CN208235927U - All steel intelligent building construction lifting platform - Google Patents

All steel intelligent building construction lifting platform Download PDF

Info

Publication number
CN208235927U
CN208235927U CN201721710836.6U CN201721710836U CN208235927U CN 208235927 U CN208235927 U CN 208235927U CN 201721710836 U CN201721710836 U CN 201721710836U CN 208235927 U CN208235927 U CN 208235927U
Authority
CN
China
Prior art keywords
frame body
guide rail
upright bar
vertical
square tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721710836.6U
Other languages
Chinese (zh)
Inventor
李福顺
翟玉辉
赖萃旺
陈习锦
李家明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi mutual construction equipment Technology Co., Ltd.
Original Assignee
Guangxi Mutual Building Materials Co Ltd Heng
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Mutual Building Materials Co Ltd Heng filed Critical Guangxi Mutual Building Materials Co Ltd Heng
Priority to CN201721710836.6U priority Critical patent/CN208235927U/en
Application granted granted Critical
Publication of CN208235927U publication Critical patent/CN208235927U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Types And Forms Of Lifts (AREA)

Abstract

A kind of all steel intelligent building construction lifting platform, including support system, attachment guiding and Load Relief System, frame body lifting system, dual anti-drop system, construction protection system, electrical control system, motor hoist setting hanging is inside frame body, primary hanging need not move repeatedly, and be blocked by steel walkway board;It is provided with the device of tower crane attached wall, can be used in the position for having tower crane wall-attaching equipment;Frame body is docked using difference in height structure, and node strength is high;Horizontal truss is installed on frame body.Its advantage is that full steel structure designs, plant produced, assembled in situ lifting reduces transportation cost, and fully integrated, full fire prevention, anti-skidding, bottom is totally-enclosed, modularization theory, is suitble to the requirement of shelter of the various structures of building;It avoids drenching with rain and building mortar is stained, reduce motor hoist and damage probability, greatly reduce the labor intensity of operator, and reduce operational hazards when hanging, horizontal truss structure ensure that the stability of frame body.

