CN108166348A - A kind of asphalt pavement crack method for repairing and mending and repairing construction - Google Patents

A kind of asphalt pavement crack method for repairing and mending and repairing construction Download PDF

Info

Publication number
CN108166348A
CN108166348A CN201711439690.0A CN201711439690A CN108166348A CN 108166348 A CN108166348 A CN 108166348A CN 201711439690 A CN201711439690 A CN 201711439690A CN 108166348 A CN108166348 A CN 108166348A
Authority
CN
China
Prior art keywords
repairing
asphalt
crack
waterstop
stepped groove
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201711439690.0A
Other languages
Chinese (zh)
Inventor
孔金河
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201711439690.0A priority Critical patent/CN108166348A/en
Publication of CN108166348A publication Critical patent/CN108166348A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C7/00Coherent pavings made in situ
    • E01C7/08Coherent pavings made in situ made of road-metal and binders
    • E01C7/18Coherent pavings made in situ made of road-metal and binders of road-metal and bituminous binders
    • E01C7/187Repairing bituminous covers, e.g. regeneration of the covering material in situ, application of a new bituminous topping

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)
  • Road Repair (AREA)

Abstract

The invention discloses a kind of asphalt pavement crack method for repairing and mending and repairing construction, for solving the problems, such as that existing asphalt pavement repairing structure is not firm enough.The method for repairing and mending includes six steps, it is followed successively by and opens stepped groove, cleaning, heating and the cementation of fissures along fractuer direction, fluting position is heated to 100 to 140 degrees centigrades, and waterstop and the emulsified asphalt of sprinkling heat are pasted at once, the disintegrating slag for finally carrying out the laying of pavement asphalt or rubble and cleaning on road surface is cleaned up and is conserved.This method is the asphalt pavement crack patching of a kind of good water-proof effect, crack repairing intensity height, service life length, the bond strength and strong degree in emulsified asphalt and gap are improved in a manner that heating carries out the cementation of fissures, effective protection is formed by the setting of waterstop, especially so that foundation of road bed below waterstop improves the reliability of roadbed from the erosion of rainwater.

