CN208263129U - Concrete precast pile automatic production line system - Google Patents

Concrete precast pile automatic production line system Download PDF

Info

Publication number
CN208263129U
CN208263129U CN201820680303.6U CN201820680303U CN208263129U CN 208263129 U CN208263129 U CN 208263129U CN 201820680303 U CN201820680303 U CN 201820680303U CN 208263129 U CN208263129 U CN 208263129U
Authority
CN
China
Prior art keywords
mold
conveyer
precast pile
concrete precast
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820680303.6U
Other languages
Chinese (zh)
Inventor
周兆弟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Application granted granted Critical
Publication of CN208263129U publication Critical patent/CN208263129U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B15/00General arrangement or layout of plant ; Industrial outlines or plant installations
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/60Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
    • B28B21/62Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements circumferential laterally tensioned

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Manufacturing & Machinery (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Piles And Underground Anchors (AREA)
  • Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)

Abstract

The utility model discloses a kind of concrete precast pile automatic production line system, including the first mold conveyer, the second mold conveyer and first movement lifting body, the first mold conveyer is successively arranged mold clean station along the conveying direction of mold, puts steel reinforcement cage station and closes die worker position, the second mold conveyer is successively arranged along the conveying direction of mold closes bolt station and tensioning station, the first movement lifting body by the first mold conveyer lower mold and upper mold be transported on the second mold conveyer.In the utility model, layout of the concrete precast pile line production system in workshop is optimized.