Description

All steel intelligent building construction lifting platform
Technical field
The present invention relates to adhesion types to go up and down hand cradle technical field, in particular to a kind of all steel intelligent building construction lifting is flat Platform.
Background technique
Chinese patent has separated Patent No. 201320538568(all steel attachment type raise scaffold) patent, this specially Benefit: 1, the motor hoist in frame body lifting system is mounted to that frame body is external, is stained for a long time by the building mortar to drench with rain, So that motor hoist damage probability is high, meanwhile, it needs to move repeatedly after hanging, operator's large labor intensity increases hanging When operational hazards, there is also leakage risks for cable;2, frame body is not provided with the device by tower crane attached wall, therefore, it is impossible to make For there is the position of tower crane wall-attaching equipment;3, it is not provided with horizontal truss, so that the stability of frame body is poor;4, guide rail and guide rail, Sustained height is butted up against between upright bar and upright bar, so that the node strength at frame body docking is poor;5, there is no electric appliance general control system, Only single lifting system is individually controlled.
Summary of the invention
It is an object of the invention to provide a kind of setting hangings of motor hoist inside frame body, and primary hanging need not be repeatedly It is mobile, it is blocked by steel walkway board, avoids drenching with rain and building mortar is stained, reduce motor hoist and damage probability, substantially reduce The labor intensity of operator, and reduce operational hazards when hanging.Cable is relatively fixed to also reduce leakage risk; It is provided with the device of tower crane attached wall, can be used in the position for having tower crane wall-attaching equipment;Frame body is high to the node strength at place, Master control and long-range control can be carried out with whole system using electric appliance general control system;The good all steel of frame body stability is intelligently built Build construction lifting platform.
Solution of the invention is such that
A kind of all steel intelligent building construction lifting platform, including support system, attachment guiding and Load Relief System, frame body are promoted System, dual anti-drop system, construction protection system, electrical control system, in the support system, mainly by guide rail, vertical vertical Bar, Z support, walkway board assembly, anti-tilt device, anti-fall device are bolted, and the frame body lifting system includes electricity The upper, middle and lower suspension centre of cucurbit elevator, cucurbit is moved, elevator uses Electric Chain Blocks, horizontal girder is equipped on frame body Frame, the horizontal truss are at least fastenedly connected with two outer vertical rods;The walkway board assembly is welded using connection orifice plate and square tube Connect the rectangular frame to be formed, the width of the strip-shaped frame with it is vertical in the distance between upright bar and vertical outer vertical rod match, So that the square tube of two sides is engaged with vertical interior upright bar, vertical outer vertical rod respectively when installation, it is provided in square tube multiple equidistant Square tube is fixed on upright bar or vertical outer vertical rod in vertical for being connected by screw bolts structure by through-hole;The one of rectangular frame Side is welded with checkered steel plate, forms the closed walkway board in top;Multiple through-holes are provided on the connection orifice plate, for adjacent Walkway board be connected with each other;Suspension centre is rod-shaped on cucurbit in the frame body lifting system, and both ends are welded with connecting plate, wherein one End connecting plate is provided with suspension centre and guide rail connecting hole on cucurbit, and other end connecting plate is provided with suspension centre and interior upright bar connecting hole on cucurbit, It is welded with lifting hole(eyelet) plate in centre, suspension centre through-hole on cucurbit is provided on lifting hole(eyelet) plate, suspension centre and guide rail, interior upright bar spiral shell on cucurbit After bolt is connected and fixed, a little it is located inside frame body so that cucurbit is hung oneself, suspension centre through-hole is hung under described towards building direction on cucurbit Point include upper and lower two lateral square tubes and left and right two vertical square tubes solderings at frame, the vertical square tube and transverse direction square tube Interconnecting part is welded with fixed orifice plate, and the fixed orifice plate is the structure of upward or lower outer stretching, in fixed orifice plate and vertical side Pipe, lateral square tube knot point on the outside of be welded with pasting board, lower suspension centre support is welded in the middle part of upper one lateral square tube, under hang Point support is provided with electric block platform sling connecting hole, and the vertical square tube in suspension centre side in fixed orifice plate bolt and frame body by standing instantly Bar fastening, after the vertical square tube in the other side is by fixed orifice plate and guide rail fastening, by electric block setting hanging inside frame body;Institute It states in support system, tower crane attached wall overturning B panel assembly is hinged at the aisle of the corresponding position of tower crane attached wall, in tower crane attached wall Overturn the turnover panel steel wire for being connected between the turning end and frame body of B panel assembly and pulling the overturning B panel assembly overturning positioning of tower crane attached wall Rope.
