CN206769335U - A kind of high stability scaffold for building - Google Patents

A kind of high stability scaffold for building Download PDF

Info

Publication number
CN206769335U
CN206769335U CN201720017337.2U CN201720017337U CN206769335U CN 206769335 U CN206769335 U CN 206769335U CN 201720017337 U CN201720017337 U CN 201720017337U CN 206769335 U CN206769335 U CN 206769335U
Authority
CN
China
Prior art keywords
process box
fixed
scaffold
high stability
brace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720017337.2U
Other languages
Chinese (zh)
Inventor
高伟男
姚银娟
白香鸽
崔四卷
李志强
薛鹏飞
张晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720017337.2U priority Critical patent/CN206769335U/en
Application granted granted Critical
Publication of CN206769335U publication Critical patent/CN206769335U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses a kind of high stability scaffold for building, including process box, cat ladder, bottom plate is provided below in the process box, the process box surrounding is provided with brace, the brace end set has steel wire rope, the steel wire rope afterbody is provided with mousing-hook, the process box rear portion is provided with expansion link, the telescopic rod end is provided with sucker, cat ladder is installed inside upper and lower two process boxs, pedal is provided with the process box of the top, the process box upper side of the top is provided with hoist engine.Beneficial effect is:The bottom of scaffold is fixed, and can be supported in erection process on wall without damaging wall body structure, conveys material up and down and is also more convenient, and work high above the ground is carried out so as to convenient.

