CN209602904U - A kind of steel plate turnover road surface - Google Patents

A kind of steel plate turnover road surface Download PDF

Info

Publication number
CN209602904U
CN209602904U CN201822272332.1U CN201822272332U CN209602904U CN 209602904 U CN209602904 U CN 209602904U CN 201822272332 U CN201822272332 U CN 201822272332U CN 209602904 U CN209602904 U CN 209602904U
Authority
CN
China
Prior art keywords
steel plate
hole
road surface
meet
enough
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201822272332.1U
Other languages
Chinese (zh)
Inventor
王东会
王涛
张福印
孙利钊
赵文豪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Construction Industry Group Co Ltd
Original Assignee
China Coal Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Construction Industry Group Co Ltd filed Critical China Coal Construction Industry Group Co Ltd
Priority to CN201822272332.1U priority Critical patent/CN209602904U/en
Application granted granted Critical
Publication of CN209602904U publication Critical patent/CN209602904U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to temporary roads to harden field, disclose a kind of steel plate turnover road surface, comprising: several fasteners, connection sheet and sliceable steel plate;The steel plate is held on it and is provided at least one first through hole at the both sides of the edge of lower end, the connection sheet is equipped with the second through-hole for cooperating first through hole described in the two neighboring steel plate upper end or lower end, the fastener by second through-hole of the connection sheet and the first through hole of the steel plate by the Interal fixation on the ground.Steel plate provided by the utility model has enough to meet the need road surface, by the way that first through hole is arranged on the steel plate, and utilize connection sheet, setting cooperates the second through-hole of two neighboring steel plate upper end or lower end first through hole in connection sheet, adjacent steel plate is fixed on the ground by fastener, assembled heavy duty shape steel plate temporary construction road system can be had enough to meet the need by constituting, and solve the problems such as wasting of resources and building waste, while substantially enhancing the stability of temporary road.