More specific technical solution further include: the horizontal truss is mounted on the first walkway board.
Further: the horizontal truss is mounted on tower crane walkway board in road second from the bottom.
Further: at least setting twice turnover panel is closed at the walkway board of frame body, wherein one of turnover panel closing setting exists First of aisle, another road turnover panel closing are arranged in third road aisle or need to set according to building.
Further: the docking location at docking between frame body guide rail and guide rail, upright bar and upright bar is not in same height Degree.
Further: the Z, which is supported on, to be connected the lower end of vertical square tube and is fixed with support tube, the front end of the support tube It is welded with groove profile bent plate, the slot of the groove profile bent plate, which is stuck on guide rail, connects spiral shell by Z-shaped supporting ellipse shape and guide rail connecting hole Bolt connect fastening with guide rail, and Z-shaped support circle and vertical external riser connecting hole are provided in vertical square tube.
Further: the bottom of the walkway board assembly is supported in aisle board bracket, and the aisle board bracket has aisle Plate support portion and with guide rail or interior upright bar interconnecting piece, wherein walkway board support portion is laterally to stretch to the bottom of walkway board assembly, with There is vertical walkway board supporting plate reeve slot and walkway board are connect with square tube on guide rail or interior upright bar for guide rail or interior upright bar interconnecting piece Square tube or interior upright bar connecting screw hole on supporting plate and guide rail.
Further: what the frame body guide rail docked that height is higher than upright bar and upright bar with guide rail docks height.
Further: the fire safety screen frame in the construction protection system uses plastic-spraying fire safety screen frame.
Further: the electrical control system includes total control box, divides control cabinet, by total control box by dividing control cabinet Each electric block is controlled, so that each seat in the plane automatically adjusts travel distance, row early warning is loaded into the overload of each seat in the plane, mistake And control, the control that guide rail Caton is alarmed and powered off.
The invention has the advantages that
1, inside frame body, primary hanging need not be moved repeatedly for motor hoist setting hanging, blocked, kept away by steel walkway board Exempt to drench with rain and building mortar is stained, reduces motor hoist and damage probability, greatly reduce the labor intensity of operator, and And operational hazards when hanging are reduced, cable is relatively fixed to also reduce leakage risk;
2, it is provided with the device of tower crane attached wall, can be used in the position for having tower crane wall-attaching equipment;
3, the node strength at frame body docking is high;
4, horizontal truss structure ensure that the stability of frame body.
5, wall-attached supporting seat uses dual anti-drop system, anti-drop system one: using eccentric impact formula catching device, passive design It never falls theory, fully automatic working, completion prevents catching device human failure;Anti-drop system two: adjustable unloading limits support top Device relies in climbing frame platform lifting process always on the anti-fall lever lever of track, once there is climbing frame tenesmus because abnormal, then Branch apical organ can withstand guide rail immediately, play the role of anti-tenesmus.Therefore the branch apical organ is that can be played to unload by operating condition in climbing frame platform Lotus effect, plays the role of anti-fall again in Lifting and lowering for scaffold operating condition;
6, T-type Track desigh and guide holder slide into formula cooperation, and guide holder is designed using double rollers, solves the problems, such as to put and tumble, The operation up and down of guide rail intelligence securely and reliably reduces and unexpectedly occurs, and cooperates guide holder electrodeless adjustment frame body with a distance from building;
7, full steel structure design, plant produced, assembled in situ lifting, reduce transportation cost, it is fully integrated, it is full fire prevention, it is anti-skidding, Bottom is totally-enclosed, modularization theory, is suitble to the requirement of shelter of the various structures of building;
8, mobile electric elevator is exempted from using integrated reverse, cancels elevator high-altitude transport process, prevents falling object from high altitude Extend the machinery equipment service life, reduces labor intensity;
9, full-automatic computer control system monitors each seat in the plane operating status in real time, automatically processes the items in operational process Signal parameter guarantees that frame body can correctly be run;
