CN207760991U - A kind of drainage system with rain processing system - Google Patents

A kind of drainage system with rain processing system Download PDF

Info

Publication number
CN207760991U
CN207760991U CN201721452278.8U CN201721452278U CN207760991U CN 207760991 U CN207760991 U CN 207760991U CN 201721452278 U CN201721452278 U CN 201721452278U CN 207760991 U CN207760991 U CN 207760991U
Authority
CN
China
Prior art keywords
water
monitoring
water conservancy
conservancy switch
switch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721452278.8U
Other languages
Chinese (zh)
Inventor
周超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shengyu Smart Ecological Environmental Protection Co ltd
Original Assignee
Wuhan Shengyu Drainage Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shengyu Drainage Systems Co Ltd filed Critical Wuhan Shengyu Drainage Systems Co Ltd
Priority to CN201721452278.8U priority Critical patent/CN207760991U/en
Application granted granted Critical
Publication of CN207760991U publication Critical patent/CN207760991U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of drainage systems with rain processing system.The drainage system includes two concatenated shunting wells, the each water outlet of drainage system is separately connected different rain processing systems, the shunting well has the effect of intelligent drainage function, by regulating and controlling each valve and associated component in pipe-line system at any time, the smooth discharge for realizing water body avoids various floods caused by being discharged not in time because of rainwater excess.Control system is set in the drainage system of the utility model, is not necessarily to manual operation in use, by control unit, the automatic adjustment of water conservancy switch may be implemented, has the characteristics that flexible and changeable, reduces a large amount of manpower and materials.The drainage system efficiently solves to be cut dirty pipe and can not carry out current limliting, clean water or later stage rainwater and can also enter to cut a phenomenon that dirty pipe be delivered to sewage treatment plant in the prior art.

Description

A kind of drainage system with rain processing system
Technical field
The utility model belongs to technical field of drainage, and in particular to a kind of drainage system with rain processing system.
Background technology
Currently, the drainage system of city and groups of building includes mainly separate system, combined system and mixed flow system, main purpose It is collection, conveying and the processing for realizing water body.For example, the system for treating all waste water using a kind of mode claims combined system.It is only There are one drainage systems, and converging system, drainage pipeline is claimed to claim combined pipeline.Waste water of different nature is treated in different ways System claim separate system, it is general, and there are two drainage systems.One is properly termed as storm-water system, for collecting rainwater and pollution journey Industrial wastewater very low, without processing direct emission water body is spent, pipeline claims storm sewer.Another is properly termed as sewage System, collects the industrial wastewater that could be discharged after sanitary sewage and needs processing, and pipeline claims sewage conduct.Mixed flow system is a kind of System between separate system and combined system is mainly since pipeline misconnection, hybrid junction etc. cause in the region of separate system There is waste water of different nature in section of tubing, i.e. storm sewer or sewage conduct has actually become combined pipeline.City Waste water in sewage conduct and combined pipeline is often referred to as municipal sewage.
Densely populated with the appearance of modern house sanitary equipment and skyscraper, excrement is conveyed with flow, is greatly increased The intensity of municipal sewage;Along with industry prosperity, industrial wastewater increases significantly, and the rivers and lakes of near cities occur as soon as and cannot hold The pollution condition born.Then sewage treatment plant is added, pipeline is used in combination to connect each water outlet, the waste water in each arterial drainage is converged Collection sewage treatment plant is handled, and shutoff type converging system is formed.Connection water outlet and shut off waste water to sewage treatment plant pipe Road claims shut off pipeline or wastewater interception pipe.
Wastewater flow rate abruptly increase when rainfall shuts off pipeline and sewage treatment plant is necessarily required to if all waste water are all retained It is very extensive, excessively increase engineering cost.So the inspection shaft of arterial drainage and intercepting sewer intersection is generally replaced with shunting Well.The construction of shunting well can have a different designs, but current design and not perfect, and be directed to different sewage quantity and rain Water does not make improvement yet.Because only having sewage, shunting well that can stop sewage in pipe when dry season, sewage pipe is flowed to;Rainy season When part rainwater and sewage stopped and flowed into sewage pipe, remaining stormwater overflow continues towards downstream by weir in well.For rain The flow direction of water and sewage, it is most in current control method to be controlled using water level or rainfall, but existing water level control Method or rainfall control methods, the flow-dividing control to rainwater and sewage is not fine, to lose meaning existing for shunting well.
Utility model content
In order to solve the deficiencies in the prior art, the utility model provides a kind of draining system with rain processing system System, the drainage system shuts off and shunts for rainwater and/or sewage, by reasonably regulating and controlling so that water body reasonable diffluence, Realize the reasonable disposition of resource.
The utility model proposes following technical solutions:
A kind of drainage system, the drainage system include the first shunting well, the second shunting well, regulate and store facility and online processing Facility;
Wherein, first shunting well includes the first shunting well well body and is set in the first shunting well well body Three openings, are the first water inlet, the first water outlet and the second water outlet respectively;
Second shunting well includes the second shunting well well body and is set in the second shunting well well body at least Three openings, are the second water inlet, the 4th water outlet and the 5th water outlet respectively;
First water outlet is connected by pipeline or gallery with the second water inlet;
4th water outlet is connected with facility of regulating and storing, and the 5th water outlet is connected with online processing facility.
The beneficial effects of the utility model:
(1) the utility model proposes a kind of drainage system with rain processing system of brand new, the drainings System includes two concatenated shunting wells, and each water outlet of the shunting well is separately connected different rain processing systems, is led to After regulating and controlling each water conservancy switch and associated component in pipe-line system at any time, realizes the smooth discharge of water body, avoid because of rainwater mistake It measures and discharges caused various floods not in time.
(2) drainage system of the utility model has many advantages, such as that floor space is small, powerful, uses a small amount of soil face What product can realize rainwater and sewage efficiently separates processing.The use of the drainage system is not limited by occasion, Ke Yishi For any bar pipe network in sewerage pipeline network.
(3) control system is set in the drainage system of the utility model, is not necessarily to manual operation in use, passes through control Unit processed may be implemented the automatic adjustment of water conservancy switch, have the characteristics that flexible and changeable, reduces a large amount of manpower and materials.Tool For body, the drainage system of the utility model has the effect of intelligent drainage function, by control system to the water in the drainage system The reasonable discharge of water body is realized in the reasonable control of the aperture and associated component of profit switch, while ensure that flood passage is safe, most Big degree shuts off to section dirty pipe and/or a facility of regulating and storing to dirty water or initial rainwater.
(4) drainage system of the utility model efficiently solves cuts dirty pipe and can not carry out current limliting, clean in the prior art Water or later stage rainwater, which can also enter, cuts the phenomenon that dirty pipe is delivered to sewage treatment plant.By reasonably controlling dirty water, initial rainwater With the discharge approach of middle and later periods rainwater, dirty water is shut off to facility of regulating and storing to greatest extent, compared with clean water through online processing Facility drains into natural water or is immediately discharged to natural water.
(5) drainage system of the utility model is in rainfall, since rainfall intensity is larger, cannot shut off in time to dirt The initial rainwater of water treatment plant is sent to facility storage of regulating and storing, and later stage cleaner rainwater drains into Natural Water through online processing facility again Body is directly discharged to natural water, it is possible to reduce the number and spillway discharge that overflow occurs in rainfall, to reduce rainwater Pollution load of overflow.
Description of the drawings
Fig. 1 is the structural schematic diagram of the drainage system described in one preferred embodiment of the utility model;
Wherein, the first water inlets of 1-;The first shunting wells of 2-;The second shunting wells of 3-;The first water outlets of 4-;5- second is discharged Mouthful;6- third water outlets;The second water inlets of 7-;The first water conservancies of 11- switch;The second water conservancies of 12- switch;13- third water conservancies switch; The 4th water conservancies of 14- switch;21- regulates and stores facility;22- online processing facilities.
Specific implementation mode
[drainage system]
The first aspect of the utility model is to provide a kind of drainage system, the drainage system include the first shunting well, Second shunting well, regulate and store facility and online processing facility;
Wherein, first shunting well includes the first shunting well well body and is set in the first shunting well well body Three openings, are the first water inlet, the first water outlet and the second water outlet respectively;
Second shunting well includes the second shunting well well body and is set in the second shunting well well body at least Three openings, are the second water inlet, the 4th water outlet and the 5th water outlet respectively;
First water outlet is connected by pipeline or gallery with the second water inlet;
4th water outlet is connected with facility of regulating and storing, and the 5th water outlet is connected with online processing facility.
In a preferred embodiment of the utility model, the drainage system further includes cutting dirt to manage and be set to second Third water outlet in shunting well well body;The third water outlet is connected by cutting dirty pipe with sewage treatment plant.
In a preferred embodiment of the utility model, the drainage system further includes outlet pipe;Described second goes out The mouth of a river is connected by outlet pipe with the pipeline towards natural water.
Further include the first water conservancy switch, the in the drainage system in a preferred embodiment of the utility model Two water conservancies switch, third water conservancy switch and the 4th water conservancy switch;Wherein, the first water conservancy is being set close to the third water outlet Switch, for controlling the water amount by third water outlet;It switchs, uses the second water conservancy is arranged close to the 4th water outlet In the water amount that control passes through the 4th water outlet;It is switched close to the 5th water outlet setting third water conservancy, for controlling Pass through the water amount of the 5th water outlet;It is switched the 4th water conservancy is arranged close to second water outlet, for controlling by the The water amount of two water outlets.
In a preferred embodiment of the utility model, the drainage system further includes control system, the control System includes the first monitoring device, the second monitoring device, third monitoring device and the control unit being connect with three's signal;It is described Control unit is switched with the first water conservancy, the second water conservancy switch, third water conservancy switch and the 4th water conservancy switching signal are connect;Described One monitoring device is used to monitor the water body situation in the first shunting well well body, and generates the first monitoring signals;Second monitoring Device is used to monitor the water body situation in the second shunting well well body, and generates the second monitoring signals;The third monitoring device is used In the water body situation that monitoring is regulated and stored in facility, and generate third monitoring signals;Described control unit is for receiving first prison Signal, the second monitoring signals and third monitoring signals are surveyed, and according to first monitoring signals, second monitoring signals and institute State the aperture that third monitoring signals control the first water conservancy switch, the second water conservancy switch, third water conservancy switch and the 4th water conservancy switch.
In a preferred embodiment of the utility model, first monitoring device includes monitoring the dress of water body liquid level (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.) be set, the device for monitoring water quality (such as can be water quality Detector, online COD monitors, online ammonia nitrogen monitor, TSS monitors, BOD monitors, TN monitors, TP monitors, electricity Pole, conductivity meter etc.), monitor the device (such as can be the electronic headstock gear etc. with function of measuring) of water body total amount, monitoring The device (such as rainfall gauge) of rainfall, at least one of device (such as timer) of monitoring time.
In a preferred embodiment of the utility model, first monitoring device may be provided at according to type demand In first shunting well well body or outside the first shunting well well body.For example, the dress of the device and monitoring water quality of monitoring water body liquid level It installs in the first shunting well well body, the device for monitoring rainfall is arranged outside the first shunting well well body, monitoring water body total amount Device is arranged on the switch of the water conservancy in the first shunting well well body, the device of monitoring time be arranged in the first shunting well well body or Outside shunting well well body.
In a preferred embodiment of the utility model, second monitoring device includes monitoring the dress of water body liquid level It sets (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.), the device for monitoring water body total amount (such as can carry At least one of electronic headstock gear of function of measuring etc.).
In a preferred embodiment of the utility model, second monitoring device may be provided at according to type demand In second shunting well well body.For example, the device of monitoring water body liquid level is arranged in the second shunting well well body, monitoring water body total amount Device is arranged on the switch of the water conservancy in the second shunting well well body.
In a preferred embodiment of the utility model, the third monitoring device includes monitoring the dress of water body liquid level It sets (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.).
In a preferred embodiment of the utility model, the third monitoring device is arranged in facility of regulating and storing.
In a preferred embodiment of the utility model, the first water conservancy switch, the second water conservancy switch, third water Profit switch and the 4th water conservancy switch are separately selected from valve (ball valve, gate valve, knife gate valve, butterfly valve etc.), gate (upper open type lock Door, bottom-open type gate etc.), one kind in weir gate (upper open type weir gate, bottom-open type weir gate, rotary weir gate etc.).
In a preferred embodiment of the utility model, maximum current limliting work(may be implemented in the first water conservancy switch Can, that is, ensure that the flow switched by first water conservancy does not exceed the flow value of setting.
In a preferred embodiment of the utility model, maximum current limliting work(may be implemented in the second water conservancy switch Can, that is, ensure that the flow switched by second water conservancy does not exceed the flow value of setting.
In a preferred embodiment of the utility model, maximum current limliting work(may be implemented in the third water conservancy switch Can, that is, ensure that the flow switched by the third water conservancy does not exceed the flow value of setting.
The drainage system of the utility model will cut dirty pipe, regulate and store facility and online processing facility is rationally arranged in a system In, the function of shunting well is realized to greatest extent.It, can be in rainfall cannot be timely specifically, the introducing for facility of regulating and storing The initial rainwater to shut off to sewage treatment plant is sent to facility storage of regulating and storing, and later stage cleaner rainwater is directly discharged to Natural Water again Body, it is possible to reduce the number and spillway discharge that overflow occurs in rainfall, to reduce the pollution load of overflow of rainwater;Online processing is set The introducing applied can effectively make up by online processing facility online processing rainwater or combined sewage and cut dirty pipe online The limited problem of combined closure system, when rainfall is relatively uniform, rainfall history is long, the advantage of the method is maximum with regard to more obvious Interception is removed to limit to the particulate matter being discharged in natural water rainwater, to protect natural water.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the facility of regulating and storing Quantity and arrangement in systems does not limit specifically, can be multiple facilities of regulating and storing of serial or parallel connection;It is specifically arranged Mode can be according to using the region area of the system reasonably to be arranged.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the facility of regulating and storing Can be known in the art facility of regulating and storing, such as including storage pond, box culvert of regulating and storing, deep tunnel or shallow tunnel etc..
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the online processing The quantity of facility in systems and arrangement do not limit specifically, can be multiple online processing facilities of serial or parallel connection;Its Specific arrangement mode can be according to using the region area of the system reasonably to be arranged.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the online processing Facility can be online processing facility known in the art, such as including biofilter, online processing pond, flocculation basin, inclined plate Sedimentation basin, setting pot or artificial swamp etc..
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that at described first point It flows in well, the shape and openings of sizes of first water inlet, the first water outlet and the second water outlet do not limit specifically, can Matched with the shape of shape or the water conservancy switch being arranged with it with coupled pipeline or gallery.Such as described The shape of one water inlet, the first water outlet and the second water outlet is circle.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that at described first point It flows in well, first water inlet, the first water outlet and the second water outlet putting in order and arranging in the first shunting well well body Mode for cloth does not limit, and reasonably setting first enters water to the region area and geopotentia that can be arranged according to the first shunting well The relative position of mouth, the first water outlet and the second water outlet.For example, first water inlet, the first water outlet and the second water outlet Mouth is arranged in the first shunting well well body side wall;Alternatively, first water inlet and the second water outlet are arranged in the first shunting well well Body sidewall, and groove is opened up in the first shunting well well body bottom, in the trench by the setting of the first water outlet.
When first water inlet, the first water outlet and the second water outlet are arranged in the first shunting well well body side wall, this Field technology personnel are appreciated that the distance from bottom first of first water inlet, the first water outlet and the second water outlet shunts The height in well shaft bottom is not particularly limited, such as the pipeline being connect with the first water inlet is in the position of high elevation, and first enters water Any position on the first shunting well well body side wall can be arranged in mouth;The pipeline being connect with the first water outlet and the second water outlet Position in low-lying, the first water outlet and the second water outlet are arranged in the first shunting well well body side wall close to the first shunting well The position of well body bottom.The purpose for the arrangement is that in order to which water body will not be saved bit by bit in the first shunting well well body, under preferably flowing to Trip.
When first water inlet and the second water outlet are arranged in the first shunting well well body side wall, and in the first shunting well well Body bottom opens up groove, when by the setting of the first water outlet in the trench, it will be understood by those skilled in the art that described first enters water The height in the first shunting well of distance from bottom shaft bottom of mouth and the second water outlet is not particularly limited, such as is connect with the first water inlet Pipeline be in the position of high elevation, any position on the first shunting well well body side wall can be arranged in the first water inlet;With The pipeline of second water outlet connection be in the position of low-lying, and the second water outlet is arranged in the first shunting well well body side wall close to the The position of one shunting well well body bottom, the first water outlet preferentially pass through the first water outlet in the position of gesture lower, water body.This The purpose that sample is done is that the water body in the first shunting well well body can be better achieved not save bit by bit, and preferably flows to downstream.
Similarly, above-mentioned setting principle is also applied for the second water inlet, third water outlet, the 4th in the second shunting well well body The setting of water outlet and the 5th water outlet.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that first shunting The shape of well well body and/or the second shunting well well body does not limit specifically, and the reasonable discharge to water body, example may be implemented If the shape of the first shunting well well body and/or the second shunting well well body is rectangular or round.
[water discharge control method]
The utility model also provides the water discharge control method of above-mentioned drainage system comprising water level method, water quality method, water quality- Water level method, when m- water level method, total amount-water level method, at least one of rainfall-water level method.
[water level method]
The second aspect of the utility model is to provide a kind of water discharge control method of water level method control, the draining control Method is based on above-mentioned drainage system, and the drainage system includes control system, the first monitoring dress in the control system It sets, the second monitoring device and third monitoring device respectively include the device of monitoring water body liquid level and be separately positioned on the first shunting well It well body, the second shunting well well body and regulates and stores in facility, the standard of the second shunting well is set in the control unit of the control system The highest reserve-water-level H3 of water level H1, the warning line H2 of the first shunting well and facility of regulating and storing;Described method includes following steps:
1a) water body enters the first shunting well from the first water inlet, by the device monitoring first in real time for monitoring water body liquid level Water body liquid level H in shunting well well body, water body liquid level in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Height H4;
2a) work as H<H2 and H5<When H1, the first water conservancy switch is in open state, and the second water conservancy switch is closed, Third water conservancy switch is closed, and the 4th water conservancy switch is in current floe condition;
3a) work as H<H2 and when H1≤H5, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in Open state, third water conservancy switch are closed, and the 4th water conservancy switch is in current floe condition;If H4 >=H3, the first water conservancy Switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy is opened It closes and is in current floe condition;
4a) as H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in opening state State, third water conservancy switch are in open state, and the 4th water conservancy switch is in open state;If H4 >=H3, at the first water conservancy switch In open state, the second water conservancy switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy switch is in Open state.
[water quality method]
It is to provide a kind of water discharge control method of water quality method control, the draining control in terms of the third of the utility model Method is based on above-mentioned drainage system, and the drainage system includes control system, the first monitoring dress in the control system It sets the device including monitoring water quality and is arranged in the first shunting well well body, the third monitoring device in the control system Including monitoring the device of water body liquid level and being arranged in facility of regulating and storing, it is dense that pollutant is set in the control unit of the control system Spend the highest reserve-water-level H3 of standard value C1, pollutant concentration excessive value C2 and facility of regulating and storing;Described method includes following steps:
1b) water body enters the first shunting well from the first water inlet, is monitored in real time by the device of water quality in monitoring well The water quality C of water body in first shunting well well body;Device by monitoring water body liquid level monitors water body liquid level in facility of regulating and storing in real time Height H4;
2b) as C >=C2, the first water conservancy switch is in open state, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in current floe condition;
3b) work as C2>C>When C1, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in unlatching State, third water conservancy switch are closed, and the 4th water conservancy switch is in current floe condition;If H4 >=H3, the first water conservancy switch In open state, the second water conservancy switch is closed, and third water conservancy switch is at open state, the 4th water conservancy switch In current floe condition;
4b) as C1 >=C, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state.
[water level-water quality method]
4th aspect of the utility model is to provide a kind of water discharge control method of water level-water quality method control, the row Water controling method is based on above-mentioned drainage system, and the drainage system includes control system, first in the control system Monitoring device includes monitoring the device of water body liquid level and the device of monitoring water quality and being separately positioned on the first shunting well well body Interior, the second monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in the second shunting well well body Interior, the third monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing, at this The normal water level H1 of the second shunting well, warning line H2, the pollutant of the first shunting well are set in the control unit of control system The highest reserve-water-level H3 of concentration standard value C1 and facility of regulating and storing;Described method includes following steps:
1c) water body enters the first shunting well from the first water inlet, by the device monitoring first in real time for monitoring water body liquid level Water body liquid level H in shunting well well body, water body liquid level in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Height H4, the device by monitoring water quality monitor water quality C in the first shunting well well body in real time;
2c) as C≤C1, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state;
3c) work as C>C1 and H<When H2, water body liquid level H5 in the second shunting well well body is judged, if H5<H1, the first water conservancy Switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, and the 4th water conservancy is opened It closes and is in current floe condition;If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch In open state, the second water conservancy switch is in open state, and third water conservancy switch is closed, at the 4th water conservancy switch In current floe condition;If H4 >=H3, the first water conservancy switch is in open state, and the second water conservancy switch is closed, third water Profit switch is in open state, and the 4th water conservancy switch is in current floe condition;
4c) work as C>C1 and when H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in Open state, third water conservancy switch are in open state, and the 4th water conservancy switch is in open state;If H4 >=H3, the first water conservancy Switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy is opened It closes and is in open state.
[water level-total amount method]
5th aspect of the utility model is to provide a kind of water discharge control method of water level-total amount method control, the row Water controling method is based on above-mentioned drainage system, and the drainage system includes control system, first in the control system Monitoring device includes monitoring the device of water body liquid level and being arranged in the first shunting well well body, the second prison in the control system It includes monitoring the device of water body total amount and the first water conservancy switch being separately positioned in the second shunting well well body and second to survey device On water conservancy switch, the second monitoring device in the control system further includes monitoring the device of water body liquid level and being arranged at second point It flows in well well body, the third monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing It is interior, the mark of rain total amount Q3 at the beginning of shunting well needs the standard shut off, the second shunting well is set in the control unit of the control system The highest reserve-water-level H3 of quasi- water level H1, the warning line H2 of the first shunting well and facility of regulating and storing;The method includes walking as follows Suddenly:
1d) when the rainy day, water body enters the first shunting well from the first water inlet, and the device by monitoring water body liquid level is supervised in real time Survey water body liquid level H in the first shunting well well body, water in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Body liquid level H4, by monitoring the device water body total amount Q1 that monitoring is switched by the first water conservancy in real time of water body total amount and passing through The water body total amount Q2 of second water conservancy switch;
2d) as (Q1+Q2) >=Q3, the first water conservancy switch is closed, and the second water conservancy switch is closed, Third water conservancy switch is closed, and the 4th water conservancy switch is in open state;
3d) as (Q1+Q2)<Q3 and H<When H2, the water body liquid level H5 in the second shunting well well body is judged, if H5<H1, First water conservancy switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, the Four water conservancies switch is in current floe condition;
If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch, which is in, to be opened State is opened, the second water conservancy switch is in open state, and third water conservancy switch is closed, and the 4th water conservancy switch, which is in, to shut off State;If H4 >=H3, the first water conservancy switch is in open state, and the second water conservancy switch is closed, third water conservancy switch In open state, the 4th water conservancy switch is in current floe condition;
4d) as (Q1+Q2)<Q3 and when H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy is opened It closes and is in open state, third water conservancy switch is in open state, and the 4th water conservancy switch is in open state;If H4 >=H3, the One water conservancy switch is in open state, and the second water conservancy switch is closed, and third water conservancy, which switchs, is in open state, and the 4th Water conservancy switch is in open state.
In a preferred embodiment of the utility model, the method further includes following steps:
5d) when fine day, water body enters the first shunting well from the first water inlet, and the first water conservancy switch is in open state, the Two water conservancies switch is closed, and third water conservancy switch is closed, and the 4th water conservancy switch is in current floe condition.
[rainfall-water level method]
6th aspect of the utility model is to provide a kind of water discharge control method of rainfall-water level method control, the row Water controling method is based on above-mentioned drainage system, and the drainage system includes control system, first in the control system Monitoring device includes monitoring the device of rainfall and the device of monitoring water body liquid level and being separately positioned on outside shunting well and the first shunting In well well body, the second monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in the second shunting well In well body, the third monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing, The standard water of rain rainfall L1 at the beginning of shunting well needs the standard shut off, the second shunting well is set in the control unit of the control system Position H1, the warning line H2 of the first shunting well and the highest reserve-water-level H3 for facility of regulating and storing;Described method includes following steps:
1e) water body enters the first shunting well from the first water inlet, by the first rain rainfall of device monitoring in real time for monitoring rainfall L;
It is at this time fine day 2e) as L=0, the first water conservancy switch is in open state, and the second water conservancy switch is in closing State, third water conservancy switch are closed, and the 4th water conservancy switch is in current floe condition;
3e) work as L>It it is at this time the rainy day when 0, the device by monitoring water body liquid level monitors in the first shunting well well body in real time Water body liquid level H4 in water body liquid level H5 and facility of regulating and storing in water body liquid level H, the second shunting well well body;
4e) as L >=L1, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state;
5e) when 0<L<L1 and H<When H2, the water body liquid level H5 in the second shunting well well body is judged, if H5<H1, first Water conservancy switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, the 4th water Profit switch is in current floe condition;
If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch, which is in, to be opened State is opened, the second water conservancy switch is in open state, and third water conservancy switch is closed, and the 4th water conservancy switch, which is in, to shut off State;If H4 >=H3, the first water conservancy switch is in open state, and the second water conservancy switch is closed, third water conservancy switch In open state, the 4th water conservancy switch is in current floe condition;
6e) when 0<L<L1 and when H >=H2, if H4<H3, the first water conservancy switch is at open state, the second water conservancy switch In open state, third water conservancy switch is in open state, and the 4th water conservancy switch is in open state;If H4 >=H3, the first water Profit switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, the 4th water conservancy Switch is in open state.
[when m- water level method]
The water discharge control method of 7th aspect of the utility model m- water level method control when being to provide a kind of, the row Water controling method is based on above-mentioned drainage system, and the drainage system includes control system, first in the control system Monitoring device includes the device of monitoring time and the device of monitoring water body liquid level and is separately positioned on outside shunting well and the first shunting In well well body, the second monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in the second shunting well In well body, the third monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing, In the control unit of the control system established standards time T1, the second shunting well normal water level H1, the first shunting well police Guard against the highest reserve-water-level H3 of water level H2 and facility of regulating and storing;Described method includes following steps:
1f) when fine day, water body enters the first shunting well from the first water inlet, and the first water conservancy switch is in open state, the Two water conservancies switch is closed, and third water conservancy switch is closed, and the 4th water conservancy switch is in current floe condition;
2f) when the rainy day, water body enters the first shunting well from the first water inlet, and the device by monitoring water body liquid level is supervised in real time Survey water body liquid level H in the first shunting well well body, water in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Body liquid level H4 monitors rain time T in real time by the device of monitoring time;
3f) as T >=T1, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state;
4f) work as T<T1 and H<When H2, the water body liquid level H5 in the second shunting well well body is judged, if H5<H1, the first water Profit switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, the 4th water conservancy Switch is in current floe condition;
If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch, which is in, to be opened State is opened, the second water conservancy switch is in open state, and third water conservancy switch is closed, and the 4th water conservancy switch, which is in, to shut off State;If H4 >=H3, the first water conservancy switch is in open state, and the second water conservancy switch is closed, third water conservancy switch In open state, the 4th water conservancy switch is in current floe condition;
5f) work as T<T1 and when H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in Open state, third water conservancy switch are in open state, and the 4th water conservancy switch is in open state;If H4 >=H3, the first water conservancy Switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy is opened It closes and is in open state.
[the specific restriction of the above method]
In a preferred embodiment of the utility model, according to second shunting well to being put down in receivable water area region The normal water level H1 of second shunting well is arranged in equal height of the topography point when ponding risk occurs.
It is minimum to topography in receivable water area according to the first shunting well in a preferred embodiment of the utility model Height of the point when ponding risk occurs sets the warning line H2 of the first shunting well in the control unit of the control system.
In a preferred embodiment of the utility model, according to the carrying capacity of the facility of regulating and storing in the control system Control unit in set the highest reserve-water-level H3 of the facility of regulating and storing.
In a preferred embodiment of the utility model, it is described monitoring water body liquid level device be liquid level sensor, Liquid level gauge, liquid-level switch etc..
In a preferred embodiment of the utility model, according to the environmental carrying capacity for the natural water being discharged into and entrance The water quality of shunting well sets pollutant concentration standard value C1 in the control unit of the control system.
In a preferred embodiment of the utility model, according to the environmental carrying capacity for the natural water being discharged into and entrance The highest pollutant concentration that the water quality and online processing facility of shunting well can be handled sets pollution in the control unit Object concentration over-standard value C2.
In a preferred embodiment of the utility model, it is described monitoring water quality device be Water quality detector, Online COD monitors, online ammonia nitrogen monitor, online TSS monitors, online BOD monitors, online NH3It is-N monitors, online TP monitors, online TN monitors, electrode, conductivity meter etc., monitoring be in shunting well well body in water body pollutant it is dense Degree, the pollutant includes TSS, COD, BOD, NH3One or more of-N, TN or TP.
In a preferred embodiment of the utility model, the Water quality detector can be using electrode method, UV light Method, optical scattering method etc. realize the detection to water quality.
In a preferred embodiment of the utility model, the environmental carrying capacity for the natural water that the shunting well is discharged into Can be natural water such as rivers,lakes and seas;When the environmental carrying capacity of the natural water is larger (such as ocean), pollutant concentration standard Value C1 can be properly increased;When the environmental carrying capacity of the natural water is smaller (such as lake), pollutant concentration standard value C1 can be with It is appropriate to reduce.It is such as middle and later periods rainwater, pollutant concentration standard value C1 can when the water quality into shunting well is preferable Suitably to reduce;Such as it is sanitary sewage and/or initial rainwater, pollutant when the water quality into shunting well is poor Concentration standard value C1 can be properly increased.Pollution the purpose is to reduction as few as possible to natural water.
In a preferred embodiment of the utility model, it is former that pollutant concentration excessive value C2 is also suitable above-mentioned setting Then, on this basis, in the concentration that the established standards of the pollutant concentration excessive value C2 can also be handled with online processing facility It limits related, is generally not more than the upper limit of concentration that online processing facility can be handled.
In a preferred embodiment of the utility model, the just rain total amount Q3 is according to the shunting well to receivable water It is to be treated to be multiplied by the shunting well that receivable water area is calculated for the first rain millimeter of required collection in surface area First rain total amount Q3.
In a preferred embodiment of the utility model, the device of the monitoring water body total amount is selected from metering work( The electronic headstock gear of energy.
In a preferred embodiment of the utility model, according to shunting well to required collection in receivable water area First rain millimeter sets shunting well in the control unit of the control system and needs rain rainfall L1 at the beginning of the standard shut off.
In a preferred embodiment of the utility model, the device of the monitoring rainfall is rainfall gauge.
In a preferred embodiment of the utility model, according to the rain time of initial rainwater and shunting well to receivable Initial rainwater whole diameter flows to shunting well required time established standards in the control unit of the control system in water area Time T1.
In a preferred embodiment of the utility model, the device of the monitoring time is timer.
In a preferred embodiment of the utility model, the first water conservancy switch, the second water conservancy switch and third Maximum current-limiting function may be implemented in water conservancy switch, refers to that the flow value switched by the water conservancy is less than etc. in open state In the peak flow values of setting, this can adjust the aperture of the water conservancy switch come real by the control unit in control system It is existing.
In a preferred embodiment of the utility model, the 4th water conservancy switch refers to water body in open state It can be switched by the water conservancy and flow to natural water.
In a preferred embodiment of the utility model, the 4th water conservancy switch refers to adjusting in current floe condition The aperture of 4th water conservancy switch, ensures that water body shuts off in the upstream end that the water conservancy switchs, and cannot be switched and be flowed by the water conservancy To natural water.
In a preferred embodiment of the utility model, the first water conservancy switch, the second water conservancy switch and third It refer to the flow value of the water body switched by the water conservancy is zero that water conservancy switch, which is closed,.
With reference to specific embodiment, the utility model is expanded on further.It should be understood that these embodiments are merely to illustrate this Utility model rather than limitation the scope of the utility model.Furthermore, it is to be understood that having read in recorded in the utility model After appearance, those skilled in the art can make various changes or modifications the utility model, and such equivalent forms equally fall within this Utility model limited range.
In the description of the present invention, it should be noted that term " first ", " second ", " third ", " the 4th " and " the 5th " is used for description purposes only, and not for instruction or implies relative importance.
Embodiment 1
As shown in Figure 1, a kind of drainage system, the drainage system includes the first shunting well 2, the second shunting well 3, regulating and storing sets Apply 21 and online processing facility 22;
Wherein, first shunting well 2 includes the first shunting well well body and is set in the first shunting well well body Three opening, be the first water inlet 1, the first water outlet 4 and the second water outlet 5 respectively;
Second shunting well 3 includes the second shunting well well body and is set in the second shunting well well body at least Three openings, are the second water inlet 7, the 4th water outlet and the 5th water outlet respectively;
First water outlet 4 is connected by pipeline or gallery with the second water inlet 7;
4th water outlet is connected with facility 21 of regulating and storing, and the 5th water outlet is connected with online processing facility 11.
In a preferred embodiment of the utility model, the drainage system further includes cutting dirt to manage and be set to second Third water outlet 6 in 3 well body of shunting well;The third water outlet 6 is connected by cutting dirty pipe with sewage treatment plant.
In a preferred embodiment of the utility model, the drainage system further includes outlet pipe;Described second goes out The mouth of a river 5 is connected by outlet pipe with the pipeline towards natural water.
In a preferred embodiment of the utility model, further include in the drainage system the first water conservancy switch 11, Second water conservancy switch 12, third water conservancy switch 13 and the 4th water conservancy switch 14;Wherein, it is set at the third water outlet 6 The first water conservancy switch 11 is set, for controlling the water amount by third water outlet 6;Close to the 4th water outlet setting the Two water conservancy switches 12, for controlling the water amount by the 4th water outlet;Close to the 5th water outlet, third water is being set Sharp switch 13, for controlling the water amount by the 5th water outlet;It is opened the 4th water conservancy is arranged close to second water outlet 14 are closed, for controlling the water amount by the second water outlet.
In a preferred embodiment of the utility model, the drainage system further includes control system, the control System includes the first monitoring device, the second monitoring device, third monitoring device and the control unit being connect with three's signal;It is described Control unit is switched with the first water conservancy, the second water conservancy switch, third water conservancy switch and the 4th water conservancy switching signal are connect;Described One monitoring device is used to monitor the water body situation in the first shunting well well body, and generates the first monitoring signals;Second monitoring Device is used to monitor the water body situation in the second shunting well well body, and generates the second monitoring signals;The third monitoring device is used In the water body situation that monitoring is regulated and stored in facility, and generate third monitoring signals;Described control unit is for receiving first prison Signal, the second monitoring signals and third monitoring signals are surveyed, and according to first monitoring signals, second monitoring signals and institute State the aperture that third monitoring signals control the first water conservancy switch, the second water conservancy switch, third water conservancy switch and the 4th water conservancy switch.
In a preferred embodiment of the utility model, first monitoring device includes monitoring the dress of water body liquid level (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.) be set, the device for monitoring water quality (such as can be water quality Detector, online COD monitors, online ammonia nitrogen monitor, TSS monitors, BOD monitors, TN monitors, TP monitors, electricity Pole, conductivity meter etc.), monitor the device (such as can be the electronic headstock gear etc. with function of measuring) of water body total amount, monitoring The device (such as rainfall gauge) of rainfall, at least one of device (such as timer) of monitoring time.
In a preferred embodiment of the utility model, first monitoring device may be provided at according to type demand In first shunting well well body or outside the first shunting well well body.For example, the dress of the device and monitoring water quality of monitoring water body liquid level It installs in the first shunting well well body, the device for monitoring rainfall is arranged outside the first shunting well well body, monitoring water body total amount Device is arranged on the switch of the water conservancy in the first shunting well well body, the device of monitoring time be arranged in the first shunting well well body or Outside shunting well well body.
In a preferred embodiment of the utility model, second monitoring device includes monitoring the dress of water body liquid level It sets (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.), the device for monitoring water body total amount (such as can carry At least one of electronic headstock gear of function of measuring etc.).
In a preferred embodiment of the utility model, second monitoring device may be provided at according to type demand In second shunting well well body.For example, the device of monitoring water body liquid level is arranged in the second shunting well well body, monitoring water body total amount Device is arranged on the switch of the water conservancy in the second shunting well well body.
In a preferred embodiment of the utility model, the third monitoring device includes monitoring the dress of water body liquid level It sets (such as can be liquid level sensor, liquid level gauge, liquid-level switch etc.).
In a preferred embodiment of the utility model, the third monitoring device is arranged in facility of regulating and storing.
In a preferred embodiment of the utility model, the first water conservancy switch, the second water conservancy switch, third water Profit switch and the 4th water conservancy switch are separately selected from valve (ball valve, gate valve, knife gate valve, butterfly valve etc.), gate (upper open type lock Door, bottom-open type gate etc.), one kind in weir gate (upper open type weir gate, bottom-open type weir gate, rotary weir gate etc.).
In a preferred embodiment of the utility model, maximum current limliting work(may be implemented in the first water conservancy switch Can, that is, ensure that the flow switched by first water conservancy does not exceed the flow value of setting.
In a preferred embodiment of the utility model, maximum current limliting work(may be implemented in the second water conservancy switch Can, that is, ensure that the flow switched by second water conservancy does not exceed the flow value of setting.
In a preferred embodiment of the utility model, maximum current limliting work(may be implemented in the third water conservancy switch Can, that is, ensure that the flow switched by the third water conservancy does not exceed the flow value of setting.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the facility of regulating and storing Quantity and arrangement in systems does not limit specifically, can be multiple facilities of regulating and storing of serial or parallel connection;It is specifically arranged Mode can be according to using the region area of the system reasonably to be arranged.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the facility of regulating and storing Can be known in the art facility of regulating and storing, such as including storage pond, box culvert of regulating and storing, deep tunnel or shallow tunnel etc..
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the online processing The quantity of facility in systems and arrangement do not limit specifically, can be multiple online processing facilities of serial or parallel connection;Its Specific arrangement mode can be according to using the region area of the system reasonably to be arranged.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that the online processing Facility can be online processing facility known in the art, such as including biofilter, online processing pond, flocculation basin, inclined plate Sedimentation basin, setting pot or artificial swamp etc..
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that at described first point It flows in well, the shape and openings of sizes of first water inlet, the first water outlet and the second water outlet do not limit specifically, can Matched with the shape of shape or the water conservancy switch being arranged with it with coupled pipeline or gallery.Such as described The shape of one water inlet, the first water outlet and the second water outlet is circle.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that at described first point It flows in well, first water inlet, the first water outlet and the second water outlet putting in order and arranging in the first shunting well well body Mode for cloth does not limit, and reasonably setting first enters water to the region area and geopotentia that can be arranged according to the first shunting well The relative position of mouth, the first water outlet and the second water outlet.For example, first water inlet, the first water outlet and the second water outlet Mouth is arranged in the first shunting well well body side wall;Alternatively, first water inlet and the second water outlet are arranged in the first shunting well well Body sidewall, and groove is opened up in the first shunting well well body bottom, in the trench by the setting of the first water outlet.
When first water inlet, the first water outlet and the second water outlet are arranged in the first shunting well well body side wall, this Field technology personnel are appreciated that the distance from bottom first of first water inlet, the first water outlet and the second water outlet shunts The height in well shaft bottom is not particularly limited, such as the pipeline being connect with the first water inlet is in the position of high elevation, and first enters water Any position on the first shunting well well body side wall can be arranged in mouth;The pipeline being connect with the first water outlet and the second water outlet Position in low-lying, the first water outlet and the second water outlet are arranged in the first shunting well well body side wall close to the first shunting well The position of well body bottom.The purpose for the arrangement is that in order to which water body will not be saved bit by bit in the first shunting well well body, under preferably flowing to Trip.
When first water inlet and the second water outlet are arranged in the first shunting well well body side wall, and in the first shunting well well Body bottom opens up groove, when by the setting of the first water outlet in the trench, it will be understood by those skilled in the art that described first enters water The height in the first shunting well of distance from bottom shaft bottom of mouth and the second water outlet is not particularly limited, such as is connect with the first water inlet Pipeline be in the position of high elevation, any position on the first shunting well well body side wall can be arranged in the first water inlet;With The pipeline of second water outlet connection be in the position of low-lying, and the second water outlet is arranged in the first shunting well well body side wall close to the The position of one shunting well well body bottom, the first water outlet preferentially pass through the first water outlet in the position of gesture lower, water body.This The purpose that sample is done is that the water body in the first shunting well well body can be better achieved not save bit by bit, and preferably flows to downstream.
Similarly, above-mentioned setting principle is also applied for the second water inlet, third water outlet, the 4th in the second shunting well well body The setting of water outlet and the 5th water outlet.
In a preferred embodiment of the utility model, it will be understood by those skilled in the art that first shunting The shape of well well body and/or the second shunting well well body does not limit specifically, and the reasonable discharge to water body, example may be implemented If the shape of the first shunting well well body and/or the second shunting well well body is rectangular or round.
Embodiment 2
The present embodiment provides a kind of water discharge control method of water level method control, the water discharge control method is to be based on embodiment Drainage system described in 1, the drainage system include control system, the first monitoring device, the second prison in the control system It surveys device and third monitoring device respectively includes the device of monitoring water body liquid level and is separately positioned on the first shunting well well body, second Shunting well well body and regulate and store in facility, set in the control unit of the control system the second shunting well normal water level H1, the The highest reserve-water-level H3 of the warning line H2 of one shunting well and facility of regulating and storing;Described method includes following steps:
1a) water body enters the first shunting well from the first water inlet, by the device monitoring first in real time for monitoring water body liquid level Water body liquid level H in shunting well well body, water body liquid level in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Height H4;
2a) work as H<H2 and H5<When H1, the first water conservancy switch is in open state, and the second water conservancy switch is closed, Third water conservancy switch is closed, and the 4th water conservancy switch is in current floe condition;Water body is arranged to be handled to sewage treatment plant;
3a) work as H<H2 and when H1≤H5, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in Open state, third water conservancy switch are closed, and the 4th water conservancy switch is in current floe condition;Part water body is arranged at sewage Factory is managed, part water body is arranged temporarily to be stored to facility of regulating and storing, and part water body is arranged to be handled to online processing facility, after processing Directly arrange to natural water;If H4 >=H3, the first water conservancy switch is in open state, and the second water conservancy switch is closed, Third water conservancy switch is in open state, and the 4th water conservancy switch is in current floe condition;Part water body is arranged to sewage treatment plant, part Water body is arranged to be handled to online processing facility, is directly arranged to natural water after processing;
4a) as H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in opening state State, third water conservancy switch are in open state, and the 4th water conservancy switch is in open state;Part water body is arranged to sewage treatment plant, Part water body is arranged temporarily to be stored to facility of regulating and storing, and part water body is arranged to be handled to online processing facility, after processing directly It arranges to natural water, part water body is directly arranged to natural water;If H4 >=H3, the first water conservancy, which switchs, is in open state, second Water conservancy switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy switch is in open state, part water Body is arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, is directly arranged after processing to natural water, part Water body is directly arranged to natural water.
Embodiment 3
The present embodiment provides a kind of water discharge control method of water quality method control, the water discharge control method is to be based on embodiment Drainage system described in 1, the drainage system include control system, and the first monitoring device in the control system includes monitoring The device of water quality and it is arranged in the first shunting well well body, the third monitoring device in the control system includes monitoring water The device of body fluid position and it is arranged in facility of regulating and storing, pollutant concentration standard value is set in the control unit of the control system The highest reserve-water-level H3 of C1, pollutant concentration excessive value C2 and facility of regulating and storing;Described method includes following steps:
1b) water body enters the first shunting well from the first water inlet, is monitored in real time by the device of water quality in monitoring well The water quality C of water body in first shunting well well body;Device by monitoring water body liquid level monitors water body liquid level in facility of regulating and storing in real time Height H4;
2b) as C >=C2, the first water conservancy switch is in open state, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in current floe condition;Water body is arranged to be handled to sewage treatment plant;
3b) work as C2>C>When C1, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in unlatching State, third water conservancy switch are closed, and the 4th water conservancy switch is in current floe condition;Part water body is arranged to sewage disposal Factory, part water body is arranged temporarily to be stored to facility of regulating and storing;If H4 >=H3, the first water conservancy switch is in open state, the second water Profit switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy switch is in current floe condition;Part water body It arranges to sewage treatment plant, part water body is arranged to be handled to online processing facility, is directly arranged to natural water after processing;
4b) as C1 >=C, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state, and water body is directly arranged to natural water.
Embodiment 4
The present embodiment provides a kind of water discharge control methods of water level-water quality method control, and the water discharge control method is to be based on Drainage system described in embodiment 1, the drainage system include control system, the first monitoring device packet in the control system It includes the device of monitoring water body liquid level and the device of monitoring water quality and is separately positioned in the first shunting well well body, the control The second monitoring device in system includes monitoring the device of water body liquid level and being arranged in the second shunting well well body, the control system Third monitoring device in system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing, in the control of the control system Set in unit the normal water level H1 of the second shunting well, the warning line H2 of the first shunting well, pollutant concentration standard value C1 and Regulate and store the highest reserve-water-level H3 of facility;Described method includes following steps:
1c) water body enters the first shunting well from the first water inlet, by the device monitoring first in real time for monitoring water body liquid level Water body liquid level H in shunting well well body, water body liquid level in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Height H4, the device by monitoring water quality monitor water quality C in the first shunting well well body in real time;
2c) as C≤C1, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state;Water body is directly arranged to natural water;
3c) work as C>C1 and H<When H2, water body liquid level H5 in the second shunting well well body is judged, if H5<H1, the first water conservancy Switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, and the 4th water conservancy is opened It closes and is in current floe condition;Water body is arranged to be handled to sewage treatment plant;
If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch, which is in, to be opened State is opened, the second water conservancy switch is in open state, and third water conservancy switch is closed, and the 4th water conservancy switch, which is in, to shut off State;Part water body is arranged to sewage treatment plant, and part water body is arranged temporarily to be stored to facility of regulating and storing;If H4 >=H3, the first water Profit switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, the 4th water conservancy Switch is in current floe condition;Part water body is arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, processing It is directly arranged afterwards to natural water;
4c) work as C>C1 and when H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in Open state, third water conservancy switch are in open state, and the 4th water conservancy switch is in open state;Part water body is arranged at sewage Factory is managed, part water body is arranged temporarily to be stored to facility of regulating and storing, and part water body is arranged to be handled to online processing facility, after processing It directly arranges to natural water, part water body is directly arranged to natural water;If H4 >=H3, the first water conservancy switch is in open state, Second water conservancy switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy switch is in open state, portion Water distribution component is arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, is directly arranged after processing to natural water, Part water body is directly arranged to natural water.
Embodiment 5
The present embodiment provides a kind of water discharge control methods of water level-total amount method control, and the water discharge control method is to be based on Drainage system described in embodiment 1, the drainage system include control system, the first monitoring device packet in the control system It includes the device of monitoring water body liquid level and is arranged in the first shunting well well body, the second monitoring device in the control system includes It monitors the device of water body total amount and the first water conservancy switch being separately positioned in the second shunting well well body and the second water conservancy switchs, The second monitoring device in the control system further includes monitoring the device of water body liquid level and being arranged in the second shunting well well body, Third monitoring device in the control system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing, in the control Shunting well is set in the control unit of system needs the standard shut off just rain total amount Q3, the normal water level H1 of the second shunting well, the The highest reserve-water-level H3 of the warning line H2 of one shunting well and facility of regulating and storing;Described method includes following steps:
1d) when the rainy day, water body enters the first shunting well from the first water inlet, and the device by monitoring water body liquid level is supervised in real time Survey water body liquid level H in the first shunting well well body, water in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Body liquid level H4, by monitoring the device water body total amount Q1 that monitoring is switched by the first water conservancy in real time of water body total amount and passing through The water body total amount Q2 of second water conservancy switch;
2d) as (Q1+Q2) >=Q3, the first water conservancy switch is closed, and the second water conservancy switch is closed, Third water conservancy switch is closed, and the 4th water conservancy switch is in open state;Water body is directly arranged to natural water;
3d) as (Q1+Q2)<Q3 and H<When H2, the water body liquid level H5 in the second shunting well well body is judged, if H5<H1, First water conservancy switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, the Four water conservancies switch is in current floe condition;Water body is arranged to be handled to sewage treatment plant;
If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch, which is in, to be opened State is opened, the second water conservancy switch is in open state, and third water conservancy switch is closed, and the 4th water conservancy switch, which is in, to shut off State;Part water body is arranged to sewage treatment plant, and part water body is arranged temporarily to be stored to facility of regulating and storing;If H4 >=H3, the first water Profit switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, the 4th water conservancy Switch is in current floe condition;Part water body is arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, processing It is directly arranged afterwards to natural water;
4d) as (Q1+Q2)<Q3 and when H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy is opened It closes and is in open state, third water conservancy switch is in open state, and the 4th water conservancy switch is in open state;Part water body arrange to Sewage treatment plant, part water body is arranged temporarily to be stored to facility of regulating and storing, and part water body is arranged to be handled to online processing facility, It is directly arranged after processing to natural water, part water body is directly arranged to natural water;If H4 >=H3, the first water conservancy switch is in unlatching State, the second water conservancy switch are closed, and third water conservancy switch is in open state, and the 4th water conservancy switch is in opening state State, part water body are arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, is directly arranged to nature after processing Water body, part water body are directly arranged to natural water.
In a preferred embodiment of the utility model, the method further includes following steps:
5d) when fine day, water body enters the first shunting well from the first water inlet, and the first water conservancy switch is in open state, the Two water conservancies switch is closed, and third water conservancy switch is closed, and the 4th water conservancy switch is in current floe condition, water body It arranges and is handled to sewage treatment plant.
Embodiment 6
The present embodiment provides a kind of water discharge control methods of rainfall-water level method control, and the water discharge control method is to be based on Drainage system described in embodiment 1, the drainage system include control system, the first monitoring device packet in the control system It includes the device of monitoring rainfall and the device of monitoring water body liquid level and is separately positioned on outside shunting well and in the first shunting well well body, institute It includes monitoring the device of water body liquid level and being arranged in the second shunting well well body to state the second monitoring device in control system, described Third monitoring device in control system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing, in the control system Control unit in setting shunting well need the standard shut off just rain rainfall L1, the normal water level H1 of the second shunting well, first point Flow the highest reserve-water-level H3 of the warning line H2 of well and facility of regulating and storing;Described method includes following steps:
1e) water body enters the first shunting well from the first water inlet, by the first rain rainfall of device monitoring in real time for monitoring rainfall L;
It is at this time fine day 2e) as L=0, the first water conservancy switch is in open state, and the second water conservancy switch is in closing State, third water conservancy switch are closed, and the 4th water conservancy switch is in current floe condition;Water body is arranged to carry out to sewage treatment plant Processing;
3e) work as L>It it is at this time the rainy day when 0, the device by monitoring water body liquid level monitors in the first shunting well well body in real time Water body liquid level H4 in water body liquid level H5 and facility of regulating and storing in water body liquid level H, the second shunting well well body;
4e) as L >=L1, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state;Water body is directly arranged to natural water;
5e) when 0<L<L1 and H<When H2, the water body liquid level H5 in the second shunting well well body is judged, if H5<H1, first Water conservancy switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, the 4th water Profit switch is in current floe condition;Water body is arranged to be handled to sewage treatment plant;
If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch, which is in, to be opened State is opened, the second water conservancy switch is in open state, and third water conservancy switch is closed, and the 4th water conservancy switch, which is in, to shut off State;Part water body is arranged to sewage treatment plant, and part water body is arranged temporarily to be stored to facility of regulating and storing;If H4 >=H3, the first water Profit switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, the 4th water conservancy Switch is in current floe condition;Part water body is arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, processing It is directly arranged afterwards to natural water;
6e) when 0<L<L1 and when H >=H2, if H4<H3, the first water conservancy switch is at open state, the second water conservancy switch In open state, third water conservancy switch is in open state, and the 4th water conservancy switch is in open state;Part water body is arranged to sewage Treatment plant, part water body is arranged temporarily to be stored to facility of regulating and storing, and part water body is arranged to be handled to online processing facility, processing It is directly arranged afterwards to natural water, part water body is directly arranged to natural water;If H4 >=H3, the first water conservancy switch is in opening state State, the second water conservancy switch are closed, and third water conservancy switch is in open state, and the 4th water conservancy switch is in opening state State, part water body are arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, is directly arranged to nature after processing Water body, part water body are directly arranged to natural water.
Embodiment 7
The present embodiment provides it is a kind of when the control of m- water level method water discharge control method, the water discharge control method is to be based on Drainage system described in embodiment 1, the drainage system include control system, the first monitoring device packet in the control system It includes the device of monitoring time and the device of monitoring water body liquid level and is separately positioned on outside shunting well and in the first shunting well well body, institute It includes monitoring the device of water body liquid level and being arranged in the second shunting well well body to state the second monitoring device in control system, described Third monitoring device in control system includes monitoring the device of water body liquid level and being arranged in facility of regulating and storing, in the control system Control unit in established standards time T1, the normal water level H1 of the second shunting well, the first shunting well warning line H2 and tune Store the highest reserve-water-level H3 of facility;Described method includes following steps:
1f) when fine day, water body enters the first shunting well from the first water inlet, and the first water conservancy switch is in open state, the Two water conservancies switch is closed, and third water conservancy switch is closed, and the 4th water conservancy switch is in current floe condition;Water body It arranges and is handled to sewage treatment plant;
2f) when the rainy day, water body enters the first shunting well from the first water inlet, and the device by monitoring water body liquid level is supervised in real time Survey water body liquid level H in the first shunting well well body, water in water body liquid level H5 and facility of regulating and storing in the second shunting well well body Body liquid level H4 monitors rain time T in real time by the device of monitoring time;
3f) as T >=T1, the first water conservancy switch is closed, and the second water conservancy switch is closed, third water Profit switch is closed, and the 4th water conservancy switch is in open state;Water body is directly arranged to natural water;
4f) work as T<T1 and H<When H2, the water body liquid level H5 in the second shunting well well body is judged, if H5<H1, the first water Profit switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is closed, the 4th water conservancy Switch is in current floe condition;Water body is arranged to be handled to sewage treatment plant;
If H1≤H5, the liquid level H4 for the water body regulated and stored in facility is judged, if H4<H3, the first water conservancy switch, which is in, to be opened State is opened, the second water conservancy switch is in open state, and third water conservancy switch is closed, and the 4th water conservancy switch, which is in, to shut off State;Part water body is arranged to sewage treatment plant, and part water body is arranged temporarily to be stored to facility of regulating and storing;If H4 >=H3, the first water Profit switch is in open state, and the second water conservancy switch is closed, and third water conservancy switch is in open state, the 4th water conservancy Switch is in current floe condition;Part water body is arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, processing It is directly arranged afterwards to natural water;
5f) work as T<T1 and when H >=H2, if H4<H3, the first water conservancy switch are in open state, and the second water conservancy switch is in Open state, third water conservancy switch are in open state, and the 4th water conservancy switch is in open state;Part water body is arranged at sewage Factory is managed, part water body is arranged temporarily to be stored to facility of regulating and storing, and part water body is arranged to be handled to online processing facility, after processing It directly arranges to natural water, part water body is directly arranged to natural water;If H4 >=H3, the first water conservancy switch is in open state, Second water conservancy switch is closed, and third water conservancy switch is in open state, and the 4th water conservancy switch is in open state, portion Water distribution component is arranged to sewage treatment plant, and part water body is arranged to be handled to online processing facility, is directly arranged after processing to natural water, Part water body is directly arranged to natural water.
In above-described embodiment 2-7, average topography point in receivable water area region is being accumulated according to second shunting well The normal water level H1 of second shunting well is arranged in height when water risk.
In above-described embodiment 2-7, ponding risk is being occurred to topography minimum point in receivable water area according to the first shunting well When height the warning line H2 of the first shunting well is set in the control unit of the control system.
In above-described embodiment 2-7, set in the control unit of the control system according to the carrying capacity of the facility of regulating and storing The highest reserve-water-level H3 of the facility of regulating and storing.
In above-described embodiment 2-7, the device of the monitoring water body liquid level is liquid level sensor, liquid level gauge, liquid-level switch etc..
In above-described embodiment 2-7, according to the water quality of the environmental carrying capacity for the natural water being discharged into and entrance shunting well Pollutant concentration standard value C1 is set in the control unit of the control system.
In above-described embodiment 2-7, according to the water quality of the environmental carrying capacity for the natural water being discharged into and entrance shunting well The highest pollutant concentration that can be handled with online processing facility sets pollutant concentration excessive value C2 in the control unit.
In above-described embodiment 2-7, the device of the monitoring water quality is Water quality detector, online COD monitors, online Ammonia nitrogen monitor, online TSS monitors, online BOD monitors, online NH3- N monitors, online TP monitors, online TN prisons Instrument, electrode, conductivity meter etc. are surveyed, what is monitored is the concentration of pollutant in water body in shunting well well body, and the pollutant includes TSS、COD、BOD、NH3One or more of-N, TN or TP.
In above-described embodiment 2-7, the Water quality detector can be using electrode method, UV optical methods, optical scattering method etc. Realize the detection to water quality.
In above-described embodiment 2-7, the environmental carrying capacity of the natural water that the shunting well is discharged into can be natural water such as Rivers,lakes and seas;When the environmental carrying capacity of the natural water is larger (such as ocean), pollutant concentration standard value C1 can be properly increased; When the environmental carrying capacity of the natural water is smaller (such as lake), pollutant concentration standard value C1 can be reduced suitably.When it is described into Enter shunting well water quality it is preferable when, be such as middle and later periods rainwater, pollutant concentration standard value C1 can reduce suitably;When described Into shunting well water quality it is poor when, be such as sanitary sewage and/or initial rainwater, pollutant concentration standard value C1 can fit Work as raising.Pollution the purpose is to reduction as few as possible to natural water.
In above-described embodiment 2-7, pollutant concentration excessive value C2 is also suitable above-mentioned setting principle, on this basis, institute The established standards for stating pollutant concentration excessive value C2 are also related with the upper limit of concentration that online processing facility can be handled, and are generally not more than The upper limit of concentration that online processing facility can be handled.
In above-described embodiment 2-7, the just rain total amount Q3 is according to the shunting well to required in receivable water area region The first rain millimeter collected is multiplied by the shunting well just rain total amount Q3 to be treated that receivable water area is calculated.
In above-described embodiment 2-7, the device of the monitoring water body total amount is selected from the electronic headstock gear with function of measuring.
In above-described embodiment 2-7, according to shunting well to the first rain millimeter of required collection in receivable water area in the control Shunting well is set in the control unit of system processed needs the standard shut off just rain rainfall L1.
In above-described embodiment 2-7, the device of the monitoring rainfall is rainfall gauge.
In above-described embodiment 2-7, according to the rain time of initial rainwater and shunting well to initial rainwater in receivable water area Whole diameters flow to shunting well required time established standards time T1 in the control unit of the control system.
In above-described embodiment 2-7, the device of the monitoring time is timer.
In above-described embodiment 2-7, the first water conservancy switch, the second water conservancy switch and third water conservancy switch may be implemented most Big current-limiting function refers to being less than or equal to the maximum stream flow of setting by the flow value that the water conservancy switchs in open state Value, this can adjust the aperture of the water conservancy switch to realize by the control unit in control system.
In above-described embodiment 2-7, the 4th water conservancy switch refers to that water body can be by the water conservancy in open state Switch flows to natural water.
In above-described embodiment 2-7, the 4th water conservancy switch refers to adjusting opening for the 4th water conservancy switch in current floe condition Degree, ensures that water body shuts off in the upstream end that the water conservancy switchs, and cannot be switched by the water conservancy and flow to natural water.
In above-described embodiment 2-7, it refers to the water body switched by the water conservancy that the water conservancy switch, which is closed, Flow value is zero.
More than, the embodiment of the utility model is illustrated.But the utility model is not limited to above-mentioned implementation Mode.Within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done, should be included in Within the scope of protection of the utility model.

Claims (19)

1. a kind of drainage system, which is characterized in that the drainage system includes the first shunting well, the second shunting well, facility of regulating and storing With online processing facility;
Wherein, first shunting well includes the first shunting well well body and be set in the first shunting well well body three Opening, is the first water inlet, the first water outlet and the second water outlet respectively;
Second shunting well include the second shunting well well body and be set in the second shunting well well body at least three Opening, is the second water inlet, the 4th water outlet and the 5th water outlet respectively;
First water outlet is connected by pipeline or gallery with the second water inlet;
4th water outlet is connected with facility of regulating and storing, and the 5th water outlet is connected with online processing facility;
The drainage system further includes the third water outlet for cutting dirty pipe and being set in the second shunting well well body;The third water outlet Mouth is connected by cutting dirty pipe with sewage treatment plant;
Further include the first water conservancy switch, the second water conservancy switch, third water conservancy switch and the 4th water conservancy switch in the drainage system; Wherein, the first water conservancy switch is being set close to the third water outlet, for controlling the water amount by third water outlet; The second water conservancy is arranged close to the 4th water outlet to switch, for controlling the water amount by the 4th water outlet;Close to institute It states the 5th water outlet setting third water conservancy to switch, for controlling the water amount by the 5th water outlet;Close to described second Water outlet is arranged the 4th water conservancy and switchs, for controlling the water amount by the second water outlet.
2. drainage system according to claim 1, which is characterized in that the drainage system further includes outlet pipe;Described Two water outlets are connected by outlet pipe with the pipeline towards natural water.
3. drainage system according to claim 2, which is characterized in that first water conservancy switch, the second water conservancy switch, the Three water conservancies switch and the 4th water conservancy switchs separately one kind in valve, gate or weir gate.
4. drainage system according to claim 3, which is characterized in that the valve is selected from ball valve, gate valve, knife gate valve, butterfly Valve, lift rubber slab shut off one kind in check-valves;The one kind of the gate in upper open type gate, bottom-open type gate; The one kind of the weir gate in upper open type weir gate, bottom-open type weir gate, rotary weir gate.
5. drainage system according to claim 2, which is characterized in that maximum current limliting may be implemented in the first water conservancy switch Function ensures that the flow switched by first water conservancy does not exceed the flow value of setting.
6. drainage system according to claim 2, which is characterized in that maximum current limliting may be implemented in the second water conservancy switch Function ensures that the flow switched by second water conservancy does not exceed the flow value of setting.
7. drainage system according to claim 2, which is characterized in that maximum current limliting may be implemented in the third water conservancy switch Function ensures that the flow switched by the third water conservancy does not exceed the flow value of setting.
8. drainage system according to claim 2, which is characterized in that the drainage system further includes control system, described Control system includes the first monitoring device, the second monitoring device, third monitoring device and the control unit being connect with three's signal; Described control unit is switched with the first water conservancy, the second water conservancy switch, third water conservancy switch and the 4th water conservancy switching signal are connect;Institute The first monitoring device is stated for monitoring the water body situation in the first shunting well well body, and generates the first monitoring signals;Described second Monitoring device is used to monitor the water body situation in the second shunting well well body, and generates the second monitoring signals;The third monitoring dress It sets for monitoring the water body situation regulated and stored in facility, and generates third monitoring signals;Described control unit is for receiving described the One monitoring signals, the second monitoring signals and third monitoring signals, and according to first monitoring signals, second monitoring signals The first water conservancy switch, the second water conservancy switch, third water conservancy switch and the 4th water conservancy switch are controlled with the third monitoring signals Aperture.
9. drainage system according to claim 8, which is characterized in that first monitoring device includes monitoring water body liquid level Device, monitor the device of water quality, monitor the device of water body total amount, monitor the device of rainfall, in the device of monitoring time At least one.
10. drainage system according to claim 9, which is characterized in that the device of the monitoring water body liquid level is that liquid level passes The device of sensor, liquid level gauge or liquid-level switch, the monitoring water quality is Water quality detector, online COD monitors, online ammonia Nitrogen monitor, TSS monitors, BOD monitors, TN monitors, TP monitors, electrode or conductivity meter, the monitoring water body are total The device of amount is the electronic headstock gear with function of measuring, and the device of the monitoring rainfall is rainfall gauge, the monitoring time Device is timer.
11. drainage system according to claim 9 or 10, which is characterized in that the device and prison of the monitoring water body liquid level The device for surveying water quality is arranged in the first shunting well well body, and the device of the monitoring rainfall is arranged in the first shunting well well body Outside, the device of the monitoring water body total amount is arranged on the switch of the water conservancy in the first shunting well well body, the dress of the monitoring time It installs in the first shunting well well body or outside shunting well well body.
12. drainage system according to claim 8, which is characterized in that second monitoring device includes monitoring water body liquid The device of position or at least one of the device for monitoring water body total amount.
13. drainage system according to claim 12, which is characterized in that the device of the monitoring water body liquid level is that liquid level passes The device of sensor, liquid level gauge or liquid-level switch, the monitoring water body total amount is the electronic headstock gear with function of measuring.
14. drainage system according to claim 12 or 13, which is characterized in that the device setting of the monitoring water body liquid level In the second shunting well well body, the device of the monitoring water body total amount is arranged on the switch of the water conservancy in the second shunting well well body.
15. drainage system according to claim 8, which is characterized in that the third monitoring device includes monitoring water body liquid The device of position.
16. drainage system according to claim 15, which is characterized in that the device of the monitoring water body liquid level is that liquid level passes Sensor, liquid level gauge or liquid-level switch.
17. drainage system according to claim 15 or 16, which is characterized in that the third monitoring device setting is being regulated and stored In facility.
18. according to the drainage system described in any one of claim 1-10, which is characterized in that the facility of regulating and storing be series connection or Multiple facilities of regulating and storing in parallel;The facility of regulating and storing includes storage pond, box culvert of regulating and storing, deep tunnel or shallow tunnel.
19. according to the drainage system described in any one of claim 1-10, which is characterized in that the online processing facility is string Connection or multiple online processing facilities of parallel connection;The online processing facility include biofilter, online processing pond, flocculation basin, tiltedly Plate sedimentation basin, setting pot or artificial swamp.
CN201721452278.8U 2017-10-30 2017-10-30 A kind of drainage system with rain processing system Active CN207760991U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721452278.8U CN207760991U (en) 2017-10-30 2017-10-30 A kind of drainage system with rain processing system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721452278.8U CN207760991U (en) 2017-10-30 2017-10-30 A kind of drainage system with rain processing system