Description

Concrete precast pile automatic production line system
Technical field
The utility model belongs to technical field of buildings, is related to a kind of concrete precast pile automatic production line system.
Background technique
Concrete precast pile industry starts to walk to develop from the eighties in last century, has there is 30 years.National is prefabricated Stake producer develops from coastal area toward hinterland, and now there are about 600 Duo Jian prefabricated pile factories, prefabricated pile dosage was from 2000 For 1300 myriametres to more than 300,000,000 meters in 2011, China was the maximum country of prefabricated pile dosage in the world.
For prefabricated pile factory, equipment is the basic unit that factory is produced, and reasonable device layout is to equilibrium Capacity of equipment keeps logistical balancing, reduction production cost to play a crucial role.But the production line of prefabricated pile factory Planning and design aspect still more lag, the normative text of prefabricated pile Design of Production Line of the domestic science for forming system not yet Part, over 30 years, there is no too big improvement for prefabricated pile technical flow design, and process flow and layout designs have superiority and inferiority, fail Reach the Efficiency Ratio of ideal input and output, or even the prefabricated pile factory having causes investment waste because planning and designing are unreasonable, The factors such as technique " bottleneck ", security risk, production cost height seriously constrain the development of prefabricated pile industry.
In recent years, with the improvement application of part new equipment, process flow is also improved, the disclosure of the applicant's application Number are as follows: the Chinese patent of CN105599128B proposes a kind of full-automatic tubular pole production line for being able to achieve automatic demoulding, for coagulation The equipment of native prefabricated pile production line makes a large amount of improvement, but is the absence of excellent to the progress of workshop inner concrete prefabricated pile line production system The integral layout of change, to constrain the raising of production efficiency.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of concrete precast pile automatic production line system, with Layout of the optimised coagulation soil prefabricated pile line production system in workshop.
In order to solve the above technical problems, the utility model provides a kind of concrete precast pile automatic production line system, packet The first mold conveyer, the second mold conveyer and first movement lifting body are included, the first mold conveyer is along mold Conveying direction is successively arranged mold clean station, puts steel reinforcement cage station and closes die worker position, and the second mold conveyer is along mould The conveying direction of tool is successively arranged conjunction bolt station and tensioning station, the first movement lifting body are defeated by first mold Lower mold and upper mold on machine is sent to be transported on the second mold conveyer.
Further, the mold stoppage in transit frequency of the first mold conveyer is different from the mould of the second mold conveyer Has stoppage in transit frequency.
Further, the concrete precast pile automatic production line system is divided by concrete precast pile stake step, Include:
The area Zhuan Long, for being transported steel reinforcement cage, fixed charge method end plate and tensioning component and being mounted on the predetermined position of lower mold;
Mould closing section for upper mold to be transported to above lower mold, and is fixedly connected on upper mold on lower mold;
Stretched zone, for the main reinforcement on steel reinforcement cage to be stretched to predetermined length;
Feed zone, in the die cavity for surrounding concrete delivery to upper mold and lower mold;
It is centrifuged area, for making concrete is closely knit to be under the influence of centrifugal force shaped to concrete precast pile;
Demoulding area, for removing upper mold from lower mold, to appear concrete precast pile;
The area Dao Zhuan, for overturning lower mold, so that concrete precast pile and lower mold separation;
Cleaning area, for cleaning the inner wall of upper mold and the inner wall of lower mold, and after cleaning by release agent brushing Upper mold inner wall and lower mould inner wall on;
Wherein, the mold clean station of the first mold conveyer is located at cleaning area, the first mold conveyer Put steel reinforcement cage station and be located at the area Zhuan Long, the first mold conveyer close die worker position, the first movement lifting body and The conjunction bolt station of the second mold conveyer is located at mould closing section, and the tensioning station of the second mold conveyer is located at tensioning Area.
Further, the concrete precast pile automatic production line system further include for by upper mold from described first Mold conveyer is overturn to the mold mechanism that closes being located above the lower mold for closing die worker position, and the mold mechanism that closes is located at molding Area.
Further, the concrete precast pile automatic production line system further includes axial conveyer and pumping machine, institute It states axial conveyer and the pumping machine is located at feed zone, be equipped between the second mold conveyer and the axial conveyer Second mobile lifting body, the pumping machine are positioned adjacent on the position of the axial conveyer and are used for towards upper mold under Pump concrete in the die cavity that mold surrounds.
Further, the concrete precast pile automatic production line system further includes the machine of falling stake and tears upper die mechanism open, institute The mobile lifting body of third is equipped between the machine of falling stake of stating and the first mold conveyer, the upper die mechanism of tearing open is positioned adjacent to On the position of the machine of falling stake and for upper mold to be transported to first mold above the lower mold on the machine of falling stake On conveyer.
Further, under the concrete precast pile automatic production line system further includes retainer and is detached from for guidance The concrete precast pile of mold moves to the guide bracket at the retainer, and the retainer and the guide bracket are located to fall stake Area.
Further, the concrete precast pile automatic production line system further includes being positioned adjacent to the retainer End plate mechanism is torn open on position, and the end plate mechanism of tearing open is located at the area Dao Zhuan.
Further, the concrete precast pile automatic production line system is divided by concrete precast pile stake step, Further include:
The area Bian Long, for working out steel reinforcement cage and fixed charge method end plate being mounted on to the end of steel reinforcement cage;
Wherein, the area Bian Long is connected with the area Zhuan Long by overhead chain conveyor.
Further, the area Bian Long is located above the cleaning area and/or the area Dao Zhuan.
Compared with prior art, the concrete precast pile automatic production line system of the utility model includes that the first mold is defeated Machine is sent, the first mold conveyer is provided with mold clean station, puts steel reinforcement cage station and closes die worker position, due in mold clean Station cleaning upper mold inner wall and/or lower mold inner wall needed for spend time, put steel reinforcement cage station place steel reinforcement cage, Time for spending needed for fixed charge method end plate and tensioning component is closing die worker position for upper mold and is overturning to above lower mold and both making to buckle Close needed for spend time it is roughly the same, therefore, when by mold clean station, put steel reinforcement cage station and close die worker position setting exist When on the first mold conveyer, " cleaning upper mold inner wall and/or lower mold inner wall ", " place steel reinforcement cage, fixed charge method end plate and Tensioning component " and " overturn upper mold to lower mold top and fasten the two " this three process are conveyed in the first mold It is completed at the same time in the break-off time of machine.
Compared with prior art, the concrete precast pile automatic production line system of the utility model further includes the second mold Conveyer and first movement lifting body, the second mold conveyer, which is provided with, closes bolt station and tensioning station, is closing bolt work Upper mold is fastened as a whole with lower mold by die bolt on position, in tensioning station tensioning component by steel reinforcement cage main reinforcement tensioning To 70% or so of its own intensity, since concrete precast pile is during stake processed, mold residence is closing bolt station, tensioning Station and mold residence in washing station, put that reinforcing bar station, to close the time of die worker position different, therefore, first movement is jacked Mechanism is arranged between the first mold conveyer and the second mold conveyer, realizes the first mold conveyer and the conveying of the second mold Machine is worked with different stoppage in transit frequencies, friction speed.It is designed in this way, through optimised coagulation soil prefabricated pile line production system in workshop Layout, with realize shorten concrete precast pile stake needed for cost time.
