CN104372923B - Scaffolding - Google Patents

Scaffolding Download PDF

Info

Publication number
CN104372923B
CN104372923B CN201410601071.7A CN201410601071A CN104372923B CN 104372923 B CN104372923 B CN 104372923B CN 201410601071 A CN201410601071 A CN 201410601071A CN 104372923 B CN104372923 B CN 104372923B
Authority
CN
China
Prior art keywords
connection fastener
transverse tube
long transverse
scaffolding
hinge structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410601071.7A
Other languages
Chinese (zh)
Other versions
CN104372923A (en
Inventor
黄国庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Anjie Scaffold Co Ltd
Original Assignee
Wuxi Anjie Scaffold Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Anjie Scaffold Co Ltd filed Critical Wuxi Anjie Scaffold Co Ltd
Priority to CN201410601071.7A priority Critical patent/CN104372923B/en
Publication of CN104372923A publication Critical patent/CN104372923A/en
Application granted granted Critical
Publication of CN104372923B publication Critical patent/CN104372923B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention discloses a kind of scaffolding, comprises column, long transverse tube, the first connection fastener, the 2nd connection fastener and loading plate, and column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial two hinge structures, 2nd connection fastener is the hinge structure that a two bolt of band connects, being fixed with pedestal on this hinge structure side, this pedestal axially extends a projection along this hinge structure, this projection is mated with this clear size of opening; This loading plate is slab construction, and its dual-side upper part extends lower prominent formation and links up with. The present invention utilizes the first connection fastener to connect two columns, convenient and swift, saves material; Recycling the 2nd connection fastener is fixed on column by long transverse tube; Recycling loading plate, is hung on long transverse tube, had both played load-carrying effect, play again the ligation in scaffolding, scaffolds erecting easily convenient.

