CN107795185A - Chimney reinforces pylon high-altitude installation node security construction method - Google Patents
Chimney reinforces pylon high-altitude installation node security construction method Download PDFInfo
- Publication number
- CN107795185A CN107795185A CN201610742824.5A CN201610742824A CN107795185A CN 107795185 A CN107795185 A CN 107795185A CN 201610742824 A CN201610742824 A CN 201610742824A CN 107795185 A CN107795185 A CN 107795185A
- Authority
- CN
- China
- Prior art keywords
- pylon
- burst
- hough
- operating platform
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009434 installation Methods 0.000 title claims abstract description 34
- 238000010276 construction Methods 0.000 title claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 43
- 239000010959 steel Substances 0.000 claims abstract description 43
- 238000000034 method Methods 0.000 claims abstract description 14
- 241000282326 Felis catus Species 0.000 claims abstract description 8
- 239000011229 interlayer Substances 0.000 claims abstract description 6
- 238000003032 molecular docking Methods 0.000 claims abstract description 5
- 230000007547 defect Effects 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 240000007594 Oryza sativa Species 0.000 description 1
- 235000007164 Oryza sativa Nutrition 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000010410 layer Substances 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 235000009566 rice Nutrition 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
- 230000035882 stress Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
- E04G23/0225—Increasing or restoring the load-bearing capacity of building construction elements of circular building elements, e.g. by circular bracing
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/10—Truss-like structures
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/342—Arrangements for stacking tower sections on top of each other
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Foundations (AREA)
Abstract
The invention discloses a kind of chimney to reinforce pylon high-altitude installation node security construction method, and pylon steel structure member is assembled into pylon burst by this method on the special stand of ground first, and the steel pipe column both ends of pylon burst are provided with flange;Temporary ladder and Hough operating platform are set on pylon burst;The two halves tight loop of Hough operating platform bottom plate wales pylon burst steel pipe column and fixation, and operating platform is located at cat ladder top;Pylon burst is lifted on tower foundation using crane;Then assembled upper strata pylon burst, upper strata pylon burst is lifted to lower floor's pylon burst using crane, is directed at steel pipe column, operating personnel are located at the docking construction operation that interlayer pylon burst flange is carried out on Hough operating platform, complete flange node installation;Hough operating platform is removed using crane, assembly and flange joint installation for next pylon burst.This method effectively improves the security of work high above the ground, reduces construction cost, improves efficiency of construction and the quality of pylon installation.
Description
Technical field
The present invention relates to a kind of chimney to reinforce pylon high-altitude installation node security construction method.
Background technology
Most steel mill is provided with steel stack, with use with the passing of time, the aging of chimney body structure, seriously corroded, summer in addition
The gradual increase of typhoon increases, and chimney rocks increase, brings huge hidden danger to safety in production, it is therefore necessary to reinforce using pylon.
It is that puncheon foundation is connected with the box foundation of existing chimney to reinforce tower foundation, reinforces pylon and uses quadrangle tower
Frame, pylon size determine according to reconnaissance trip, and pylon post uses Variable Section Steel tubing string from low to high according to stress difference, cross bar and
Support bar uses isometrical steel pipe, sets sliding support to be connected with chimney at the different levels such as pylon 25m, 45m, 60m absolute altitude, right
Chimney provides horizontal support, vertically to slip.
As shown in figure 1, when steel structure reinforcing pylon is installed, first on ground by steel pipe column 11, cross bar 12 and support bar 13
Pylon burst 1 is assembled into, upper strata pylon point is successively installed using crane 5 after the surrounding ground installing bottom layer pylon burst 2 of chimney 3
Piece, the overhead connection position 4 of interlayer pylon burst is mostly flange connection or welding, and it is several that this requires that workmen must climb up
Rice even tens meters of high-altitudes are constructed, and using manually setting up operating platform or setting temporary operating platform on ground, are then operated
The dismounting of platform is cumbersome, and is work high above the ground, dangerous high.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of chimney and reinforce pylon high-altitude installation node security construction party
Method, this method overcome the defects of node construction is installed in conventional tower high-altitude, effectively improve the security of work high above the ground, reduce
Construction cost, improve efficiency of construction and the quality of pylon installation.