In the utility model, first movement lifting body by the first mold conveyer lower mold and upper mold transport To the second mold conveyer.It is designed in this way, the lower mold and upper mold on the first mold conveyer are without passing through row Vehicle is hoisted on the conjunction bolt station of the second mold conveyer.
Detailed description of the invention
Fig. 1 is the plane figure schematic diagram of the utility model concrete precast pile automatic production line system;
Fig. 2 is the side view of first longitudinal direction pipeline in Fig. 1;
Fig. 3 is the partial enlarged view in the area Tu2Zhong Daozhuan.
Specific embodiment
Technical solutions of the utility model in order to facilitate understanding are described in detail below in conjunction with attached drawing and specific embodiment.
In the utility model, the concrete precast pile includes but is not limited to the solid square pile for having end plate or end-plate-free, sky Heart square pile, solid tubular pole, hollow shell pill, solid shaped pile, hollow shaped pile and bamboo joint pile.
Referring to Fig. 1, concrete precast pile automatic production line system, including the first mold conveyer 100, the second mold are defeated Machine 200 and first movement lifting body 300 are sent, the first mold conveyer 100 is disposed with mold along the conveying direction of mold Washing station 1001 puts steel reinforcement cage station 1002 and closes die worker position 1003, and the second mold conveyer 200 is along the conveying side of mold Bolt station 2001 and tensioning station 2002 are closed to being disposed with, first movement lifting body 300 is by the first mold conveyer Lower mold and upper mold on 100 are transported on the second mold conveyer 200.
Since upper mold is stopped in 1001 residence time of mold clean station, lower mold in mold clean station 1001 Time, lower mold put 1002 residence time of steel reinforcement cage station, lower mold is closing die worker position 1003 residence times and mould Tool (in the utility model, the mold includes upper mold and lower mold) is different in 2002 residence time of tensioning station, therefore, By mold clean station 1001, puts steel reinforcement cage station 1002 and closes 1003 setting of die worker position on the first mold conveyer 100, Tensioning station 2002 is arranged on the second mold conveyer 200, the first mold conveyer 100 is to be different from the conveying of the second mold The mold stoppage in transit frequency of machine 200 transports mold, to realize the stake speed processed for improving concrete precast pile.
It is to be understood that the definition of " the mold stoppage in transit frequency " is: within the unit time, mold conveyer pause fortune Send the number of mold.The definition of mold stoppage in transit frequency is used in the embodiments of the present invention, i.e. the first mold conveyer 100 mold stoppage in transit frequency is the number that mold is transported in the pause of the first mold conveyer 100 within the unit time, and the second mold is defeated The mold stoppage in transit frequency for sending machine 200 is then that the second mold conveyer 200 suspends the number for transporting mold within the unit time.
With reference to the time of existing concrete prefabricated pile cost needed for each stake step processed, mold is closing bolt station 2001 Roughly the same with the time of 200 break-off of the second mold conveyer needed for tensioning station 2002, mold is in mold clean station 1001, the time of 100 break-off of the first mold conveyer needed for putting steel reinforcement cage station 1002 and closing die worker position 1003 is substantially Identical, the time > mold of mold 200 break-off of the second mold conveyer needed for closing bolt station 2001 is closing die worker The time of first mold conveyer, 100 break-off needed for position 1003.Therefore, preferably the first mold conveyer in the present embodiment The mold stoppage in transit frequency of 100 mold stoppage in transit frequency the second mold of > conveyer 200.
Referring to Fig. 1, concrete precast pile automatic production line system, including the area Zhuan Long 2, mould closing section 3, stretched zone 4, feeding The step of area 5, centrifugation area 6, demoulding area 8, the area Dao Zhuan 9 and cleaning area 10, concrete precast pile one of which stake includes:
Step 1, in the area Zhuan Long 2 by steel reinforcement cage (steel reinforcement cage includes main reinforcement and the spiral bar that is welded in main reinforcement), fixing end (fixed charge method end plate has two pieces to plate, and one piece is head plate, and one end that mold is located at tensioning component is arranged in head plate, and another piece is tailgate, tail The one end of mold far from tensioning component is arranged in plate) and tensioning component be mounted on lower mold;Firstly, will at least partly fixing end With clamping, screw, welding etc., any one or more mounting means is mounted on the inner wall of lower mold plate (head plate), secondly, will Steel reinforcement cage, fixed charge method end plate (tailgate), tensioning fixed plate are transported on the inner wall of the lower mold in the area Zhuan Long 2, again, will at least Part fixed charge method end plate (tailgate) is mounted on the inner wall of lower mold with any one or more mounting means such as clamping, screw, welding On, finally, steel reinforcement cage by stretch board, tensioning positioning sleeve and tensioning screw rod (tensioning component include stretch board, tensioning fixed plate, Tensioning positioning sleeve, tensioning screw rod) it is arranged in fixed charge method end plate (head plate);
Upper mold and lower mold are fixed as whole mold in mould closing section 3 by step 2;Firstly, will be under in step 1 Mold and the steel reinforcement cage being arranged on lower mold, fixed charge method end plate, tensioning component are transported to from mould closing section 3 from the area Zhuan Long 2, It is secondary, upper mold is fastened on above lower mold using clamping, again, is locked die bolt using die bolt retaining mechanism Tightly so that upper mold and lower mold are closely fixed as whole mold;
Step 3 carries out tensioning to steel reinforcement cage in stretched zone 4;Firstly, the mold in step 2 is transported to stretched zone 4 Place again, fills big nut secondly, steel reinforcement cage is stretched to 70% or so of its own intensity by tensioning component by tensioning mechanism Machine will drive big nut to rotate relative to the tensioning screw rod of tensioning component, until big nut is resisted against admittedly in direct or indirect mode On the end face of fixed end plate (head plate);
Step 4, in 5 pump concrete of feed zone;Firstly, the mold in step 3 is transported at feed zone 5, secondly, Pumping machine will be in the die cavity of concrete pumping to mold;
Step 5 makes concrete compaction be shaped to concrete precast pile in centrifugation area 6;Firstly, by the mold in step 4 Be transported to centrifugation area 6 at, secondly, centrifuge according to preset rotation speed work 10min-18min so that concrete compaction at Type is concrete precast pile, and again, after centrifuge stops working, hoisting mechanism improves the height that mold is located at tensioning component one end Degree, so that mold tail end topples over the waste pulp water that mold generates in centrifugal process;
Step 6 removes upper mold in demoulding area 8 from lower mold;It is torn open firstly, the mold in step 5 is transported to At mould area 8, secondly, the tensioning screw rod for tearing big nut machine driving big nut open relative to tensioning component rotates, so that big nut and fixation End plate (head plate) separation, again, tears bolt mechanism open and removes die bolt from upper mold, finally, tearing upper die mechanism open for upper mold Tool removes from lower mold and upper mold is placed on from cleaning area 10, is at least partially disposed in lower mould inner wall to realize to appear On concrete precast pile;
Step 7 pours out the concrete precast pile of mould inner wall under fitting in the area Dao Zhuan 9;Start the machine of falling stake (due to tearing open The area mould area 8 and Dao Zhuan 9 partially overlaps, and therefore, concrete precast pile and lower mold are not necessarily to movement after completing step 6) and drive Lower mold rotation in dynamic step 6 so that concrete precast pile under the effect of gravity with lower mold separation and move to In guide bracket;
