CN204626931U - In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform - Google Patents

In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform Download PDF

Info

Publication number
CN204626931U
CN204626931U CN201520241673.6U CN201520241673U CN204626931U CN 204626931 U CN204626931 U CN 204626931U CN 201520241673 U CN201520241673 U CN 201520241673U CN 204626931 U CN204626931 U CN 204626931U
Authority
CN
China
Prior art keywords
climbing
tower crane
platform
operation platform
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520241673.6U
Other languages
Chinese (zh)
Inventor
王鹏
张学臣
闫海强
杨迪
王智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
China Railway Construction Group Southern Engineering Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201520241673.6U priority Critical patent/CN204626931U/en
Application granted granted Critical
Publication of CN204626931U publication Critical patent/CN204626931U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

To the utility model discloses in a kind of inside-climbing tower crane well hole suspension type from climbing operation platform, comprise middle platform main body and turnover panel, the checkered steel plate that platform main body comprises middle platform skeleton and is welded on platform skeleton, be connected with wire rope between tower body and operation platform body, between wire rope and operation platform body, be connected with jack.The beneficial effects of the utility model: operation platform of the present utility model is simple and practical, by using operation platform of the present utility model, thus workman upwards can be climbed along with tower crane in work progress, and make workman obtain safe and reliable operating environment when tower crane well in-cavity construction, and then shorten the time of climbing in workman's tower crane, improve in tower crane the efficiency of climbing construction.

Description

In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform
Technical field
The utility model relates to operation platform field, specifically, to relate in a kind of inside-climbing tower crane well hole suspension type from climbing operation platform.
Background technology
At present, Reinforced Concrete Core Walls Structure adds super highrise building many employings inner climbing crane tower construction of steel tube concrete frame puncheon form of structure, inside-climbing tower crane is generally arranged in Reinforced Concrete Core Walls Structure, floor corresponding to tower crane bottom need get rid of the construction of lower secondary, and this causes this position to form Jing Dong from top to bottom.Because inside-climbing tower crane jacking girder steel needs rotation upwards to fall use, workman dismantles girder steel does not have operation platform, can adopt steel tube fastener erection construction platform when floor is lower, and it is large that floor raises rear erection construction platform difficulty gradually, the manpower and materials of at substantial.
For the problem in above-mentioned correlation technique, at present effective solution is not yet proposed.
Utility model content
For problem above-mentioned in correlation technique, the utility model proposes suspension type in a kind of inside-climbing tower crane well hole and, from climbing operation platform, can shorten in tower crane and climb time, improve in tower crane and climb efficiency of construction.
For realizing above-mentioned technical purpose, the technical solution of the utility model is achieved in that
In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform, comprise middle platform main body and turnover panel, the checkered steel plate that described platform main body comprises middle platform skeleton and is welded on described platform skeleton, secondary joist, periphery main joist and middle main joist that described platform skeleton is fixedly installed by intersection are formed, described middle main joist is provided with suspension ring, described turnover panel is welded in described periphery main joist by hinge, described suspension ring are connected with tower body by wire rope, are connected with jack between described wire rope and described suspension ring.
Further, described jack upper end is fixedly connected with described wire rope by the wire line hitch that wire rope is arranged.
The beneficial effects of the utility model: operation platform of the present utility model is simple and practical, by using operation platform of the present utility model, thus workman upwards can be climbed along with tower crane in work progress, and make workman obtain safe and reliable operating environment when tower crane well in-cavity construction, and then shorten the time of climbing in workman's tower crane, improve in tower crane the efficiency of climbing construction.
Accompanying drawing explanation
In order to be illustrated more clearly in the utility model embodiment or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment below, apparently, accompanying drawing in the following describes is only embodiments more of the present utility model, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the top view of the operation platform body according to the utility model embodiment;
Fig. 2 be in the inside-climbing tower crane well hole according to the utility model embodiment suspension type from climbing the lateral view of operation platform;
Fig. 3 be in the inside-climbing tower crane well hole according to the utility model embodiment suspension type from the partial enlarged drawing of lateral view of the operation platform that climbs.
In figure:
1, secondary joist; 2, periphery main joist; 3, middle main joist; 4, tower body; 5, suspension ring; 6, Core Walls Structure shear wall; 7, turnover panel; 8, hinge; 9, checkered steel plate; 10, jack; 11, wire rope; 12, wire line hitch; 13, supporting leg; 14, spandrel girder.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the utility model embodiment, be clearly and completely described the technical scheme in the utility model embodiment, obviously, described embodiment is only the utility model part embodiment, instead of whole embodiments.Based on the embodiment in the utility model, the every other embodiment that those of ordinary skill in the art obtain, all belongs to the scope of the utility model protection.
As Figure 1-3, in a kind of inside-climbing tower crane well hole according to embodiment of the present utility model, suspension type is from climbing operation platform, it is characterized in that, comprise middle platform main body and turnover panel 7, the checkered steel plate 9 that described platform main body comprises middle platform skeleton and is welded on described platform skeleton, described platform skeleton is by intersecting the secondary joist 1 be fixedly installed, periphery main joist 2 and middle main joist 3 are formed, described middle main joist 3 is provided with suspension ring 5, described turnover panel 7 is welded in described periphery main joist 2 by hinge 8, described suspension ring 5 are connected with tower body 4 by wire rope 11, jack 10 is connected with between described wire rope 11 and described suspension ring 5.
In addition, in a specific embodiment, described jack 10 upper end is fixedly connected with described wire rope 11 by the wire line hitch 12 that wire rope 11 is arranged.
Conveniently understand technique scheme of the present utility model, below by way of in concrete mode of occupation, technique scheme of the present utility model is described in detail.
When specifically using, periphery main joist 2 and secondary joist 1, middle main joist 3 are welded into platform skeleton, checkered steel plate 9 is welded on platform skeleton becomes platform main body, turnover panel 7 is welded on periphery main joist 2 by hinge 8, like this can by turnover panel 7 fold inward in platform lifting process, collision free Core Walls Structure shear wall 6 or supporting leg 13.
Suspension ring 5 are welded on main joist 3, wire rope 11 upper end is fixed on tower body 4, and lower end is fixed on suspension ring 5, under operation platform body being suspended on tower crane with this, when wire rope 11 is flat, directly suspension platform is not stressed, and it can play safety rope when jack 10 loses efficacy; Jack 10 upper end is fixed on wire line hitch 12, and lower end is fixed on suspension ring 5, plays the effect of hanging operation platform body at ordinary times.
Constructor stands on operation platform body, can realize installing or removing supporting leg 13, spandrel girder 14, and is regulated the height of operation platform body within a certain height by jack 10.
In sum, by means of technique scheme of the present utility model, operation platform of the present utility model is simple and practical, by using operation platform of the present utility model, thus workman upwards can be climbed along with tower crane in work progress, and make workman obtain safe and reliable operating environment when tower crane well in-cavity construction, and then shorten the time of climbing in workman's tower crane, improve in tower crane the efficiency of climbing construction.
The foregoing is only preferred embodiment of the present utility model; not in order to limit the utility model; all within spirit of the present utility model and principle, any amendment done, equivalent replacement, improvement etc., all should be included within protection domain of the present utility model.

