交通科学研究院 A kind of asphalt pavement crack fast repairing method
CN105332329A (en) * 2015-11-17 2016-02-17 江苏中路工程技术研究院有限公司 Pavement crack disposal structure and technology
CN105421227A (en) * 2015-12-23 2016-03-23 常熟市联动工程材料有限公司 High-strength expansion joint
CN107044080A (en) * 2016-12-07 2017-08-15 华南农业大学 A kind of concrete panel crack steel plate sewing method
CN108166348A (en) * 2017-12-27 2018-06-15 孔金河 A kind of asphalt pavement crack method for repairing and mending and repairing construction
CN108221537A (en) * 2018-01-16 2018-06-29 长沙理工大学 A kind of quick maintenance method of Rigid-flexible composite of the road seam crossing asphalt surface course
CN108221538A (en) * 2018-01-16 2018-06-29 长沙理工大学 The armored concrete plate method for maintaining of continuous reinforcement concrete composite bituminous paving
CN108824117A (en) * 2018-07-20 2018-11-16 四川瑞通工程建设集团有限公司 A kind of asphalt pavement pit repairing construction technology
CN109853346A (en) * 2019-01-14 2019-06-07 黑龙江省公路科学研究院 A kind of pavement crack T shape notch and fill slot method for blocking
CN110552281A (en) * 2019-09-02 2019-12-10 重庆工程职业技术学院 Asphalt pavement defect repairing method and reinforced workpiece
CN110565472A (en) * 2019-09-09 2019-12-13 浙江宁波甬台温高速公路有限公司 Side surface sticker for new and old road surface sealing of pit and construction method
CN111005283A (en) * 2019-12-24 2020-04-14 河北水熠木丰工程技术有限责任公司 Asphalt pavement damaged repairing structure and repairing process
CN111005283B (en) * 2019-12-24 2021-06-29 河北水熠木丰工程技术有限责任公司 Asphalt pavement damaged repairing structure and repairing process
CN111501510A (en) * 2020-06-03 2020-08-07 吴武基 Microcrack repairing process for bridge deck
CN112176817A (en) * 2020-08-20 2021-01-05 中冶天工集团有限公司 Method for treating cracks of base panel of road reconstruction project
CN113462177A (en) * 2021-07-08 2021-10-01 江苏聚科特新材料科技有限公司 Polymer composite modified asphalt and highway pavement structure thereof
CN113404326A (en) * 2021-08-04 2021-09-17 肖长程 Method for repairing floor cracks by using steel plates

Similar Documents

Publication Publication Date Title
CN203034334U (en) Crack repairing structure for asphalt concrete pavement
CN107227667B (en) A kind of Asphalt Pavement with Flexible Base splicing Widening Construction method
CN103924501B (en) Reinforcement construction method in the cement pavement local failure reparation of a kind of rural area
CN103233406B (en) A kind of road and storage yard pavement structure layer of long-term durable stable use and construction method thereof
CN202787044U (en) Longitudinal crack treatment structure for bituminous concrete pavement
CN104328730B (en) The construction method of embedded reinforcement bitumen layer transformation cement concrete pavement
CN104988823A (en) Cement concrete pavement structure provided with continuous steel bars
CN211621055U (en) Pitch combined type town road pavement structure
CN103938514B (en) A kind of cement pavement Darkening process structure and construction method
CN103711056B (en) Steel tool-type temporary construction road and construction method thereof
CN104631268B (en) A kind of concrete road pavement structure
CN104452510A (en) Immediate construction method of rural road
CN106320352B (en) Construction method of multifunctional steel sheet pile cofferdam
CN101892637A (en) Ring type anchor rod locking method for repairing cracks on abutment side wall of highway bridge abutment
CN204570414U (en) Concrete Overlays pitch prevents the structure of reflection crack
CN102635104A (en) Wedge-shaped Geocell cement reinforced soil structure for road-bridge connection and construction method thereof
CN206887665U (en) A kind of Asphalt Pavement with Flexible Base splices widened structure
CN105937204A (en) Large-span steel box girder rigidity coordination type composite bridge deck pavement layer structure and construction method thereof
CN103422410B (en) A kind of airfield pavement is not suspended and is overlayed the construction method of concrete prefabricated board
CN203295915U (en) Road storage yard surfacing structure layer capable of being used durably and stably for long time
CN112900181B (en) Construction method for widening thin layer of asphalt pavement
CN210507007U (en) Roadbed structure suitable for unilateral heavy-load transportation
CN112962383A (en) Asphalt pavement structure capable of preventing crack propagation and construction method
CN202730735U (en) Wedge-shaped geocell cement reinforced soil structure for road and bridge connection
CN108642992B (en) Cement pavement structure and construction method

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130703

Termination date: 20161130

CF01 Termination of patent right due to non-payment of annual fee