Description

A kind of asphalt pavement crack method for repairing and mending and repairing construction
Technical field
The invention is related to asphalt pavement repairing technical field.
Background technology
In highway engineering, bituminous paving is a kind of most commonly seen pavement structure, in bituminous paving during one's term of military service, due to road Bituminous paving will appear crack under the action of the various factors such as face locally settles, freezes disaster, overload rolls.These cracks are not if Punishment in time, over time, base's even roadbed of middle face layer can be all softened, and generate purt slurry, check crack, depression, faulting of slab ends, so as to Accelerate the destruction of road pavement.So it needs timely to repair damaged asphalt pavement crack.
According to industry companion, the method for repairing and mending of prior art fracture is broadly divided into the hot method cementation of fissures and the cold process cementation of fissures. The so-called hot method cementation of fissures refers to, the gap-grouting material for solid or thick liquid under room temperature is used, by heating equipment to cementation of fissures material Material is heated in advance, and usual gap-grouting material requires heat to 150 DEG C or more, after viscosity is substantially reduced, and can just pour into crack.It fills After entering, with the reduction of temperature, since road surface is low-temperature condition, the viscosity of Embedding Material will increased dramatically again, so it is difficult to oozing Thoroughly in the bituminous paving of crack both sides, one can not be formed with old bituminous paving, bad adhesion is easily split again Seam not only increases repairing cost but also increases repair procedure.
The so-called cold process cementation of fissures refers to, direct embedding is carried out using emulsified asphalt, and emulsified asphalt need not heat before use, Low with room temperature viscosity, good fluidity, surface tension is small, is ideal gap-grouting material the advantages that being easy to permeate.It is but existing The cold process cementation of fissures using manually directly pouring into technology, there are significant limitations and deficiency.First, the prior art can only be for splitting Slit width degree<It is repaired in 3 millimeters of slight crack;Secondly as emulsified asphalt directly is poured into crack, emulsified asphalt pours into It measures small, emulsified asphalt can not be made to be completely filled with entire crack and its periphery gap, be not achieved and be closed completely crack and periphery gap Purpose;Third, due to being the simple cementation of fissures, it is limited that emulsified asphalt oozes down flowing velocity in a short time, fills discontented phenomenon and dashes forward Go out, and be difficult to observe by, but after military service, with the change of time and environment, the height for stitching internal emulsification pitch just can be apparent It reduces, and over a period to come, with the extension of time, the height of material can continue to reduce in seam, therefore, existing cold process fills Bituminous paving after seam punishment often can shortly occur crack again after maintenance at crack;The reason is that, gap-grouting material Intensity far below asphalt pavement material, the phenomenon that therefore, usage time is short, needs repeatedly to repair, and life-cycle maintenance costs is high. As it can be seen that existing cold process Slit-pouring Technology, it is impossible to play the performance advantage of emulsified bituminous materials, repair efficiency is poor.
More than technical problem is also a kind of commonplace technical phenomena present in existing technology, existing technology hand It is related in volume to introduce scheme of introducing that is more, but not providing relatively good, the present invention be exactly from it is above-mentioned the problem of, carry Go out a kind of better solution.
Invention content
In order to solve the deficiencies in the prior art, the present invention provides a kind of asphalt pavement crack method for repairing and mending and repairing construction, It is a kind of cold-penetration envelope scheme, for solving the problems, such as that existing cold-penetration seam gap-grouting material is few, easily generating secondary crack.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of asphalt pavement crack method for repairing and mending, this method are that the crack occurred in bituminous highway is handled, special Sign is, is handled according to the following steps:
Step 1 along fractuer direction, opens stepped groove in asphalt surface course,
Step 2 clears up the dust of the disintegrating slag in stepped groove slot and stepped groove both sides;
Step 3 heats the simultaneously cementation of fissures, several slurry injection nozzle lower ends is inserted into crack, and sealing is placed in stepped groove Item, and sealing strip is compressed, the sealing strip and slurry injection nozzle are intervally installed, and pass through blast heater and slurry injection nozzle first The hot wind that temperature is not less than 1 megapascal not less than 80 degrees Celsius, pressure is blasted into crack, then stop air blast and is filled into crack Enter emulsified asphalt, until the emulsified asphalt continuously overflows at the crack of sealing strip, will be spilled over in stepped groove using scraper plate Emulsified asphalt shakeout;
Fluting position is heated to 100 to 140 degrees centigrades, then proceeded as follows at once by step 4:
A, waterstop is pasted,
B, in the emulsified asphalt of waterstop uppermost spray heat,
Step 5: spray emulsified asphalt and carry out the laying of pavement asphalt or rubble, after laying roll it is smooth,