10, it is easy management, it is highly-safe, it is to modernize the selection preferentially selected.
Detailed description of the invention
Fig. 1 is structural schematic diagram of the invention.
Fig. 2 is the A-A cross-sectional view of Fig. 1.
Fig. 3 is the local I enlarged drawing of Fig. 2.
Fig. 4 is Fig. 2 local J enlarged drawing.
Fig. 5 is the front schematic view of structure shown in Fig. 1.
Fig. 6 is the top view of Fig. 5.
Fig. 7 is the left view of Fig. 5.
Fig. 8 is the local K enlarged drawing of Fig. 7.
Fig. 9 is the B-B cross-sectional view of Fig. 8.
Figure 10 is the C-C cross-sectional view of Fig. 5.
Figure 11 is the local M enlarged drawing of Fig. 7.
Figure 12 is frame body lifting system schematic diagram.
Figure 13 is system control schematic diagram.
Figure 14 is the structural schematic diagram of suspension centre 2 on cucurbit.
Figure 15 is the structural schematic diagram of wall-attached supporting seat 3.
Figure 16 is the partial enlarged view of Figure 15.
Figure 17 is the structural schematic diagram of Z-shaped support 6.
Figure 18 is the structural schematic diagram of horizontal truss 8.
Figure 19 is the structural schematic diagram of lower suspension centre 9.
Figure 20 is the structural schematic diagram of fire safety frame 11.
Figure 21 is the structural schematic diagram of I-shaped prop 15.
Figure 22 is the structural schematic diagram of walkway board 14.
Figure 23 is the structural schematic diagram of aisle board bracket 18.
Figure 24 is the structural schematic diagram of guide rail 19.
Figure 25 is the structural schematic diagram of turnover panel connecting square pipes 20.
Figure 26 is the entopic structural schematic diagram of frame body outside tower crane wall-attaching equipment.
Figure 27 is the structural schematic diagram when frame body being located at outside tower crane wall-attaching equipment passes through wall-attaching equipment.
Appended drawing reference in figure are as follows: 1, building level surface, 2, suspension centre on cucurbit, 3, wall-attached supporting seat, 4, middle suspension centre, 5, interior upright bar, 6, Z-shaped supports, 7, Electric Chain Blocks, 8, horizontal truss, 9, lower suspension centre, 10, tower crane attached wall overturning B panel assembly, 11, fire safety Screen frame, 12, outer vertical rod, 13, Z-type bent plate, 14, walkway board assembly, 15, I-shaped prop, 16, I-shaped prop closed plate, 17, reprint dress It sets, 18, walkway board supporting plate, 19, guide rail, 20, reprint connecting square pipes, 21, external splint, 22, built-in inserted plate, 23, screen frame fixing seat, 24, first of turnover panel closing, 25, the closing of second turnover panel, 26, tapping screw, the position that 27, guide rail and interior upright bar are docked, 28, The position of outer vertical rod docking, 29, suspension centre and guide rail connecting hole on cucurbit, 30, suspension centre and interior upright bar connecting hole on cucurbit, 31, calabash Suspension centre through-hole on reed, 32, company's wall screw, 33, New-type plate support, 34, adjustable unloading limit branch apical organ, 35, guiding branch Seat, 36, anti-fall device, 37, Z-shaped supporting ellipse shape and guide rail connecting hole, 38, Z-shaped support circle and vertical external riser connecting hole, 39, horizontal truss and vertical external riser connecting hole, 40, horizontal truss connecting hole, 41, with electric block platform sling connecting hole, 42, with Upright bar or guide rail connecting hole in frame body, 43, with walkway board connecting hole, 44, with turnover panel square tube connecting hole, 45, walkway board supporting plate with Slot is injected in square tube or interior upright bar connection on guide rail, square tube or interior upright bar connecting screw hole on 46, walkway board supporting plate and guide rail, and 47, walk Guidance tape supporting plate and walkway board connecting screw hole, 48, the support portion of walkway board supporting plate and walkway board lower surface, 49, Vertical Square guide To guide groove, 50, with aisle board bracket connecting hole, 51, turnover panel connecting square pipes and I-shaped prop or panel turnover device connecting hole 52 turn over Crab bolt, 53, turnover panel wirerope, 54, walkway board connect orifice plate, 55, walkway board square tube, 56, checkered steel plate, 57, lower suspension centre it is solid Determine orifice plate, 58, lower suspension centre pasting board, 59, support tube.
Specific embodiment
As shown in Figure 1, the present invention include support system, attachment guiding and Load Relief System, it is frame body lifting system, dual anti-fall System, construction protection system, electrical control system.
In the support system, 6, walkway board assembly 14 is mainly supported by guide rail 19, vertical upright bar, Z, anti-tilt device, is prevented Fall device is bolted, and the frame body lifting system includes the upper, middle and lower suspension centre of electric block elevator, cucurbit, Elevator uses Electric Chain Blocks, is equipped with horizontal truss 8 on frame body, the horizontal truss 8 at least with two outer vertical rods 12 are fastenedly connected, and mean level truss installa-tion is equipped with through the device of tower crane attached wall, is mounted on first of walkway board On tower crane walkway board in road second from the bottom, horizontal truss transverse direction will guarantee continuity.
