CN209538646U - A kind of arc gradual change is interior to receive structure attached lifting scaffold - Google Patents

A kind of arc gradual change is interior to receive structure attached lifting scaffold Download PDF

Info

Publication number
CN209538646U
CN209538646U CN201920008655.1U CN201920008655U CN209538646U CN 209538646 U CN209538646 U CN 209538646U CN 201920008655 U CN201920008655 U CN 201920008655U CN 209538646 U CN209538646 U CN 209538646U
Authority
CN
China
Prior art keywords
scaffold
floor
support beam
gradual change
ontology
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920008655.1U
Other languages
Chinese (zh)
Inventor
黄鸿鹏
徐学东
李超
胡竹稳
卫自康
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fifth Engineering Bureau Co Ltd
Original Assignee
China Construction Fifth Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fifth Engineering Bureau Co Ltd filed Critical China Construction Fifth Engineering Bureau Co Ltd
Priority to CN201920008655.1U priority Critical patent/CN209538646U/en
Application granted granted Critical
Publication of CN209538646U publication Critical patent/CN209538646U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Movable Scaffolding (AREA)

Abstract

The utility model discloses a kind of interior receipts structure attached lifting scaffold of arc gradual change, scaffold is attached on each layer floor for receiving construction in arc gradual change, it is received in successively relative to the edge of lower floor at the edge of upper floor, support beam is installed at least two layers of floor, and the support beam of each layer is leant out from the edge on each layer floor, it is located in same vertical plane from the support beam end face that the edge of lower floor is leant out and from the support beam end face that the edge of upper floor corresponding position is leant out, one end that support beam is leant out is equipped with guide type shoe, sliding in the pilot hole of guide type shoe vertically-mounted has guide rail, side on guide rail far from floor is installed by scaffold ontology, it further include elevating mechanism, elevating mechanism is able to drive guide rail and scaffold ontology and goes up and down along the pilot hole of guide type shoe.It tiltedly climbs utility model has the advantages that becoming directly to climb up and down, dexterously solves the problems, such as very much in arc gradual change that receipts construction is difficult to protect, scaffold climbs difficulty.