In order to solve the above technical problems, chimney of the present invention reinforces pylon high-altitude installation node security construction method including as follows
Step:
Step 1: steel pipe column, cross bar and support bar assembly pylon burst are used on ground, pylon burst both sides steel pipe column both ends point
She You not flange;
Step 2: pylon burst both sides set temporary ladder respectively, and in the upper and lower part of pylon burst both sides steel pipe column point
Falsework is not set;
Step 3: making Hough operating platform, Hough operating platform includes Hough bottom plate, fence, strengthens rib and Hough fastening
Circle, fence are vertical at Hough bottom plate outer ring, and Hough bottom plate center is provided with through hole, and Hough tight loop leads to located at Hough bottom plate center
Hole, strengthen rib and be located between Hough tight loop and Hough bottom plate outer ring;
Step 4: Hough operating platform is arranged on pylon burst both sides steel pipe column by fastening clip and is fixed on steel pipe column
On, Hough operating platform is located at cat ladder top;
Step 5: pylon burst is lifted to tower foundation using crane;
Step 6: assembled upper strata pylon burst and Hough operating platform, cat ladder connect upper strata pylon to repeat step one to four successively
Hough operating platform between burst and lower floor's pylon burst;
Step 7: upper strata pylon burst is lifted on by lower floor's pylon burst top using crane and is directed at steel pipe column, operating personnel
The docking construction operation of interlayer pylon burst flange is carried out on Hough operating platform, completes flange node installation;
Step 8: remove Hough operating platform, the assembly for next pylon burst using crane after flange joint installation
Installed with flange joint, so as to complete the construction that chimney reinforces pylon high-altitude installation node.
Further, when the Hough tight loop of Hough operating platform divides two halves banding pylon burst both sides steel pipe column, in Hough
Rubber washer is encased inside between tight loop and steel pipe column.
Pylon high-altitude installation node security construction method is reinforced due to chimney of the present invention and employs above-mentioned technical proposal, i.e., first will
Pylon steel structure member is assembled into pylon burst on the special stand of ground, and the steel pipe column both ends of pylon burst are provided with flange;
Temporary ladder and Hough operating platform are set on pylon burst;The two halves tight loop of Hough operating platform bottom plate wales pylon burst
Steel pipe column and fixation, Hough operating platform are located at cat ladder top;Pylon burst is lifted on tower foundation using crane;Then
With same method assembly upper strata pylon burst, upper strata pylon burst is lifted to lower floor's pylon burst using crane, is directed at steel
Tubing string, operating personnel carry out the docking construction operation of interlayer pylon burst flange on Hough operating platform, complete flange joint
Installation;Hough operating platform is removed using crane, assembly and flange joint installation for upper strata pylon burst.This method overcomes
The defects of conventional tower high-altitude installation node construction, the security of work high above the ground is effectively improved, reduce construction cost, improve
Efficiency of construction and the quality of pylon installation.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is that chimney reinforces pylon burst scheme of installation;
Fig. 2 is that chimney of the present invention reinforces pylon high-altitude installation node security construction method schematic diagram;
Fig. 3 is the structural representation of operating platform in this method.
Embodiment
As shown in Figures 2 and 3, chimney of the present invention reinforces pylon high-altitude installation node security construction method to be included such as embodiment
Lower step:
Step 1: use steel pipe column 11, cross bar 12 and the assembled pylon burst 1 of support bar 13, the both sides steel pipe of pylon burst 1 on ground
The both ends of post 11 are respectively equipped with flange 14;
Step 2: the both sides of pylon burst 1 set temporary ladder 6 respectively, and on the top of the both sides steel pipe column 11 of pylon burst 1 with
Portion sets falsework 7 respectively;
Step 3: making Hough operating platform 8, Hough operating platform 8 includes Hough bottom plate 81, fence 82, strengthens the and of rib 83
Hough tight loop 84, fence 82 are vertical at the outer ring of Hough bottom plate 81, and the center of Hough bottom plate 81 is provided with through hole 85, Hough tight loop
84 are located at the central through hole 85 of Hough bottom plate 81, strengthen rib 83 and are located between Hough tight loop 84 and the outer ring of Hough bottom plate 81;
Step 4: Hough operating platform 8 is arranged on the both sides steel pipe column 11 of pylon burst 1 by fastening clip 87 and is fixed on
On steel pipe column 11, Hough operating platform 8 is located at the top of cat ladder 6;
Step 5: pylon burst 1 is lifted to tower foundation using crane;
Step 6: assembled upper strata pylon burst and Hough operating platform, cat ladder connect upper strata pylon to repeat step one to four successively
Hough operating platform between burst and lower floor's pylon burst;
Step 7: upper strata pylon burst is lifted on by lower floor's pylon burst top using crane and is directed at steel pipe column 11, operator
Member carries out the docking construction operation of interlayer pylon burst flange 14 on Hough operating platform 8, completes flange node installation;
Step 8: remove Hough operating platform 8, the assembly for next pylon burst using crane after flange joint installation
Installed with flange joint, so as to complete the construction that chimney reinforces pylon high-altitude installation node.
Preferably, when the Hough tight loop 84 of Hough operating platform 8 divides two halves banding pylon 1 both sides steel pipe column 11 of burst,
Rubber washer 86 is encased inside between Hough tight loop 84 and steel pipe column 11.Rubber washer increases rubbing between tight loop and steel pipe column
Power is wiped, so that operating platform can be stably fixed on steel pipe column, while avoids the abrasion of tight loop and steel pipe column, improves construction matter
Amount.