As shown in figure 22, the rectangle frame that the walkway board assembly 14 is formed using connection orifice plate 54 and the welding of square tube 55 Frame, the width of the strip-shaped frame with it is vertical in the distance between upright bar 5 and vertical outer vertical rod 12 match, when so that installing, The square tube of two sides is engaged with vertical interior upright bar 5, vertical outer vertical rod 12 respectively, and multiple equidistant through-holes are provided in square tube 55, Square tube 55 is fixed on upright bar 7 or vertical outer vertical rod 12 in vertical for being connected by screw bolts structure;The one of rectangular frame Side is welded with checkered steel plate 56, forms the closed walkway board in top;Multiple through-holes are provided on the connection orifice plate 54, are used for Adjacent walkway board is connected with each other.
Above-mentioned support system is bolted, and frame body platform aisle has anti-skidding, fire-proof function, and frame body walks height can According to construction demand adjustment.
Attachment guiding and the Load Relief System system by guide rail, adjustable off-load limit branch apical organ, guide wheel group, wall-attached supporting seat and Through-wall bolt composition.
As shown in figure 14, on the cucurbit in the frame body lifting system suspension centre 2 be it is rod-shaped, both ends are welded with connecting plate, Middle one end connecting plate is provided with suspension centre and guide rail connecting hole 29 on cucurbit, and other end connecting plate is provided with suspension centre and interior upright bar on cucurbit and connects Connect hole 30, be welded with lifting hole(eyelet) plate in centre, suspension centre through-hole 31 on cucurbit is provided on lifting hole(eyelet) plate, on cucurbit suspension centre 2 and guide rail, After interior upright bar is joined with bolts, so that suspension centre 2 is located inside frame body on cucurbit, suspension centre through-hole 31 is towards building side on cucurbit To.
As shown in figure 19, the lower suspension centre 9 includes upper and lower two lateral square tubes and left and right two vertical square tubes solderings At frame, the vertical square tube and lateral square tube interconnecting part be welded with fixed orifice plate 57, the fixed orifice plate 57 be upwards or The outer structure stretched out under person, fixed orifice plate 57 and vertical square tube, lateral square tube knot point on the outside of be welded with pasting board 58, upper It is welded with lower suspension centre support in the middle part of one lateral square tube, lower suspension centre support is provided with electric block platform sling connecting hole 41, hangs instantly The point vertical square tube in 9 sides is fastened by upright bar in the bolt of fixed orifice plate 57 and frame body, and the vertical square tube in the other side passes through fixation hole After plate 57 and guide rail fastening, by electric block setting hanging inside frame body.
As shown in figure 12, the motor hoist including suspension centre 2, lower suspension centre 9 and middle suspension centre on cucurbit is arranged in frame body Portion, primary hanging need not be moved repeatedly, be blocked by steel walkway board, avoid drenching with rain and building mortar is stained, reduce electronic promotion Machine damages probability, greatly reduces the labor intensity of operator, and reduce operational hazards when hanging.Cable is relatively solid Surely leakage risk is also reduced;Mobile electric elevator is exempted from using integrated reverse, cancels elevator high-altitude transport process, prevents Falling object from high altitude extends the machinery equipment service life, reduces labor intensity.
Dual anti-drop system anti-drop system one: using eccentric impact formula catching device, passive to design theory of never falling;It is anti- Drop system two: adjustable unloading limit branch apical organ relies on the anti-fall lever lever of track always in climbing frame platform lifting process On, once there is climbing frame tenesmus because abnormal, then branch apical organ can withstand guide rail immediately, play the role of anti-tenesmus.Therefore the branch apical organ It is that Unloading Effect can be played the role of by operating condition in climbing frame platform, is played again in Lifting and lowering for scaffold operating condition anti-fall.
As shown in Figure 26,27, in the support system, it is attached at the aisle of the corresponding position of tower crane attached wall to be hinged with tower crane Wall overturns B panel assembly 10, is connected between the turning end and frame body of tower crane attached wall overturning B panel assembly 10 and tower crane attached wall is pulled to turn over The turnover panel wirerope 53 for turning the overturning positioning of B panel assembly 10 under normal condition as shown in figure 26 when will be by tower crane attached wall, be torn open Safe net frame is removed, tower crane attached wall overturning B panel assembly 10 and connection bolt are removed, tightening turnover panel steel wire restricts by force 53, forms Figure 27 institute Show structure, so that it may set back at once after tower crane attached wall by tower crane attached wall.
