- CN207700068U CN207700068U CN201721836334.8U CN201721836334U CN207700068U CN 207700068 U CN207700068 U CN 207700068U CN 201721836334 U CN201721836334 U CN 201721836334U CN 207700068 U CN207700068 U CN 207700068U
- Authority
- CN
- China
- Prior art keywords
- construction
- operation platform
- layer
- construction operation
- bridge pier
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
A kind of modularization Bridge Pier Construction job platform, is related to bridge construction field.Equipped at least one layer of construction operation platform, every layer of construction operation platform is connected around a loop configuration being closed, upper layer construction operation platform vertical pile is formed on lower layer's construction operation platform and by fastener by 4 L-shaped unit modules by fastener connection;At least 1 is equipped with the band railing step being connected to upper layer construction operation platform in every layer of 4 L-shaped unit modules;The L-shaped unit module is L-shaped frame structure, including skeleton, landing slab and guardrail, and landing slab is set to skeleton upper surface, and guardrail is set to skeleton lateral surface.
Description
Technical field
The utility model is related to bridge construction field more particularly to a kind of modularization Bridge Pier Construction job platforms.
Background technology
Currently, the conventional method of science of bridge building Bridge Pier Construction is usually to set up scaffold construction job platform in periphery, then
Reinforcing bar binding is carried out using construction operation platform and template is installed.The joint of traditional steel pipe scaffold connection is more, steel pipe dosage
Greatly, it builds, long, high labor cost of removing the period, there is the danger caved in if quality is not tight to check on, and often carry out a bridge
The construction of pier is required for building again removes completely again, and construction efficiency is relatively low.
With the development of science and technology, engineers and technicians develop the assembling-type operation platforms of some modulars in recent years
Or connection system for guide rail, but these operation platforms or complicated, on-site consolidation is inconvenient, or only two-row structure, and structure lacks
Weary stability, safety is relatively low, and is not easy for the construction of bridge pier side is opposite.
Invention content
The purpose of this utility model is that improve one kind can modularization installation, disassembly and assembly time is short, stable structure, safety
Height can effectively improve a kind of modularization Bridge Pier Construction job platform of construction efficiency and construction quality.
To achieve the above object, the utility model uses following technical scheme:
A kind of modularization Bridge Pier Construction job platform is equipped at least one layer of construction operation platform, every layer of construction operation platform
By 4 L-shaped unit modules by fastener connection around the loop configuration for forming a closure, upper layer construction operation platform is vertical
It overlays on lower layer's construction operation platform and is connected by fastener;At least 1 is equipped in every layer of 4 L-shaped unit modules
The band railing step being connected to upper layer construction operation platform;The L-shaped unit module is L-shaped frame structure, including skeleton, platform
Plate and guardrail, landing slab are set to skeleton upper surface, and guardrail is set to skeleton lateral surface.
Further:
The skeleton is steel structure framework, is welded using shaped steel.
The construction operation platform outer periphery is equipped with purse seine.
Compared with the prior art, the beneficial effects of the utility model are as follows:
In use, the construction operation platform is attached installation around bridge pier.As a result of modular unit knot
Structure can successively be superimposed assembly by way of lifting, and the set-up time is short efficient, has saved cost of labor;In modular unit
Welding manner installation can be used in steel, and adjacent modular units, which can be used, to be bolted, and globality and stability are good, and install shield
Column and purse seine, it is safe;Compared with other pin-connected panel operating platforms, modular unit is L-shaped structure, and structure is more stablized, with
Bridge pier profile is more close to all directions, which both provide, around bridge pier stablizes broad standing plane, can facilitate construction, effectively
Improve construction efficiency and construction quality;Use is can be repeated several times, component is not easy to lose.
Description of the drawings
Fig. 1 is the schematic diagram (vertical view) after the utility model embodiment structure and installation.
Fig. 2 is the L-shaped unit module structural schematic diagram (stereogram) in the utility model embodiment.
Specific implementation mode
The utility model is further described with reference to specific embodiments and the drawings.
Fig. 1 and 2 is participated in, a kind of modularization Bridge Pier Construction job platform (is only drawn equipped with multilayer construction operation platform in figure
One layer of construction operation platform), every layer of construction operation platform is surrounded by fastener connection by 4 L-shaped unit modules 1 and forms one
The loop configuration of closure.Upper layer construction operation platform vertical pile connects on lower layer's construction operation platform and by fastener.
At least 1 is equipped with the band railing step 2 being connected to upper layer construction operation platform in every layer of 4 L-shaped unit modules 1.The L
Shape unit module 1 is L-shaped frame structure, including skeleton, landing slab and guardrail, and landing slab is set to skeleton upper surface, and guardrail is set to
Skeleton lateral surface.
The skeleton is steel structure framework, is welded using shaped steel.The construction operation platform outer periphery is equipped with purse seine.
Label " 3 " in Fig. 1 is bridge pier.
Claims (3)
1. a kind of modularization Bridge Pier Construction job platform, which is characterized in that be equipped at least one layer of construction operation platform, every layer of construction
Job platform is by 4 L-shaped unit modules by fastener connection around the loop configuration for forming a closure, upper layer construction operation
Platform vertical pile connects on lower layer's construction operation platform and by fastener;In every layer of 4 L-shaped unit modules at least
1 is equipped with the band railing step being connected to upper layer construction operation platform;The L-shaped unit module is L-shaped frame structure, including bone
Frame, landing slab and guardrail, landing slab are set to skeleton upper surface, and guardrail is set to skeleton lateral surface.
2. a kind of modularization Bridge Pier Construction job platform as described in claim 1, which is characterized in that the skeleton is steel construction bone
Frame is welded using shaped steel.
3. a kind of modularization Bridge Pier Construction job platform as described in claim 1, which is characterized in that outside the construction operation platform
Periphery is equipped with purse seine.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721836334.8U CN207700068U (en) | 2017-12-25 | 2017-12-25 | A kind of modularization Bridge Pier Construction job platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721836334.8U CN207700068U (en) | 2017-12-25 | 2017-12-25 | A kind of modularization Bridge Pier Construction job platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207700068U true CN207700068U (en) | 2018-08-07 |
Family
ID=63028442
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721836334.8U Active CN207700068U (en) | 2017-12-25 | 2017-12-25 | A kind of modularization Bridge Pier Construction job platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207700068U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763427A (en) * | 2018-12-29 | 2019-05-17 | 中交路桥华东工程有限公司 | A kind of assembled operating platform of pier shaft reinforcing bar binding and its installation and method for dismounting |
CN110331847A (en) * | 2019-07-05 | 2019-10-15 | 中铁一局集团厦门建设工程有限公司 | A kind of rectangular column construction operation platform |
CN113863738A (en) * | 2021-09-22 | 2021-12-31 | 成都飞机工业(集团)有限责任公司 | Modular aircraft assembly working platform |
-
2017
- 2017-12-25 CN CN201721836334.8U patent/CN207700068U/en active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109763427A (en) * | 2018-12-29 | 2019-05-17 | 中交路桥华东工程有限公司 | A kind of assembled operating platform of pier shaft reinforcing bar binding and its installation and method for dismounting |
CN110331847A (en) * | 2019-07-05 | 2019-10-15 | 中铁一局集团厦门建设工程有限公司 | A kind of rectangular column construction operation platform |
CN113863738A (en) * | 2021-09-22 | 2021-12-31 | 成都飞机工业(集团)有限责任公司 | Modular aircraft assembly working platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207700068U (en) | A kind of modularization Bridge Pier Construction job platform | |
CN203924696U (en) | Backform hanger fast-assembling system | |
CN207700729U (en) | The integral totally enclosed special upper people's escape way of tower crane | |
CN205501837U (en) | Steel case roof beam becomes bridge welding simple platform | |
CN103362069B (en) | Steel and concrete combined box girder concrete wing plate formwork and construction method | |
CN211472143U (en) | Pier steel form | |
CN202000265U (en) | Concrete construction formwork for high pier of bridge | |
CN207512610U (en) | A kind of assembled bridge pier construction operation platform | |
CN203475310U (en) | Formwork for concrete slabs of composite steel-concrete box girders | |
CN107795185A (en) | Chimney reinforces pylon high-altitude installation node security construction method | |
CN203795459U (en) | Foundation structure of tower crane for high-altitude roofs | |
CN207553565U (en) | A kind of crosshead of truss | |
CN206233115U (en) | A kind of supporting bracket of bridge construction | |
CN205444739U (en) | Fixed railing structure of detachable | |
CN204662926U (en) | A kind of operating platform for steel pipe column top construction operation | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed | |
CN208235587U (en) | A kind of large-span deep foundation pit underground power house rack assembling construction platform | |
CN209227390U (en) | A kind of assembled Multifunction side is across cast-in-place support | |
CN208830767U (en) | A kind of assembled architecture hoistway regularization protection and vertical passageway device | |
CN202023375U (en) | Construction site processing room | |
CN209277586U (en) | A kind of concrete column core cushion block for building jacking increasing layer | |
CN202781420U (en) | Multifunctional operation platform for subsection jointing construction of concrete member | |
CN205100242U (en) | Three laminar cantilever operation platform systems | |
CN207244957U (en) | A kind of modularization Prefabricated stacking floor for being used to drop plate region | |
CN207244453U (en) | A kind of suspension bridge light anchorage mast apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 361009 unit 1101-1104, No. 2368, Fangzhong Road, Huli District, Xiamen City, Fujian Province Patentee after: Jianfa Hecheng Engineering Consulting Co.,Ltd. Address before: 361009 unit 1101-1104, No. 2368, Fangzhong Road, Huli District, Xiamen City, Fujian Province Patentee before: HOLSIN ENGINEERING CONSULTING GROUP CO.,LTD. |