Description

Scaffolding
Technical field
The present invention relates to building implement technical field, especially a kind of scaffolding.
Background technology
Scaffolding is be the various supports that workman operates that also high-rise working is set up in working-yard, is the generic term of building field, is mainly used in the high place that cannot directly construct of exterior wall, inside fitting or layer on building sites. Scaffolding makes material bamboo and wood, steel pipe or synthetic materials etc. usually; Also being used as template by scaffolding in part engineering at present, it is also widely used in the fields such as advertising, municipal administration, traffic road and bridge, mine in addition. And return in building field, the scaffolding used at present mainly adopts steel pipe, connection card and other parts to set up according to predetermined specification, required fixed sturcture cannot be set up on existing frame body in the process set up temporarily, and the different sites for frame body needs the steel pipe using different size, cause scaffolding material kind more, and frame structure is complicated, all needing to expend too much artificial in the process of assembling and dismounting, with regard to single workmen, labour intensity is big; During assembling, the consistence of frame body different sites connection structure is low simultaneously, and then the uncertainty produced by human factor in an assembling process also increases thereupon, easily causes frame body to there is many potential safety hazards; Therefore based on foregoing problems, it is necessary to the structure for existing building scaffolding does further improvement.
Summary of the invention
The present invention is directed to the deficiencies in the prior art, it is proposed to a kind of scaffolding, structure is ingenious, it may also be useful to safety.
In order to realize foregoing invention object, the present invention provides following technical scheme: a kind of scaffolding, comprises column, long transverse tube, the first connection fastener, the 2nd connection fastener and loading plate, and column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial two hinge structures, 2nd connection fastener is the hinge structure that a two bolt of band connects, being fixed with pedestal on this hinge structure side, this pedestal axially extends a projection along this hinge structure, this projection is mated with this clear size of opening;This loading plate is slab construction, and its dual-side upper part extends lower prominent formation and links up with.
Further, the size of this hook is mated with seamless square tube.
Further, being provided with trilateral muscle plate below this pedestal, a side is fixed on this hinge structure, and another side is fixed on base bottom surface.
Compared with prior art, the present invention has the following advantages: utilize the first connection fastener to connect two columns, convenient and swift, saves material; Recycling the 2nd connection fastener is fixed on column by long transverse tube; Recycling loading plate, is hung on long transverse tube, had both played load-carrying effect, play again the ligation in scaffolding, scaffolds erecting easily convenient.
Accompanying drawing explanation
Fig. 1 is the structural representation of scaffolding of the present invention;
Fig. 2 is the structural representation of the first connection fastener and column;
Fig. 3 is the 2nd connection fastener structural representation;
Fig. 4 is the structural representation of long transverse tube.
Embodiment
Describing the present invention below in conjunction with accompanying drawing, the description of this part is only exemplary and explanatory, it should not protection scope of the present invention has any restriction.
A kind of scaffolding as shown in Figure 1, comprises column 1, long transverse tube 3, first connection fastener 4, the 2nd connection fastener 2 and loading plate 5, column 1 and long transverse tube 3 and is seamless square tube, and long transverse tube 3 two ends are equipped with through hole 31, as in Figure 2-4; First connection fastener 4 is coaxial two hinge structures, 2nd connection fastener 2 is the hinge structure 21 that a two bolt of band connects, this hinge structure 21 side is fixed with pedestal 22, this pedestal 22 axially extends a projection 23 along this hinge structure 21, this projection 23 and this through hole 31 size match; This loading plate 5 is slab construction, and its dual-side upper part extends lower prominent formation and links up with.
The size of this hook is mated with long transverse tube 3, facilitates loading plate 5 to be hung on long transverse tube 3, in installation foot hand cradle process, hangs up loading plate 5 in time, can play the effect of stable scaffolding, conveniently scaffold erecting again; After scaffolding installation, loading plate 5 is indispensable instrument in construction.
Being provided with trilateral muscle plate 24, side below this pedestal 22 is fixed on this hinge structure 2, another side is fixed on pedestal 22 bottom surface, it is to increase holding capacity.
The above is only the preferred embodiment of the present invention; it is noted that for those skilled in the art, under the premise without departing from the principles of the invention; can also making some improvements and modifications, these improvements and modifications also should be considered as protection scope of the present invention.

Claims (3)

1. a scaffolding, it is characterised in that: comprising column, long transverse tube, the first connection fastener, the 2nd connection fastener and loading plate, column and long transverse tube are seamless square tube, and long transverse tube two ends are equipped with through hole; First connection fastener is coaxial two hinge structures, 2nd connection fastener is the hinge structure that a two bolt of band connects, being fixed with pedestal on this hinge structure side, this pedestal axially extends a projection along this hinge structure, this projection is mated with this clear size of opening; This loading plate is slab construction, and its dual-side upper part extends lower prominent formation and links up with.
2. scaffolding as claimed in claim 1, it is characterised in that: the size of this hook is mated with seamless square tube.
3. scaffolding as claimed in claim 1, it is characterised in that: being provided with trilateral muscle plate below this pedestal, a side is fixed on this hinge structure, and another side is fixed on base bottom surface.
CN201410601071.7A 2014-10-31 2014-10-31 Scaffolding Active CN104372923B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410601071.7A CN104372923B (en) 2014-10-31 2014-10-31 Scaffolding

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410601071.7A CN104372923B (en) 2014-10-31 2014-10-31 Scaffolding

Publications (2)

Publication Number Publication Date
CN104372923A CN104372923A (en) 2015-02-25
CN104372923B true CN104372923B (en) 2016-06-08

Family

ID=52552089

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410601071.7A Active CN104372923B (en) 2014-10-31 2014-10-31 Scaffolding

Country Status (1)