This method only needs some Hough operating platforms to be made, in tower according to pylon steel pipe column dimension before pylon installation
The Hough operating platform is fixed in pylon connecting node before frame installation.After pylon structure lifting, workmen can be safe
Constructed on the Hough operating platform, after the completion of the lifting connection of adjacent pylon burst, the Hough operating platform is removed, under being used for
The installation of one pylon burst.The problem of present method solves steelwork tower truss overhead connection node construction process without safety guarantee,
The security of steel structural overhead installation node construction can be effectively ensured, improve efficiency of construction and quality.Use this method can be with
Accomplish unified making, the operating platform of unified standard when pylon is installed, avoid fragmentary fabrication and installation from causing operating platform to make
Quality and the potential safety hazard using process, and the Hough operating platform in this method can recycle, and reduce cost.
Claims (2)
1. a kind of chimney reinforces pylon high-altitude installation node security construction method, it is characterised in that this method comprises the following steps:
Step 1: steel pipe column, cross bar and support bar assembly pylon burst are used on ground, pylon burst both sides steel pipe column both ends point
She You not flange;
Step 2: pylon burst both sides set temporary ladder respectively, and in the upper and lower part of pylon burst both sides steel pipe column point
Falsework is not set;
Step 3: making Hough operating platform, Hough operating platform includes Hough bottom plate, fence, strengthens rib and Hough fastening
Circle, fence are vertical at Hough bottom plate outer ring, and Hough bottom plate center is provided with through hole, and Hough tight loop leads to located at Hough bottom plate center
Hole, strengthen rib and be located between Hough tight loop and Hough bottom plate outer ring;
Step 4: Hough operating platform is arranged on pylon burst both sides steel pipe column by fastening clip and is fixed on steel pipe column
On, Hough operating platform is located at cat ladder top;
Step 5: pylon burst is lifted to tower foundation using crane;
Step 6: assembled upper strata pylon burst and Hough operating platform, cat ladder connect upper strata pylon to repeat step one to four successively
Hough operating platform between burst and lower floor's pylon burst;
Step 7: upper strata pylon burst is lifted on by lower floor's pylon burst top using crane and is directed at steel pipe column, operating personnel
The docking construction operation of interlayer pylon burst flange is carried out on Hough operating platform, completes flange node installation;
Step 8: remove Hough operating platform, the assembly for next pylon burst using crane after flange joint installation
Installed with flange joint, so as to complete the construction that chimney reinforces pylon high-altitude installation node.
2. chimney according to claim 1 reinforces pylon high-altitude installation node security construction method, it is characterised in that:Hough
When the Hough tight loop of operating platform divides two halves banding pylon burst both sides steel pipe column, padded between Hough tight loop and steel pipe column
Enter rubber washer.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610742824.5A CN107795185A (en) | 2016-08-29 | 2016-08-29 | Chimney reinforces pylon high-altitude installation node security construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201610742824.5A CN107795185A (en) | 2016-08-29 | 2016-08-29 | Chimney reinforces pylon high-altitude installation node security construction method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN107795185A true CN107795185A (en) | 2018-03-13 |
Family
ID=61527815
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201610742824.5A Pending CN107795185A (en) | 2016-08-29 | 2016-08-29 | Chimney reinforces pylon high-altitude installation node security construction method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN107795185A (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109626212A (en) * | 2018-12-21 | 2019-04-16 | 中国电建集团核电工程有限公司 | Chimney installation auxiliary device |
| CN110566029A (en) * | 2019-08-26 | 2019-12-13 | 常州第一建筑集团有限公司 | gradual installation and construction method for high-rise steel tower |
| CN113323362A (en) * | 2021-06-08 | 2021-08-31 | 中国建筑第八工程局有限公司 | Overhead supporting operation frame based on bottom steel platform |
| CN116146024A (en) * | 2022-12-19 | 2023-05-23 | 中国二十二冶集团有限公司 | Installation construction method for glass fiber reinforced plastic chimney of granulating tower of blast furnace granulated slag system |
Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08246659A (en) * | 1995-03-14 | 1996-09-24 | Hitachi Plant Eng & Constr Co Ltd | Scaffolding |
| CN202039587U (en) * | 2011-03-21 | 2011-11-16 | 苏州工业园区云白华鼎烟囱制造有限公司 | Temporary platform for installing mating flange on steel chimney |