As shown in Figure 1, at least setting twice turnover panel is closed at the walkway board of frame body, between frame body and building Closing, wherein one turnover panel closing setting is in first of aisle, another road turnover panel closing setting third road aisle or according to Building needs to set.
As shown in figure 11, the docking location at docking between frame body guide rail and guide rail, upright bar and upright bar is not same Highly, in the present embodiment, the frame body guide rail docks the height of docking that height is higher than upright bar and upright bar with guide rail, guarantees frame body pair The node strength for connecing position is greater than or equal to the intensity of other nodes.
As shown in figure 17, Z support 6 is fixed with support tube 59, the support tube in the lower end for connecting vertical square tube 59 front end is welded with groove profile bent plate, and the slot of the groove profile bent plate is stuck on guide rail through Z-shaped supporting ellipse shape and guide rail connecting hole 37 connect fastening with guide rail with connection bolt, and Z-shaped support circle and vertical external riser connecting hole 38 are provided in vertical square tube.
As shown in Figure 22,23, the bottom of the walkway board assembly 14 is supported in aisle board bracket 18, the aisle board bracket 18 have walkway board support portion and with guide rail or interior upright bar interconnecting piece, wherein walkway board support portion is laterally to stretch to walkway board assembly Bottom, with guide rail or interior upright bar interconnecting piece there is vertical walkway board supporting plate to connect reeve slot with square tube on guide rail or interior upright bar 45 and walkway board supporting plate and guide rail on square tube or interior upright bar connecting screw hole 46.
As shown in figure 13, the electrical control system includes total control box, divides control cabinet, passes through sub-control system by total control box Case controls each electric block, so that each seat in the plane automatically adjusts travel distance, to the overload of each seat in the plane, loses to be loaded into and go in advance Alert and control, the control that guide rail Caton is alarmed and powered off.
Electrical control system is developed in strict accordance with " construction tool type scaffold technical specification of security " standard Lifting and lowering for scaffold early warning system, this system has the following characteristics that
1, each seat in the plane has synchronism;
2, each seat in the plane has automatic adjustment travel distance, and the distance for guaranteeing that each electric block seat in the plane is walked is equal 's;
3, each seat in the plane has overload, loses load early warning and control device;
4, there is guide rail Caton to alarm and power off, while is sent on the computer remotely monitored, and sound an alarm;Work as guide rail When Caton, which can become larger suddenly, main control box, issue alarm sound, report the failure of the seat in the plane, and Power-off, prevents wall-attached supporting seat architecture storey drawing crack;
5, the system can also be monitored remotely, and monitoring content has: every time lifting when time, load, the distance of lifting, It is whether faulty, can also remote repairing fault code, the data gone up and down every time can also be printed, convenient for the maintenance of later stage work And operation.Signal acquisition is connect using single twisted-pair shielded wire and multiple monitoring points with main controller, pc machine, and remote transmission is anti-dry Ability is strong, exempts the multi-thread connection of construction site multiple spot, more adaptation complex working condition.
As shown in figure 20, the fire safety screen frame 11 in the construction protection system uses plastic-spraying fire safety screen frame, climbs Body panel construction protection system by plastic-spraying fire safety screen frame, anti-slip steel walkway board, Z-type bent plate security seal steel protection turnover panel and Bolt is connected to constitute.
As shown in Figure 15,16, wall-attached supporting seat uses dual anti-drop system, anti-drop system 1: anti-fall using eccentric impact formula Device, passive to design theory of never falling, fully automatic working is completed to prevent catching device human failure;Anti-drop system 2: adjustable Unloading limit branch apical organ relies in climbing frame platform lifting process always on the anti-fall lever lever of track, once because of abnormal appearance Climbing frame tenesmus, then branch apical organ can withstand guide rail immediately, play the role of anti-tenesmus.Therefore the branch apical organ is by operating condition in climbing frame platform It can play the role of Unloading Effect, be played again in Lifting and lowering for scaffold operating condition anti-fall.
As shown in Figure 24,25, T-type Track desigh and guide holder slide into formula cooperation, and guide holder is designed using double rollers, solve Put the problem of tumbling, the operation up and down of guide rail intelligence, securely and reliably, reduce it is unexpected occur, cooperation guide holder electrodeless adjustment frame body from The distance of building.