Description

A kind of arc gradual change is interior to receive structure attached lifting scaffold
Technical field
The utility model relates to building fields, and in particular to a kind of arc gradual change is interior to receive structure attached lifting scaffold.
Background technique
Today that high level, super high-rise building are grown rapidly in city, attachment type raise scaffold has obtained more and more extensive Application, but the attachment type raise scaffold construction that structure is received in arc gradual change is looked into and is newly had not been reported at home, is lacked similar Engineering construction reference.The building that structure is received in arc gradual change, received since a certain floor, in every layer it is primary, from the bottom up by It is received in layer, as shown in figure 5, four faces of such building are in internally curved arcuate structure, and the quadrangle of building is then The arcuate structure being bent outwardly, just because of the particularity for receiving structure in this arc gradual change, according to attachment type raise scaffold Tiltedly to climb, four side inner arcs of scaffold are longer with floor lift rack body length, and the increased range of frame body can only be located in the middle part of four sides, And four angle outer arcs reduce with floor lift rack body length.Therefore according to tiltedly climbing, frame body is classified into multistage and is promoted, fracture Position is more, and there are biggish security risks.Therefore, it is faced when receiving the construction of structure attachment type raise scaffold in this arc gradual change Frame body climbs the problems such as being difficult to totally-enclosed protection at difficult, arc, brings very big difficulty to site operation.
Utility model content
It is difficult to prevent technical problem to be solved by the utility model is: receiving construction in arc gradual change in the prior art Shield, scaffold climb difficult problem.
In order to solve the above technical problems, technical solution adopted in the utility model is: a kind of arc gradual change is interior to receive structure Attached lifting scaffold, scaffold are attached on each layer floor for receiving construction in arc gradual change, the edge of upper floor Edge relative to lower floor is received in successively, is equipped with support beam, and the support beam of each layer at least two layers of floor Leant out from the edge on each layer floor, the support beam end face leant out from the edge of lower floor with from upper floor corresponding position The support beam end face that edge is leant out is located in same vertical plane, and one end that support beam is leant out is equipped with guide type shoe, guiding Slided in the pilot hole of support it is vertically-mounted have a guide rail, scaffold ontology is installed in the side on guide rail far from floor, further includes rising Descending mechanism, elevating mechanism are able to drive guide rail and scaffold ontology and go up and down along the pilot hole of guide type shoe.
Further, it is provided with the first mounting hole on the floor, the second mounting hole is provided in support beam, bolt is worn It is threaded together after crossing the first mounting hole, the second mounting hole with nut.
Further, one end that the support beam is leant out is connect with its upper floor by support beam pull rod.
Further, the anti-fall device for preventing guide rail from dropping is provided on the guide type shoe.
Further, the anti-fall device includes the top pillar that first end is hinged on guide type shoe, transverse direction on the guide rail It is provided with transverse tube, the articulated shaft of top pillar is parallel to transverse tube, and the second end of top pillar is provided with the groove with transverse tube cooperation, top pillar Second end is withstood on transverse tube by groove.
Further, working face has been built on the scaffold ontology, working face is hingedly provided with close to the one end on floor The articulated shaft of turnover panel, turnover panel is located in horizontal plane, and the width of turnover panel is greater than the spacing between working face and floor.
Further, pass through oblique rope between the one end on floor and the scaffold ontology above turnover panel on the turnover panel Connection.
Further, it is connected between the bottom of the turnover panel and the scaffold ontology below turnover panel by support rod.
It further, further include that tower crane of the scaffold ontology far from floor side is set, the tower crane is attached by tower crane Arm is connected on building, and the tower crane attached arm passes through scaffold ontology, has been built working face on the scaffold ontology, has been located at Overturning suspension bridge is provided at working face over and under tower crane attached arm, the overturning suspension bridge is hinged on working face, and is overturn The articulated shaft horizontal distribution of suspension bridge, when the gap that overturning suspension bridge is formed when starting around articulated shaft can guarantee the lifting of scaffold ontology Tower crane attached arm passes through.
Further, the elevating mechanism includes the movable pulley being arranged on scaffold ontology, further includes being wound on movable pulley On drawstring, the traction device that is arranged in above movable pulley, the first end of drawstring is connected in the support beam above movable pulley, The second end of drawstring is connected on the traction end of traction device.
The utility model has the beneficial effects that:
1. the support beam end face leant out in the utility model from the edge of lower floor with from upper floor corresponding position The support beam end face that leans out of edge be located in same vertical plane, one end that support beam is leant out is equipped with guide type shoe, leads Slided into the pilot hole of support it is vertically-mounted have a guide rail, scaffold ontology is installed in the side on guide rail far from floor, further includes Elevating mechanism, elevating mechanism are able to drive guide rail and scaffold ontology and go up and down along the pilot hole of guide type shoe, make guide rail and foot hand Frame ontology can be gone up and down relative to building along vertical direction, and then overcome building itself and be not suitable for the defect tiltedly climbed, Change is tiltedly climbed directly to climb up and down, dexterously solves very much that receipts construction in arc gradual change is difficult to protect, scaffold climbs difficulty Problem;
2. support beam is mounted on floor by bolt, nut, structure, principle are simple, and are convenient to mount and dismount, operating efficiency It is high, at low cost;
3. the setting of support beam pull rod increases the rigidity and stability of support beam, consolidate total more, Reliably;
It, can be firmly by guide rail and scaffold 4. anti-fall device can prevent guide rail and the improper tenesmus of scaffold ontology Ontology is fixed on a certain height, and then operator is facilitated to carry out corresponding operating to building;
5. guide rail and scaffold ontology be fixed on a certain height using top pillar, and then play the role of anti-fall, structure is simple, Anti-sagging reliability;
6. scaffold is gone up and down, turnover panel is turned up, and then prevents turnover panel and building when lifting from generating interference, scaffold is solid Surely after arriving a certain height, turnover panel is stretched out and is ridden on floor, and then realize the seamless connection of scaffold and floor, facilitate worker Operation reduces the generation for the safety accidents such as fall;
7. on the one hand the setting of oblique rope further ensures the safety for riding over floor flap, on the other hand can guarantee The safety of turnover panel between upper layer and lower layer floor allows worker very easily to stand and is accordingly grasped in hanging turnover panel Make;
8. support rod can further enhance the stability of turnover panel, safety;
9. high-rise is usually provided with tower crane in the construction process, tower crane is connected to building by tower crane attached arm On, during lifting, tower crane attached arm can interfere to be positioned above and the working face of lower section passes through scaffold, is overturn The setting of suspension bridge then can guarantee tower when the gap formed when overturning suspension bridge is started around articulated shaft can guarantee the lifting of scaffold ontology It hangs attached arm to pass through, guarantees that the case where working face does not interrupt and very good solution tower crane attached arm are asked with what working face was interfered Topic;
10. traction device works, gradually drawstring is shunk, the entirety that scaffold can be realized is climbed, and structure is simple, behaviour Facilitate.
Detailed description of the invention
Fig. 1 is a kind of interior schematic diagram for receiving structure attached lifting scaffold of arc gradual change in the utility model embodiment;
Fig. 2, which is that a kind of arc gradual change is interior in the utility model embodiment, receives the signal after structure attached lifting scaffold climbs Figure;
Fig. 3 is the operation schematic diagram of top pillar in the utility model embodiment;
Fig. 4 is the top view of guide type shoe and guide rail cooperation in the utility model embodiment;
Fig. 5 is receipts structure attached lifting scaffold in arc gradual change a kind of in the utility model embodiment around building Distribution schematic diagram;
Fig. 6 is I partial enlarged view in Fig. 5;
Fig. 7 is the main view of overturning suspension bridge and tower crane attached arm distribution in the utility model embodiment;
Fig. 8 is the top view of overturning suspension bridge and tower crane attached arm distribution in the utility model embodiment;
Fig. 9 is main view when overturning suspension bridge starts in the utility model embodiment;
Figure 10 is top view when overturning suspension bridge starts in the utility model embodiment;
Wherein, floor -1, support beam -2, guide type shoe -3, guide rail -4, scaffold ontology -5, elevating mechanism -6, tower Hang the -7, first mounting hole -11, the second mounting hole -21, bolt -22, nut -23, support beam pull rod -24, top pillar -31, cross Pipe -41, working face -51, turnover panel -52, oblique rope -53, support rod -54, overturning suspension bridge -55, suspension bridge drag-line -56, capstan winch -57, Movable pulley -61, drawstring -62, traction device -63, tower crane attached arm -71.
Specific embodiment
The utility model is described in detail below in conjunction with attached drawing.
In the description of the present invention, it should be noted that the orientation of the instructions such as term " on ", "lower", "vertical" or Positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of describing the present invention and simplifying the description, Rather than the device or element of indication or suggestion meaning must have a particular orientation, be constructed and operated in a specific orientation, because This should not be understood as limiting the present invention.
As shown in Fig. 1,5,6, a kind of arc gradual change is interior to receive structure attached lifting scaffold, and scaffold is attached in gradual change and receives On each layer floor 1 of construction, the edge of upper floor 1 is received in successively relative to the edge of lower floor 1, each foot hand Frame includes support beam 2, guide type shoe 3, guide rail 4, scaffold ontology 5, elevating mechanism 6, further includes tower crane 7, and the tower crane 7 is logical It crosses tower crane attached arm 71 to be connected on building, the vertical dotted line drawn upwards in Fig. 1-2 from the edge on bottom one layer of floor 1 is i.e. It can show in floor 1 is successively from bottom to top and receive, described "inner" refers to that, to interior of building, "outside" refers in the utility model Be outside building, " edge " refers to edge of the every layer of building outside building.
Support beam 2 is installed at least two layers of floor 1, as shown in Figs. 1-2, on continuous three layers of floor in the present embodiment Support beam 2 is installed, and the support beam 2 of each layer is leant out from the edge on each layer floor 1, is leant out from the edge of lower floor 1 on 1 2 end face of support beam be located at same vertical plane with 2 end face of support beam that leans out from the edge of 1 corresponding position of upper floor Interior, one end that support beam 2 is leant out is equipped with guide type shoe 3, and it is vertical to slide as shown in Figure 3-4, in the pilot hole of guide type shoe 3 Guide rail 4 is installed, it further includes elevating mechanism 6,6 energy of elevating mechanism that scaffold ontology 5 is installed in the side far from floor 1 on guide rail 4 Guide rail 4 and scaffold ontology 5 is enough driven to go up and down along the pilot hole of guide type shoe 3.
As shown in Figs. 1-2, support beam 2 is mounted in the following manner on floor 1 in the present embodiment: on the floor 1 It is provided with the first mounting hole 11, the second mounting hole 21 is provided in support beam 2, bolt 22 passes through the first mounting hole 11, second It is threaded together after mounting hole 21 with nut 23, support beam 2 is mounted on by floor 1, structure, principle by bolt 22, nut 23 Simply, it and is convenient to mount and dismount, operating efficiency is high, at low cost.One end and its upper floor 1 that the support beam 2 is leant out pass through branch It supports beam tie bar 24 to connect, the setting of support beam pull rod 24 increases the rigidity and stability of support beam 2, makes whole knot Structure is more firm, reliable, and the first end of support beam pull rod 24 is connected thereto layer floor 1 by bolt and nut in the present embodiment On, the second end of support beam pull rod 24 is connected on one end that the support beam 2 is leant out by bolt and nut.
As shown in figure 3, being provided with the anti-fall device for preventing guide rail 4 from dropping on the guide type shoe 3, anti-fall device can be prevented Only guide rail 4 and the improper tenesmus of scaffold ontology 5, firmly can be fixed on a certain height for guide rail 4 and scaffold ontology 5, And then operator is facilitated to carry out corresponding operating to building, anti-fall device described in the present embodiment includes that first end is hinged on and leads Top pillar 31 on support 3 is horizontally arranged with transverse tube 41 on the guide rail 4, and the articulated shaft of top pillar 31 is parallel to transverse tube 41, top pillar 31 articulated shaft is between floor 1 and guide rail 4, and the second end of top pillar 31 is provided with the groove cooperated with transverse tube 41, top pillar 31 second end is withstood on transverse tube 41 by groove, and guide rail 4 and scaffold ontology 5 are fixed on a certain height using top pillar 31, And then playing the role of anti-fall, structure is simple, anti-sagging reliability.
As shown in Figs. 1-2, working face 51 has been built on the scaffold ontology 5, working face 51 is cut with scissors close to the one end on floor 1 It connects and is provided with turnover panel 52, the articulated shaft of turnover panel 52 is located in horizontal plane, and the width of turnover panel 52 is greater than between working face 51 and floor 1 Spacing, scaffold go up and down when, turnover panel 52 is turned up, so prevent lifting when turnover panel 52 and building generate interference, scaffold After a certain height, turnover panel 52 is stretched out and is ridden on floor 1, and then realizes the seamless connection of scaffold and floor 1, side Just worker operation, reduces the generation for the safety accidents such as fall, close to 52 top of one end and turnover panel on floor 1 on the turnover panel 52 It is connected between scaffold ontology 5 by oblique rope 53, oblique rope 53 uses wirerope in the present embodiment, and the first end of wirerope is tied up Close to the one end on floor 1 on turnover panel 52, the second end of wirerope is tied up on the scaffold ontology 5 above turnover panel 52, oblique rope On the one hand 53 setting further ensures the safety for riding over 1 flap 52 of floor, on the other hand can guarantee and be located at upper and lower two The safety of turnover panel 52 between layer floor 1 allows worker very easily to stand and carries out corresponding operating, institute in hanging turnover panel 52 It states and is connected between the scaffold ontology 5 of 52 lower section of bottom and turnover panel of turnover panel 52 by support rod 54, support rod 54 can be into one The stability of step enhancing turnover panel 52, safety.
As shown in Figure 5-10, the tower crane attached arm 71 passes through scaffold ontology 5, has built work on the scaffold ontology 5 Make face 51, overturning suspension bridge 55 is provided at the working face 51 over and under tower crane attached arm 71, the overturning suspension bridge 55 is cut with scissors It connects on working face 51, and overturns the articulated shaft horizontal distribution of suspension bridge 55, the sky that overturning suspension bridge 55 is formed when starting around articulated shaft Gap can guarantee that tower crane attached arm 71 passes through when scaffold ontology 5 is gone up and down, as is seen in figs 7-10, every place's tower crane attached arm in the present embodiment Two overturning suspension bridges 55 are set on the working face 51 of 71 upper and lowers, overturns one end on suspension bridge 55 far from its articulated shaft and passes through suspension bridge Drag-line 56 is connected on the capstan winch 57 that overturning 55 top scaffold ontology 5 of suspension bridge is arranged in, and capstan winch 57 is hand or electronic Formula when scaffold needs to go up and down, by controlling capstan winch 57, suspension bridge drag-line 56 is risen, overturning is hung immediately as shown in figs. 9-10 Bridge 55 is started, and two overturning suspension bridges 55 for being oppositely arranged together form a gap after being started, when the width of this gap is big After the width of tower crane attached arm 71, during scaffold lifting, working face 51 can be passed through locating for tower crane attached arm 71 Position.High-rise is usually provided with tower crane 7 in the construction process, and tower crane 7 is connected to building by tower crane attached arm 71 On, during lifting, tower crane attached arm 71 can interfere to be positioned above and the working face 51 of lower section passes through scaffold, The setting of overturning suspension bridge 55 then can guarantee that the gap formed when overturning suspension bridge 55 is started around articulated shaft can guarantee scaffold ontology 5 Tower crane attached arm 71 passes through when lifting, guarantees the case where working face 51 does not interrupt and very good solution tower crane attached arm 71 and work Make the problem of face 51 is interfered.
As shown in Figs. 1-2, elevating mechanism 6 described in the present embodiment includes the movable pulley 61 being arranged on scaffold ontology 5, Further include the drawstring 62 being wound on movable pulley 61, the traction device 63 that 61 top of movable pulley is set, is led described in the present embodiment Leading-in device 63 is electric block, and the first end of drawstring 62 is connected in the support beam 2 of 61 top of movable pulley, the second of drawstring 62 End is connected on the traction end of traction device 63, when traction device 63 works, gradually shrinks drawstring 62, scaffold can be realized Entirety climb, structure is simple, easy to operate.
Working principle:
For ease of description and understand, as shown in Figs. 1-2, one layer of floor 1 bottom in figure is named as one layer of bottom plate 1, it is past On be successively 1, three layer of two layers of floor, 1, four layer of floor, 1, five layer of floor, 1, six layer of floor floor 1, as shown in figure 5, according to reality Demand builds scaffold around building according to above structure, first on two, three, four layers of floor of building in this programme Support beam 2 is installed on 1, after being installed each component by the scheme in the present embodiment, then the first end of drawstring 62 is connected It is started in the support beam 2 at three layers of floor, 1 edge, and by the overturning suspension bridge 55 of 71 lower section of tower crane attached arm, by all support rods 54 remove, and turnover panel 52 is started.
Then start all traction devices 63 simultaneously, under the traction of traction device 63, as shown in Fig. 2, scaffold is drawn It rises to higher position, after reaching predetermined position, removes two layers of support beam 2, and by this support beam 2, guide type shoe 3, branch Support beam tie bar 24 is installed to the edge on five layers of floor 1, and guarantees that all support beams 2 are respectively positioned on together close to the end face of scaffold It on one vertical plane, after being installed, is withstood on the transverse tube 41 of guide rail 4 with top pillar 31, puts down turnover panel 52 and overturning suspension bridge 55 Realize that scaffold receives the attached climbing on construction in arc gradual change.
2 end face of support beam that is leant out in the utility model from the edge of lower floor 1 with from 1 corresponding position of upper floor 2 end face of support beam that leans out of edge be located in same vertical plane, one end that support beam 2 is leant out is equipped with guide type shoe 3, Slided in the pilot hole of guide type shoe 3 it is vertically-mounted have a guide rail 4, scaffold ontology 5 is installed in the side on guide rail 4 far from floor 1, It further include elevating mechanism 6, elevating mechanism 6 is able to drive guide rail 4 and scaffold ontology 5 and goes up and down along the pilot hole of guide type shoe 3, makes Guide rail 4 and scaffold ontology 5, which can go up and down relative to building along vertical direction, and then overcome building itself, to be not suitable for The defect tiltedly climbed, change are tiltedly climbed directly to climb up and down, dexterously solve very much receipts construction in arc gradual change be difficult to protect, foot hand Frame climbs difficult problem.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the utility model within the spirit and principle of utility model Protection scope within.