Step 8 cleans the inner wall of upper mold and the inner wall of lower mold in cleaning area 10, and release agent brushing is existed On upper mold inner wall and lower mould inner wall after cleaning;Firstly, by step 7 upper mold and lower mold be transported to clearly Area 10 is washed, is sprayed secondly, cleaning machine sprays cleaning solution for washing away the concrete being attached on upper mold inner wall and cleaning machine Cleaning solution is for washing away the concrete being attached on lower mould inner wall, and again, cleaning machine or other equipment exist release agent brushing On the inner wall of the inner wall of upper mold and lower mold.
In the present embodiment, the mold clean station 1001 of the first mold conveyer 100 is located at cleaning area 10, and the first mold is defeated The steel reinforcement cage station 1002 of putting of machine 100 is sent to be located at the area Zhuan Long 2, the die worker position 1003, first of closing of the first mold conveyer 100 is moved The conjunction bolt station 2001 of dynamic lifting body 300 and the second mold conveyer 200 is located at mould closing section 3, the second mold conveyer 200 Tensioning station 2002 be located at stretched zone 4.
Referring to Fig. 1, in step 5, to make the intensity of concrete precast pile reach 40MPa or more, when mold completion is toppled over When waste pulp water, the mold for being centrifuged area 6 is transported in the steam-cured pond in steam-cured area 7, and make mold is quiet in steam-cured pond to stop 1h to 2h, Mold in steam-cured pond it is quiet stop 1h to 2h after, steam is passed through in steam-cured pond and temperature in steam-cured pond is made to be slowly increased to 90 DEG C extremely 100 DEG C, mold conserves 3h to 8h in the steam-cured pond that temperature is 90 DEG C to 100 DEG C, air pressure is 0.1MPa.Certainly, practical at this In novel other embodiments, when concrete precast pile is mounted on the not high work-yard of intensity requirement, concrete precast pile It natural curing can directly use for a period of time after centrifugation.
In step 5, to make the intensity of concrete precast pile reach 80MPa or more, when waste pulp water is toppled in mold completion When, the mold for being centrifuged area 6 is transported in the autoclave in steam-cured area 7 and carries out high temperature steam curing, the maximum temperature in autoclave It is 180 DEG C to 200 DEG C, saturated vapour pressure 1.0MPa, curing time 8h to 12h.
In the present embodiment, the area Dao Zhuan 9, cleaning area 10, the area Zhuan Long 2, mould closing section 3 and stretched zone 4 successively are longitudinally arranged to be formed First longitudinal direction pipeline, is centrifuged area 6 and steam-cured area 7 is successively longitudinally arranged to form second longitudinal direction pipeline, and the setting of feed zone 5 is being opened It draws and forms the first lateral transfer line between area 4 and centrifugation area 6, the setting of demoulding area 8 forms the between steam-cured area 7 and the area Dao Zhuan 9 Two lateral transfer lines.Concrete precast pile line production system with first longitudinal direction pipeline and second longitudinal direction pipeline is known as Concrete precast pile two is arranged between one end of first longitudinal direction pipeline and one end of second longitudinal direction pipeline across line production system There is the first lateral transfer line, is provided with second between the other end of first longitudinal direction pipeline and the other end of second longitudinal direction pipeline Lateral transfer line, is designed in this way, and mold is along first longitudinal direction pipeline, the first lateral transfer line, second longitudinal direction pipeline and second It is successively moved on lateral transfer line with the motion profile of " returning " font.
Referring to Fig. 1, the concrete precast pile automatic production line system of the present embodiment further includes axial conveyer 52 and pump Machine 51 is sent, axial conveyer 52 and pumping machine 51 are located at feed zone 5, and pumping machine 51 is positioned adjacent to the position of axial conveyer 52 It goes up and pump concrete in the die cavity that is used to surround towards upper mold and lower mold, first longitudinal direction pipeline is located at according to stretched zone 4 And feed zone 5 is located at the first lateral transfer line and is not difficult to obtain, mold stretched zone 4 the direction of motion and mold in feed zone 5 The direction of motion be different, the second mobile lifting body is equipped between the second mold conveyer 200 and axial conveyer 52 53, realize that the second mold conveyer 200 and axial conveyer 52 are worked with different stoppage in transit frequencies, friction speed.
Referring to Fig. 1, concrete precast pile automatic production line system is divided by concrete precast pile stake step, is also wrapped It includes:
The area Bian Long 1, for working out steel reinforcement cage and fixed charge method end plate and/or tensioning fixed plate being mounted on to the end of steel reinforcement cage;
Wherein, the area Bian Long 1 is connected with the area Zhuan Long 2 by overhead chain conveyor 20.Be designed in this way, the steel reinforcement cage woven without Need to drive a vehicle can be transported to the area Zhuan Long 2.
Figure it is seen that the area Bian Long 1 is located at 9 top of cleaning area 10 and the area Dao Zhuan.When the area Bian Long 1 is located at cleaning area 10 When with 9 top of the area Dao Zhuan, it will be conveyed by the first mold after brushing release agent positioned at the upper mold of cleaning area 10 and lower mold Machine 100 is transported to the area Zhuan Long 2.In the other embodiments of the utility model, the area Bian Long can be located at cleaning area and the area Dao Zhuan One of them top.
Referring to fig. 2, concrete precast pile automatic production line system further includes the machine of falling stake 91 and tears upper die mechanism open, tears upper mold open Mechanism is positioned adjacent on the position of the machine of falling stake 91 and for upper mold to be transported to the above the lower mold on the machine of falling stake 91 On one mold conveyer 100, the machine of falling stake 91 is used to adjust the inner wall direction of lower mold, to realize concrete precast pile in itself weight Relative lower dies movement with the inner wall of lower mold until separating under the action of power, the machine of falling stake 91 and the first mold conveyer The mobile lifting body of third is equipped between 100, when concrete precast pile is separated with the inner wall of lower mold, the mobile jack of third Lower mold on the machine of falling stake 91 is transported on the first mold conveyer 100 by structure.
Referring to Fig. 3, concrete precast pile automatic production line system further includes retainer 93 and is detached from lower die for guiding The concrete precast pile of tool moves to the guide bracket 94 at retainer 93, and retainer 93 and guide bracket 94 are located at the area Dao Zhuan 9.
From figure 3, it can be seen that moved at retainer 93 for guiding concrete prefabricated pile, the guide bracket 94 of the present embodiment Upper surface is inclined-plane.
Preferably, concrete precast pile automatic production line system further includes being positioned adjacent on the position of retainer 93 It tears end plate mechanism open, tears end plate mechanism open and be located at the area Dao Zhuan 9.Tear open end plate mechanism can will be resisted against it is concrete prefabricated at retainer 93 Fixed charge method end plate, tensioning fixed plate in stake remove.
Referring to Fig. 1, concrete precast pile automatic production line system further includes for conveying upper mold from the first mold The overturning of machine 100 closes mold mechanism 31 to above the lower mold for closing die worker position 1003, closes mold mechanism 31 and is located at molding Area 3.Closing mold mechanism 31 and tearing upper die mechanism open can be same set of mechanism.
First mold conveyer, the second mold conveyer, first movement lifting body, clamping, die bolt locking Mechanism, dress big nut machine, pumping machine, centrifuge, hoisting mechanism, steam-cured pond, tears bolt mechanism, the machine of falling stake, cleaning open at tensioning mechanism Machine, the mobile lifting body of third, tears big nut machine, axial conveyer, overhead chain conveyor, high pressure open at the second mobile lifting body Kettle, retainer, guide bracket, the equipment tearing end plate mechanism open etc. and referring in specific embodiment of the present invention are existing skill Art.
Above are merely preferred embodiments of the utility model, the protection scope of the utility model is limited with claim Range subject to, several improvement and profit that those skilled in the art make without departing from the spirit and scope of the utility model Decorations, also should be regarded as the protection scope of the utility model.