Disintegrating slag on road surface is cleaned up and conserved by step 6.
The stepped groove includes first order fluting and second level fluting, wherein, first order fluting size for 100 mm wides and 30 millimeters deeps, the second level are 50 mm wides and 10 millimeters deeps.
There is hot-air channel and emulsified asphalt channel, hot-air channel and blast heater therein connect in the slurry injection nozzle It connects, the emulsified asphalt channel connects cementation of fissures equipment.
Slurry injection nozzle upper end is columned connecting pin, and lower end is to be inserted into the flat structure for facilitating insertion into crack.
In step 3, the blast heater provides pulsed high-pressure hot wind.
The crack is not less than 3 millimeters of wide seam for width.
In step 4, heated using road-surface heating machine.
In step 4, sub-step A and B can interact carry out multilayer proofing.
The waterstop has the fold of longitudinal direction.
Asphalt pavement crack repairing construction, the origin road essential structure include top-down asphalt surface course, binder course and Base, and generate crack in highway essential structure, which is characterized in that stepped groove, the ladder are opened in the asphalt surface course Emulsified asphalt is filled in crack below slot, the stepped groove slot bottom is fitted with waterstop, and in the ladder of the top of waterstop Sealing coat is equipped in slot.
The beneficial effects of the invention are as follows:
This method is a kind of good water-proof effect, and crack repairing intensity is high, the asphalt pavement crack patching of service life length, The bond strength and strong degree in emulsified asphalt and gap are improved in a manner that heating carries out the cementation of fissures, passes through the setting shape of waterstop Into effective protection, the foundation of road bed below waterstop is especially caused from the erosion of rainwater, to improve the reliability of roadbed.
Description of the drawings
Fig. 1 is the schematic diagram (section) at asphalt pavement crack position to be repaired.
Fig. 2 is the schematic diagram that emulsified asphalt is filled into crack (along fractuer direction).
Fig. 3 is stepped groove sectional schematic diagram.
Fig. 4 is the schematic diagram (section) that emulsified asphalt is filled into crack.
Fig. 5 is the schematic diagram (section) after repairing.
Fig. 6 is partial enlarged view at A in Fig. 5.
Fig. 7 is the stereogram of slurry injection nozzle.
Fig. 8 is the full sectional view of Fig. 7.
Fig. 9 is the stereogram of waterstop.
In figure:001 asphalt surface course, 002 binder course, 003 base, 004 crack,
100 stepped grooves,
200 slurry injection nozzles, 210 hot-air channels, 220 emulsified asphalt channels, 230 rubber weather strips,
300 emulsified asphalts,
400 waterstops I,
400 ' waterstops II,
500 sealing coats.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, embodiment is exemplified below, the present invention is made into one Step is described in detail.
In order to effectively improve the repair efficiency of asphalt pavement crack, the service life of bituminous paving is improved, the present invention, When processing asphalt pavement crack, fluting operation is carried out first, after grooving, has carried out clear slot, heating, breast respectively The change pitch cementation of fissures, stickup waterstop, sprinkling emulsified asphalt, filler and maintenance and etc., crack can be closed completely by the method And its periphery gap, and make the crack after repairing have with the comparable intensity in protobitumen road surface, completely with protobitumen road surface formed one Body effectively improves the service life of bituminous paving, saves its life-cycle maintenance input.
With reference to the diagram in Figure of description 1 to Figure of description 9, the present embodiment satisfies the need in terms of construction technology and effect The step of facial cleft seam (width that especially cracks is more than 3 millimeters of relatively large fracture) repairing, is introduced as follows:
The existing highway essential structure in China:From top to bottom for asphalt surface course 001, binder course 002, base 003, reference chart 1, need to solve is the crack problem occurred in Fig. 1, that is, the crack 004 occurred in Fig. 1 is carried out to block bonding processing.
1st, it is fluting link first, with reference to figure 1 and Fig. 3.It is constructed by the way of two-stage fluting, forms stepped groove 100, preferably select two-stage slot grooving technique in the present embodiment, first order fluting size is 100 mm wides and 30 millimeters deeps, second Grade is 50 mm wides and 10 millimeters deeps, and 100 depth of stepped groove of two-stage fluting is usually less than the depth of road bituminous layers, that is, slots Position does not destroy original base and binder course structure, slot operation when grooving tool used be brill formula groover or special Fluting vehicle, direction of extraction can be according to practical fracture strike, and forms vertical masonry joint as possible.It, should basis before brill formula groover Groove width installs satisfactory qualified drill bit in advance, and regulates groover groove depth, could start operation of slotting.
2nd, clear slot.
With mobile hair-dryer by the ash in 10 centimetres~50 cm range of the disintegrating slag in slot and stepped groove both sides, that is, periphery Dirt thoroughly cleans up.