Claims (10)

1. a kind of all steel intelligent building construction lifting platform, including support system, attachment guiding and Load Relief System, frame body promote system System, dual anti-drop system, construction protection system, electrical control system, in the support system, mainly by guide rail (19), vertical Upright bar, Z support (6), walkway board assembly (14), anti-tilt device, anti-fall device are bolted, and the frame body promotes system System includes the upper, middle and lower suspension centre of electric block elevator, cucurbit, and elevator uses Electric Chain Blocks, it is characterised in that: It is equipped on frame body horizontal truss (8), the horizontal truss (8) is at least fastenedly connected with two outer vertical rods (12);Described walks Guidance tape assembly (14) using connection orifice plate (54) and square tube (55) welding formed rectangular frame, the width of the rectangular frame with The distance between upright bar (5) and vertical outer vertical rod (12) match in vertical, and when so that installing, the square tube of two sides is respectively and vertically Interior upright bar (5), vertical outer vertical rod (12) engagement, are provided with multiple equidistant through-holes on square tube (55), for being connected using bolt Square tube (55) is fixed on upright bar (5) or vertical outer vertical rod (12) in vertical by binding structure;It is welded in the side of rectangular frame Checkered steel plate (56) forms the closed walkway board in top;Multiple through-holes are provided on the connection orifice plate (54), for adjacent Walkway board be connected with each other;Suspension centre (2) is rod-shaped on cucurbit in the frame body lifting system, and both ends are welded with connecting plate, Middle one end connecting plate is provided with suspension centre and guide rail connecting hole (29) on cucurbit, and other end connecting plate is provided with suspension centre and interior upright bar on cucurbit Connecting hole (30) is welded with lifting hole(eyelet) plate in centre, suspension centre through-hole (31) on cucurbit, the suspension centre on cucurbit is provided on lifting hole(eyelet) plate (2) after being joined with bolts with guide rail, interior upright bar, so that suspension centre (2) is located inside frame body on cucurbit, suspension centre through-hole on cucurbit (31) towards building direction, the lower suspension centre (9) includes upper and lower two lateral square tubes and left and right two vertical square tubes solderings At frame, the vertical square tube and lateral square tube interconnecting part be welded with fixed orifice plate (57), the fixed orifice plate (57) be to The structure of upper or lower outer stretching is welded with pasting board in the knot point outside of fixed orifice plate (57) and vertical square tube, lateral square tube (58), lower suspension centre support is welded in the middle part of upper one lateral square tube, lower suspension centre support is provided with electric block platform sling connecting hole (41), the vertical square tube in suspension centre (9) side is fastened by fixed orifice plate (57) with upright bar in bolt and frame body instantly, and the other side is vertical After square tube is by fixed orifice plate (57) and guide rail fastening, by electric block setting hanging inside frame body;In the support system, Tower crane attached wall overturning B panel assembly (10) is hinged at the aisle of the corresponding position of tower crane attached wall, in tower crane attached wall overturning B plate dress Set the turnover panel wirerope for being connected between the turning end and frame body of (10) and pulling tower crane attached wall overturning B panel assembly (10) overturning positioning (53).
2. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: the horizontal truss (8) It is mounted on the first walkway board.
3. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: the horizontal truss (8) It is mounted on tower crane walkway board in road second from the bottom.
4. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: at the walkway board of frame body At least setting twice turnover panel is closed, wherein one turnover panel closing setting is in first of aisle, another road turnover panel closing setting is the Three aisle need to set according to building.
5. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: frame body guide rail with lead The docking location for docking place between rail, upright bar and upright bar is not in sustained height.
6. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: the Z support (6) exists The lower end for connecting vertical square tube is fixed with support tube (59), and the front end of the support tube (59) is welded with groove profile bent plate, the groove profile The slot of bent plate, which is stuck on guide rail, connect fastening with guide rail with connection bolt by Z-shaped supporting ellipse shape and guide rail connecting hole (29), Z-shaped support circle and vertical external riser connecting hole (38) are provided in vertical square tube.
7. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: the walkway board assembly (14) bottom is supported in aisle board bracket (18), the aisle board bracket (18) have walkway board support portion and with guide rail or interior Upright bar interconnecting piece, wherein walkway board support portion is the bottom for laterally stretching to walkway board assembly, is had with guide rail or interior upright bar interconnecting piece There is vertical walkway board supporting plate to connect with square tube on guide rail or interior upright bar and injects square tube on slot (45) and walkway board supporting plate and guide rail Or interior upright bar connecting screw hole (46).
8. all steel intelligent building construction lifting platform according to claim 5, it is characterised in that: the frame body guide rail with lead What rail docking height was higher than upright bar and upright bar docks height.
9. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: the construction protection system In fire safety screen frame (11) use plastic-spraying fire safety screen frame.
10. all steel intelligent building construction lifting platform according to claim 1, it is characterised in that: the electrical equipment control system System includes total control box, divides control cabinet, by total control box by dividing control cabinet to control each electric block, so that each Seat in the plane automatically adjusts travel distance, is loaded into row early warning and control to the overload of each seat in the plane, mistake, the control that guide rail Caton is alarmed and powered off System.
CN201721710836.6U 2017-12-11 2017-12-11 All steel intelligent building construction lifting platform Active CN208235927U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721710836.6U CN208235927U (en) 2017-12-11 2017-12-11 All steel intelligent building construction lifting platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721710836.6U CN208235927U (en) 2017-12-11 2017-12-11 All steel intelligent building construction lifting platform

