CN101886468A - Construction method of suspension type template support in high-position conjoined structure - Google Patents

Construction method of suspension type template support in high-position conjoined structure Download PDF

Info

Publication number
CN101886468A
CN101886468A CN 201010134815 CN201010134815A CN101886468A CN 101886468 A CN101886468 A CN 101886468A CN 201010134815 CN201010134815 CN 201010134815 CN 201010134815 A CN201010134815 A CN 201010134815A CN 101886468 A CN101886468 A CN 101886468A
Authority
CN
China
Prior art keywords
steel
construction
conversion layer
girder
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 201010134815
Other languages
Chinese (zh)
Other versions
CN101886468B (en
Inventor
仓恒芳
刘亚非
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Dadi Construction Group Co Ltd
Original Assignee
Nanjing Dadi Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Dadi Construction Group Co Ltd filed Critical Nanjing Dadi Construction Group Co Ltd
Priority to CN2010101348150A priority Critical patent/CN101886468B/en
Publication of CN101886468A publication Critical patent/CN101886468A/en
Application granted granted Critical
Publication of CN101886468B publication Critical patent/CN101886468B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention relates to a construction method of a suspension type template support in high-position conjoined structure. The construction method comprises the working procedures of installing a tank type steel hanging post, installing steel beams and profiled steel plates, welding shearing-resistance studs, bonding reinforcing bar nets and pouring floor bearing plate concrete to accomplish the construction of the suspension type template support in the high-position conjoined structure. The invention overcomes the defects of large use level of support materials, long mounting and demounting construction period, high reinforcing expense, high construction cost, large dead weight, large construction difficulty and the like existing in the traditional method of bearing full supports and erecting high-altitude heavy operation platforms. The invention sufficiently utilizes the bearing capacity of a conversion-floor steel girder so that the combined floorslab in the conversion floor is used as an operation platform for erecting the template support in the construction stage and is used as a permanent refuge floor of an ultrahigh-rise building in the usage stage, thereby ensuring the safety of high-altitude work, saving the construction expense and increasing the use area. The steel girders are used as stiff reinforcing bars in the work of steel skeleton concrete conjoined structure to together bear the structural dead weight and the construction load which are gradually increased in each layer of the upper part of the steel girder.