3rd, heating and the cementation of fissures, the tool used have blast heater, cementation of fissures equipment, slurry injection nozzle 200 and rubber weather strip 230, potting fixture cooperation slurry injection nozzle 200 carries out the pressurized cementation of fissures, and slurry injection nozzle 200 structural reference Fig. 8 and Fig. 7 are being noted Starching has hot-air channel 210 and emulsified asphalt channel 220 in nozzle 200, hot-air channel 210 therein is used for and blast heater connects It connects, hot wind is sent into gap by blast heater, blast heater is roots blower pressure, and pressure is two standard atmospheric pressures, hot Wind mode of heating is infrared heating or Resistant heating, and the temperature of hot wind is 100 degrees centigrades, the side of preferred pulse formula Formula supplies hot wind, plays best impurity-eliminating effect.Emulsified asphalt channel 220 is centrally located.The upper end of slurry injection nozzle 200 is Connecting pin, cylindrical-shaped structure are attached by connecting silk braid with cementation of fissures equipment, in 200 lower end inserted into gap of slurry injection nozzle, are Flat structure.The quantity of slurry injection nozzle carries out rational deployment spacing, usual two grouting spray according to the width in road conditions and gap Spacing between first 200 is within 0.5 meter, since the surface in gap can be blocked, and coordinate the sealing strip of slit surfaces by dust, It is blocked so forming top, forms the path of wind, hot wind is turned back flowing, in the process, synchronization upwards after recycle from gap Complete the cleaning of sundries in heating and the gap at gap.Sealing strip rubber material, and apply pressure to be formed to facilitate on top It is partially sealed.Secondary cleaning is carried out to the sundries that hot wind is blown out with the use of dust catcher in the process.
After gap cleans out, carry out filling emulsified asphalt 300, cementation of fissures equipment pair using pressurized cementation of fissures mode fracture Emulsified asphalt pressurizes, it is forced to be flowed in gap, causes to be filled emulsified asphalt 300 substantially in gap as possible after the cementation of fissures, by Temperature in gap is relatively high, and emulsified asphalt 300 has better mobility.During the cementation of fissures, after gap is filled, breast To change pitch to overflow upward from gap, be deposited in stepped groove, the quantity of the emulsified asphalt in stepped groove is judged, When the emulsified asphalt in stepped groove from gap extrusion bubble-free, illustrate that gap is filled substantially, stop fill emulsification drip It is green.
Then the emulsified asphalt 300 being spilled over in stepped groove is shakeout using scraper plate, the emulsified asphalt height after shakeouing is not Higher than the depth of first order fluting, by the emulsified asphalt good fluidity used in this present embodiment, and gap is in hot wind action Lower temperature is higher than environment temperature in gap after heating, and cold emulsified asphalt is enable rapidly to be seeped into crack and its periphery down In gap;On the other hand densely full of crack and its periphery gap under the effect of the atmospheric pressure of roots blower, so as to make to split Seam and its periphery gap are closed completely, and have saved material itself flowing to be full of the time in crack.Under the action of pressurization, breast Changing pitch fully can down ooze into crack and its periphery gap, and very densely full of crack and its periphery gap, by road Face base position repairing ground is more preferable, and the emulsified asphalt after the cementation of fissures has certain mobile performance in itself, can after meet the later stage Micro flexible requirement.
4th, it heats, fluting position is heated to 140 degrees centigrades using road-surface heating machine, is then grasped as follows at once Make:
A/ pastes waterstop I 400, and the waterstop I structural reference Fig. 9 and Fig. 6 have the fold of longitudinal direction, and 410 folds are deposited Causing rectangular formation several waterstop sealings of the waterstop I along crack, while micro having perpendicular to the direction in crack Telescopicing performance.The waterstop I is the thin-film materials such as the aluminum foil film with waterproof effect, polyethylene film, and in thin-film material Both side surface be coated with butyl rubber waterproof material, not only there is flexibility, but also with waterproof effect.
B/ waterstop uppermost spray heat emulsified asphalt,
C/ pastes waterstop II 400 ', forms secondary protection, II structure of waterstop is the same as waterstop I.
5th, it sprays emulsified asphalt and carries out the laying of pavement asphalt or rubble, form sealing coat 500, ground after laying It flattens, rolling effect, effect such as Fig. 6 after closing can be improved to being heated at gap before rolling.
After disintegrating slag on road surface is cleaned up and conserves a period of time, just can open to traffic, the general maintenance time be 12 Or so a hour, specific open to traffic time can flexibly be grasped according to temperature situation.
Pass through the bituminous paving of this method reparation, since emulsified asphalt is adequately filled in gap, all filling bases Plinth is preferable, the setting of waterstop, can form waterproofing protection to the region below waterstop, be particularly advantageous to repair below position The protection of roadbed.The military service stage after repairing, even if there is micro deformation and generates crack in mend, due to emulsified asphalt and The effect of waterstop can also form relatively good waterproof effect, that is to say, that though sealing coat and both sides bituminous paving it Between generate gap, and under ooze a small amount of water, moisture is also difficult to largely penetrate waterstop, the base below waterstop is caused to soak, After the rain, mend can be dried in time, will not cause mortal injury to roadbed.

