CN202882374U - Novel elevator shaft lifting type diagonal bracing operation steel platform - Google Patents

Novel elevator shaft lifting type diagonal bracing operation steel platform Download PDF

Info

Publication number
CN202882374U
CN202882374U CN 201220530836 CN201220530836U CN202882374U CN 202882374 U CN202882374 U CN 202882374U CN 201220530836 CN201220530836 CN 201220530836 CN 201220530836 U CN201220530836 U CN 201220530836U CN 202882374 U CN202882374 U CN 202882374U
Authority
CN
China
Prior art keywords
welded
elevator shaft
diagonal brace
diagonal
novel elevator
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201220530836
Other languages
Chinese (zh)
Inventor
周蔚文
屠孝军
刘炬
刘会玲
黄�俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Original Assignee
Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Engineering Co Ltd of China Construction Third Engineering Division filed Critical Second Construction Engineering Co Ltd of China Construction Third Engineering Division
Priority to CN 201220530836 priority Critical patent/CN202882374U/en
Application granted granted Critical
Publication of CN202882374U publication Critical patent/CN202882374U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model relates to a novel elevator shaft lifting type diagonal bracing operation steel platform. The novel elevator shaft elevating type diagonal bracing operation steel platform structurally comprises two main beams and two sub beams, wherein the two main beams are placed in a parallel mode, and the two sub beams are respectively welded on the two main beams to form a shape which is like the Chinese character 'jing'. Four side frame square steel tubes are respectively welded on the edges of the two main beams and the two sub beams to form a cube-shaped framework, a steel plate is welded on the cube-shaped framework, one end of each of two upright columns is welded on the bottom face where the two main beams and the two sub beams intersect, each diagonal brace corresponds to one upright column, the two diagonal braces are respectively welded on the other ends of the two main beams, and each diagonal brace and the bottom end of the upright column corresponding to the diagonal brace are welded together. A limiting component is welded at the bottom end of each diagonal brace, and a horizontal brace is welded between the two diagonal braces. According to the novel elevator shaft elevating type diagonal bracing operation steel platform, the structure of a lower layer is used as a supporting point for providing an operation platform for the structure construction of an upper layer, and after the construction is finished, the novel elevator shaft lifting type diagonal bracing operation steel platform can be lifted to the next upper layer by a tower crane for continuous construction, and therefore the novel elevator shaft lifting type diagonal bracing operation steel platform can be used repeatedly, safety of operating staff on the construction layer is guaranteed, labor and materials are saved, and work efficiency is improved.

