CN109797958A - Intelligent and safe elevating scaffold - Google Patents
Intelligent and safe elevating scaffold Download PDFInfo
- Publication number
- CN109797958A CN109797958A CN201910167603.3A CN201910167603A CN109797958A CN 109797958 A CN109797958 A CN 109797958A CN 201910167603 A CN201910167603 A CN 201910167603A CN 109797958 A CN109797958 A CN 109797958A
- Authority
- CN
- China
- Prior art keywords
- intelligent
- vertical frame
- main vertical
- pipe
- safe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Abstract
The present invention relates to the elevating scaffolds of intelligent and safe material-saving saving of labor, are to hang over the mechanism that lifting is built on tall building wall outside by it.Than adhesion type climbing frame safety more labor and material saving, and it is equipped with intelligent apparatus and further decreases cost of labor and promote safety.Because invention has used intelligent safe practice, labor and material saving, operation readiness are realized, the problem of reduction extends the duration because of process conflict, the decline of production and construction cost is obvious, now by the lifting of above-mentioned intelligent and safe elevating scaffold, the device elaboration of fall arrest, Anti-inclining, saving of labor, material-saving.The flat tube main vertical frame [calling main vertical frame in the following text] of scaffold is welded with hook and cross bar, cross bar with step on pipe and pipe thread connect after, installation steel cable and lifting pulley and electric device.Step on the brace that pipe is equipped with load-bearing.
Description
[field] the present invention relates to the elevating scaffolds of intelligent and safe material-saving saving of labor, are outer hang on tall building wall by it
The building mechanism of lifting.Than adhesion type climbing frame safety more labor and material saving, and be equipped with Intelligent sensing device further decrease manually at
This and promotion are safe.
Scaffold well known to [background] has very much, such as early stage bamboo-wood frame, mid-term steel pipe frame, present adhesion type climbing frame.When
Preceding climbing frame is very fast using development, but there is also many defects, and main materials are on the high side, and recruitment is more expensive, and the construction ending duration is longer, respectively
Procedure conflict phenomenon is more, lacks artificial intelligence mechanism.Such as tiling, water, electricity, gas, communication are installed, facility can interact
Duration of a project normally delivers.
[purpose the invention is realized in this way, building stratum concrete column or concrete beam be arranged built-in fitting locating slot punching block
Plate, track base main force frame, derricking gear, anti-fall, anti-offset mechanism, artificial intelligence equipment reduce cost of labor and material cost,
Drop to various processes conflict lower.Hook and sensor and smart box, hook and the catching device on track base are set on main vertical frame
In conjunction with, catching device oil pressure cylinder can be swung up and down with the lifting of main vertical frame, and there is reinforcement brace in one end on cross bar, main vertical frame is connected,
Drag-line bridge of its shape as large span.Reach i.e. reduction steel pipe dosage, and the pipe of stepping on of load can be made to carry external weight power.Not only
Catching device on track base have it is upper fastly under slow characteristic, there are also the effects for controlling main vertical frame upward drift, realize safe operation
Realize material-saving, saving of labor and intelligence.
[scheme] realizes labor and material saving because invention has used intelligent safe practice, and operation readiness is reduced because of work
Sequence conflict and the problem of extend the duration, the decline of production and construction cost is obvious, now by (the following letter of above-mentioned intelligent and safe elevating scaffold
Claim scaffold) lifting, fall arrest, Anti-inclining, saving of labor, material-saving device illustrate.The flat tube main vertical frame of scaffold [is called in the following text main vertical
Frame] equipped with hook and cross bar, cross bar with step on pipe and pipe thread connect after, steel cable and lifting pulley and electric machine are installed.It steps on pipe
Brace equipped with load-bearing, brace middle part are connect with cross bar, and end is connect with pipe is stepped on.Riding boogie board is additionally arranged on stepping on pipe.When foot hand
Frame rises, and the hook on main vertical frame will automatically disengage catching device.When being raised to the equidistant built-in fitting area of a upper floor, the biography in catching device area
Sensor is issued an order, and motor reversal aft hook tangles the catching device on upper layer.Since built-in fitting track base, anti-bias directive wheel and catching device are
It is located at each section above main riser equidistant positioning.Each one layer of the liter of hook all can precisely be fallen in one layer of catching device.It is main
When stand and hook are surprisingly broken in rising operation such as steel cable, catching device can prevent and block hook and scaffold falls.
[effect] is with reference to the accompanying drawings and examples described in further detail invention: Fig. 1 is main view of the invention,
Fig. 2 is side view, and Fig. 3 is mansion view, and Fig. 4 is partial enlargement, and Fig. 5 is catching device and standpipe section.Fig. 6 is through-hole fastening screw.Fig. 7
It is bolt side, Fig. 8 is U-shaped item, and Fig. 9 is U-shaped side.