Claims (10)

1. a kind of asphalt pavement crack method for repairing and mending, this method is that the crack occurred in bituminous highway is handled, feature It is, is handled according to the following steps:
Step 1 along fractuer direction, opens stepped groove in asphalt surface course,
Step 2 clears up the dust of the disintegrating slag in stepped groove slot and stepped groove both sides;
Step 3 heats the simultaneously cementation of fissures, several slurry injection nozzle lower ends is inserted into crack, and sealing strip is placed in stepped groove, and Sealing strip is compressed, the sealing strip and slurry injection nozzle are intervally installed, first by blast heater and slurry injection nozzle to splitting The hot wind that temperature is not less than 1 megapascal not less than 80 degrees Celsius, pressure is blasted in seam, then stop air blast and breast is poured into crack Change pitch, until the emulsified asphalt continuously overflows at the crack of sealing strip, the breast that will be spilled over in stepped groove using scraper plate Change pitch to shakeout;
Fluting position is heated to 100 to 140 degrees centigrades, then proceeded as follows at once by step 4:
A, waterstop is pasted,
B, in the emulsified asphalt of waterstop uppermost spray heat,
Step 5: spray emulsified asphalt and carry out the laying of pavement asphalt or rubble, after laying roll it is smooth,
Disintegrating slag on road surface is cleaned up and conserved by step 6.
2. a kind of asphalt pavement crack method for repairing and mending according to claim 1, which is characterized in that the stepped groove includes the Level-one is slotted and second level fluting, wherein, first order fluting size is 100 mm wides and 30 millimeters deeps, and the second level is 50 millimeters Wide and 10 millimeters deeps.
3. a kind of asphalt pavement crack method for repairing and mending according to claim 1, which is characterized in that have in the slurry injection nozzle There are hot-air channel and emulsified asphalt channel, hot-air channel therein is connected with blast heater, and the emulsified asphalt channel connection fills It seams standby.
4. a kind of asphalt pavement crack method for repairing and mending according to claim 3, which is characterized in that slurry injection nozzle upper end is circle Columnar connecting pin, lower end are to be inserted into the flat structure for facilitating insertion into crack.
5. a kind of asphalt pavement crack method for repairing and mending according to claim 1, which is characterized in that described in step 3 Blast heater provides pulsed high-pressure hot wind.
6. a kind of asphalt pavement crack method for repairing and mending according to claim 1, which is characterized in that the crack for width not Wide seam less than 3 millimeters.
7. a kind of asphalt pavement crack method for repairing and mending according to claim 1, which is characterized in that in step 4, use Road-surface heating machine is heated.
8. a kind of asphalt pavement crack method for repairing and mending according to claim 1, which is characterized in that in step 4, sub-step Rapid A and B can interact carry out multilayer proofing.
9. a kind of asphalt pavement crack method for repairing and mending according to claim 1, which is characterized in that the waterstop has vertical To fold.
10. asphalt pavement crack repairing construction, the origin road essential structure include top-down asphalt surface course, binder course and base Layer, and generate crack in highway essential structure, which is characterized in that stepped groove, the stepped groove are opened in the asphalt surface course Emulsified asphalt is filled in the crack of lower section, the stepped groove slot bottom is fitted with waterstop, and in the stepped groove of the top of waterstop Inside it is equipped with sealing coat.
CN201711439690.0A 2017-12-27 2017-12-27 A kind of asphalt pavement crack method for repairing and mending and repairing construction Pending CN108166348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201711439690.0A CN108166348A (en) 2017-12-27 2017-12-27 A kind of asphalt pavement crack method for repairing and mending and repairing construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201711439690.0A CN108166348A (en) 2017-12-27 2017-12-27 A kind of asphalt pavement crack method for repairing and mending and repairing construction