Description

A kind of steel plate turnover road surface
Technical field
The utility model relates to temporary roads to harden field, in particular to a kind of steel plate has enough to meet the need road surface.
Background technique
In existing engineering construction, the temporary road of construction site generallys use cast-in-place concrete road, but cast-in-place Concrete coagulation hardening slowly, needs to be caused delaying using the time with water curing for a long time, influenced project progress, in addition road The intensity on road depends entirely on the curing condition of concrete, and heavily loaded Construction traffic transport is very frequent, and concrete road surface is easy to damage Bad, general data needs multiple repairing road from going into operation to being completed, and repairs be required to abolish original damage road again every time, then Again it casting concrete and conserves more days, a large amount of manpower and material resources is not only wasted, but also seriously affect vehicle pass-through, to be delayed work Phase causes huge economic loss.
If construction efficiency is high using Simple mounting temporary construction steel plate road surface, the construction time is saved, can be thrown as early as possible Enter to use, be hardly damaged in use process, late maintenance cost is extremely low.Commonly cast-in-place concrete road surface is disposable, It to be often removed as construction temporary road in the later period discarded, generate a large amount of building wastes, resource and environment are caused to waste And destruction.If using Simple mounting temporary construction steel plate road surface, reusable saving material not only increases economy Benefit also greatly protects surrounding enviroment.
Utility model content
(1) technical problems to be solved
The utility model provides a kind of steel plate turnover road surface, to solve existing temporary road hardening, with cast-in-place concrete Based on easily cause a large amount of material resources to waste and the problems such as building waste.
(2) technical solution
To solve the above problems, the utility model provides a kind of steel plate turnover road surface, comprising: several fasteners, connection Piece and sliceable steel plate;The steel plate is held on it and is provided at least one first through hole at the both sides of the edge of lower end, described Connection sheet is equipped with the second through-hole for cooperating first through hole described in the two neighboring steel plate upper end or lower end, and the fastener passes through Second through-hole of the connection sheet and the first through hole of the steel plate by the Interal fixation on the ground.
Further, kerbstone;The both ends of the width direction of the steel plate, and the corresponding steel is arranged in the kerbstone The both ends of the width direction of plate are equipped with groove, and the steel plate is embedded in the groove and is fixed on the kerbstone.
Further, the kerbstone is formed by armored concrete is prefabricated, and the kerbstone is internally provided with steel mesh Piece, cross section are L-shaped structure, and the cast-in fixing bolt for lifting is embedded at the top of the L-shaped structure.
Further, further includes: the outside of the kerbstone is arranged in spray equipment, the spray equipment, is fixed on institute In the ground for stating kerbstone edge, to be rinsed to the steel plate.
Further, the spray equipment includes: spray head, spray piping, reservoir and water pump;The spray head passes sequentially through The spray piping and the water pump are connected to the reservoir.
Further, further includes: the draining in the groove is arranged in drainage pipeline, the entrance of the drainage pipeline The discharge outlet of pipeline is connected to the reservoir.
Further, further includes: the top and bottom two sides of the bottom surface of the adjacent steel plate are arranged in pedestal, the pedestal Edge, the fastener are consolidated the steel plate by second through-hole of the connection sheet and the first through hole of the steel plate Determine on the base.
Further, further includes: metalling, the steel plate and the pedestal are arranged on the metalling.
Further, the fastener is hex bolts, and performance rate 10.9, specification is M20 × 1.5 × 55.
Further, the connection sheet is rectangular hot rolled steel plate, having a size of 100 × 50mm, with a thickness of 10~ 20mm。
(3) beneficial effect
The utility model provides a kind of steel plate turnover road surface, and it is logical by setting first on the steel plate which has enough to meet the need road surface Hole, and connection sheet is utilized, setting cooperates the second through-hole of two neighboring steel plate upper end or lower end first through hole in connection sheet, makes Obtaining adjacent steel plate can be fixed on the ground by fastener, and assembled heavy duty shape steel plate temporary construction road can be had enough to meet the need by constituting System solves the problems such as wasting of resources and building waste, while substantially enhancing the stability of temporary road.