Claims (10)

1. concrete precast pile automatic production line system, which is characterized in that conveyed including the first mold conveyer, the second mold Machine and first movement lifting body, the first mold conveyer along the conveying direction of mold be successively arranged mold clean station, It puts steel reinforcement cage station and closes die worker position, the second mold conveyer is successively arranged along the conveying direction of mold and closes bolt station With tensioning station, the first movement lifting body by the first mold conveyer lower mold and upper mold be transported to On the second mold conveyer.
2. concrete precast pile automatic production line system as described in claim 1, which is characterized in that the first mold conveying The mold stoppage in transit frequency of machine is different from the mold stoppage in transit frequency of the second mold conveyer.
3. concrete precast pile automatic production line system as described in claim 1, which is characterized in that the concrete precast pile Automatic production line system is divided by concrete precast pile stake step, comprising:
The area Zhuan Long, for being transported steel reinforcement cage, fixed charge method end plate and tensioning component and being mounted on the predetermined position of lower mold;
Mould closing section for upper mold to be transported to above lower mold, and is fixedly connected on upper mold on lower mold;
Stretched zone, for the main reinforcement on steel reinforcement cage to be stretched to predetermined length;
Feed zone, in the die cavity for surrounding concrete delivery to upper mold and lower mold;
It is centrifuged area, for making concrete is closely knit to be under the influence of centrifugal force shaped to concrete precast pile;
Demoulding area, for removing upper mold from lower mold, to appear concrete precast pile;
The area Dao Zhuan, for overturning lower mold, so that concrete precast pile and lower mold separation;
Cleaning area, for cleaning the inner wall of upper mold and the inner wall of lower mold, and by release agent brushing after cleaning upper On mould inner wall and lower mould inner wall;
Wherein, the mold clean station of the first mold conveyer is located at cleaning area, and the first mold conveyer puts steel Muscle cage station is located at the area Zhuan Long, and the first mold conveyer closes die worker position, the first movement lifting body and described The conjunction bolt station of second mold conveyer is located at mould closing section, and the tensioning station of the second mold conveyer is located at stretched zone.
4. concrete precast pile automatic production line system as claimed in claim 3, which is characterized in that the concrete precast pile Automatic production line system further include for by upper mold from the first mold conveyer overturn to be located at close die worker position Mold mechanism is closed above lower mold, the mold mechanism that closes is located at mould closing section.
5. concrete precast pile automatic production line system as claimed in claim 3, which is characterized in that the concrete precast pile Automatic production line system further includes axial conveyer and pumping machine, and the axial direction conveyer and the pumping machine are located at feeding Area is equipped with the second mobile lifting body, the pumping machine setting between the second mold conveyer and the axial conveyer Pump concrete in die cavity on the position of the neighbouring axial conveyer and for being surrounded towards upper mold and lower mold.
6. concrete precast pile automatic production line system as claimed in claim 3, which is characterized in that the concrete precast pile Automatic production line system further includes the machine of falling stake and tears upper die mechanism open, is set between the machine of falling stake and the first mold conveyer Have a mobile lifting body of third, it is described tear open upper die mechanism be positioned adjacent on the position of the machine of falling stake and be used for by upper mold from It is transported on the first mold conveyer above lower mold on the machine of falling stake.
7. concrete precast pile automatic production line system as claimed in claim 3, which is characterized in that the concrete precast pile Automatic production line system further includes that retainer and the concrete precast pile for guiding disengaging to play mold move to the stop Guide bracket at device, the retainer and the guide bracket are located at the area Dao Zhuan.
8. concrete precast pile automatic production line system as claimed in claim 7, which is characterized in that the concrete precast pile Automatic production line system further includes being positioned adjacent to tear end plate mechanism open on the position of the retainer, described to tear end plate mechanism open Positioned at the area Dao Zhuan.
9. concrete precast pile automatic production line system as claimed in claim 3, which is characterized in that the concrete precast pile Automatic production line system is divided by concrete precast pile stake step, further includes:
The area Bian Long, for working out steel reinforcement cage and fixed charge method end plate being mounted on to the end of steel reinforcement cage;
Wherein, the area Bian Long is connected with the area Zhuan Long by overhead chain conveyor.
10. concrete precast pile automatic production line system as claimed in claim 9, which is characterized in that the area Bian Long is located at Above the cleaning area and/or the area Dao Zhuan.
CN201820680303.6U 2018-02-12 2018-05-08 Concrete precast pile automatic production line system Active CN208263129U (en)

Applications Claiming Priority (4)

Application Number Priority Date Filing Date Title
CN2018202540652 2018-02-12
CN201820254065 2018-02-12
CN201810286764X 2018-03-30
CN201810286764 2018-03-30

Publications (1)

Publication Number Publication Date
CN208263129U true CN208263129U (en) 2018-12-21

Family

ID=64681391

Family Applications (12)

Application Number Title Priority Date Filing Date
CN201810423028.4A Withdrawn CN109910167A (en) 2018-02-12 2018-05-05 A kind of production technology of prefabricated pile
CN201820680303.6U Active CN208263129U (en) 2018-02-12 2018-05-08 Concrete precast pile automatic production line system
CN201810429702.XA Withdrawn CN110154222A (en) 2018-02-12 2018-05-08 Concrete precast pile automatic production line system
CN201820676676.6U Active CN208263128U (en) 2018-02-12 2018-05-08 Concrete precast pile two is across line production system
CN201810429658.2A Withdrawn CN110154221A (en) 2018-02-12 2018-05-08 Concrete precast pile two is across line production system
CN201820674474.8U Active CN208263143U (en) 2018-02-12 2018-05-08 Bian Long mechanism and concrete precast pile automatic production line system
CN201810429705.3A Withdrawn CN110154226A (en) 2018-02-12 2018-05-08 Bian Long mechanism and concrete precast pile automatic production line system
CN201810530407.3A Withdrawn CN110480821A (en) 2018-02-12 2018-05-29 Concrete precast pile automatic production line workshop and production system
CN201810530193.XA Withdrawn CN110154223A (en) 2018-02-12 2018-05-29 A kind of production technology of prefabricated pile
CN201820815993.1U Active CN208788805U (en) 2018-02-12 2018-05-29 A kind of concrete precast pile automatic production line
CN201820815641.6U Active CN208788804U (en) 2018-02-12 2018-05-29 Concrete precast pile automatic production line workshop and production system
CN201810530194.4A Withdrawn CN110480820A (en) 2018-02-12 2018-05-29 A kind of concrete precast pile automatic production line

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201810423028.4A Withdrawn CN109910167A (en) 2018-02-12 2018-05-05 A kind of production technology of prefabricated pile

Family Applications After (10)

Application Number Title Priority Date Filing Date
CN201810429702.XA Withdrawn CN110154222A (en) 2018-02-12 2018-05-08 Concrete precast pile automatic production line system
CN201820676676.6U Active CN208263128U (en) 2018-02-12 2018-05-08 Concrete precast pile two is across line production system
CN201810429658.2A Withdrawn CN110154221A (en) 2018-02-12 2018-05-08 Concrete precast pile two is across line production system
CN201820674474.8U Active CN208263143U (en) 2018-02-12 2018-05-08 Bian Long mechanism and concrete precast pile automatic production line system
CN201810429705.3A Withdrawn CN110154226A (en) 2018-02-12 2018-05-08 Bian Long mechanism and concrete precast pile automatic production line system
CN201810530407.3A Withdrawn CN110480821A (en) 2018-02-12 2018-05-29 Concrete precast pile automatic production line workshop and production system
CN201810530193.XA Withdrawn CN110154223A (en) 2018-02-12 2018-05-29 A kind of production technology of prefabricated pile
CN201820815993.1U Active CN208788805U (en) 2018-02-12 2018-05-29 A kind of concrete precast pile automatic production line
CN201820815641.6U Active CN208788804U (en) 2018-02-12 2018-05-29 Concrete precast pile automatic production line workshop and production system
CN201810530194.4A Withdrawn CN110480820A (en) 2018-02-12 2018-05-29 A kind of concrete precast pile automatic production line

Country Status (1)

Country Link
CN (12) CN109910167A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110154222A (en) * 2018-02-12 2019-08-23 周兆弟 Concrete precast pile automatic production line system
CN114700446A (en) * 2022-05-07 2022-07-05 中国核工业电机运行技术开发有限公司 Reinforcing cage binding and forming production line

Families Citing this family (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110421879A (en) * 2019-08-08 2019-11-08 江苏江盈家居用品有限公司 A kind of production system of serialization
CN110774437A (en) * 2019-08-27 2020-02-11 杨红平 Automatic production line for concrete pipe piles
CN110893645B (en) * 2019-12-23 2021-05-11 东莞市中机建科实业有限公司 Combined type multi-link curing kiln curing concrete prefabricated part production line
CN111618992A (en) * 2020-07-01 2020-09-04 建华建材(中国)有限公司 Concrete pile production system
CN111958810A (en) * 2020-08-18 2020-11-20 广东联星瑞业水泥制品有限公司 Flat lantern ring interface cement pipe manufacture equipment
CN112720822B (en) * 2020-12-30 2022-11-18 南京钜砼建筑工业技术研究所有限公司 Modularization intelligent movement tubular pile production system
CN112936555A (en) * 2021-01-27 2021-06-11 付庆文 Automatic production system and production method for prestressed concrete piles and electric poles
CN112873519A (en) * 2021-01-27 2021-06-01 付庆文 Automatic production system and production process for prestressed concrete piles and electric poles
CN112783899B (en) * 2021-02-08 2023-03-24 青岛港国际股份有限公司 Method for interaction between air rail single machine control system and wharf equipment control system
CN113246294A (en) * 2021-06-02 2021-08-13 江苏苏誉建筑构件有限责任公司 Production line method and equipment for prefabricated reinforced concrete square pile
CN113681284B (en) * 2021-08-24 2022-07-12 厦门航天思尔特机器人系统股份公司 Assembly production line
CN114055619A (en) * 2021-11-24 2022-02-18 江苏宗恒科技有限公司 Automatic double-circulation production line for cement piles conveyed by chain conveyor between five-span vehicles
CN115496478B (en) * 2022-10-18 2023-04-18 南珠建材(清远)有限公司 Production management method and system for concrete pipe pile
CN117697945B (en) * 2023-11-24 2024-09-10 中铁九局集团有限公司 Production line and production method for multiple products of concrete member

Family Cites Families (31)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2780587B2 (en) * 1992-12-01 1998-07-30 平岡金属工業株式会社 Reinforcing cage manufacturing equipment
JP2652605B2 (en) * 1993-03-29 1997-09-10 株式会社ジオトップ Method of attaching end plate metal fittings to reinforced cage and device used for the method
CN101642932B (en) * 2009-08-25 2011-05-25 湖北天利建筑技术有限责任公司 Production process of short tubular piles
CN101920529A (en) * 2010-08-13 2010-12-22 安徽建华管桩有限公司 Annular layout for producing tubular piles
CN201971535U (en) * 2011-02-18 2011-09-14 广东建华管桩有限公司 Novel tubular pile demoulding lifting device
CN202062499U (en) * 2011-04-15 2011-12-07 海通能源集团有限公司 Twin-span rotary-type concrete tubular pile manufacturing device
CN102275219B (en) * 2011-08-18 2012-10-31 广东建华管桩有限公司 Automatic production line for pipe pile
CN202318561U (en) * 2011-09-20 2012-07-11 国鼎(南通)管桩有限公司 Automatic production line for concrete pipe piles
CN102366918B (en) * 2011-09-20 2013-05-22 国鼎(南通)管桩有限公司 Automatic production line for concrete tubular pile
CN202656296U (en) * 2012-05-04 2013-01-09 南通中技桩业有限公司 Concrete tubular pile production line
CN202805399U (en) * 2012-06-21 2013-03-20 上海中技桩业股份有限公司 Production line of centrifugal pile
CN202805405U (en) * 2012-06-21 2013-03-20 上海中技桩业股份有限公司 Automatic production line of centrifugal pile
CN102699996A (en) * 2012-06-29 2012-10-03 江苏建华管桩有限公司 Prestressed pipe pile and production method thereof
CN102744779B (en) * 2012-07-13 2014-08-27 天津港航桩业有限公司 PHC (prestressed concrete pipe pile) pile streamline conveying production line
CN202668745U (en) * 2012-07-13 2013-01-16 天津港航桩业有限公司 Production stream line for conveying prestress high concrete (PHC) pipe piles
CN103171047A (en) * 2012-12-31 2013-06-26 广东三和管桩有限公司 Concrete pipe pile automatic production line
CN104416675A (en) * 2013-09-02 2015-03-18 青岛兴河建材有限公司 Manufacturing process of pre-tensioned prestressed centrifugal concrete square pile
CN203485296U (en) * 2013-09-30 2014-03-19 福建永强岩土工程有限公司 Adjustable structure of bracket of cage-making machine
CN203792500U (en) * 2013-10-23 2014-08-27 建华建材(中国)投资有限公司 Concrete pipe pile production line
CN103624872B (en) * 2013-11-27 2016-04-13 江苏东浦管桩有限公司 Prestressed concrete anticorrosion pile tube automatic assembly line operating platform
KR101434913B1 (en) * 2014-07-04 2014-08-29 삼표이앤씨 주식회사 Manufacturing device for precast concrete slab panel and manufacturing method by using manufacturing device for precast concrete slab Panel
CN105500502A (en) * 2016-01-18 2016-04-20 周兆弟 Precast pile pumping and pouring die
CN105583947B (en) * 2016-02-29 2018-09-14 周兆弟 It is continuous to compile cage pile pile production line
CN105599128B8 (en) * 2016-02-29 2018-03-06 周兆弟 Full-automatic pile tube production line
CN105666681B (en) * 2016-02-29 2019-01-08 周兆弟 Pipe die for automatic production line for pipe pile tears big nut machine open
CN105668178B (en) * 2016-02-29 2018-08-03 周兆弟 Integral type steel reinforcement cage pipeline for pile pile production line
CN105600335B (en) * 2016-02-29 2019-08-06 周兆弟 For the steel reinforcement cage storage of tubular pole production line, conveying device
CN105619590B (en) * 2016-02-29 2018-08-03 周兆弟 Steel reinforcement cage jacking apparatus for pile pile production line
CN205394800U (en) * 2016-02-29 2016-07-27 周兆弟 Full -automatic pipe pile production line
CN107662278A (en) * 2016-07-27 2018-02-06 湖北兴葆科技有限责任公司 A kind of " returning " font electric pole workshop
CN109910167A (en) * 2018-02-12 2019-06-21 周兆弟 A kind of production technology of prefabricated pile

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110154222A (en) * 2018-02-12 2019-08-23 周兆弟 Concrete precast pile automatic production line system
CN114700446A (en) * 2022-05-07 2022-07-05 中国核工业电机运行技术开发有限公司 Reinforcing cage binding and forming production line
CN114700446B (en) * 2022-05-07 2023-06-20 中国核工业电机运行技术开发有限公司 Reinforcement cage binding and forming production line

Also Published As

Publication number Publication date
CN208263128U (en) 2018-12-21
CN110154222A (en) 2019-08-23
CN109910167A (en) 2019-06-21
CN208263143U (en) 2018-12-21
CN110480821A (en) 2019-11-22
CN110154226A (en) 2019-08-23
CN110480820A (en) 2019-11-22
CN110154221A (en) 2019-08-23
CN208788804U (en) 2019-04-26
CN208788805U (en) 2019-04-26
CN110154223A (en) 2019-08-23

Similar Documents

Publication Publication Date Title
CN208263129U (en) Concrete precast pile automatic production line system
CN209022254U (en) Prepare two cross-systems of concrete precast pile
CN105583947B (en) It is continuous to compile cage pile pile production line
CN105600335B (en) For the steel reinforcement cage storage of tubular pole production line, conveying device
CN107186877B (en) Automatic forming device for precast concrete member and using method of automatic forming device
CN204604568U (en) Combined production line is starched in a kind of slip casting for Ceramic manufacturing
CN105599128B (en) Full-automatic pile tube production line
CN105666685B (en) Pipe die tears fixed charge method end plate primary nut machine open
CN110142862A (en) The production system of concrete precast pile automatic production line workshop and prefabricated pile
CN105668178B (en) Integral type steel reinforcement cage pipeline for pile pile production line
CN107761034B (en) A kind of zinc-plated equipment for after-treatment of malleable cast iron pipe fitting
CN106333051A (en) Ice cream production translation device and method for production cycle of die assembly thereof
CN205397327U (en) A steel reinforcement cage is deposited, conveyor for pipe pile production line
CN205394799U (en) Compile cage pipe pile production line in succession
CN207435406U (en) A kind of clean vinasse skip car of discharging
CN210695859U (en) Raw materials washs controlling means for can production
CN109514723B (en) Cleaning type prefabricated part processing equipment
CN210934717U (en) Powder animal remedy V type compounding apparatus for producing
CN207525321U (en) A kind of zinc-plated equipment for after-treatment of malleable cast iron pipe fitting
CN207238638U (en) A kind of roseleaf cleaning transhipment dewatering system
CN205387329U (en) A compile cage reinforcing bar and store frame and compile cage reinforcing bar conveyor for pipe pile production line
CN215198882U (en) Processing apparatus for building plastic waste
RU84775U1 (en) DEVICE FOR MANUFACTURE OF REINFORCED CONCRETE EMPTY BLOCKS
CN202700708U (en) Mold-releasing oil spraying apparatus for concrete pipe pile
CN210190111U (en) Spraying device for sleeper prefabricated release agent

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant