CN206948843U - A kind of citrus orchard moat structures - Google Patents

A kind of citrus orchard moat structures Download PDF

Info

Publication number
CN206948843U
CN206948843U CN201720311104.3U CN201720311104U CN206948843U CN 206948843 U CN206948843 U CN 206948843U CN 201720311104 U CN201720311104 U CN 201720311104U CN 206948843 U CN206948843 U CN 206948843U
Authority
CN
China
Prior art keywords
soil
trench
seugh
moat structures
tread
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720311104.3U
Other languages
Chinese (zh)
Inventor
罗弟福
吴彦*
吴彦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Three Gorges Xinpai Agricultural Group Co ltd
Original Assignee
Chongqing Paisen 100 Orange Juice Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Paisen 100 Orange Juice Co Ltd filed Critical Chongqing Paisen 100 Orange Juice Co Ltd
Priority to CN201720311104.3U priority Critical patent/CN206948843U/en
Application granted granted Critical
Publication of CN206948843U publication Critical patent/CN206948843U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

A kind of citrus orchard moat structures of the utility model, including trench and seugh, the trench depth is 0.8~1.0 meter, it is filled with four layers of soil horizon, kind is implanted with citrus on the soil horizon, wherein, first soil horizon is the bottom, mixed and formed by lower soil and bulky grain material of improving the soil, second soil horizon is mixed and formed by upper layer of soil and little particle material of improving the soil, 3rd soil horizon is mixed and formed by topsoil and little particle material of improving the soil, 4th soil horizon is made up of BC soil layer, solve the problems, such as that preservation of fertility and water discharge technology can not be met existing for prior art simultaneously.

Description

A kind of citrus orchard moat structures
Technical field
It the utility model is related to orchard technical field of drainage, and in particular to a kind of citrus orchard moat structures.
Background technology
Requirement of the mandarin tree to water is higher, and soil is unable to too dry can not too wet.If soil moisture, closely The trunk in face gummosis and can rot, and cause blade to turn yellow, fallen leaves, gently then reduce yield, can also extremely be set when serious.
Mandarin tree result is more, yield is high, and fertilizer, water consumption are big, and the requirement to edaphic condition is higher than in general crop.High yield Citrus orchard requires soil layer depth, fertile soil, loose, acid-base value is suitable.In general arable land is difficult to reach this requirement, deserted mountain barren hill It is worse.It is improved soil, intensification soil layer, increase fertility to improve the soil, and adjusts soil acidity or alkalinity, is laid a solid foundation for citrus high yield.Pass through Much it was verified that every well-done citrus orchard of improving the soil, is easy for obtaining good quality and high output;Every improve the soil is made the citrus of difference Garden, yield and quality are difficult to improve.Must soil improvement is good so building citrus orchard, basis is accomplished fluently.Trench is improved the soil It is that the relatively common citrus orchard of one of which is improved the soil mode, but prior art citrus orchard moat structures are difficult to that soil will be kept Fertility meets simultaneously with draining.
Utility model content
In order to solve the problems, such as to meet existing for prior art preservation of fertility and water discharge technology simultaneously, this practicality is newly Type provides a kind of citrus orchard moat structures, and adopts the following technical scheme that:
A kind of citrus orchard moat structures of the utility model, including trench and seugh, the trench depth be 0.8~ 1.0 meters, it is filled with four layers of soil horizon, and kind is implanted with citrus on the soil horizon;Wherein, the first soil horizon is the bottom, Mixed and formed by lower soil and bulky grain material of improving the soil, the second soil horizon mixes group by upper layer of soil and little particle material of improving the soil Mixed and formed by topsoil and little particle material of improving the soil into, the 3rd soil horizon, the 4th soil horizon is made up of BC soil layer;Directly To being filled up trench and being higher by 0.3~0.4 meter of original ground, make the landfill depth of table soil and material of improving the soil in the main of Citrus Root Distributed area;Every layer of filled slope is 0.15~0.20 meter;Under described, in, upper and topsoil refer respectively to original 0.6~0.8 The soil horizon of rice, 0.4~0.6 meter, 0.2~0.4 meter and 0~0.2 meter depth;
For the moat structures of gentle slope ground of the gradient no more than 10%:The bottom of the trench is additionally provided with desilting water hole, institute State in desilting water hole and be filled with sandy soil;Connected between the trench by seugh, described seugh one end connects gutter, described Gutter is vertical with the trench, the seugh bottom and trench bottom at grade, and the seugh with Trench base plane sets 0.3% ratio drop, and it is minimum that the seugh with gutter is connected one end;
For the moat structures of slope of the gradient more than 10%:The moat structures also include back of the body ditch, the moat structures It is arranged on terraced fields, tread is be arranged in parallel with contour, and multiple trenches are uniformly arranged along contour direction on the tread, described Trench is arranged at tread center, and the tread is 2.5~3.5m of width, and the slightly lower plane in the slightly higher inner side in outside is described flat The gradient of face and horizontal plane is less than or equal to 10 °, is set at 0.3~0.5m of the tread inner distance ladder wall parallel to contour Ditch is carried on the back, the tread outside sets the side ridge along terraced wall.
Further, the trench spacing is 3.5m × 4.5m~3.5m × 4.5m.
Further, the trench is trapezium structure, the wide 1~1.5m in top, the wide 0.8~1.2m in bottom, deep 0.8~1m.
Further, bulky grain material of improving the soil is ratchel, head water-permeable pipe, branch or mao bamboon.
Further, little particle material of improving the soil is weeds, straw and farm manure.
Further, the seugh can build a fluid-tight parapet at middle part with stone or careless base, parapet Highly reach the 1/2~2/3 of ditch depth.
Further, in 10 annual~November, wide 40~60cm, deep 60~80cm expansion are set in the outside of former trench Cave ditch.
Further, if the terraced wall material is stone, the leaning angle of terraced wall and horizontal plane is 80 °~85 °;It is if described Terraced wall material is soil, then the leaning angle of terraced wall and horizontal plane is 65 °~80 °.
A kind of advantageous effects of citrus orchard moat structures of the utility model are:3~5 are filled in trench from bottom to top Layer soil horizon, the certain improvement of carry out to soil, has deepened soil layer, has added soil fertility, while reached good row Water purpose;Trench bottom sets desilting water hole, can play the purpose of water storage, and ensures that the nutrition in soil is not washed away; Seugh builds a fluid-tight parapet at middle part with stone or careless base, seugh is designed as " ring ditch ", under each Parapet during rain in ditch just can intercept rainwater and silt, reduce soil erosion, while and can draining.
Brief description of the drawings
Accompanying drawing 1 is a kind of structure of the citrus orchard moat structures of the utility model in gentle slope ground of the gradient no more than 10% Schematic diagram.
Accompanying drawing 2 is a kind of citrus orchard moat structures of the utility model hanging down in gentle slope ground of the gradient no more than 10% Directly in the profile in gutter.
Accompanying drawing 3 is a kind of structural representation of the citrus orchard moat structures of the utility model in slope of the gradient more than 10% Figure.
In accompanying drawing, 1 is trench, 2 is desilting water hole, 3 is gutter, 4 be seugh, and 5 be back of the body ditch, and 6 be the side ridge, and 7 be terraced Face, 8 be terraced wall.
A kind of citrus orchard moat structures of the utility model are described further with specific embodiment below in conjunction with the accompanying drawings.
Embodiment
Referring to a kind of citrus orchard moat structures structure of the utility model includes trench 1 and seugh 4, the trench 1 depth is 0.8~1.0 meter, and it is filled with four layers of soil horizon, and kind is implanted with citrus on the soil horizon;Wherein, the first soil horizon For the bottom, mixed and formed by lower soil and bulky grain material of improving the soil, the second soil horizon is improved the soil by upper layer of soil and little particle Material mixing composition, the 3rd soil horizon are mixed and formed by topsoil and little particle material of improving the soil, and the 4th soil horizon is native by middle level Earth layer forms;Until being filled up trench and being higher by 0.3~0.4 meter of original ground, make the landfill depth of table soil and material of improving the soil in mandarin orange The main distributed area of tangerine root system;Every layer of filled slope is 0.15~0.20 meter;Under described, in, upper referred respectively to topsoil The soil horizon of originally 0.6~0.8 meter, 0.4~0.6 meter, 0.2~0.4 meter and 0~0.2 meter depth;If orchard soil is purple stone The stronger soil of the alkalescence such as frame soil, 3~10 kilograms of Cosans are added in every cubic metre of backfill soil;If orchard soil is The acid strong soil such as big yellow soil, 1~3 kilogram of lime is added in every cubic metre of backfill soil;In addition, the knot of improved soil Structure, clay can also be added in sandy soil, sandy soil are added in clay, purple soil be added in yellow earth and red soil, in purple soil Middle addition yellow earth or red soil, the soil of addition will mix with original soil.
It is no more than 10% gentle slope ground moat structures for the gradient:The bottom of the trench 1 is additionally provided with desilting water hole 2, institute State in desilting water hole 2 and be filled with sandy soil;Connected between the trench 1 by seugh 4, described one end of seugh 4 connects gutter 3, the gutter 3 is vertical with the trench 1, and the bottom of seugh 4 and the bottom of trench 1 are at grade, and described Seugh 4 and the base plane of trench 1 set 0.3% ratio to drop, and it is minimum that the seugh 4 with gutter 3 is connected one end.It is right In thirsty fields, desilting water hole can make orchard will not too dry with water storage;Seugh 4 tilts to the direction of gutter 3, is beneficial to Draining.
For slope moat structures of the gradient more than 10%:The moat structures also include back of the body ditch 5, the moat structures It is arranged on terraced fields, tread 7 is be arranged in parallel with contour, and multiple trenches 1 are uniformly arranged along contour direction on the tread 7, The trench 1 is arranged at the center of tread 7, and the tread 7 is 2.5~3.5m of width, the slightly lower plane in the slightly higher inner side in outside, The plane and the gradient of horizontal plane are 5 °~20 °, parallel to contour at the 0.3~0.5m of inner distance ladder wall of tread 7 Back of the body ditch 5 is set, and the outside of tread 7 sets the side ridge 6 along terraced wall 8.The more arid orchard tread gradient is 5 °~15 °, paddy field fruit The gradient of garden tread 7 is 10 °~20 °, and back of the body ditch is lower slightly skewed in the slightly higher one end in one end, is easy to draining.
Trench 1 is trapezium structure, the wide 1~1.5m in top, the wide 0.8~1.2m in bottom, deep 0.8~1m.The spacing of trench 1 is 3.5m × 4.5m~3.5m × 4.5m.
Wherein bulky grain material of improving the soil is ratchel, head water-permeable pipe, branch or mao bamboon.Little particle improve the soil material for weeds, Straw and farm manure.
Seugh 4 can build a fluid-tight parapet at middle part with stone or careless base, and the height of parapet reaches ditch depth 1/2~2/3.Seugh 4 is arranged to " ring ditch ", and parapet when raining every time in ditch subtracts with regard to that can intercept rainwater and silt Few soil erosion, while and can draining.
In 10 annual~November, wide 40~60cm is set in the outside of former trench, deep 60~80cm expansion cave ditch, makes mandarin orange The growth of tangerine root system will not be confined in former trench, limit the growth of citrus, it is difficult to reach high yield, the purpose of stable yields.
If the material of terraced wall 8 is stone, the leaning angle of terraced wall 8 and horizontal plane is 80 °~85 °;If the material of terraced wall 8 Expect for soil, then the leaning angle of terraced wall 8 and horizontal plane is 65 °~80 °.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this It is all within the spirit and principles of the utility model for the technical staff in field, any modification for being made, equivalent substitution, change Enter, should be included within the scope of protection of the utility model.

Claims (6)

1. a kind of citrus orchard moat structures, including trench and seugh, it is characterised in that:The trench depth is 0.8~1.0 Rice, it is filled with four layers of soil horizon, and kind is implanted with citrus on the soil horizon;Trench is filled up and is higher by original ground by soil horizon 0.3~0.4 meter;Every layer of filled slope is 0.15~0.20 meter;
For the moat structures of gentle slope ground of the gradient no more than 10%:The bottom of the trench is additionally provided with desilting water hole, described heavy Sandy soil are filled with husky water hole;Connected between the trench by seugh, described seugh one end connects gutter, the draining Ditch is vertical with the trench, the seugh bottom and trench bottom at grade, and the seugh and trench Base plane sets 0.3% ratio drop, and it is minimum that the seugh with gutter is connected one end;
For the moat structures of slope of the gradient more than 10%:The moat structures also include back of the body ditch, and the moat structures are set In on terraced fields, tread is be arranged in parallel with contour, and multiple trenches, the trench are uniformly arranged along contour direction on the tread Be arranged at tread center, the tread is 2.5~3.5m of width, the slightly lower plane in the slightly higher inner side in outside, the plane with The gradient of horizontal plane is less than or equal to 10 °, sets and carries on the back parallel to contour at 0.3~0.5m of the tread inner distance ladder wall Ditch, the tread outside set the side ridge along terraced wall.
A kind of 2. citrus orchard as claimed in claim 1 moat structures, it is characterised in that:The trench spacing is 3.5m × 4.5m ~3.5m × 4.5m.
A kind of 3. citrus orchard as claimed in claim 1 moat structures, it is characterised in that:The trench is trapezium structure, top Wide 1~1.5m, the wide 0.8~1.2m in bottom, deep 0.8~1m.
A kind of 4. citrus orchard as claimed in claim 1 moat structures, it is characterised in that:The seugh can be used at middle part Stone or careless base build a fluid-tight parapet, and the height of parapet reaches the 1/2~2/3 of ditch depth.
A kind of 5. citrus orchard as claimed in claim 1 moat structures, it is characterised in that:Width is additionally provided with the outside of former trench 40~60cm, deep 60~80cm expansion cave ditch.
A kind of 6. citrus orchard as claimed in claim 1 moat structures, it is characterised in that:If the terraced wall material is stone, The leaning angle of terraced wall and horizontal plane is 80 °~85 °;If the terraced wall material is soil, the leaning angle of terraced wall and horizontal plane is 65 ° ~80 °.
CN201720311104.3U 2017-03-28 2017-03-28 A kind of citrus orchard moat structures Active CN206948843U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720311104.3U CN206948843U (en) 2017-03-28 2017-03-28 A kind of citrus orchard moat structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720311104.3U CN206948843U (en) 2017-03-28 2017-03-28 A kind of citrus orchard moat structures