| CN203008344U (en) * | 2012-11-22 | 2013-06-19 | 中国石油天然气第一建设公司 | Detachable and reusable operating platform device |
| CN203559570U (en) * | 2013-11-11 | 2014-04-23 | 中建钢构有限公司北京分公司 | Operating platform for steel pipe support frame overhung on surrounding columns |
| CN203640247U (en) * | 2013-10-30 | 2014-06-11 | 五冶集团上海有限公司 | Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel |
| CN104594618A (en) * | 2013-10-30 | 2015-05-06 | 五冶集团上海有限公司 | Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel |
-
2016
- 2016-08-29 CN CN201610742824.5A patent/CN107795185A/en active Pending
Patent Citations (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08246659A (en) * | 1995-03-14 | 1996-09-24 | Hitachi Plant Eng & Constr Co Ltd | Scaffolding |
| CN202039587U (en) * | 2011-03-21 | 2011-11-16 | 苏州工业园区云白华鼎烟囱制造有限公司 | Temporary platform for installing mating flange on steel chimney |
| CN203008344U (en) * | 2012-11-22 | 2013-06-19 | 中国石油天然气第一建设公司 | Detachable and reusable operating platform device |
| CN203640247U (en) * | 2013-10-30 | 2014-06-11 | 五冶集团上海有限公司 | Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel |
| CN104594618A (en) * | 2013-10-30 | 2015-05-06 | 五冶集团上海有限公司 | Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel |
| CN203559570U (en) * | 2013-11-11 | 2014-04-23 | 中建钢构有限公司北京分公司 | Operating platform for steel pipe support frame overhung on surrounding columns |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109626212A (en) * | 2018-12-21 | 2019-04-16 | 中国电建集团核电工程有限公司 | Chimney installation auxiliary device |
| CN109626212B (en) * | 2018-12-21 | 2020-05-15 | 中国电建集团核电工程有限公司 | Chimney installation auxiliary device |
| CN110566029A (en) * | 2019-08-26 | 2019-12-13 | 常州第一建筑集团有限公司 | gradual installation and construction method for high-rise steel tower |
| CN113323362A (en) * | 2021-06-08 | 2021-08-31 | 中国建筑第八工程局有限公司 | Overhead supporting operation frame based on bottom steel platform |
| CN113323362B (en) * | 2021-06-08 | 2023-06-09 | 中国建筑第八工程局有限公司 | High altitude support operation frame based on bottom steel platform |
| CN116146024A (en) * | 2022-12-19 | 2023-05-23 | 中国二十二冶集团有限公司 | Installation construction method for glass fiber reinforced plastic chimney of granulating tower of blast furnace granulated slag system |
| CN116146024B (en) * | 2022-12-19 | 2025-07-25 | 中国二十二冶集团有限公司 | Installation construction method for glass fiber reinforced plastic chimney of granulating tower of blast furnace granulated slag system |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107795185A (en) | Chimney reinforces pylon high-altitude installation node security construction method | |
| CN207919363U (en) | A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system | |
| CN207700068U (en) | A kind of modularization Bridge Pier Construction job platform | |
| CN206692235U (en) | A kind of steel structure dome lifts by crane erecting device | |
| CN201367728Y (en) | Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction | |
| CN101845912A (en) | Segmental-body assembly type emergency communication tower | |
| CN202530769U (en) | Large span steel structure high-altitude subsection hoisting support system | |
| CN105804400A (en) | Curved surface net frame lifting construction method | |
| CN103899093A (en) | Step-by-step hoisting construction method of mega-frame steel truss beam | |
| CN204185120U (en) | Mobile unit dolly in place | |
| CN106193780A (en) | A kind of overall installation method of segmentation highrise steel structure building | |
| CN106655009A (en) | Hydraulic lifting type crossing structure | |
| CN102493666A (en) | High-altitude translation installation and construction method for super-large super-heavy member | |
| CN104989111A (en) | Construction method for steel structure high-rise hoisting | |
| CN206144124U (en) | A scaffold for construction of tall and big space | |
| CN204530493U (en) | A kind of high pier over-form construction platform | |
| CN207512610U (en) | A kind of assembled bridge pier construction operation platform | |
| CN106544959A (en) | The construction method of the lifting sections of the king-tower containing saddle and bridge main tower saddle | |
| CN206769349U (en) | Light clamper formula scaffold on joist steel upright | |
| CN104404883A (en) | Inner working platform for rapid construction of bridge pier and construction method using inner working platform | |
| CN201635390U (en) | Automatic formwork supporting machine for high-rise building elevator shaft construction | |
| CN206220534U (en) | The pump line support meanss of concrete pumping equipment | |
| CN204212065U (en) | Bridge crossing anticollision barrier punching block erection equipment | |
| CN204530492U (en) | A kind of hydraulic climbing mould construction platform | |
| CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| RJ01 | Rejection of invention patent application after publication | ||
| RJ01 | Rejection of invention patent application after publication |
Application publication date: 20180313 |