Publications (1)

Publication Number Publication Date
CN207760991U true CN207760991U (en) 2018-08-24

Family

ID=63179043

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721452278.8U Active CN207760991U (en) 2017-10-30 2017-10-30 A kind of drainage system with rain processing system

Country Status (1)

Country Link
CN (1) CN207760991U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335446A (en) * 2020-04-01 2020-06-26 杭州瓦兴智能科技有限公司 Sewage index detection well for sewage discharge pipeline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111335446A (en) * 2020-04-01 2020-06-26 杭州瓦兴智能科技有限公司 Sewage index detection well for sewage discharge pipeline

Similar Documents

Publication Publication Date Title
CN107605006B (en) Drainage system and drainage control method
CN107761900A (en) It is a kind of to carry the double shunting wells of flap gate including the drainage system of the shunting well and water discharge control method
CN107653958B (en) A kind of drainage system and water discharge control method with facility of regulating and storing
CN207436200U (en) A kind of shunting well with downflow weir and the drainage system including the shunting well
CN207959445U (en) A kind of drainage system with regulate and store facility and online processing facility
CN107842088A (en) A kind of drainage system and water discharge control method with regulate and store facility and online treatment facility
CN107587580A (en) A kind of band surge bottom-open type weir gate and pump row drainage system and water discharge control method
CN107605005A (en) A kind of drainage system and water discharge control method arranged with waterpower non-return weir gate and pump
CN207761004U (en) A kind of shunting well with downflow weir and the drainage system including the shunting well
CN107620367A (en) A kind of drainage system and water discharge control method with section dirty pipe and facility of regulating and storing
CN107558593A (en) It is a kind of to enter four drainage systems and water discharge control method for going out formula shunting well including one
CN207760983U (en) A kind of drainage system with facility of regulating and storing
CN207760984U (en) A kind of drainage system managed with section dirt with online processing facility
CN207761003U (en) A kind of drainage system with regulate and store facility and integrated treatment facility
CN207760991U (en) A kind of drainage system with rain processing system
CN207436179U (en) A kind of shunting well with double flap gates and the drainage system including the shunting well
CN207436183U (en) A kind of carry cuts dirty pipe, a drainage system for regulate and store facility and online treatment facility
CN207760985U (en) A kind of band surges the drainage system of bottom-open type weir gate and pump row
CN107558594A (en) A kind of one, which enters four, goes out formula shunting well including the drainage system and water discharge control method of the shunting well
CN207436188U (en) A kind of drainage system with rain processing system
CN107587579A (en) A kind of a drainage system and water discharge control method with section dirt pipe and rainwater treatment facility
CN207959468U (en) A kind of one into four goes out formula shunting well and the drainage system including the shunting well
CN207760980U (en) It is a kind of to carry the drainage system for cutting dirty pipe and facility of regulating and storing
CN107806154A (en) A kind of drainage system and water discharge control method with online treatment facility
CN207436223U (en) A kind of drainage system for going out formula shunting well including one into four

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: No. 509 Weihu Road, Shamao Street, Hannan District, Wuhan City, Hubei Province, 430000

Patentee after: Wuhan Shengyu Smart Ecological Environmental Protection Co.,Ltd.

Address before: 430000, No. 189, Minli North Road, Wuhan Economic and Technological Development Zone, Hubei Province

Patentee before: WUHAN SHENGYU DRAINAGE SYSTEM Co.,Ltd.