Claims (10)

1. receiving structure attached lifting scaffold in a kind of arc gradual change, scaffold, which is attached in arc gradual change, receives construction On each layer floor (1), the edge of upper floor (1) is received in successively relative to the edge of lower floor (1), it is characterised in that: extremely It is equipped with support beam (2) on rare two layers of floor (1), and the support beam (2) of each layer is visited from the edge of each layer floor (1) Out, support beam (2) end face leant out from the edge of lower floor (1) is leant out with from the edge of upper floor (1) corresponding position Support beam (2) end face be located in same vertical plane, one end that support beam (2) is leant out is equipped with guide type shoe (3), guiding Slided in the pilot hole of support (3) it is vertically-mounted have guide rail (4), on guide rail (4) far from floor (1) side install scaffold sheet Body (5), further includes elevating mechanism (6), and elevating mechanism (6) is able to drive guide rail (4) and scaffold ontology (5) along guide type shoe (3) pilot hole lifting.
2. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 1, it is characterised in that: describedly It is provided with the first mounting hole (11), is provided in support beam (2) the second mounting hole (21) on plate (1), bolt (22) passes through the One mounting hole (11), the second mounting hole (21) are threaded together with nut (23) afterwards.
3. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 1, it is characterised in that: the branch One end that support crossbeam (2) is leant out is connect with its upper floor (1) by support beam pull rod (24).
4. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 1, it is characterised in that: described to lead The anti-fall device for preventing guide rail (4) from dropping is provided on support (3).
5. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 4, it is characterised in that: described anti- Fall device includes the top pillar (31) that first end is hinged on guide type shoe (3), is horizontally arranged with transverse tube on the guide rail (4) (41), the articulated shaft of top pillar (31) is parallel to transverse tube (41), and the second end of top pillar (31) is provided with and transverse tube (41) cooperation The second end of groove, top pillar (31) is withstood on transverse tube (41) by groove.
6. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 1, it is characterised in that: the foot It has been built on hand cradle ontology (5) working face (51), working face (51) is hingedly provided with turnover panel (52) close to the one end of floor (1), The articulated shaft of turnover panel (52) is located in horizontal plane, and the width of turnover panel (52) is greater than the spacing between working face (51) and floor (1).
7. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 6, it is characterised in that: described to turn over It is connect between the one end and the scaffold ontology (5) above turnover panel (52) of floor (1) by oblique rope (53) on plate (52).
8. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 6 or 7, it is characterised in that: institute It states and is connect between the bottom of turnover panel (52) and the scaffold ontology (5) below turnover panel (52) by support rod (54).
9. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 1, it is characterised in that: further include Tower crane (7) in scaffold ontology (5) far from floor (1) side is set, and the tower crane (7) is connected to by tower crane attached arm (71) On building, the tower crane attached arm (71) passes through scaffold ontology (5), has built working face on the scaffold ontology (5) (51), it is located at the working face (51) over and under tower crane attached arm (71) and is provided with overturning suspension bridge (55), the overturning suspension bridge (55) it is hinged on working face (51), and overturns the articulated shaft horizontal distribution of suspension bridge (55), overturning suspension bridge (55) is lifted around articulated shaft The gap formed when rising can guarantee that tower crane attached arm (71) passes through when scaffold ontology (5) lifting.
10. receiving structure attached lifting scaffold in a kind of arc gradual change according to claim 1, it is characterised in that: described Elevating mechanism (6) includes the movable pulley (61) being arranged on scaffold ontology (5), further includes the drawstring being wound on movable pulley (61) (62), the traction device (63) being arranged above movable pulley (61), the first end of drawstring (62) are connected to above movable pulley (61) Support beam (2) on, the second end of drawstring (62) is connected on the traction end of traction device (63).
CN201920008655.1U 2019-01-03 2019-01-03 A kind of arc gradual change is interior to receive structure attached lifting scaffold Expired - Fee Related CN209538646U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920008655.1U CN209538646U (en) 2019-01-03 2019-01-03 A kind of arc gradual change is interior to receive structure attached lifting scaffold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920008655.1U CN209538646U (en) 2019-01-03 2019-01-03 A kind of arc gradual change is interior to receive structure attached lifting scaffold