Detailed description of the invention
Fig. 1 is the structural schematic diagram on the steel plate turnover road surface provided in the utility model first preferred embodiment;
Fig. 2 is the structural schematic diagram of the connection sheet provided in the utility model first preferred embodiment;
Fig. 3 is the structural schematic diagram on the steel plate turnover road surface provided in the second preferred embodiment of the utility model;
Fig. 4 is the structural schematic diagram of the connection sheet provided in the second preferred embodiment of the utility model;
Fig. 5 is the structural representation in the steel plate turnover road surface section in the width direction provided in the preferred embodiment in the utility model Figure;
Fig. 6 is the structural representation in the steel plate turnover road surface section along its length provided in the preferred embodiment in the utility model Figure;
Fig. 7 is the structural schematic diagram of the pedestal provided in the preferred embodiment in the utility model;
Wherein, 1: steel plate;2: connection sheet;3: kerbstone;4: spray equipment;5: drainage pipeline;6: pedestal;7: metalling; 11: first through hole;21: the second through-holes;31: groove;41: spray head;42: spray piping;43: reservoir;44: water pump.
Specific embodiment
It is practical new below in conjunction with this to keep the objectives, technical solutions, and advantages of the embodiments of the present invention clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is a part of the embodiment of the utility model, instead of all the embodiments.Based on the reality in the utility model Apply example, those of ordinary skill in the art's every other embodiment obtained without making creative work, all Belong to the range of the utility model protection.
The utility model embodiment provides a kind of steel plate turnover road surface, and as depicted in figs. 1 and 2, which has enough to meet the need road surface packet It includes: several fasteners, connection sheet 2 and sliceable steel plate 1.
In the present embodiment, which can be selected the steel plate of 20mm or so, first drill rear car silk to steel plate 1, be used for fastener The fixation being screwed into connection sheet 2.Steel plate 1 is held on it and is provided at least one first through hole 11 at the both sides of the edge of lower end, Connection sheet 2 is equipped with the second through-hole 21 for cooperating two neighboring 1 upper end of steel plate or lower end first through hole 11, and fastener passes through connection sheet 2 the second through-hole 21 and the first through hole 11 of steel plate 1 fix steel plate 1 on the ground.When having enough to meet the need road surface using the steel plate, due to It is fixed by two through-holes using fastener, substantially enhances the stability of temporary road.
Wherein, the fastening structures such as bolt, screw can be selected in fastener, such as in a specific embodiment, fastener Hex bolts can be selected, specification is M20 × 1.5 × 55, and the high-strength bolt that performance rate is 10.9, material is through Overheating Treatment Afterwards, tensile strength can reach 1000MPa grades, and yield tensile ratio value is 0.9.Yield strength is up to 1000 × 0.9=900MPa grades.
Wherein, rectangular hot rolled steel plate can be selected in connection sheet 2, and size is arranged according to the size of first through hole 11, Generally 100 × 50mm, with a thickness of 10~20mm, preferably 15mm.
In the present embodiment, the quantity of the second through-hole 21 in first through hole 11 and connection sheet 2 on steel plate 1 can basis Demand is adjusted.As depicted in figs. 1 and 2, one first can be opened up at the top and bottom both sides of the edge of each steel plate 1 Two the second through-holes 21 are accordingly arranged in through-hole 11 in connection sheet 2.
In other embodiments, the stability that road surface is had enough to meet the need further to promote the steel plate may be used also as shown in Figure 3 and Figure 4 Multiple first through hole 11, such as the left upper end in each steel plate 1 are opened up at the top and bottom both sides of the edge of each steel plate 1 A first through hole 11 is opened up with bottom righthand side setting, two first is opened up at the lower-left end of each steel plate 1 and upper right side setting and leads to Hole 11.It is corresponding that three the second through-holes 21 are set in connection sheet 2, i.e., by set the connection sheet 2 there are three the second through-hole 21 come Fixed adjacent steel plate 1.
The utility model embodiment provides a kind of steel plate turnover road surface, which has enough to meet the need road surface by being arranged on steel plate 1 First through hole 11, and connection sheet 2 is utilized, setting cooperates two neighboring 1 upper end of steel plate or lower end first through hole 11 in connection sheet 2 The second through-hole 21, adjacent steel plate 1 is fixed on the ground by fastener, assembled heavy-load type can be had enough to meet the need by constituting Steel plate temporary construction road system, solves the problems such as wasting of resources and building waste, while substantially enhancing temporary road Stability.
