CN205348727U - A promote formula operation platform for in shaft - Google Patents

A promote formula operation platform for in shaft Download PDF

Info

Publication number
CN205348727U
CN205348727U CN201521088439.0U CN201521088439U CN205348727U CN 205348727 U CN205348727 U CN 205348727U CN 201521088439 U CN201521088439 U CN 201521088439U CN 205348727 U CN205348727 U CN 205348727U
Authority
CN
China
Prior art keywords
vertical shaft
spandrel girder
operating platform
type operating
base plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201521088439.0U
Other languages
Chinese (zh)
Inventor
郭颖
高翔
张云富
张振禹
邓忠宇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd, Third Construction Engineering Co Ltd of China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201521088439.0U priority Critical patent/CN205348727U/en
Application granted granted Critical
Publication of CN205348727U publication Critical patent/CN205348727U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a promote formula operation platform for in shaft, the upper falsework who includes height equal with the structural layer, upper falsework sets up on the lower part is supported, the rectangle bottom plate that is equipped with with shaft well adaptation is supported to the lower part, upper falsework sets up on the bottom plate, the below of bottom plate is equipped with many distribution roof beams, distribute the roof beam rigid coupling on rather than the vertically spandrel girder the both ends of spandrel girder are equipped with rather than articulated outrigger, the inner of landing leg is connected with reset spring, reset spring's lower extreme is connected on the dead lever, the dead lever rigid coupling is in the below of spandrel girder, the inner troops under one's command side of landing leg is equipped with the stull. The utility model discloses only need set up with the structural layer scaffold of equal height, can accomplish the construction of whole work layers in the whole shaft, it is less to occupy the material to can sparingly demolish and the time of setting up.

Description

For the hoisting type operating platform in vertical shaft
Technical field
This utility model relates to a kind of operating platform, particularly a kind of for the hoisting type operating platform in vertical shaft.
Background technology
Development along with urban economy, increasing high-rise building becomes the main force of urban construction, along with the growth of depth of building, inevitably bring the excessive risk of work high above the ground, especially the district occurred frequently of falling from high altitude and object strike accident especially in the elevator of skyscraper.At present, in elevator, the Normal practice of work layer operating platform divides two kinds, and one is to set up console model full hall scaffold in elevator, and another kind is to adopt shaped steel or steel pipe two ends to ride upon on hoistway shear wall, as the crossbeam setting up upper falsework.The former is applicable to tier building or small sized multiple story building, and the latter is applicable to skyscraper or high-rise building, but above two structure all exists dismounting and sets up and expend time in longer, takies the problem that material is more.
Summary of the invention
This utility model provides a kind of for the hoisting type operating platform in vertical shaft for solving the technical problem of existence in known technology, and this platform can be saved dismounting and set up the time, and it is less to take material.
This utility model is that the technical problem solving to exist in known technology is adopted the technical scheme that: a kind of for the hoisting type operating platform in vertical shaft, including the upper falsework contour with structure sheaf, described upper falsework rides upon in lower support;Described lower support is provided with the rectangular base plate adaptive with vertical shaft hoistway;Described upper falsework rides upon on described base plate;It is connected with many distribution beam at described base plate, described distribution beam is fixed on perpendicular spandrel girder, it is provided with the outrigger hinged with it at the two ends of described spandrel girder, the inner of described supporting leg is connected with back-moving spring, the lower end of described back-moving spring is connected on fixing bar, and described fixing bar is fixed in the lower section of described spandrel girder;Inner end at described supporting leg is connected with stull.
Described spandrel girder is made up of two back-to-back channel-section steels, and described supporting leg is arranged between two described channel-section steels.
Described distribution beam is made up of square steel.
Described stull is made up of angle steel.
Described base plate is made up of checkered steel plate.
The outer end facade of described supporting leg adopts arcuate structure.
This utility model has the advantage that and has the benefit effect that after the construction completing understructure, tower crane and steel wire rope is utilized to pass through hoistway, platform is allocated and transported on the base plate of a supreme Rotating fields in place, the construction of last layer structure is carried out again with platform, repeatedly repeat above operation, the construction of all work layers in vertical shaft can be completed.Only need to set up the scaffold contour with structure sheaf, the construction of all work layers in whole vertical shaft can be completed, take material less, and dismounting can be saved and set up the time.In sum, this utility model is easy to use, draw materials conveniently, simple for production, can recycle, good in economic efficiency.
Accompanying drawing explanation
Fig. 1 is structural representation during this utility model application;
Fig. 2 is this utility model structural representation when lifting up;
Fig. 3 is bottom bracing structure schematic diagram of the present utility model.
In figure: 1, lower support;1-1, spandrel girder, 1-2, supporting leg, 1-3, bearing pin, 1-4, back-moving spring, 1-5, base plate, 1-6, distribution beam, 1-7, stull, 2, upper falsework;3, second layer structure;4, reserved opening;5, third layer structure.
Detailed description of the invention
For summary of the invention of the present utility model, feature and effect can be further appreciated that, hereby enumerate following example, and it be as follows to coordinate accompanying drawing to describe in detail:
Referring to Fig. 1~Fig. 3, a kind of for the hoisting type operating platform in vertical shaft, including the upper falsework 2 contour with structure sheaf, described upper falsework 2 rides upon in lower support 1.
Described lower support 2 is provided with the rectangular base plate 1-5 adaptive with vertical shaft hoistway;Described upper falsework 2 rides upon on described base plate 1-5;It is connected with many distribution beam 1-6 at described base plate 1-5, described distribution beam 1-6 is fixed on perpendicular spandrel girder 1-1, the outrigger 1-2 hinged with it, described supporting leg 1-2 it is provided with hinged by bearing pin 1-3 and described spandrel girder 1-1 at the two ends of described spandrel girder 1-1.The inner of described supporting leg 1-2 is connected with back-moving spring 1-4, and the lower end of described back-moving spring 1-4 is connected in fixing bar (not shown), and described fixing bar is fixed in the lower section of described spandrel girder 1-1;Inner end at described supporting leg 1-2 is connected with stull 1-7.
In the present embodiment, described spandrel girder 1-1 is made up of two back-to-back channel-section steels, and described supporting leg 1-2 is arranged between two described channel-section steels.Described distribution beam 1-6 is made up of square steel.Described stull 1-7 is made up of angle steel.Described base plate 1-5 is made up of checkered steel plate.The outer end facade of described supporting leg 1-2 adopts arcuate structure, damages structural wall during to avoid platform to propose.
Using method of the present utility model:
One) after second layer structure 3 has been constructed, the lower support 1 of this platform utilizing tower crane lift to Shaft Location, supporting leg 1-2 falls within structure wall or beam;
Two) on the base plate 1-5 of lower support 1, the upper falsework 2 contour with third layer structure is set up, as the scaffold of third layer structure construction;
Three) when constructing third layer structure 5, stay set reserved opening 4 in the position that puts off of platform legs 1-2;
Four) after the concreting of third layer structure completes, building waste is cleared up;
Five) utilize tower crane and steel wire rope by vertical shaft hoistway, platform is allocated and transported on the base plate of a supreme Rotating fields in place;
Six) step 2 is repeatedly repeated)~five), the construction of work layer in vertical shaft can be completed.
Although preferred embodiment of the present utility model being described above in conjunction with accompanying drawing; but this utility model is not limited to above-mentioned detailed description of the invention; above-mentioned detailed description of the invention is merely schematic; it is not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; without departing under this utility model objective and scope of the claimed protection situation, it is also possible to making a lot of form, these belong within protection domain of the present utility model.

Claims (6)

1. for the hoisting type operating platform in vertical shaft, including the upper falsework contour with structure sheaf, it is characterised in that described upper falsework rides upon in lower support;Described lower support is provided with the rectangular base plate adaptive with vertical shaft hoistway;Described upper falsework rides upon on described base plate;It is connected with many distribution beam at described base plate, described distribution beam is fixed on perpendicular spandrel girder, it is provided with the outrigger hinged with it at the two ends of described spandrel girder, the inner of described supporting leg is connected with back-moving spring, the lower end of described back-moving spring is connected on fixing bar, and described fixing bar is fixed in the lower section of described spandrel girder;Inner end at described supporting leg is connected with stull.
2. according to claim 1 for the hoisting type operating platform in vertical shaft, it is characterised in that described spandrel girder is made up of two back-to-back channel-section steels, and described supporting leg is arranged between two described channel-section steels.
3. according to claim 1 for the hoisting type operating platform in vertical shaft, it is characterised in that described distribution beam is made up of square steel.
4. according to claim 1 for the hoisting type operating platform in vertical shaft, it is characterised in that described stull is made up of angle steel.
5. according to claim 1 for the hoisting type operating platform in vertical shaft, it is characterised in that described base plate is made up of checkered steel plate.
6. according to claim 1 for the hoisting type operating platform in vertical shaft, it is characterised in that the outer end facade of described supporting leg adopts arcuate structure.
CN201521088439.0U 2015-12-22 2015-12-22 A promote formula operation platform for in shaft Expired - Fee Related CN205348727U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201521088439.0U CN205348727U (en) 2015-12-22 2015-12-22 A promote formula operation platform for in shaft

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201521088439.0U CN205348727U (en) 2015-12-22 2015-12-22 A promote formula operation platform for in shaft

Publications (1)

Publication Number Publication Date
CN205348727U true CN205348727U (en) 2016-06-29

Family

ID=56170105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201521088439.0U Expired - Fee Related CN205348727U (en) 2015-12-22 2015-12-22 A promote formula operation platform for in shaft

Country Status (1)

Country Link
CN (1) CN205348727U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108661302A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of elevator climbing system and its application method
CN108821068A (en) * 2018-06-01 2018-11-16 阳江市奇正建筑智能设备研究院 A kind of elevator hangs a liter stage apparatus
CN110747875A (en) * 2019-10-23 2020-02-04 上海宝冶集团有限公司 Construction method for building scaffold for open caisson construction of cyclone tank
CN114892944A (en) * 2022-05-10 2022-08-12 中铁广州工程局集团第三工程有限公司 Temporary fixing device applied to shaft steel frame
CN115538753A (en) * 2022-11-30 2022-12-30 徐州鑫烨致胜安防科技有限公司 Safety protection platform for high-rise building light well

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108821068A (en) * 2018-06-01 2018-11-16 阳江市奇正建筑智能设备研究院 A kind of elevator hangs a liter stage apparatus
CN108821068B (en) * 2018-06-01 2020-09-29 阳江市奇正建筑智能设备研究院 Elevator shaft hoisting platform device
CN108661302A (en) * 2018-07-23 2018-10-16 广东快建模架科技有限公司 A kind of elevator climbing system and its application method
CN110747875A (en) * 2019-10-23 2020-02-04 上海宝冶集团有限公司 Construction method for building scaffold for open caisson construction of cyclone tank
CN114892944A (en) * 2022-05-10 2022-08-12 中铁广州工程局集团第三工程有限公司 Temporary fixing device applied to shaft steel frame
CN114892944B (en) * 2022-05-10 2024-06-04 中铁广州工程局集团第三工程有限公司 Temporary fixing device applied to vertical shaft steel frame
CN115538753A (en) * 2022-11-30 2022-12-30 徐州鑫烨致胜安防科技有限公司 Safety protection platform for high-rise building light well

Similar Documents

Publication Publication Date Title
CN205348727U (en) A promote formula operation platform for in shaft
CN201158933Y (en) High-rise maintaining scaffold device with extruding structure
CN202324571U (en) Overhanging type double-row scaffold
CN101886468A (en) Construction method of suspension type template support in high-position conjoined structure
CN106013419B (en) Long-span Cantilever abnormity transfinites structural steel corridor construction engineering method
CN103206074A (en) Elevator shaft template construction method, platform and support
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN203514750U (en) Truss type operating platform for aloft work
CN205369875U (en) A operation protection platform collet for in shaft
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN205348728U (en) A promote formula operation platform bearing structure for in shaft
CN205857026U (en) A kind of movable type bridge anticollision barrier construction operation chassis
CN203097281U (en) Nuclear power station double-layer containment vessel hydraulic creeping formwork
CN104847108A (en) Hydraulic climbing formwork structure and construction method of hydraulic climbing formwork structure
CN205348729U (en) A instrument formula operation protection platform for in shaft
CN104499706A (en) Elevator well template platform and construction method thereof
CN204059906U (en) Elevator hoistways Integral lifting type steel scaffold
CN106522541A (en) Steel platform formwork lifting point bearing beams and lifting method for formwork system
CN203795459U (en) Foundation structure of tower crane for high-altitude roofs
CN204754150U (en) Dish -type node formula scaffold
CN105839905A (en) Super high-rise core-tube elevator double-well rapid lifting operation platform device
CN204402001U (en) For the mobile operating platform system that structure for steel structure roof inner slab is installed
CN203320922U (en) Supporting device for forming of elevator shaft template
CN208870379U (en) The integrated lifting steel plateform system of floor synchronous construction
CN202882374U (en) Novel elevator shaft lifting type diagonal bracing operation steel platform

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160629

Termination date: 20191222

CF01 Termination of patent right due to non-payment of annual fee