CN206110633U - Roofing and computer lab pipeline overhaul prevents trampling device - Google Patents

Roofing and computer lab pipeline overhaul prevents trampling device Download PDF

Info

Publication number
CN206110633U
CN206110633U CN201620921725.9U CN201620921725U CN206110633U CN 206110633 U CN206110633 U CN 206110633U CN 201620921725 U CN201620921725 U CN 201620921725U CN 206110633 U CN206110633 U CN 206110633U
Authority
CN
China
Prior art keywords
platform
roofing
isosceles trapezoid
welded
angle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201620921725.9U
Other languages
Chinese (zh)
Inventor
章艳平
陈伟
高成名
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Original Assignee
China Railway 11th Bureau Group Co Ltd
China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 11th Bureau Group Co Ltd, China Railway 11th Bureau Group Construction and Installation Engineering Co Ltd filed Critical China Railway 11th Bureau Group Co Ltd
Priority to CN201620921725.9U priority Critical patent/CN206110633U/en
Application granted granted Critical
Publication of CN206110633U publication Critical patent/CN206110633U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a roofing and computer lab pipeline overhaul prevents trampling device. Including the maintenance frame of a sectional type, overhaul the frame and divide into the triplex and be formed by connecting, the device of marking time on horizontally platform above including both sides about and, wherein mark time the device for the stair shape, the welding including both sides becomes parallelogram's guardrail, the footboard of bottom, the platform be grid structure, adopt the bottom surface that the angle steel welded into the lattice -shaped to also welded the guardrail on both sides, be provided with the mobilizable couple of a plurality of on the angle steel of platform bottom surface and be used for personnel's construction operation, the platform and mark time and adopt hinged joint between the device to be provided with fastener, the platform constitutes an isosceles trapezoid with the device of marking time, and the contained angle angle of isosceles trapezoid's height and waist can be adjusted. The utility model discloses simple structure, the cross section passes through for isosceles trapezoid can supply the people to walk, avoids the air conditioner to supply return water collecting main heat preservation to receive and tramples, and the security that has improved constructor has improved the efficiency of construction.

Description

Roofing and machine room pipeline maintenance are prevented trampling device
Technical field
This utility model is related to technical field of building construction, is related specifically to a kind of roofing and machine room pipeline maintenance is prevented trampling Device.
Background technology
The maintenance of the equipment such as the attached communication of pipeline, monitoring, electric power, not job content specific to pipeline maintenance.One As in fact, pipeline maintenance refers to clear pipe inspection pipe, line upkeep and pipe first-aid etc..
In building field, roofing air-conditioning is often considered as galvanized iron sheet for the design protection of backwater main pipe heat-insulation layer Containment vessel, in maintenance practice, it is often necessary to manually stand on containment vessel, consequently found that can deform after containment vessel is trampled, Main heat-insulation layer is had and is to a certain degree destroyed.
Additionally, manually standing on containment vessel, surrounding is general to be difficult with safety prevention measure, therefore to workmen's Personal safety can not ensure, be susceptible to security incident.
In order to solve this problem, it is desirable to provide a kind of new anti-to trample device.
The content of the invention
Technical problem to be solved in the utility model is the defect for overcoming prior art, there is provided a kind of simple structure, horizontal Section passes through for the confession people walking of isosceles trapezoid, and avoids air-conditioning from being trampled for backwater main heat-insulation layer, improves workmen Safety, the roofing and machine room pipeline maintenance for improving efficiency of construction anti-tramples device.
To achieve these goals, this utility model is employed the following technical solutions:
Roofing and machine room pipeline maintenance are prevented trampling device, it is characterised in that include the repairing frame of a stagewise, overhaul Frame is divided into three parts and is formed by connecting, and includes the platform of level above, and the step device of the right and left;Wherein described steps on Step device is stairway form, includes the guardrail for being welded into parallelogram, the pedal of bottom of both sides;Described platform is grid Lattice structure, is welded into the bottom surface of lattice-shaped using angle steel, and is also welded with guardrail on both sides, be provided with the angle steel of platform base Several are movably linked up with for personnel's construction operation;Chain connection is adopted between described platform and step device, and is set Clamp device is equipped with, platform and step device constitute an isosceles trapezoid, and the angle angle of the height and waist of isosceles trapezoid Can adjust.
In such scheme, the clamp device of plug-in type is provided between described platform and step device, i.e., in platform Top edge arranges several spliced eyes, step device edge is provided with several corresponding latches, in latch insertion spliced eye It is fixed.
In such scheme, on described platform, be additionally provided with a lifting device, lifting device include hoist engine and Rope, can be by personnel's vacantly operation on pipeline by lifting device.
This utility model is had the advantages that as a result of above-mentioned technical proposal:
This utility model simple structure, cross section are that isosceles trapezoid can pass through for people's walking, it is to avoid air-conditioning is dry for backwater Pipe heat-insulation layer is trampled, and is improve the safety of workmen, is improve efficiency of construction.
Description of the drawings
Fig. 1 is the overall structure figure of this utility model embodiment;
In figure:1 step device, 2 platforms, 3 guardrails, 4 pedals, 5 hooks, 6 lifting devices.
Specific embodiment
In order that content of the present utility model is readily apparent understood, below according to specific embodiment and with reference to attached Figure, is described in further detail to this utility model.
Roofing and machine room pipeline maintenance as shown in Figure 1 is prevented trampling device, includes the repairing frame of a stagewise, repairing frame It is divided into three parts to be formed by connecting, includes the platform 2 of level above, and the step device 1 of the right and left;Wherein described steps on Step device 1 is stairway form, includes the pedal 4 of the guardrail 3, bottom for being welded into parallelogram of both sides;Described platform 2 For lattice structure, the bottom surface of lattice-shaped is welded into using angle steel, and guardrail 3 is also welded with both sides, on the angle steel of 2 bottom surface of platform Being provided with several moveable hooks 5 is used for personnel's construction operation;Hinge is adopted between described platform 2 and step device 1 Connection, and clamp device is provided with, platform 2 and step device 1 constitute an isosceles trapezoid, and the height and waist of isosceles trapezoid Angle angle can adjust.
In the present embodiment, the clamp device of plug-in type is provided between described platform 2 and step device 1, i.e., flat 2 top edge of platform arranges several spliced eyes, and 1 edge of step device is provided with several corresponding latches, latch insertion grafting It is fixed in hole.
In the present embodiment, a lifting device 6 is additionally provided with described platform 2, lifting device 6 includes hoist engine And rope, can be by personnel's vacantly operation on pipeline by lifting device.
Particular embodiments described above, the technical problem solved to this utility model, technical scheme and beneficial effect are entered Go further description, it is be should be understood that to the foregoing is only specific embodiment of the utility model, and without It is in this utility model is limited, all within spirit of the present utility model and principle, any modification, equivalent substitution and improvements done Deng should be included within protection domain of the present utility model.

Claims (3)

1. roofing and machine room pipeline maintenance is prevented trampling device, it is characterised in that include the repairing frame of a stagewise, repairing frame It is divided into three parts to be formed by connecting, includes the platform of level above, and the step device of the right and left;Wherein described marks time Device is stairway form, includes the guardrail for being welded into parallelogram, the pedal of bottom of both sides;Described platform is grid Structure, is welded into the bottom surface of lattice-shaped using angle steel, and is also welded with guardrail on both sides, if being provided with the angle steel of platform base Dry is movably linked up with for personnel's construction operation;Chain connection is adopted between described platform and step device, and is arranged There are clamp device, platform and step device to constitute an isosceles trapezoid, and the angle angle of the height and waist of isosceles trapezoid can To adjust.
2. roofing as claimed in claim 1 and machine room pipeline maintenance is anti-tramples device, it is characterised in that described platform with step on The clamp device of plug-in type is provided between step device, i.e., several spliced eyes is set in platform top edge, on step device side Edge is provided with several corresponding latches, is fixed in latch insertion spliced eye.
3. roofing as claimed in claim 1 and machine room pipeline maintenance is prevented trampling device, it is characterised in that on described platform also A lifting device is provided with, lifting device includes hoist engine and rope, can be by personnel vacantly in pipeline by lifting device Upper operation.
CN201620921725.9U 2016-08-23 2016-08-23 Roofing and computer lab pipeline overhaul prevents trampling device Expired - Fee Related CN206110633U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620921725.9U CN206110633U (en) 2016-08-23 2016-08-23 Roofing and computer lab pipeline overhaul prevents trampling device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620921725.9U CN206110633U (en) 2016-08-23 2016-08-23 Roofing and computer lab pipeline overhaul prevents trampling device

Publications (1)

Publication Number Publication Date
CN206110633U true CN206110633U (en) 2017-04-19

Family

ID=58511387

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620921725.9U Expired - Fee Related CN206110633U (en) 2016-08-23 2016-08-23 Roofing and computer lab pipeline overhaul prevents trampling device

Country Status (1)

Country Link
CN (1) CN206110633U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374325A (en) * 2018-01-22 2018-08-07 国核电力规划设计研究院有限公司 A kind of step device of jet chimney

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108374325A (en) * 2018-01-22 2018-08-07 国核电力规划设计研究院有限公司 A kind of step device of jet chimney

Similar Documents

Publication Publication Date Title
CN206174436U (en) Hard protector of scaffold that encorbelments frame steel sheet
CN206110633U (en) Roofing and computer lab pipeline overhaul prevents trampling device
CN207700068U (en) A kind of modularization Bridge Pier Construction job platform
CN207048345U (en) Construction discharge platform device
CN206928624U (en) A kind of heavy ladder cage for high-altitude building
CN101876209A (en) Supertall building core tube construction safety fire protection system and device
CN205474792U (en) Movable type cable ditch escape way bridge
CN212103679U (en) A construction platform for installation of assembled tower
CN205777633U (en) Telescopic lifting formula guard rail
CN206189886U (en) Construction elevator protector
CN208686053U (en) A kind of elevator well sizing climbing platforms device
CN207553565U (en) A kind of crosshead of truss
CN206245769U (en) A kind of floor opening safety device
CN203096620U (en) Steel pipe arch rib operation platform
CN205777427U (en) A kind of plug-in operating platform used for building exterior wall
CN106869471A (en) Indoor individual layer scaffold
CN209510271U (en) Setting of casing mentions effect device
CN205617771U (en) Construction operation platform and pipe -line transportation integrated device in high residential building elevartor shaft
CN206636153U (en) Indoor individual layer scaffold
CN208618907U (en) A kind of inside is equipped with three towers of operating platform
CN205500628U (en) Climb in tower crane and install conversion equipment who climbs between roof beam and bracket
CN207658909U (en) A kind of construction elevator cage door
CN206957256U (en) A kind of assembled folding electric stair shaft plain net protection
CN213072949U (en) Computer network control box
CN215803079U (en) Novel elevator shaft sealing platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170419

Termination date: 20190823

CF01 Termination of patent right due to non-payment of annual fee