Publications (1)

Publication Number Publication Date
CN108166348A true CN108166348A (en) 2018-06-15

Family

ID=62521906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201711439690.0A Pending CN108166348A (en) 2017-12-27 2017-12-27 A kind of asphalt pavement crack method for repairing and mending and repairing construction

Country Status (1)

Country Link
CN (1) CN108166348A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108824118A (en) * 2018-07-20 2018-11-16 四川瑞通工程建设集团有限公司 A kind of summer asphalt pavement repairing method
CN108867230A (en) * 2018-07-13 2018-11-23 阜阳师范学院 A kind of method for repairing and mending of asphalt pavement crack
CN109853346A (en) * 2019-01-14 2019-06-07 黑龙江省公路科学研究院 A kind of pavement crack T shape notch and fill slot method for blocking
CN110042722A (en) * 2019-03-12 2019-07-23 同济大学 A kind of road rehabilitation structure based on settlement Control
CN110144799A (en) * 2019-06-29 2019-08-20 郑州航空工业管理学院 Airfield runway Crack Detection and maintenance of equipment
CN110552281A (en) * 2019-09-02 2019-12-10 重庆工程职业技术学院 Asphalt pavement defect repairing method and reinforced workpiece
CN110965423A (en) * 2019-12-17 2020-04-07 中交路桥华北工程有限公司 Anti-crack construction method for asphalt pavement splicing
CN111005283A (en) * 2019-12-24 2020-04-14 河北水熠木丰工程技术有限责任公司 Asphalt pavement damaged repairing structure and repairing process
CN111235997A (en) * 2020-01-10 2020-06-05 陕西省高速公路建设集团公司汉宁分公司 Asphalt pavement repairing method and asphalt pavement structure
CN113062597A (en) * 2021-03-02 2021-07-02 台州市瑞恒优创科技有限公司 Grout seam plugging device of prefabricated assembled structure
CN113235350A (en) * 2021-05-20 2021-08-10 福建新华夏建工集团有限公司 Method for realizing concrete road reconstruction by additionally paving asphalt concrete surface layer
CN113462177A (en) * 2021-07-08 2021-10-01 江苏聚科特新材料科技有限公司 Polymer composite modified asphalt and highway pavement structure thereof
CN113981789A (en) * 2021-12-08 2022-01-28 张冬 Method and device for repairing local cracks of asphalt pavement

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5749674A (en) * 1996-09-04 1998-05-12 Wilson, Sr.; Jack H. Method of pavement repair
CN1479826A (en) * 2000-11-14 2004-03-03 ������.�ҿ�.½ Process of finishing slits of surface layer of airplane runway
CN201593158U (en) * 2009-10-09 2010-09-29 西安达刚路面机械股份有限公司 Novel multifunctional caulking gun
CN102296507A (en) * 2011-06-08 2011-12-28 中冶建工集团有限公司 Treatment method of subgrade cracks
CN203034334U (en) * 2012-11-30 2013-07-03 浙江信博城市建设有限公司 Crack repairing structure for asphalt concrete pavement

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5749674A (en) * 1996-09-04 1998-05-12 Wilson, Sr.; Jack H. Method of pavement repair
CN1479826A (en) * 2000-11-14 2004-03-03 ������.�ҿ�.½ Process of finishing slits of surface layer of airplane runway
CN201593158U (en) * 2009-10-09 2010-09-29 西安达刚路面机械股份有限公司 Novel multifunctional caulking gun
CN102296507A (en) * 2011-06-08 2011-12-28 中冶建工集团有限公司 Treatment method of subgrade cracks
CN203034334U (en) * 2012-11-30 2013-07-03 浙江信博城市建设有限公司 Crack repairing structure for asphalt concrete pavement