Description

A kind of high stability scaffold for building
Technical field
Construction equipment technical field is the utility model is related to, more particularly to a kind of high stability pin hand for building Frame.
Background technology
Scaffold (scaffold) refer to job site for operation and solve vertically and horizontally transport set up it is various Support.The generic term of architecture field, refer to and exterior wall, inside fitting or the higher ground that can not directly construct of floor height are used on construction site Side.Mainly for workmen works or perimeter security net is gone along with sb. to guard him and high-altitude installation component etc. up and down, scaffold making material leads to Chang You:Bamboo and wood, steel pipe or synthetic material etc..Some engineerings are also with scaffold when template use, in addition in advertising, municipal administration, friendship The departments such as path bridge, mine are also used extensively.The Chinese patent of Application No. 201310274502.9, disclose a kind of pin hand Frame, a kind of scaffold of square framework is provided for the small-scale constructions work in low latitude, facilitate worker highly efficient complete in construction Into building a wall, transmitting cement material and material of brick and other items, ensure the security of low latitude operation.Scaffold, including restocking, connecting pin, under Frame, base, U-shaped jacking, linking arm, pedal and staircase;It is characterized in that be provided with U-shaped jacking above the restocking, it is described on Frame side is provided with linking arm, and the linking arm is connected with undercarriage, and connecting pin is provided with below the restocking.Above-mentioned patent is present can only Carry out low latitude operation, highly higher than 5m after, the stability of scaffold substantially reduces, dangerous during use.
Utility model content
The purpose of this utility model is that to solve the above problems and provides a kind of high stability scaffold for building.
The utility model is achieved through the following technical solutions above-mentioned purpose:
Bottom plate is provided below in a kind of high stability scaffold for building, including process box, cat ladder, the process box, institute State process box surrounding and be provided with brace, the brace end set has steel wire rope, and the steel wire rope afterbody is provided with anticreep Hook, the process box rear portion are provided with expansion link, and the telescopic rod end is provided with sucker, inside upper and lower two process boxs Cat ladder is installed, pedal is provided with the process box of the top, the process box upper side of the top is provided with volume Raise machine.
Further, the process box protects vertical rod, cross bar, reinforcing bar, adapter sleeve, and the vertical rod is highly 1.5m, described Cross bar is divided into long and short two kind size, and four vertical rods and four cross bars are fixed to form square institute by the adapter sleeve Process box is stated, the reinforcing bar is fixed by screws between the column.
Further, the sleeve for installing the vertical rod is provided with the bottom plate, the bottom plate is fixed on institute by bearing pin State bottom of upright rod.
Further, the brace is fixed on the surrounding of the process box by bearing pin, and described steel wire rope one end is fixed On the brace, the steel wire rope other end is fixed in the mousing-hook.
Further, the expansion link bearing pin is fixed in the vertical rod of the side of wall, is set on the sucker There is depression bar.
Further, multiple process boxs are fixed together to form scaffold vertically by the adapter sleeve, described to climb Ladder is fixed on by neck in the reinforcing bar of upper and lower two process boxs.
Further, the pedal is fixed in the process box by neck, and the foot-operated plate surface is wire netting Shape designs, can be with two pedals placed side by side on the cross bar of the process box.
The beneficial effects of the utility model are:The bottom of scaffold is fixed, and can be propped up in erection process Support, without damaging wall body structure, conveys material and is also more convenient up and down on wall, and work high above the ground is carried out so as to convenient.
Brief description of the drawings
Fig. 1 is a kind of space multistory view of high stability scaffold for building described in the utility model.
Description of reference numerals is as follows:
1st, bottom plate;2nd, mousing-hook;3rd, steel wire rope;4th, brace;5th, vertical rod;6th, cat ladder;7th, pedal;8th, process box;9、 Hoist engine;10th, adapter sleeve;11st, cross bar;12nd, sucker;13rd, expansion link;14th, reinforcing bar.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in figure 1, a kind of high stability scaffold for building, including process box 8, cat ladder 6, process box 8 are provided below There is bottom plate 1, the surrounding of process box 8 is provided with brace 4, and the end set of brace 4 has steel wire rope 3, and the afterbody of steel wire rope 3 is provided with anti- Break off relations 2, the rear portion of process box 8 is provided with expansion link 13, and the end set of expansion link 13 has a sucker 12, inside upper and lower two process boxs 8 Cat ladder 6 is installed, pedal 7 is provided with the process box 8 of the top, the upper side of process box 8 of the top is provided with hoist engine 9。
In said structure, when scaffold is installed, first four vertical rods 5 are fixed in the sleeve of bottom plate 1 by bearing pin, selected Promise four bottom plates 1 in suitable ground are in same level, and installing cross bar 11 by adapter sleeve 10 forms single work Make frame 8, brace 4 is fixed in vertical rod 5, by being fixed on the ground after the tense wire rope 3 of mousing-hook 2, it is necessary to which high-altitude is made New process box 8 is successively fixed during industry on process box 8, and sucker 12 is fixed on wall by the length by adjusting expansion link 13 On, workmen is climbed to operation is carried out on pedal 7 by the cat ladder 6 being arranged on inside process box 8, and it is real to pass through hoist engine 9 Existing fast removal material.
Further, process box 8 protects vertical rod 5, cross bar 11, reinforcing bar 14, adapter sleeve 10, and the height of vertical rod 5 is 1.5m, cross bar 11 points are that long and short two kind size, four vertical rods 5 and four cross bars 11 form square process box 8 by the fixation of adapter sleeve 10, are added Gu bar 14 is fixed by screws between column, the sleeve of installation vertical rod 5 is provided with bottom plate 1, bottom plate 1 is fixed on by bearing pin The bottom of vertical rod 5, brace 4 are fixed on the surrounding of process box 8 by bearing pin, and the one end of steel wire rope 3 is fixed on brace 4, steel wire 3 other ends of restricting are fixed in mousing-hook 2, and the bearing pin of expansion link 13 is fixed in the vertical rod 5 of the side of wall, is set on sucker 12 There is depression bar, multiple process boxs 8 are fixed together to form scaffold vertically by adapter sleeve 10, and cat ladder 6 is fixed on by neck In the reinforcing bar 14 of lower two process boxs 8, pedal 7 is fixed in process box 8 by neck, and the surface of pedal 7 is wire netting Shape designs, can be with two pedals 7 placed side by side on the cross bar 11 of process box 8.
General principle, principal character and advantage of the present utility model has been shown and described above.The technical staff of the industry It should be appreciated that the utility model is not restricted to the described embodiments, the simply explanation described in above-described embodiment and specification is originally The principle of utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model also has various change And improvement, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model requires protection scope Defined by appended claims and its effect thing.