Based on the above embodiment, in a preferred embodiment, as shown in figure 5, the steel plate has enough to meet the need road surface further include: road Kerb 3.The both ends of the width direction of steel plate 1 are arranged in kerbstone 3, and the both ends of the width direction of corresponding steel plate 1 are equipped with groove 31, steel plate 1 is embedded in groove 31 and is fixed on kerbstone 3.
Wherein, kerbstone 3 is formed by armored concrete is prefabricated.Kerbstone 3 is internally provided with reinforced mesh, reinforced mesh It is that longitudinal reinforcement and transverse steel with certain spacing arrangement and are mutually right angle, the net that whole crosspoint welds together respectively Piece, for enhancing the intensity of kerbstone 3.The cross section of kerbstone 3 is L-shaped structure, and is located at convenient for the group on steel plate turnover road surface Dress, L-shaped structure top can also the pre-buried cast-in fixing bolts for lifting.
To guarantee that road is clean, dust pollution is reduced, as shown in figure 5, steel plate has enough to meet the need road surface further include: spray equipment 4, spray The outside of kerbstone 3 is arranged in shower device 4, is fixed in the ground at 3 edge of kerbstone, to be rinsed to steel plate 1.Wherein, Spray equipment 4 includes: spray head 41, spray piping 42, reservoir 43 and water pump 44.Spray head 41 be rotation sprayer, spray head 41 according to It is secondary to be connected to by spray piping 42 and water pump 44 with reservoir 43.
It is understood that the length on the quantity basis steel sheet turnover road surface of spray equipment 4 can be adjusted, while may be used also Spray equipment 4 is set in the unilateral side of kerbstone 3 or two sides according to the actual situation.Each spray equipment 4 can will be stored by connecting pipe Pond 43 is connected to.
Wherein, which has enough to meet the need the also settable drainage pipeline 5 in road surface, and the entrance of drainage pipeline 5 is arranged in groove 31, The discharge outlet of drainage pipeline 5 is connected to reservoir 43, and the water that spray equipment 4 sprays can be flowed back by groove 31 and drainage pipeline 5 The waste of resource can be reduced while guaranteeing road cleaning to reservoir 43.
As shown in Figure 6 and Figure 7, which has enough to meet the need road surface further include: pedestal 6.I-steel or H profile steel can be selected in pedestal 6, directly Connecing, adjacent steel plate 1 can be arranged in 6 side of pedestal.Such as: the top and bottom two of the bottom surface of adjacent steel plate 1 are arranged in pedestal 6 At side edge, steel plate 1 is fixed on pedestal 6 by the second through-hole 21 of connection sheet 2 and the first through hole 11 of steel plate 1 by fastener On.
To prevent from deflecting when steel plate 1 carries weight with pedestal 6, steel plate 1 and 6 contact position of pedestal are solid by welding It is fixed.
In addition, the steel plate has enough to meet the need road surface further include: metalling 7, steel plate 1 and pedestal 6 are arranged on metalling 7.Rubble Layer 7 is, using the gap of cementitious material and mortar filler aggregate, to be paved by embedded squeezing principle using graded broken stone as aggregate and be compacted system At.
In conclusion the utility model embodiment provides a kind of steel plate turnover road surface, steel plate turnover road surface passes through in steel First through hole 11 is set on plate 1, and utilizes connection sheet 2, setting cooperates two neighboring 1 upper end of steel plate or lower end in connection sheet 2 Second through-hole 21 of first through hole 11, enables adjacent steel plate 1 to fix on the ground by fastener, dress can be had enough to meet the need by constituting With formula heavy duty shape steel plate temporary construction road system, solves the problems such as wasting of resources and building waste, while substantially enhancing The stability of temporary road.In addition, being different from above-described embodiment, the present embodiment is by being arranged spray dress in the outside of kerbstone 3 4 are set, steel plate 1 can be rinsed, guarantees that road is clean, reduces dust pollution.Meanwhile the present embodiment is additionally provided with drainage pipeline 5, the entrance of drainage pipeline 5 is arranged in groove 31, the discharge outlet of drainage pipeline 5 is connected to reservoir 43, and spray equipment 4 sprays The water spilt can be back to reservoir 43 by groove 31 and drainage pipeline 5, while guaranteeing road cleaning, can reduce resource Waste.
Finally, it should be noted that above embodiments are only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, those skilled in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or part of technical characteristic is carried out etc. With replacement;And these are modified or replaceed, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The spirit and scope of scheme.

Claims (10)

1. a kind of steel plate has enough to meet the need road surface characterized by comprising
Several fasteners, connection sheet and sliceable steel plate;The steel plate is held on it and is provided at the both sides of the edge of lower end At least one first through hole, the connection sheet, which is equipped with, cooperates the of first through hole described in the two neighboring steel plate upper end or lower end Two through-holes, the fastener is by the first through hole of second through-hole of the connection sheet and the steel plate by the steel Plate fixes on the ground.
2. steel plate according to claim 1 has enough to meet the need road surface, which is characterized in that further include: kerbstone;The kerbstone setting It is equipped with groove at the both ends at the both ends of the width direction of the steel plate, and the width direction of the corresponding steel plate, the steel plate is embedding Enter the groove to be fixed on the kerbstone.
3. steel plate according to claim 2 has enough to meet the need road surface, which is characterized in that the kerbstone it is prefabricated by armored concrete and At the kerbstone is internally provided with reinforced mesh, and cross section is L-shaped structure, is embedded at the top of the L-shaped structure for hanging The cast-in fixing bolt of dress.
4. steel plate according to claim 2 has enough to meet the need road surface, which is characterized in that further include:
The outside of the kerbstone is arranged in spray equipment, the spray equipment, is fixed in the ground at the kerbstone edge, To be rinsed to the steel plate.
5. steel plate according to claim 4 has enough to meet the need road surface, which is characterized in that the spray equipment includes: spray head, spray tube Road, reservoir and water pump;The spray head passes sequentially through the spray piping and the water pump is connected to the reservoir.
6. steel plate according to claim 5 has enough to meet the need road surface, which is characterized in that further include:
Drainage pipeline, the entrance of the drainage pipeline are arranged in the groove, the discharge outlet of the drainage pipeline and the storage Pond connection.
7. steel plate according to claim 1 has enough to meet the need road surface, which is characterized in that further include: pedestal, the pedestal are arranged in phase At the top and bottom both sides of the edge of the bottom surface of the adjacent steel plate, second through-hole that the fastener passes through the connection sheet With the first through hole of the steel plate by the Interal fixation on the base.
8. steel plate according to claim 7 has enough to meet the need road surface, which is characterized in that further include: metalling, the steel plate and described Pedestal is arranged on the metalling.
9. steel plate according to claim 1 has enough to meet the need road surface, which is characterized in that the fastener is hex bolts, performance etc. Grade is 10.9, and specification is M20 × 1.5 × 55.
10. steel plate according to claim 1 has enough to meet the need road surface, which is characterized in that the connection sheet is rectangular hot rolling Steel plate, having a size of 100 × 50mm, with a thickness of 10~20mm.
CN201822272332.1U 2018-12-29 2018-12-29 A kind of steel plate turnover road surface Expired - Fee Related CN209602904U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201822272332.1U CN209602904U (en) 2018-12-29 2018-12-29 A kind of steel plate turnover road surface

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201822272332.1U CN209602904U (en) 2018-12-29 2018-12-29 A kind of steel plate turnover road surface

Publications (1)

Publication Number Publication Date
CN209602904U true CN209602904U (en) 2019-11-08

Family

ID=68398137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201822272332.1U Expired - Fee Related CN209602904U (en) 2018-12-29 2018-12-29 A kind of steel plate turnover road surface

Country Status (1)

Country Link
CN (1) CN209602904U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962353A (en) * 2020-08-05 2020-11-20 安徽智星交通科技股份有限公司 Assembled road surface device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111962353A (en) * 2020-08-05 2020-11-20 安徽智星交通科技股份有限公司 Assembled road surface device

Similar Documents

Publication Publication Date Title
CN106801517B (en) External reinforcing and reinforcing method for school shed with prefabricated porous plate brick mixed structure
CN210975404U (en) Composite assembled road surface board
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CH714877A2 (en) Process for rehabilitating, repairing, reinforcing, protecting or rebuilding corrugated steel tunnels and corrugated steel tunnels.
CN110468790A (en) A kind of aqueduct body post-pouring zone construction process
CN207109477U (en) Prefabricated assembled regeneration concrete heavy load builder's road plate can be recycled in one kind
CN209602904U (en) A kind of steel plate turnover road surface
CN105463986A (en) Construction method of bridge expansion joint
CN109972475A (en) A kind of ecological permeable paving structure
CN213417462U (en) Novel assembled road
CN211713627U (en) Deep crack grouting structure
CN211689728U (en) Assembled temporary road
CN210712589U (en) Road and bridge crack reinforced structure
CN108457148A (en) A kind of multi-functional temporary road structure of assembled and its construction method
CN108004866A (en) A kind of precast concrete road system and construction method
CN209397518U (en) A kind of Hollow Slab Beam Bridge transverse prestress friction plate ruggedized construction
CN208009182U (en) A kind of prefabricated assembled Cement Concrete Pavement Slab
CN203905331U (en) Cast-in-place plate-type staircase with seamless steps
CN212103531U (en) Environment-friendly temporary road system
CN209975293U (en) Road bridge road bed reinforced structure
CN209556414U (en) Prevent reinforcing bar when floor concrete casting from being trampled the passage frame of deformation
CN212077610U (en) Bridge shock attenuation expansion joint device of easy change
CN210262550U (en) Asphalt pavement structure based on cement pavement
CN107034759A (en) Steel plate road surface structure and construction method
CN207347861U (en) Prefabricated reinforced concrete roadbed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191108

Termination date: 20201229