Description

Construction method of suspension type template support in high-position conjoined structure
Technical field
The present invention relates to high-position conjoined structure in a kind of highrise building, particularly a kind of construction method of suspension type template support in high-position conjoined structure.
Background technology
The building that aerial vestibule or conjoined structure are set between the double tower building of high-storey business and office building is more and more, whether the high-altitude disjunctor concrete structure conversion layer formwork bracing system construction technology for these buildings is reasonable, to directly affect safety, quality, duration and the construction cost of engineering, selecting correct shutterings-supported construction technology is the key of this conversion layer structure construction.Before the present invention, shutterings-supported construction technology has:
The one, adopt the full hall of traditional load-bearing bracing frame.Take measures after the reinforcing of podium roofing, the full hall formula formwork-support of the about 100m of scaffolding height on roofing, support body is guaranteed stable and is carried out effective drawknot with high building, makes it satisfy the construction requirement of conjoined structure.This scheme is comparatively safe but the backing material consumption is big, take tear open long in time limit, reinforcing expense height, construction cost is big.
The 2nd, set up high-altitude heavy duty operations platform.When two high building main body concrete structure constructions, default embedded part below conjoined structure conversion layer design elevation after this position concrete reaches design strength, utilizes embedded part welding fixed steel support.Six or four formula railway military beams are installed on the shaped steel bearing are formed the heavy construction operating platform, set up the conjoined structure formwork-support again.This construction technology is safe and reliable, but operating platform is from great temporarily, and its cost of making, lease, install and removing is also big, and has certain difficulty of construction.
Because this job practices or technology all are provisional, for the conjoined structure of constructing between two high buildings is provided with, be to need to remove after construction finishes, so engineering time and cost, the time of dismounting and cost and difficulty all are to consider.Obviously, above-mentioned two kinds of job practicess are all undesirable.
Summary of the invention
Purpose of the present invention just is to overcome above-mentioned defective, develops a kind of construction method of suspension type template support in high-position conjoined structure.
Technical scheme of the present invention is:
Construction method of suspension type template support in high-position conjoined structure, its major technique step is:
(1) conversion layer steel girder is installed
The disjunctor conversion layer is a steel reinforced concrete structure, two high buildings have all been reserved the steel corbel that is connected with conjoined structure during main body construction, utilize the steel corbel of relevant position, conversion layer upper end to hang tackle pulley, the method that lifts with two-shipper is promoted to design attitude and correction in time and welding with the steel girder by root, and all the other steel secondary beams are installed with tower crane;
(2) hang the refuge story structure construction
Utilize tower crane that steel davit and the steel work floor support plate that hangs refuge story is installed, its working procedure is:
Install bin shaped steel davit → installation girder steel → profiled sheet → welding shearing resistance peg → assembling reinforcement net sheet → build floor support plate concrete;
(3) on refuge story, set up support for shuttering
On the suspension floor support plate, set up support for shuttering, supporting conversion layer slab form, support for shuttering gate-type frame, also available bowl button frame and fastener, steel pipe are set up, and support for shuttering and two ends high building agent structure are carried out and are effectively socketed;
(4) conversion layer girder, secondary beam self-supporting template are installed
1) at the stiffening rib place welded reinforcement of steel girder web both sides as reinforcing pull rod, when deck-siding is 800mm, the reinforcing bar of a pair of Φ 18 is set, when deck-siding is 800~1200mm, two pairs of Φ 20 reinforcing bars are set;
2) it is stupefied in the reinforcing pull rod lower end channel-section steel horizontal stroke to be set, and regulate with straight screw sleeve and fix, the horizontal stupefied mounting rail soffit formwork of going up of channel-section steel, the deadweight of concrete conversion beam and whole working load upwards pass to the steel girder by reinforcing pull rod;
3) in girder, secondary beam both sides side form, back cord and split bolt are installed;
(5) conversion layer beam reinforced steel bar colligation, presstressed reinforcing steel are installed
Concrete conversion beam longitudinal stress reinforcing bar Φ 32 and the interlaced layout of steel column, to passing the longitudinal reinforcement of steel column, location drilling on the steel column web in advance, diameter steel bar adopts the sleeve cold-extrusion technology to connect; The conversion layer floor bar is the double-layer double-direction configuration, and Non-cohesive Prestressing Force Technology has been adopted in the floor design;
(6) remove conversion layer template and support for shuttering.
Advantage of the present invention and effect are to make full use of the supporting capacity of conversion layer steel girder self.Conversion layer steel girder is designed to welded H section steel, and the high 2600mm in cross section has sizable supporting capacity through checking, and can utilize its suspension operational platform and the template system of self fully.Design, construction and unit in charge of construction think and can hang one deck steel work composite floor under conversion layer steel girders through repeatedly research.This layer composite floor set up formwork-support in the construction stage as operating platform, at the permanent refuge story of operational phase as super highrise building, both guaranteed work high above the ground safety, saved operating expenses, increased usable floor area for the owner again.
Adopt the stiffness arrangement of reinforcement of welded H section steel, and under conversion layer, hang the operating platform (Fig. 1) of one deck steel work floor support plate as the construction stage as concrete conjoined structure conversion layer girder, secondary beam.Make full use of the enough big supporting capacity of H shaped steel girder self,, independently bear working load such as disjunctor conversion layer self-supporting template and dead load, the following steel work refuge story deadweight of hanging of beam and floor slab formerecting frame in the disjunctor conversion layer construction stage; In the disjunctor conversion layer superstructure construction stage, this steel girder participates in the work of steel reinforced concrete conjoined structure as the stiffness arrangement of reinforcement, bears dead load and working load that its each layer of top increases gradually jointly.
Description of drawings
Fig. 1--principle of the invention structural representation.
Fig. 2--set up among the present invention at the support for shuttering structural representation that hangs on the refuge story.
The specific embodiment
As shown in Figure 1 and Figure 2:
Steel reinforced concrete disjunctor conversion layer suspended formwork support system is made up of two parts:
1) steel reinforced concrete disjunctor conversion beam 3 (being made of steel girder 1 and concrete) adopts self-supporting template (being made of steel girder 1, reinforcing pull rod 5, channel-section steel 9 and straight screw sleeve 10), and its concrete, reinforcing bar and template weight and construction mobile load are passed to steel girder 1 by many to equally distributed reinforcing pull rod 5;
2) conversion layer concrete floor 4 adopts conventional floor slab formerecting frame 6, is born every load of floor slab formerecting frame 6 by the steel work refuge story 7 of several steel davits 2 suspensions by the conversion layer bottom.
1, forms the disjunctor load-carrying construction by the suspension steel work refuge story 7 of steel reinforced concrete disjunctor conversion layer and its below.Hang steel work floor support plate 8 the construction stage as interim operating platform, as the highrise building refuge story, perfect function of use has increased building area in operational phase; H shaped steel girder 1 hangs steel work refuge story 7 as permanent structure as disjunctor conversion layer structure stiffness arrangement of reinforcement, does not increase the structural steel amount, has reduced engineering cost;
2, by steel reinforced concrete disjunctor conversion beam 3 self-supporting templates with set up at the floor slab formerecting frame 6 that hangs on the steel work refuge story 7, form the suspended formwork support system, bear whole loads of conjoined structure construction stage jointly, need not to set up and land the superelevation support for shuttering, need not to install the heavy one-shot job platform in high-altitude, need not large-scale hoisting machinery equipment, reduce a large amount of circulation materials, artificial and plant equipment input, alleviate labor strength, accelerating construction progress, technical economic benefit is remarkable;
3, the self-supporting template is by being welded on the reinforcing pull rod 5 of steel girder 1 web, conversion beam 3 templates (comprising reinforcing bar, concrete deadweight and working load) are upwards passed to steel girder 1, make full use of the enough big supporting capacity of steel girder 1 and bear the conjoined structure own wt;
4, set up conversion layer floor slab formerecting frame 6 on suspension steel work refuge story 7, refuge story 7 dead loads and whole working load upwards are passed to steel girder 1 by steel davit 2, and power transmission is clear and definite, and technology is reasonable, easy construction; Steel work refuge story 7 is suspended on disjunctor conversion layer below, forms the work high above the ground protective barrier of conjoined structure construction stage.
Performance analysis
1, suspended formwork support system operating expenses and Analysis of Time-limit
Set up conversion layer floor slab formerecting frame 6 on suspension steel work floor support plate 8, floor height 4.8m sets up area 570m 2, about 50,000 yuan of required portal support lease, mounting or dismounting expense; About 100,000 yuan of materials such as the required reinforcing pull rod 5 of conversion beam 3 self-supporting templates, channel-section steel 9, straight screw sleeve 10 and labour cost; 150,000 yuan of total expenses.1 month construction period.
2, hall supporting frame construction expense and Analysis of Time-limit are expired in traditional load-bearing
Be to adopt to set up full hall bracing frame at the podium roofing and carry out the conversion layer structure construction in the prior art, need take measures to reinforce the podium roofing, then the about 100m of scaffolding height, area 570m on roofing 2, the about 4000t of weight the full hall of a load-bearing support for shuttering, the backing material consumption is big, take tear open long in time limit, reinforcing expense height, construction cost is big.Considered by 4 months construction periods, need to drop into about 270.74 ten thousand yuan of general expenses.
3, economic and social benefit
Adopt this construction technology to save ten thousand yuan of operating expenses 270.74-15=255.74.The project subject structure bound approximately in advance in 3 months.
As the suspension steel work floor support plate 8 of construction stage operating platform, construction finishes to need not to remove, and operational phase is as building refuge story 7, for the owner increases 570m 2Building area.
4, environmental benefit
Adopt the present invention to save turnover materials such as super amount steel pipe and fastener; avoid the stacking of on-the-spot circulation material to take the construction land tenure situation, reduced the construction noise pollution, reduced the influence of construction activities surrounding enviroment; help environmental protection, site operation is civilization more.

Claims (1)

1. construction method of suspension type template support in high-position conjoined structure, its step is:
(1) conversion layer steel girder is installed
The disjunctor conversion layer is a steel reinforced concrete structure, two high buildings have all been reserved the steel corbel that is connected with conjoined structure during main body construction, utilize the steel corbel of relevant position, conversion layer upper end to hang tackle pulley, the method that lifts with two-shipper is promoted to design attitude and correction in time and welding with the steel girder by root, and all the other steel secondary beams are installed with tower crane;
(2) hang the refuge story structure construction
Utilize tower crane that steel davit and the steel work floor support plate that hangs refuge story is installed, its working procedure is:
Install bin shaped steel davit → installation girder steel → profiled sheet → welding shearing resistance peg → assembling reinforcement net sheet → build floor support plate concrete;
(3) on refuge story, set up support for shuttering
On the suspension floor support plate, set up support for shuttering, supporting conversion layer slab form, support for shuttering gate-type frame, also available bowl button frame and fastener, steel pipe are set up, and support for shuttering and two ends high building agent structure are carried out and are effectively socketed;
(4) conversion layer girder, secondary beam self-supporting template are installed
1) at the stiffening rib place welded reinforcement of steel girder web both sides as reinforcing pull rod, when deck-siding is 800mm, the reinforcing bar of a pair of Φ 18 is set, when deck-siding is 800~1200mm, two pairs of Φ 20 reinforcing bars are set;
2) it is stupefied in the reinforcing pull rod lower end channel-section steel horizontal stroke to be set, and regulate with straight screw sleeve and fix, the horizontal stupefied mounting rail soffit formwork of going up of channel-section steel, the deadweight of concrete conversion beam and whole working load upwards pass to the steel girder by reinforcing pull rod;
3) in girder, secondary beam both sides side form, back cord and split bolt are installed;
(5) conversion layer beam reinforced steel bar colligation, presstressed reinforcing steel are installed
Concrete conversion beam longitudinal stress reinforcing bar Φ 32 and the interlaced layout of steel column, to passing the longitudinal reinforcement of steel column, location drilling on the steel column web in advance, diameter steel bar adopts the sleeve cold-extrusion technology to connect; The conversion layer floor bar is the double-layer double-direction configuration, and Non-cohesive Prestressing Force Technology has been adopted in the floor design;
(6) remove conversion layer template and support for shuttering.
CN2010101348150A 2010-03-29 2010-03-29 Construction method of suspension type template support in high-position conjoined structure Expired - Fee Related CN101886468B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010101348150A CN101886468B (en) 2010-03-29 2010-03-29 Construction method of suspension type template support in high-position conjoined structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010101348150A CN101886468B (en) 2010-03-29 2010-03-29 Construction method of suspension type template support in high-position conjoined structure

Publications (2)

Publication Number Publication Date
CN101886468A true CN101886468A (en) 2010-11-17
CN101886468B CN101886468B (en) 2011-08-24

Family

ID=43072541

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010101348150A Expired - Fee Related CN101886468B (en) 2010-03-29 2010-03-29 Construction method of suspension type template support in high-position conjoined structure

Country Status (1)

Country Link
CN (1) CN101886468B (en)

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102094391A (en) * 2011-03-03 2011-06-15 中铁四局集团第一工程有限公司 Positioning construction method for top reinforcing mesh in railway bridge support platform
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN102337784A (en) * 2011-07-13 2012-02-01 葛加君 Method for constructing reinforced concrete frame of tall curved tower
CN102392536A (en) * 2011-10-28 2012-03-28 山东万鑫建设有限公司 Construction method for long-span hanging vestibule type template support system
CN102400506A (en) * 2011-09-22 2012-04-04 姚攀峰 Template-free energy consumption steel plate shear wall and construction method thereof
CN102505635A (en) * 2011-10-18 2012-06-20 中铁大桥局股份有限公司 Cast-in-situ formwork for bridge construction
CN102767282A (en) * 2012-08-08 2012-11-07 龙信建设集团有限公司 Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN103046743A (en) * 2012-12-04 2013-04-17 中建三局建设工程股份有限公司 High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN103452326A (en) * 2013-07-25 2013-12-18 浙江精工钢结构有限公司 Method and equipment for sequentially constructing ultra-long hanging posts
CN104563503A (en) * 2013-10-11 2015-04-29 卓越置业集团有限公司 Cast-in-place reinforced concrete high-altitude automatic building method of high-rise and ultra high-rise residential buildings
CN104594635A (en) * 2015-01-26 2015-05-06 贵州新联爆破工程集团有限公司 Construction method for high-rise building frame structure
CN104878926A (en) * 2015-06-16 2015-09-02 中建八局第三建设有限公司 Suspended template system construction method and turnover brackets
CN105019556A (en) * 2015-07-24 2015-11-04 安徽富煌钢构股份有限公司 Lap-joint structure assisting quick hoisting of high-rise steel beam, and application of lap-joint structure
CN105113542A (en) * 2015-09-21 2015-12-02 中铁上海工程局有限公司 Cantilever system and method for underground station construction
CN108775071A (en) * 2018-06-29 2018-11-09 聂超 A kind of construction method of prestressed suspension type building structure
CN109610834A (en) * 2019-02-02 2019-04-12 南通职业大学 The high-altitude construction method of Long-span Multi-storey Frame heavy duty concrete structure
CN110158934A (en) * 2019-06-24 2019-08-23 中信国安建工集团有限公司 Guard system for suspended operating platform in large space
CN111926911A (en) * 2020-08-05 2020-11-13 中国三冶集团有限公司 Construction method of super high-rise air corridor structure
CN114427295A (en) * 2021-12-31 2022-05-03 中国建筑第二工程局有限公司 Pre-buried ground anchor pulling connection and holding column combined ultrahigh and ultralimit formwork system and construction method thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001107566A (en) * 1999-10-12 2001-04-17 Taisei Corp Tower-like building construction method
CN1760490A (en) * 2004-10-11 2006-04-19 上海市第二建筑有限公司 Method for constructing stand-board built from fair-faced concrete
CN101255766A (en) * 2007-06-29 2008-09-03 浙江宝业建设集团有限公司 Method for compact installation of retaining type steel support and main steel component

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001107566A (en) * 1999-10-12 2001-04-17 Taisei Corp Tower-like building construction method
CN1760490A (en) * 2004-10-11 2006-04-19 上海市第二建筑有限公司 Method for constructing stand-board built from fair-faced concrete
CN101255766A (en) * 2007-06-29 2008-09-03 浙江宝业建设集团有限公司 Method for compact installation of retaining type steel support and main steel component

Cited By (29)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102134907A (en) * 2010-12-31 2011-07-27 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN102134907B (en) * 2010-12-31 2012-07-04 中铁二局股份有限公司 Construction method of steel bar truss floor support plate
CN102094391B (en) * 2011-03-03 2012-08-22 中铁四局集团第一工程有限公司 Positioning construction method for top reinforcing mesh in railway bridge support platform
CN102094391A (en) * 2011-03-03 2011-06-15 中铁四局集团第一工程有限公司 Positioning construction method for top reinforcing mesh in railway bridge support platform
CN102337784B (en) * 2011-07-13 2013-07-10 葛加君 Method for constructing reinforced concrete frame of tall curved tower
CN102337784A (en) * 2011-07-13 2012-02-01 葛加君 Method for constructing reinforced concrete frame of tall curved tower
CN102400506A (en) * 2011-09-22 2012-04-04 姚攀峰 Template-free energy consumption steel plate shear wall and construction method thereof
CN102505635A (en) * 2011-10-18 2012-06-20 中铁大桥局股份有限公司 Cast-in-situ formwork for bridge construction
CN102505635B (en) * 2011-10-18 2014-01-15 中铁大桥局股份有限公司 Cast-in-situ formwork for bridge construction
CN102392536A (en) * 2011-10-28 2012-03-28 山东万鑫建设有限公司 Construction method for long-span hanging vestibule type template support system
CN102392536B (en) * 2011-10-28 2013-05-01 山东万鑫建设有限公司 Construction method for long-span hanging vestibule type template support system
CN102767282B (en) * 2012-08-08 2014-10-29 龙信建设集团有限公司 Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN102767282A (en) * 2012-08-08 2012-11-07 龙信建设集团有限公司 Assembly-type high-formwork construction method for cantilever of oversized special-shaped conversion layer
CN103046743B (en) * 2012-12-04 2016-05-25 中建三局建设工程股份有限公司 A kind of Super High conversion layer steel reinforced concrete crossbeam suspension type form bracing system and construction method
CN103046743A (en) * 2012-12-04 2013-04-17 中建三局建设工程股份有限公司 High-rise conversion layer type steel concrete girder hanging type template supporting system and construction method
CN103452326A (en) * 2013-07-25 2013-12-18 浙江精工钢结构有限公司 Method and equipment for sequentially constructing ultra-long hanging posts
CN104563503A (en) * 2013-10-11 2015-04-29 卓越置业集团有限公司 Cast-in-place reinforced concrete high-altitude automatic building method of high-rise and ultra high-rise residential buildings
CN104563503B (en) * 2013-10-11 2016-06-29 卓越置业集团有限公司 High level and Super high-rise dwelling house cast-in-situ steel reinforced concrete high-altitude automatization method of construction
CN104594635A (en) * 2015-01-26 2015-05-06 贵州新联爆破工程集团有限公司 Construction method for high-rise building frame structure
CN104594635B (en) * 2015-01-26 2017-01-04 贵州新联爆破工程集团有限公司 A kind of high-storey building frame structure construction method
CN104878926A (en) * 2015-06-16 2015-09-02 中建八局第三建设有限公司 Suspended template system construction method and turnover brackets
CN105019556A (en) * 2015-07-24 2015-11-04 安徽富煌钢构股份有限公司 Lap-joint structure assisting quick hoisting of high-rise steel beam, and application of lap-joint structure
CN105113542A (en) * 2015-09-21 2015-12-02 中铁上海工程局有限公司 Cantilever system and method for underground station construction
CN108775071A (en) * 2018-06-29 2018-11-09 聂超 A kind of construction method of prestressed suspension type building structure
CN109610834A (en) * 2019-02-02 2019-04-12 南通职业大学 The high-altitude construction method of Long-span Multi-storey Frame heavy duty concrete structure
CN110158934A (en) * 2019-06-24 2019-08-23 中信国安建工集团有限公司 Guard system for suspended operating platform in large space
CN111926911A (en) * 2020-08-05 2020-11-13 中国三冶集团有限公司 Construction method of super high-rise air corridor structure
CN114427295A (en) * 2021-12-31 2022-05-03 中国建筑第二工程局有限公司 Pre-buried ground anchor pulling connection and holding column combined ultrahigh and ultralimit formwork system and construction method thereof
CN114427295B (en) * 2021-12-31 2022-08-16 中国建筑第二工程局有限公司 Pre-buried ground anchor pulling connection and holding column combined ultrahigh and ultralimit formwork system and construction method thereof

Also Published As

Publication number Publication date
CN101886468B (en) 2011-08-24

Similar Documents

Publication Publication Date Title
CN101886468B (en) Construction method of suspension type template support in high-position conjoined structure
CN102444203B (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN102535845A (en) Construction method of bearing frame of corridor structure
CN107090925A (en) Reinforced precast reinforced concrete shear wall, structural system and its construction method
CN100365237C (en) Autolifting type variable-shape diassembllable integrated lifting steel plateform system and construction method thereof
CN103195256A (en) Hanging column type steel structure jig frame construction method
CN205012666U (en) High altitude steel construction vestibule integrally lift up support structure
CN103046645A (en) Large span prefabricated monolithic casting structure and construction method
CN207268073U (en) Novel flexible formwork bearing frame
CN106759909B (en) Bearing structure system and its construction method are hung up under one kind
CN109184190A (en) It climbs and carries integrated beam type hydraulic climbing platform and its installation method
CN204781927U (en) Elevartor shaft formwork and elevartor shaft concrete placement operation platform
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN216042835U (en) Layer adding device with light wall board for raising frame structure
CN104775363B (en) The spelling method of upper king-post strut reinforcing bar sections
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN114134820A (en) Formwork support and construction method for I-shaped composite beam cast-in-place bridge deck
CN203230165U (en) Template support platform for ultra-high cantilever structure
CN201687083U (en) Suspension type template supporting structure with high-position integrated structure
CN102691267A (en) High pier construction method for external whole operation platform
CN102619335A (en) Construction method of large-height small-sized cast-in-place concrete beam slab
CN103482493A (en) Internal climbing tower crane
JP7370626B2 (en) Side span support structure for a continuous T-girder viaduct spanning the existing railway line
CN107700363B (en) Bridge tower rack with lifting system and construction method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110824