Publications (1)

Publication Number Publication Date
CN206948843U true CN206948843U (en) 2018-02-02

Family

ID=61376424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720311104.3U Active CN206948843U (en) 2017-03-28 2017-03-28 A kind of citrus orchard moat structures

Country Status (1)

Country Link
CN (1) CN206948843U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113396662A (en) * 2021-06-24 2021-09-17 武汉市新洲区果茶技术服务站 Method for improving civil garden through pear tree cultivation

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113396662A (en) * 2021-06-24 2021-09-17 武汉市新洲区果茶技术服务站 Method for improving civil garden through pear tree cultivation
CN113396662B (en) * 2021-06-24 2022-09-09 武汉市新洲区果茶技术服务站 Method for improving civil garden through pear tree cultivation

Similar Documents

Publication Publication Date Title
CN101946573B (en) Method for ameliorating saline and alkaline land
CN102067753B (en) Long-term governance method for converting saline-alkali soil into fertile farmland
CN103988758A (en) Method for improving afforestation survival rate by water collecting, water retention and water replenishing
CN102656987B (en) Method for supplementing water and fertilizer by using biogas slurry
CN101112157A (en) Method for greening high precipitous rock slope
CN103340114A (en) Multilayer plant-cultivating bag made of linen
CN104838947A (en) Construction method for keeping ecological orchard by water and soil of south red earth hilly area
CN102392453B (en) Terrace bank construction method for changing slope farmland into level terrace in reservoir area of Three Gorges
CN103416278A (en) Method for culturing vegetation in Karst landform region
CN105210494A (en) Loess steep slope is mixed hands over Afforestation method
CN105594564A (en) Rainwater collecting and deep infiltrating method for economic forest in mountainous region
CN204762564U (en) Ecological orchard construction equipment of south red soil hills area soil and water conservation
CN109041626A (en) Newly-built citrus orchard soil improvement and fertilizer application method
CN106922242A (en) A kind of method of improving the soil in citrus orchard field
CN108301422A (en) A kind of ecological restoration method for rocky slope
CN203015513U (en) Commercial crop planting pit of seasonal-drought hilly land
CN105340408A (en) Afforestation and soil preparation method for rocky barren mountains in semi-arid regions
CN102498758B (en) A kind of water-saving cultivation method and growing structures
CN206948843U (en) A kind of citrus orchard moat structures
CN206916716U (en) A kind of citrus orchard paddy field moat structures
CN107950345A (en) Terraced fields establishment of economic forest method in alluvial plain under the conditions of a kind of loess hilly landform area abrupt slope
CN108293831A (en) Heavy saline afforestation greening method
CN104762946A (en) Filler and method for ecologically repairing damaged mountain
CN205232722U (en) Slot type ecological isolation takes terraced fields in xeothermic river valley district
CN106085458A (en) A kind of salt-soda soil shrub plantation modifying agent formula and modification method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220930

Address after: Wenbi Village, Xinli Town, Zhong County, Chongqing 404325

Patentee after: Chongqing Three Gorges Xinpai Agricultural Group Co.,Ltd.

Address before: Sancha Bay, Xinli Town, Zhong County, Chongqing 404325

Patentee before: CHONGQING PAISENBAI ORANGE JUICE CO.,LTD.

TR01 Transfer of patent right