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867230A (en) * 2018-07-13 2018-11-23 阜阳师范学院 A kind of method for repairing and mending of asphalt pavement crack
CN108824118A (en) * 2018-07-20 2018-11-16 四川瑞通工程建设集团有限公司 A kind of summer asphalt pavement repairing method
CN109853346A (en) * 2019-01-14 2019-06-07 黑龙江省公路科学研究院 A kind of pavement crack T shape notch and fill slot method for blocking
CN110042722A (en) * 2019-03-12 2019-07-23 同济大学 A kind of road rehabilitation structure based on settlement Control
CN110144799B (en) * 2019-06-29 2020-12-29 郑州航空工业管理学院 Airport runway crack detection and maintenance equipment
CN110144799A (en) * 2019-06-29 2019-08-20 郑州航空工业管理学院 Airfield runway Crack Detection and maintenance of equipment
CN110552281A (en) * 2019-09-02 2019-12-10 重庆工程职业技术学院 Asphalt pavement defect repairing method and reinforced workpiece
CN110965423A (en) * 2019-12-17 2020-04-07 中交路桥华北工程有限公司 Anti-crack construction method for asphalt pavement splicing
CN111005283A (en) * 2019-12-24 2020-04-14 河北水熠木丰工程技术有限责任公司 Asphalt pavement damaged repairing structure and repairing process
CN111005283B (en) * 2019-12-24 2021-06-29 河北水熠木丰工程技术有限责任公司 Asphalt pavement damaged repairing structure and repairing process
CN111235997A (en) * 2020-01-10 2020-06-05 陕西省高速公路建设集团公司汉宁分公司 Asphalt pavement repairing method and asphalt pavement structure
CN113062597A (en) * 2021-03-02 2021-07-02 台州市瑞恒优创科技有限公司 Grout seam plugging device of prefabricated assembled structure
CN113235350A (en) * 2021-05-20 2021-08-10 福建新华夏建工集团有限公司 Method for realizing concrete road reconstruction by additionally paving asphalt concrete surface layer
CN113462177A (en) * 2021-07-08 2021-10-01 江苏聚科特新材料科技有限公司 Polymer composite modified asphalt and highway pavement structure thereof
CN113981789A (en) * 2021-12-08 2022-01-28 张冬 Method and device for repairing local cracks of asphalt pavement

Similar Documents

Publication Publication Date Title
CN108166348A (en) A kind of asphalt pavement crack method for repairing and mending and repairing construction
CN109162152B (en) Method for remedying slurry pumping disease of ballastless track bed of high-speed rail
CN108411939A (en) The spliced prefabricated pipe gallery of one kind and its construction method
CN106284425A (en) Basement in high rise building roof deformation seam water proof structure construction method
CN101481931A (en) Sticking modified asphalt waterproof coiled material and adhesive, as well as preparation method and application thereof
CN105586818A (en) Light foam layer for widening roadbed of road and construction process of light foam layer
CN207092153U (en) A kind of bottom deformation seam percolating water repairs structure
CN107476149B (en) A kind of non-excavation type ballastless track mortar leafing seams seam processing method
CN204530366U (en) Novel anticracking asphalt roads structure
CN111021161A (en) Construction method of durable tramcar track side pavement structure
CN110396926A (en) A kind of concrete bridge deck pavement structure and construction method
CN209482103U (en) A kind of highway pavement crack repairing structure
CN202787014U (en) Asphalt pavement structure formed by modifying cement pavement
CN207727375U (en) A kind of Highway Asphalt Pavement Cracks repairing structure
CN206616711U (en) A kind of waterproof construction at subway station main body and accessory interface
CN202318559U (en) Prefabricated beam end mould plate seam processing device
CN106592376B (en) Bituminous paving joint process method
CN104775347B (en) Hot asphalt spraying repair construction method with characteristic of concurrent repair and unblocking of municipal road
CN108221540A (en) A kind of extremely thin type asphalt wearing layer structure and its construction method
CN111705640B (en) Seamless expansion joint structure for bridge joint treatment and construction process thereof
CN114876075A (en) Water seepage prevention construction method for garage top plate
CN204803705U (en) Concrete road surface expansion joint filleting structure
CN109468906B (en) Asphalt pavement joint process
CN107574740A (en) A kind of grouting formula composite pavement construction edge bonding method
CN204039864U (en) Concrete structure above a kind of gap be applied in bridge or road

Legal Events

Date Code Title Description
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180615

WD01 Invention patent application deemed withdrawn after publication