Country Link
CN (1) CN104372923B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107152158B (en) * 2017-06-21 2019-05-21 上海森大机械制造有限公司 A kind of fixed scaffold
CN108166767A (en) * 2018-01-18 2018-06-15 北京崇建工程有限公司 A kind of construction method and outer climbing frame protective device
CN109025245A (en) * 2018-09-10 2018-12-18 严晓安 A kind of square tube scaffold connector and square tube scaffold
CN110627000B (en) * 2019-09-28 2020-12-01 永康普物电子科技有限公司 Scaffolding for mural painting with ruler function

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2419374A1 (en) * 1978-03-07 1979-10-05 Pons Punti Juan Extendable working platform for scaffolding - uses two coplanar inter-sliding panels of parallel interspaced tubes connected by end straps with hooks and stops to prevent over-extension
CN101372864A (en) * 2007-08-22 2009-02-25 卢兴明 Multi-direction centralized connection type composed scaffold
JP2009263906A (en) * 2008-04-23 2009-11-12 Japan Steels Group Kk Movable working table
CN203086058U (en) * 2013-02-05 2013-07-24 彭自力 Multidirectional combined-type crossing frame
CN204163358U (en) * 2014-10-31 2015-02-18 无锡市安捷脚手架有限公司 Scaffold

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2419374A1 (en) * 1978-03-07 1979-10-05 Pons Punti Juan Extendable working platform for scaffolding - uses two coplanar inter-sliding panels of parallel interspaced tubes connected by end straps with hooks and stops to prevent over-extension
CN101372864A (en) * 2007-08-22 2009-02-25 卢兴明 Multi-direction centralized connection type composed scaffold
JP2009263906A (en) * 2008-04-23 2009-11-12 Japan Steels Group Kk Movable working table
CN203086058U (en) * 2013-02-05 2013-07-24 彭自力 Multidirectional combined-type crossing frame
CN204163358U (en) * 2014-10-31 2015-02-18 无锡市安捷脚手架有限公司 Scaffold

Also Published As

Publication number Publication date
CN104372923A (en) 2015-02-25

Similar Documents

Publication Publication Date Title
CN104372923B (en) Scaffolding
CN105201195A (en) Liftable supporting leg type elevator shaft construction platform and method
CN205935621U (en) Simple and easy outer scaffold frame and shear force wall connecting device
CN203441069U (en) Outer wall dangling working platform capable of overturning
CN204174915U (en) Scaffold
CN205955171U (en) Fall to ground scaffold collet device
CN204163358U (en) Scaffold
CN204174902U (en) Scaffold
CN207110442U (en) The connector that a kind of scaffold uses
CN202055509U (en) Upright rod installation structure of directly-inserted scaffold
CN202047581U (en) Wall connecting piece for scaffold
CN207228674U (en) Movable municipal administration open caisson ramp-type platform
CN104372935A (en) Scaffold
CN205617772U (en) Gallows structure under lifting foot hand rack special use
CN204531362U (en) Scaffold
CN204174903U (en) Scaffold
CN104372922A (en) Scaffold
CN204174904U (en) Scaffold
CN210152201U (en) Construction scaffold and construction bearing frame
CN204174919U (en) Scaffold
CN201521128U (en) Non-hole seamless construction device
CN205873735U (en) Device is climbed to special tower built -in in superelevation layer
CN106149568A (en) A kind of device for the outside construction of box beam chamber and construction method
CN204163359U (en) Scaffold
CN211080984U (en) Scaffold frame stabilising arrangement of pre-buried formula

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Scaffolding

Effective date of registration: 20220401

Granted publication date: 20160608

Pledgee: Agricultural Bank of China Limited by Share Ltd. Wuxi science and Technology Branch

Pledgor: WUXI SAFETY-SCAFFOLDING Co.,Ltd.

Registration number: Y2022320000154

PE01 Entry into force of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20230707

Granted publication date: 20160608

Pledgee: Agricultural Bank of China Limited by Share Ltd. Wuxi science and Technology Branch

Pledgor: WUXI SAFETY-SCAFFOLDING Co.,Ltd.

Registration number: Y2022320000154

PC01 Cancellation of the registration of the contract for pledge of patent right