Description

A kind of novel elevator hoistways lift-type diagonal brace operation steel platform
Technical field
The utility model relates to a kind of novel elevator hoistways lift-type diagonal brace operation steel platform, particularly builds the structure construction at elevator hoistways place, and its operating platform design and application belongs to technical field of building construction.
Background technology
Along with development of construction, increasing high level and super highrise building have appearred, the elevator shaft excessive height, for construction operation brings potential safety hazard, this has brought greatly challenge also for construction and safety.
Elevator shaft position in the common highrise building, often because elevator shaft headroom size is narrow and small, highly large and without work plane, the difficulty of constructing is larger, common processing way is to utilize scaffold building safe construction platform, though this job practices can satisfy the construction needs, limitation is also apparent.All need to set up in advance scaffold before each construction, during to certain altitude, can only rely on the resistance of elevator shaft both sides shear wall and steel pipe jacking to do the strong point, and also need remove after structure construction is finished, this just causes the material of consumption many, labour cost increases, the cost of security protection aspect is also more.Because the elevator shaft operating platform set up of steel pipe, scaffolding height is higher, is prone to up and down vertical rod out of plumb in addition, drawknot, shores not in placely, and support body is unstable, caves in easily, falling accident.
Summary of the invention
The purpose of this utility model provides a kind of novel elevator hoistways lift-type diagonal brace operation steel platform, greatly made things convenient for the construction in the high-rise building elevator shaft, the utility model has reduced difficulty and the intensity of constructing, construction speed is fast, construction cost is low, workmanship is high, is particularly useful for the construction in the high-rise building elevator shaft.
The technical solution of the utility model is:
A kind of novel elevator hoistways lift-type diagonal brace operation steel platform, comprise steel plate, two girders, two secondary beams, four frame square steel pipes, two diagonal braces, two vertical rods, a horizontal support, two limit components, it is characterized in that: two parallel placements of girder, two secondary beams are welded on respectively on two girders and become groined type, four frame square steel pipes are welded on respectively two girders, form quadro frame on two secondary beam limits, Plate Welding is on quadro frame, two vertical rod one ends are welded on respectively on the bottom surface of two girders and secondary beam intersection, every corresponding vertical rod of diagonal brace, two diagonal braces are welded on respectively on two girder other ends, and every diagonal brace welds together with the bottom of corresponding vertical rod, limit component of bottom welding of every diagonal brace, horizontal support of welding between two diagonal braces.
The utility model also comprises two suspension ring, and two suspension ring are welded on respectively on two girders and pass steel plate.After this layer structure construction is complete, adopt tower crane that operation steel platform of the present utility model handling to last layer is continued construction.
The length of described steel plate is elevator shaft headroom length-100mm, and wide is elevator shaft clearance breadth-100mm, and reserving 100mm is to guarantee that operation steel platform of the present utility model freely promotes.Described steel plate is the thick checkered plates of 3mm.
Limit component is fixed on lower one deck structure operation steel platform of the present utility model sidesway not to occur, play fixation.
Operation steel platform surface layer of the present utility model adopts the thick checkered plates welding of 3mm to be assemblied to form steel plate and the whole full welds of secondary beam contact.
The utility model adopts a kind of novel elevator hoistways lift-type diagonal brace operation steel platform, utilize lower one deck structure to do the strong point, for superstructure construction provides operating platform, construct and utilize tower crane handling to last layer to continue construction after complete, thus can Reusability.This novel diagonal brace operation steel platform is guaranteed construction layer operating personnel's safety, can obviously shorten the activity duration, and the trouble of scaffold building is increased work efficiency when reducing the elevator shaft structure construction.
The utility model has the advantages that, according to this construction of lift well job platform, not only can reduce difficulty of construction, improve speed of application, guarantee construction quality and safety, and save the input of labour and material, reduce cost, therefore, have obvious economic benefit, promotional value is arranged.
Description of drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the floor map that the utility model is removed the construction steel platform of steel plate.
Fig. 3 is that Fig. 2 adds the A of upper steel plate to view.
At Fig. 1 light plate 1, secondary beam 2, suspension ring 3, frame square steel pipe 4, girder 5, diagonal brace 6, vertical rod 7, horizontal support 8, limit component 9.
The specific embodiment
By reference to the accompanying drawings the utility model is described in detail:
Such as Fig. 1, Fig. 2, shown in Figure 3,
A kind of novel elevator hoistways lift-type diagonal brace operation steel platform, comprise steel plate 1, two suspension ring 3, two girders 5, two secondary beams 2, four frame square steel pipes 4, two diagonal braces 6, two vertical rods 7, a horizontal support 8, two limit components 9, described steel plate 1 is the thick checkered plates of 3mm, the length of steel plate 1 is elevator shaft headroom length-100mm, wide is elevator shaft clearance breadth-100mm, suspension ring 3 are the A20 suspension ring, and girder 5 is 12.6 #Channel-section steel, secondary beam 2 is the square steel pipe of 50 mm * 50 mm * 6 mm, frame square steel pipe 4 is the square steel pipe of 50 mm * 50 mm * 6 mm, diagonal brace 6 is 12.6 #I iron, vertical rod 7 are the square steel pipe of 50 mm * 50 mm * 6 mm, and horizontal support 8 is the square steel pipe of 50 mm * 50 mm * 6 mm, and limit component 9 is 12.6 #I iron; Two girder 5 parallel placements, two secondary beams 2 are welded on respectively on two girders 5 and become groined type, four frame square steel pipes 4 are welded on respectively two girders 5, form quadro frame on two secondary beam 2 limits, steel plate 1 is welded on the quadro frame, two vertical rod 7 one ends are welded on respectively on the bottom surface of two girders 5 and secondary beam 2 intersections, every diagonal brace 6 corresponding vertical rods 7, two diagonal braces 6 are welded on respectively on two girder 5 other ends, and every diagonal brace 6 welds together with the bottom of corresponding vertical rod 7, limit component 9 of bottom welding of every diagonal brace 6, a welding horizontal support 8, two suspension ring 3 are welded on respectively on two girders 5 and pass steel plate 1 between two diagonal braces 6.After this layer structure construction is complete, adopt tower crane that operation steel platform of the present utility model handling to last layer is continued construction.
Operation steel platform of the present utility model, in work progress, the constructor can carry out at platform the construction of this layer elevator hoistways.Rely on diagonal brace 6 to support whole platform deadweight and working load, the top relies on the elevator shaft structure of having constructed that platform is played a supporting role, and the bottom relies on 9 pairs of platforms of limit component to play fixation, so that platform does not drop, security performance is high like this.
After this layer structure construction is complete, utilize tower crane, by two suspension ring 3 on the operation steel platform, with the handling of whole operation steel platform to last layer elevator shaft structure face, because the diagonal brace of operation steel platform of the present utility model bottom is in the elevator hoistways outside, during handling, platform must be offset certain angle could pass through.

Claims (4)

1. a novel elevator hoistways lift-type diagonal brace operates the steel platform, comprise steel plate, two girders, two secondary beams, four frame square steel pipes, two diagonal braces, two vertical rods, a horizontal support, two limit components, it is characterized in that: two parallel placements of girder, two secondary beams are welded on respectively on two girders and become groined type, four frame square steel pipes are welded on respectively two girders, form quadro frame on two secondary beam limits, Plate Welding is on quadro frame, two vertical rod one ends are welded on respectively on the bottom surface of two girders and secondary beam intersection, every corresponding vertical rod of diagonal brace, two diagonal braces are welded on respectively on two girder other ends, and every diagonal brace welds together with the bottom of corresponding vertical rod, limit component of bottom welding of every diagonal brace, horizontal support of welding between two diagonal braces.
2. novel elevator hoistways lift-type diagonal brace according to claim 1 operation steel platform is characterized in that: also comprise two suspension ring, two suspension ring are welded on respectively on two girders and pass steel plate.
3. novel elevator hoistways lift-type diagonal brace according to claim 1 and 2 operates the steel platform, and it is characterized in that: described steel plate is the thick checkered plates of 3mm.
4. novel elevator hoistways lift-type diagonal brace according to claim 1 and 2 operation steel platform is characterized in that: the length of described steel plate be elevator shaft headroom length-100mm, wide is elevator shaft clearance breadth-100mm.
CN 201220530836 2012-10-17 2012-10-17 Novel elevator shaft lifting type diagonal bracing operation steel platform Expired - Lifetime CN202882374U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201220530836 CN202882374U (en) 2012-10-17 2012-10-17 Novel elevator shaft lifting type diagonal bracing operation steel platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201220530836 CN202882374U (en) 2012-10-17 2012-10-17 Novel elevator shaft lifting type diagonal bracing operation steel platform

Publications (1)

Publication Number Publication Date
CN202882374U true CN202882374U (en) 2013-04-17

Family

ID=48073815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201220530836 Expired - Lifetime CN202882374U (en) 2012-10-17 2012-10-17 Novel elevator shaft lifting type diagonal bracing operation steel platform

Country Status (1)

Country Link
CN (1) CN202882374U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654059A (en) * 2017-08-31 2018-02-02 上海宝冶集团有限公司 For the mobile operating platform constructed in elevator hoistway
CN107975225A (en) * 2017-12-30 2018-05-01 中建四局第五建筑工程有限公司 A kind of elevator well crosshead and its construction technology

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107654059A (en) * 2017-08-31 2018-02-02 上海宝冶集团有限公司 For the mobile operating platform constructed in elevator hoistway
CN107975225A (en) * 2017-12-30 2018-05-01 中建四局第五建筑工程有限公司 A kind of elevator well crosshead and its construction technology

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN205025074U (en) Elevator well steel bracing promotes double -deck scaffold operation platform of formula
CN206646835U (en) It is a kind of from hoisting type steel structure slipping measure support
CN103266778A (en) Detachable triangular scaffold and steel truss assembly construction method
CN203223003U (en) Detachable triangular jig frame for steel truss assembling
CN205348727U (en) A promote formula operation platform for in shaft
CN105421741B (en) A kind of self-supporting tower crane integrated operation platform system integrated with mould bases
CN202882374U (en) Novel elevator shaft lifting type diagonal bracing operation steel platform
CN203514750U (en) Truss type operating platform for aloft work
CN206233546U (en) A kind of elevator hoistways workbench
CN105952129B (en) Elevator shaft combined type integral lifting operation platform and construction method thereof
CN103774838A (en) Assembly type safe operation platform for elevator shaft construction and use method thereof
CN202831628U (en) Combined type bailey frame load-bearing shelving for pouring large span concrete beam
CN206828012U (en) The central jack-up system of internally climbing tower crane
CN103711112B (en) Build large-span concrete beam combined type Bailey bracket bearing bent frame
CN107055367A (en) The central jack-up system of internally climbing tower crane
CN203320922U (en) Supporting device for forming of elevator shaft template
CN204326487U (en) A kind of novel movable lift-type hoistway operation platform
CN206034874U (en) Elevator shaft combined type integral lifting operation platform
CN203961239U (en) High-altitude overhanging awning construction operation platform
CN207737870U (en) A kind of large-scale storage tank fliping lifting device
CN217353728U (en) Assembled prefabricated staircase construction is with platform device that falls on
CN205134533U (en) Complicated special -shaped steel mesh frame and steel skeleton construction and installation structure
CN204873441U (en) Novel big plate -girder of boiler hoist and mount lug
CN211622525U (en) Can have enough to meet need elevartor shaft construction operation platform