Publications (1)

Publication Number Publication Date
CN209538646U true CN209538646U (en) 2019-10-25

Family

ID=68268365

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920008655.1U Expired - Fee Related CN209538646U (en) 2019-01-03 2019-01-03 A kind of arc gradual change is interior to receive structure attached lifting scaffold

Country Status (1)

Country Link
CN (1) CN209538646U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629813A (en) * 2019-01-03 2019-04-16 中国建筑第五工程局有限公司 A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN113216590A (en) * 2021-05-13 2021-08-06 中建一局集团建设发展有限公司 Hanging seat system on cantilever structure and construction method
CN114809572A (en) * 2022-04-25 2022-07-29 中国建筑第二工程局有限公司 Climbing frame protection structure and curved surface inclined climbing construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109629813A (en) * 2019-01-03 2019-04-16 中国建筑第五工程局有限公司 A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN113216590A (en) * 2021-05-13 2021-08-06 中建一局集团建设发展有限公司 Hanging seat system on cantilever structure and construction method
CN114809572A (en) * 2022-04-25 2022-07-29 中国建筑第二工程局有限公司 Climbing frame protection structure and curved surface inclined climbing construction method
CN114809572B (en) * 2022-04-25 2024-04-02 中国建筑第二工程局有限公司 Climbing frame protection structure and curved surface inclined climbing construction method

Similar Documents

Publication Publication Date Title
CN209538646U (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN109629813A (en) A kind of arc gradual change is interior to receive structure attached lifting scaffold
CN105226560B (en) A kind of crossing frame and its construction method
AU2006233182A1 (en) Luffing jib crane erection process and system
CN212743427U (en) Climbing type discharging platform
CN217028004U (en) Annular hanging basket suspension device for curtain wall construction of super high-rise building
CN214989776U (en) Bridge crane with anti-swing function
CN208518312U (en) A kind of double lifting point elevator shaft operation platform
KR20120131896A (en) Vertical and horizontal type Hydro-crane
CN107720569B (en) A kind of dismounting inner climbing crane tower is hung with masts type roofing
CN2771160Y (en) Elevation operating cradle for elevator mounting
CN210563479U (en) Assembled material platform that climbs
CN208249734U (en) One kind is built the road gantry crane
CN108035530A (en) A kind of inner wall of oil tank construction hanging basket
CN214653190U (en) Adjustable portable lifting device
CN204225458U (en) A kind of novel household building crane
CN209989033U (en) Multifunctional guide rail type maintenance platform for blade edge
CN210886924U (en) Maintenance platform in retractable double-cable-plane cable-stayed bridge tower stay cable area
CN207812982U (en) A kind of inner wall of oil tank construction hanging basket
CN105540440A (en) Monitoring device for hoisting of steel wire rope
CN216476251U (en) Safety protection platform that construction was used
CN216190876U (en) Leveling system for working bucket of aerial working platform
CN2303893Y (en) Multifunction pulley-lifting mould rack
CN220267256U (en) Curtain wall unit hoisting construction equipment
CN204081442U (en) Template is climbed drop preventer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20191025