Claims (2)

1. in an inside-climbing tower crane well hole suspension type to climb operation platform, it is characterized in that, comprise middle platform main body and turnover panel (7), the checkered steel plate (9) that described platform main body comprises middle platform skeleton and is welded on described platform skeleton, described platform skeleton is by intersecting the secondary joist (1) be fixedly installed, periphery main joist (2) and middle main joist (3) are formed, described middle main joist (3) is provided with suspension ring (5), described turnover panel (7) is welded in described periphery main joist (2) by hinge (8), described suspension ring (5) are connected with tower body (4) by wire rope (11), jack (10) is connected with between described wire rope (11) and described suspension ring (5).
2. in inside-climbing tower crane well hole according to claim 1, suspension type, from climbing operation platform, is characterized in that, described jack (10) upper end is fixedly connected with described wire rope (11) by the upper wire line hitch (12) arranged of wire rope (11).
CN201520241673.6U 2015-04-20 2015-04-20 In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform Expired - Fee Related CN204626931U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520241673.6U CN204626931U (en) 2015-04-20 2015-04-20 In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520241673.6U CN204626931U (en) 2015-04-20 2015-04-20 In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform

Publications (1)

Publication Number Publication Date
CN204626931U true CN204626931U (en) 2015-09-09

Family

ID=54045971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520241673.6U Expired - Fee Related CN204626931U (en) 2015-04-20 2015-04-20 In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform

Country Status (1)

Country Link
CN (1) CN204626931U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110945195A (en) * 2017-06-30 2020-03-31 Hws混凝土塔有限公司 Self-climbing apparatus for vertical and quasi-vertical concrete surfaces

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110945195A (en) * 2017-06-30 2020-03-31 Hws混凝土塔有限公司 Self-climbing apparatus for vertical and quasi-vertical concrete surfaces

Similar Documents

Publication Publication Date Title
CN103711301A (en) Construction method and device for two-track movable electric basket and lifting hoist
CN205421880U (en) Instrument formula protection frame suitable for assemble integral concrete outer wall board
CN204418629U (en) Integrated form climbs frame
CN205934735U (en) A operation platform for stretch -draw of cantilever bent cap
CN206233546U (en) A kind of elevator hoistways workbench
CN202577925U (en) Lifting type platform in elevator shaft
CN204626930U (en) Integrated lifting frame operating platform
CN204626931U (en) In a kind of inside-climbing tower crane well hole, suspension type is from climbing operation platform
CN104372923B (en) Scaffolding
CN203783105U (en) Fast construction operating platform used for section steel column interior pouring concrete
CN202882377U (en) Hanging scaffold for integral hanging construction of truss
CN203129580U (en) Formwork system
CN205476420U (en) Modular steel cat ladder
CN204238537U (en) A kind of elevated hoistway operation platform
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN205171979U (en) Integrated form all steel lift platform
CN203654754U (en) Double-layered overhanging type discharging platform
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN205134921U (en) Building outer wall concrete constructional column hangs construction platform
CN205276843U (en) Instrument formula protection frame suitable for assemble protruding type component of integral concrete
CN203320922U (en) Supporting device for forming of elevator shaft template
CN204023414U (en) The few fulcrum support entirety of a kind of novel large falls rack device
CN204038917U (en) Detachable external hanging type operating platform
CN204456813U (en) A kind of single support operation platform for elevator hoistways

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20171211

Address after: 511458 Guangdong city of Guangzhou province Nansha District City Road South Ring Shacheng office building A

Patentee after: CHINA RAILWAY CONSTRUCTION GROUP SOUTH ENGINEERING Co.,Ltd.

Address before: 100131 Shijingshan Road, Beijing, No. 20, No.

Patentee before: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180115

Address after: 100131 Shijingshan Road, Beijing, No. 20, No.

Co-patentee after: CHINA RAILWAY CONSTRUCTION GROUP SOUTH ENGINEERING Co.,Ltd.

Patentee after: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.

Address before: 511458 Guangdong city of Guangzhou province Nansha District City Road South Ring Shacheng office building A

Patentee before: CHINA RAILWAY CONSTRUCTION GROUP SOUTH ENGINEERING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150909