Claims (7)

  1. A kind of 1. high stability scaffold for building, it is characterised in that:Including process box, cat ladder, the process box is provided below There is bottom plate, the process box surrounding is provided with brace, and the brace end set has steel wire rope, and the steel wire rope afterbody is set Mousing-hook is equipped with, the process box rear portion is provided with expansion link, and the telescopic rod end is provided with sucker, upper and lower two works Make inframe portion and cat ladder is installed, pedal, the process box upper side of the top are provided with the process box of the top It is provided with hoist engine.
  2. A kind of 2. high stability scaffold for building according to claim 1, it is characterised in that:The process box includes vertical Bar, cross bar, reinforcing bar, adapter sleeve, the vertical rod are highly 1.5m, and the cross bar is divided into long and short two kind size, and four described vertical Bar and four cross bars are fixed to form the square process box by the adapter sleeve, and the reinforcing bar is fixed by screw Between the vertical rod.
  3. A kind of 3. high stability scaffold for building according to claim 2, it is characterised in that:It is provided with the bottom plate The sleeve of the vertical rod is installed, the bottom plate is fixed on the bottom of upright rod by bearing pin.
  4. A kind of 4. high stability scaffold for building according to claim 1, it is characterised in that:The brace passes through pin Axle is fixed on the surrounding of the process box, and described steel wire rope one end is fixed on the brace, and the steel wire rope other end is consolidated It is scheduled in the mousing-hook.
  5. A kind of 5. high stability scaffold for building according to claim 2, it is characterised in that:The expansion link bearing pin is consolidated In the vertical rod of the side of fixed close wall, depression bar is provided with the sucker.
  6. A kind of 6. high stability scaffold for building according to claim 2, it is characterised in that:Multiple process boxs lead to Cross the adapter sleeve to be fixed together to form scaffold vertically, the cat ladder is fixed on two process boxs up and down by neck Reinforcing bar on.
  7. A kind of 7. high stability scaffold for building according to claim 2, it is characterised in that:The pedal passes through card Groove is fixed in the process box, and the foot-operated plate surface is metal net shaped design, can be with the cross bar of the process box Two pedals placed side by side.
CN201720017337.2U 2017-01-08 2017-01-08 A kind of high stability scaffold for building Expired - Fee Related CN206769335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720017337.2U CN206769335U (en) 2017-01-08 2017-01-08 A kind of high stability scaffold for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720017337.2U CN206769335U (en) 2017-01-08 2017-01-08 A kind of high stability scaffold for building

Publications (1)

Publication Number Publication Date
CN206769335U true CN206769335U (en) 2017-12-19

Family

ID=60647623

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720017337.2U Expired - Fee Related CN206769335U (en) 2017-01-08 2017-01-08 A kind of high stability scaffold for building

Country Status (1)

Country Link
CN (1) CN206769335U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898831A (en) * 2019-03-15 2019-06-18 东阳市天杨建筑工程设计有限公司 A kind of scaffold and its material conveying method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109898831A (en) * 2019-03-15 2019-06-18 东阳市天杨建筑工程设计有限公司 A kind of scaffold and its material conveying method
CN109898831B (en) * 2019-03-15 2021-06-08 东阳市天杨建筑工程设计有限公司 Scaffold and material conveying method thereof

Similar Documents

Publication Publication Date Title
CN103206074B (en) Elevator shaft template construction method, platform and support
CN101942901A (en) Support frame or scaffold and construction method thereof
CN106400691A (en) Integrated construction process for anti-collision wall formwork
CN205348727U (en) A promote formula operation platform for in shaft
CN206769335U (en) A kind of high stability scaffold for building
CN205296799U (en) Construction of elevator well and protection platform
CN205206284U (en) But detachably assembled formula elevartor shaft operation platform
CN104372923B (en) Scaffolding
CN205857026U (en) A kind of movable type bridge anticollision barrier construction operation chassis
CN207144446U (en) A kind of construction Skidproof hanging cradle
CN206769351U (en) A kind of regularization hoistway operation platform hoisting frame
CN207499376U (en) A kind of scaffold for building
CN207063484U (en) Movable operation platform for corridor construction
CN206053269U (en) Bamboo ferrum mixing frame for building
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN204492133U (en) A kind of easy insulated column construction tool frame
CN107829553A (en) A kind of elevator hoistways construction platform system
CN208732557U (en) Mobile hydraulic elevating device
CN207434909U (en) Lifting/lowering type dedusting tower crane
CN206397107U (en) Armored concrete construction of lift well operating platform bracket
CN206205446U (en) A kind of steel assembles passage
CN206591798U (en) A kind of stable type scaffold for building
CN204626931U (en) In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform
CN205348728U (en) A promote formula operation platform bearing structure for in shaft
CN205348729U (en) A instrument formula operation protection platform for in shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

Termination date: 20190108