Publications (1)

Publication Number Publication Date
CN208235927U true CN208235927U (en) 2018-12-14

Family

ID=64579111

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721710836.6U Active CN208235927U (en) 2017-12-11 2017-12-11 All steel intelligent building construction lifting platform

Country Status (1)

Country Link
CN (1) CN208235927U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797958A (en) * 2019-02-26 2019-05-24 彭绍华 Intelligent and safe elevating scaffold
CN111910905A (en) * 2020-08-26 2020-11-10 恒强(天津)模架有限公司 Vertical main frame of lifting operation safety protection platform for high-rise building construction
CN112093228A (en) * 2020-09-21 2020-12-18 苏州市吴中区教育印刷有限公司 Environment-friendly high strength packing carton

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797958A (en) * 2019-02-26 2019-05-24 彭绍华 Intelligent and safe elevating scaffold
CN111910905A (en) * 2020-08-26 2020-11-10 恒强(天津)模架有限公司 Vertical main frame of lifting operation safety protection platform for high-rise building construction
CN112093228A (en) * 2020-09-21 2020-12-18 苏州市吴中区教育印刷有限公司 Environment-friendly high strength packing carton

Similar Documents

Publication Publication Date Title
CN208235927U (en) All steel intelligent building construction lifting platform
CN103375023A (en) Attached type lifting scaffold
CN103230655B (en) A kind of hanging-basket-type high-rise device
CN104074349B (en) A kind of new-type protection type attachment type raise scaffold
CN102886107A (en) Firefighting and lifesaving device for high-rise building
CN102671333B (en) Wall-climbing fire-fighting robot for high-rise buildings
CN202627466U (en) Adhesion type lifting scaffold
CN112431399A (en) Hanging basket for building outer wall and mounting method thereof
CN208814562U (en) A kind of visualization formula glass curtain wall plate vertical transit system
CN112761348A (en) Hanging basket suspension system without counter weight and installation method
CN209538646U (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN107522062A (en) A kind of installation construction method for elevator
CN204081437U (en) Climbing scaffold falling proof device
CN104153586B (en) A kind of suspension cable hangs the construction method of mounting purlines
CN202099993U (en) Lift type external scaffold made of square steel pipes
CN102168484A (en) External hanging scaffold and application method thereof
CN104652803B (en) Attached electric lifting guide rail scaffold
CN209145256U (en) The dedicated climbing frame of assembled architecture
CN202214974U (en) 5.8 m ultrahigh external climbing frame
CN204418629U (en) Integrated form climbs frame
CN205577383U (en) Attached lifting scaffold
CN203924662U (en) A kind of attaching integral lifting scaffold
CN109629813A (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN109653484A (en) A kind of roofing superelevation faces the plug-in hanging basket mounting structure of sky curtain wall engineering
CN108888889A (en) A kind of control of high-rise building ground exterior wall lift fire-fighting spraying, hanging basket escape device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: Keelung Village Industrial Park, Liuzhou City, Iraq Liunan District No. 2 the Guangxi Zhuang Autonomous Region 545000

Patentee after: Guangxi mutual construction equipment Technology Co., Ltd.

Address before: Keelung Village Industrial Park, Liuzhou City, Iraq Liunan District No. 2 the Guangxi Zhuang Autonomous Region 545000

Patentee before: Guangxi mutual building materials Co., Ltd. Heng