[drawing explanation] main vertical frame (1), track base (3), hook (4), cross bar (5), steps on pipe (6), oblique pull at built-in fitting (2)
Muscle (7), pulley (9), steel cable (10), elevator (11), riding boogie board (12), adjusts screw (13), protective net 14, guardrail at catching device (8)
(15), sensor (16), bracket (17), support turn device (18), channel steel (19), steel cable hook (20), U-shaped item (21), through-hole positioning pin
(22) standpipe (23), bolt (24), motor (25), screw rod (26), oil pressure cylinder (27), directive wheel (28),
[implementation] main vertical frame (1) hook (4) catching device (8) track base (3) built-in fitting (2) bolt (24) is connected it
It is locked in the identical equidistant position of main vertical frame (1) with through-hole positioning pin (22) afterwards, concrete is prevented to be poured shift.On main vertical frame (1)
It steps on pipe (6) and reduces standpipe (23) quantity equipped with triangle brace (7).It is fast that catching device (8) has oil pressure cylinder (25) to realize that intelligence rises
Slow down function.Main vertical frame (1) bottom turns device (18) with channel steel (19) support and is connected, and realizes and accurately installs in ground energy Portable safety.Foot
Main vertical frame (1) hook (4) in hand cradle is hung on catching device (22).Catching device (8) track base (3) built-in fitting (2) bolt (24)
Same position is locked them in through-hole positioning pin (22) after being connected, waits concretes to do after built-in fitting (2) is embedded to by Cast-in-place concrete
Gu motor (25) elevator (11) on main vertical frame (1) starts, main vertical frame (1) is raised to upper layer by rope hook (20) pulley (9) fastly
Built-in fitting (2) region, hook (4) tangle catching device (8) and are locked with through-hole positioning pin (22) when downward.Track base (3) is main vertical
Pipe (5) outer end dress U-shaped item (21) is stepped on frame (1).A group and two scaffolds of B group are to divide the parallel construction that can be closed up and down.It
Two groups, which are fixed, after positioning in U-shaped item steps on pipe (5) anastomosis.Positioning action when being gone up and down there are also A group or B group.
Pipe (6) of stepping on main vertical frame (1) can be with room width adjustment distance, and reducing standpipe (23) cost is to use brace
(7) and adjusting screw (13) realize.Brace (7) middle section adjusting screw (13) and main vertical frame (1) are connected with adjustment screw (13)
It connects on cross bar (5).It steps on pipe (6) adjustment screw (13) needed for having brace (7) to engage with (1) upper layer on main vertical frame, two
It holds and steps on pipe (6) corresponding position and engage to form triangle hanging shape, reach and save standpipe (23) purpose.It steps on and auxiliary on pipe (6) puts riding boogie board
(12) guardrail (15) protective net (14) is then set, main force's frame (1) is when ground is installed and the channel steel (19) of the location hole of setting is pre-buried
Part (2) support turns device (24) and is connected.On ground concrete beam, the more convenient precise and safety when main vertical frame (1) is installed on ground.Main vertical frame
(1) with flat tube (29) and hook (4) cross bar (5) screw rod (26) fastening.It prevents the deformation of weldering knot and reduces traffic expense.
Claims (8)
1. the intelligent and safe elevating scaffold according to claim, it is characterized in that: main vertical frame (1) hook (4) catching device (8)
Track base (3) built-in fitting (2) bolt (24), which is connected, is locked in main vertical frame (1) equidistant position with through-hole positioning pin (22) later, main
The flat tube (29) and hook (4) cross bar (5) of stand (1) are fastened with screw rod (26), are prevented weldering knot deformation, can also be reduced traffic expense.
2. intelligent and safe elevating scaffold according to claim 1 is it is characterized in that: catching device (8) has oil pressure cylinder (27) realization
Intelligence rises and slows down function fastly.
3. intelligent and safe elevating scaffold according to claim 2 is it is characterized in that: main vertical frame (1) is mounted in the U of track base (3)
In shape hole, realize that control main vertical frame (1) positioned-lifting and anti-deflection and sliding in track base (3) act on directive wheel (28).
4. intelligent and safe elevating scaffold according to claim 3 is it is characterized in that: main vertical frame (1) bottom and channel steel (19) are held in the palm
Turn device (18) to be connected, realizes and accurately installed in ground energy Portable safety.
5. intelligent and safe elevating scaffold according to claim 4 is it is characterized in that: main vertical frame (1) is equipped with limit sensors
(16), (4) are linked up with when scaffold is raised to setting floor, and limit sensors (16) can be such that elevator declines accurately fall in catching device
(8) in.
6. intelligent and safe elevating scaffold according to claim 5 is it is characterized in that: the cross bar (5) on main vertical frame (1) is set
Pipe (6) are stepped on equipped with brace (7), adjustment screw (13) can adjust well-distributed pressure.
7. intelligent and safe elevating scaffold according to claim 6 is it is characterized in that: step on pipe (6) pipe end equipped with wide according to room
The U-shaped item (21) of narrow different and adjustable scaffold can be realized.
8. intelligent and safe elevating scaffold according to claim 7 is it is characterized in that: step on pipe (5) outer end on main vertical frame (1)
Fill U-shaped item (21), be A group and two scaffolds of B group can divide the structure that can be closed, fix two groups step on pipe (5) with couple and go up and down
Positioning action.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910167603.3A CN109797958A (en) | 2019-02-26 | 2019-02-26 | Intelligent and safe elevating scaffold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201910167603.3A CN109797958A (en) | 2019-02-26 | 2019-02-26 | Intelligent and safe elevating scaffold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109797958A true CN109797958A (en) | 2019-05-24 |
Family
ID=66562632
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201910167603.3A Pending CN109797958A (en) | 2019-02-26 | 2019-02-26 | Intelligent and safe elevating scaffold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109797958A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2782837Y (en) * | 2005-03-10 | 2006-05-24 | 深圳市特辰升降架工程有限公司 | Integral lifting form-climbing platform system |
CN201826516U (en) * | 2010-10-28 | 2011-05-11 | 崔玉平 | Novel attached lifting scaffold |
CN102108784A (en) * | 2011-03-18 | 2011-06-29 | 北城致远集团有限公司 | Special attached lifting scaffold |
KR20180023218A (en) * | 2016-08-25 | 2018-03-07 | 이경화 | Elevating type cage for architecture |
CN208235927U (en) * | 2017-12-11 | 2018-12-14 | 广西互恒建筑材料有限公司 | All steel intelligent building construction lifting platform |
CN208518310U (en) * | 2018-07-10 | 2019-02-19 | 宁夏天鹰同创建筑技术有限公司 | All steel type attachment type raise scaffold |
-
2019
- 2019-02-26 CN CN201910167603.3A patent/CN109797958A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2782837Y (en) * | 2005-03-10 | 2006-05-24 | 深圳市特辰升降架工程有限公司 | Integral lifting form-climbing platform system |
CN201826516U (en) * | 2010-10-28 | 2011-05-11 | 崔玉平 | Novel attached lifting scaffold |
CN102108784A (en) * | 2011-03-18 | 2011-06-29 | 北城致远集团有限公司 | Special attached lifting scaffold |
KR20180023218A (en) * | 2016-08-25 | 2018-03-07 | 이경화 | Elevating type cage for architecture |
CN208235927U (en) * | 2017-12-11 | 2018-12-14 | 广西互恒建筑材料有限公司 | All steel intelligent building construction lifting platform |
CN208518310U (en) * | 2018-07-10 | 2019-02-19 | 宁夏天鹰同创建筑技术有限公司 | All steel type attachment type raise scaffold |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204958134U (en) | Prefabricated floor plate special hoisting bar | |
CN103630416B (en) | The test platform of hoisting mechanism | |
CN208792758U (en) | A kind of huge column climbing apparatus | |
CN111021749A (en) | Simple hoisting mechanism for bare concrete exterior wall cladding and construction method thereof | |
CN103104090B (en) | Silo concrete whole slip template | |
CN104153586B (en) | A kind of suspension cable hangs the construction method of mounting purlines | |
CN105347142B (en) | A kind of building hoist is mounted on the threading installation method on basement roof | |
CN107086474B (en) | Meter box installation power assisting device | |
CN109797958A (en) | Intelligent and safe elevating scaffold | |
CN205936608U (en) | Vertical shaft concrete and quick slip form construction device of rock mass grout | |
CN110184937B (en) | Hydraulic creeping formwork construction method based on digital control | |
CN202441045U (en) | Rail-type electric attached lifting scaffold | |
CN211143073U (en) | High-precision vertical pile positioning and verticality adjusting device | |
CN208563968U (en) | A kind of rectangle chimney twin-well frame displacement type template integral lifting apparatus | |
CN208934377U (en) | Roof flower set a roof beam in place on without counterweight nacelle device | |
US4205826A (en) | Lifting and supporting apparatus for a tower crane | |
CN202831621U (en) | Integrated slipform for silo concrete | |
CN109941933A (en) | A kind of hoisting frame for workshop Pipe installing | |
CN206458074U (en) | A kind of aerial work basket outer support support | |
CN214144786U (en) | A reinforcement auxiliary device for job site | |
CN113833259A (en) | Limestone warehouse engineering slip form structure and special construction scheme thereof | |
CN209855194U (en) | Portable construction scaffold | |
CN208415895U (en) | The scalable general operation platform of elevator | |
CN206636149U (en) | The tier building built of small-sized crane is installed | |
CN201292656Y (en) | Inner formwork construction support of shaft |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190524 |
|
WD01 | Invention patent application deemed withdrawn after publication |