CN210597037U - 一种超高横梁支架的预压结构 - Google Patents
一种超高横梁支架的预压结构 Download PDFInfo
- Publication number
- CN210597037U CN210597037U CN201921155171.6U CN201921155171U CN210597037U CN 210597037 U CN210597037 U CN 210597037U CN 201921155171 U CN201921155171 U CN 201921155171U CN 210597037 U CN210597037 U CN 210597037U
- Authority
- CN
- China
- Prior art keywords
- support
- steel pipe
- bearing
- bridge
- pressing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本实用新型提供一种超高横梁支架的预压结构,横梁支架设置在两桥塔之间,横梁支架包括钢管支架和承重横梁,在两桥塔相对的侧壁上位于钢管支架上方一定高度处分别设有一排临时支撑牛腿,临时支撑牛腿上方设有一排反压牛腿,承重横梁的两端分别位于两桥塔侧壁上的临时支撑牛腿和反压牛腿之间;在钢管支架顶部设有多个预压千斤顶,每个预压千斤顶上端朝向所述承重横梁底部。本实用新型由千斤顶向上顶推承重横梁,承重横梁提供反力对支架进行预压,与常规堆载预压方法相比,省去材料吊装堆载过程,可加快施工进度,降低施工风险,节省施工投入。
Description
技术领域
本实用新型属于桥梁施工技术领域,涉及桥梁施工所采用的支架,尤其是一种对超高横梁支架进行预压的结构。
背景技术
在桥梁横梁施工中,通常普遍支架作为临时结构。图1所示的是一种桥塔横梁支架的结构示意图,横梁支架设置在两桥塔1之间,横梁支架包括钢管支架和承重横梁,钢管支架包括横桥向设置的两排钢管桩2,相邻钢管桩间通过平联3连接,在钢管支架纵桥向的每两根钢管桩顶部设有一垫梁4,承重横梁5搭设在钢管支架上。横梁支架在搭设完成后、混凝土浇筑之前需要预压,以消除支架各个构件的非弹性变形,使混凝土浇筑时支架能保持稳定,提高施工安全性。常用的支架预压方法为堆载法,将一定载荷的钢筋、混凝土块、水箱等堆载到支架上进行预压,此方法需要大量的材料来达到预压效果,操作过程繁琐,用时较长,成本高,效率低;对于超高支架来说,将大量材料吊装到支架上,还会增加施工风险。
发明内容
本实用新型的目的是针对现有支架堆载预压方法存在的问题,提供一种超高横梁支架的预压结构,通过千斤顶提供反力进行预压,避免堆载预压造成的风险。
本实用新型的技术方案如下:
一种超高横梁支架的预压结构,所述横梁支架设置在两桥塔之间,横梁支架包括钢管支架和承重横梁;所述钢管支架包括横桥向设置的两排钢管桩,相邻钢管桩间通过平联连接,在钢管支架纵桥向的每两根钢管桩顶部设有一垫梁;其特征在于:在两桥塔相对的侧壁上位于钢管支架上方一定高度处分别设有一排临时支撑牛腿,临时支撑牛腿上方设有一排反压牛腿,所述承重横梁的两端分别位于两桥塔侧壁上的临时支撑牛腿和反压牛腿之间;在每根所述垫梁上纵桥向设有多个预压千斤顶,每个预压千斤顶上端朝向所述承重横梁底部。
本实用新型与常规采用堆载预压方法相比,省去材料吊装堆载过程,操作简单,预压过程快速,荷载加载准确,预压效果可控,不仅降低了施工风险,还可节省施工投入。
附图说明
图1是一种横梁支架的结构示意图;
图2是本实用新型的结构示意图;
图3是图2中的A-A向剖视图。
具体实施方式
如图2、图3所示,本实用新型提供的一种超高横梁支架的预压结构,所述横梁支架设置在两桥塔1之间,横梁支架包括钢管支架和承重横梁5;所述钢管支架包括横桥向设置的两排钢管桩2,相邻钢管桩间通过平联3连接,在钢管支架纵桥向的每两根钢管桩顶部设有一垫梁4;在两桥塔1相对的侧壁上位于钢管支架上方一定高度处分别设有一排临时支撑牛腿6,临时支撑牛腿上方设有一排反压牛腿7,所述承重横梁5的两端分别位于两桥塔侧壁上的临时支撑牛腿6和反压牛腿7之间;在每根所述垫梁4上纵桥向设有多个预压千斤顶8,每个预压千斤顶8上端朝向所述承重横梁底部。
本实用新型在桥塔施工时,在预先设计位置预埋临时支撑牛腿和反压牛腿的连接件。在钢管支架搭设完成后,安装临时支撑牛腿6,先将承重横梁5搭设在临时支撑牛腿上,然后安装反压牛腿7。在钢管支架顶部的垫梁上布设预压千斤顶8,根据设计的预压载荷,启动预压千斤顶向上顶推承重横梁5,承重横梁5由反压牛腿7限位,并提供向下的反力对钢管支架进行预压。具体操作时,预压可分级进行,根据千斤顶的读数实时掌握当前施加的预压载荷,便于对预压过程进行控制。
为使承重横梁受力均匀,本实用新型具体实施时,可横桥向在两桥塔侧壁上每两个相对的临时支撑牛腿上搭设一下分配梁9,所述承重横梁5支撑在所述下分配梁上,每个预压千斤顶8上端支撑在所述下分配梁9底面;在两桥塔侧壁上每两个相对的反压牛腿下方设一上分配梁10,每根上分配梁10横桥向搭设在所述承重横梁5顶面。
预压结束后,预压千斤顶回缩,拆除反压牛腿,然后先将承重横梁吊离临时支撑牛腿,拆除临时支撑牛腿,移除预压千斤顶,将承重横梁搭设到钢管支架上,恢复到如图1所示的状态。在横梁支架上安装模板,开始桥塔横梁混凝土浇筑施工。
Claims (2)
1.一种超高横梁支架的预压结构,所述横梁支架设置在两桥塔之间,横梁支架包括钢管支架和承重横梁;所述钢管支架包括横桥向设置的两排钢管桩,相邻钢管桩间通过平联连接,在钢管支架纵桥向的每两根钢管桩顶部设有一垫梁;其特征在于:在两桥塔相对的侧壁上位于钢管支架上方一定高度处分别设有一排临时支撑牛腿,临时支撑牛腿上方设有一排反压牛腿,所述承重横梁的两端分别位于两桥塔侧壁上的临时支撑牛腿和反压牛腿之间;在每根所述垫梁上纵桥向设有多个预压千斤顶,每个预压千斤顶上端朝向所述承重横梁底部。
2.根据权利要求1所述的超高横梁支架的预压结构,其特征在于:横桥向在两桥塔侧壁上每两个相对的临时支撑牛腿上搭设一下分配梁,所述承重横梁支撑在所述下分配梁上,每个预压千斤顶上端支撑在所述下分配梁底面;在两桥塔侧壁上每两个相对的反压牛腿下方设一上分配梁,每根上分配梁横桥向搭设在所述承重横梁顶面。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921155171.6U CN210597037U (zh) | 2019-07-22 | 2019-07-22 | 一种超高横梁支架的预压结构 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921155171.6U CN210597037U (zh) | 2019-07-22 | 2019-07-22 | 一种超高横梁支架的预压结构 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210597037U true CN210597037U (zh) | 2020-05-22 |
Family
ID=70721417
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921155171.6U Active CN210597037U (zh) | 2019-07-22 | 2019-07-22 | 一种超高横梁支架的预压结构 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210597037U (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114775431A (zh) * | 2022-04-13 | 2022-07-22 | 中交路桥建设有限公司 | 斜拉桥索塔大吨位钢横梁的拼装滑移支架 |
-
2019
- 2019-07-22 CN CN201921155171.6U patent/CN210597037U/zh active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114775431A (zh) * | 2022-04-13 | 2022-07-22 | 中交路桥建设有限公司 | 斜拉桥索塔大吨位钢横梁的拼装滑移支架 |
CN114775431B (zh) * | 2022-04-13 | 2024-05-14 | 中交路桥建设有限公司 | 斜拉桥索塔大吨位钢横梁的拼装滑移支架 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104695336B (zh) | 双层现浇梁先上后下支架施工方法 | |
CN112502471B (zh) | 一种钢框架结构托梁拔柱改造加固方法及结构 | |
CN103556578A (zh) | 连续梁直线段与边跨合拢段的浇筑模具系统及其搭建方法 | |
CN210032599U (zh) | 一种梁板结构混凝土现浇支撑体系中的梁板共支单元 | |
CN112411391A (zh) | 一种独柱盖梁钢管柱贝雷梁施工支撑系统及其施工方法 | |
CN111794127A (zh) | 一种超高悬浇梁0#块支架的反力预压系统及预压方法 | |
CN210597037U (zh) | 一种超高横梁支架的预压结构 | |
CN103132513A (zh) | 高桩码头受损基桩的修复方法 | |
CN113026792B (zh) | 桥梁桩基施工钢平台局部沉降加固结构及其加固方法 | |
CN202000644U (zh) | 移动式承重支架平台 | |
CN105369745A (zh) | 一种桥梁支座更换顶升反力架 | |
CN210507146U (zh) | 一种连续梁施工托架预压装置 | |
CN204365715U (zh) | 轧机整体液压提升系统 | |
CN105297643A (zh) | 空心板式桥梁支座更换方法 | |
CN108342984B (zh) | 一种滩涂软弱地基栈桥及其安装沉降方法 | |
CN214328534U (zh) | 一种连续刚构桥0#块托架预压装置 | |
CN203855879U (zh) | 新型高墩道岔连续梁支架 | |
CN209873759U (zh) | 一种移动式桩基施工平台 | |
CN110883920B (zh) | 一种预制t梁自行式液压模板装置及模板系统 | |
CN210684474U (zh) | 一种桥梁顶升施工用随动支撑装置 | |
CN115420630B (zh) | 现场载荷和直剪试验复合型竖向加载机构及其加载方法 | |
CN201605828U (zh) | 建筑物顶升用混凝土垫块 | |
CN207582971U (zh) | 泵管支座 | |
CN217174415U (zh) | 一种用于多幅桥梁拆除的可移动支架 | |
CN212358039U (zh) | 一种超高悬浇梁0#块支架的反力预压系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |