CN107795185A CN201610742824.5A CN201610742824A CN107795185A CN 107795185 A CN107795185 A CN 107795185A CN 201610742824 A CN201610742824 A CN 201610742824A CN 107795185 A CN107795185 A CN 107795185A
Authority
CN
China
Prior art keywords
pylon
burst
hough
operating platform
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610742824.5A
Other languages
Chinese (zh)
Inventor
张健
夏士龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201610742824.5A priority Critical patent/CN107795185A/en
Publication of CN107795185A publication Critical patent/CN107795185A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0218Increasing or restoring the load-bearing capacity of building construction elements
    • E04G23/0225Increasing or restoring the load-bearing capacity of building construction elements of circular building elements, e.g. by circular bracing
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • E04H12/10Truss-like structures
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/34Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
    • E04H12/342Arrangements for stacking tower sections on top of each other

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Foundations (AREA)

Abstract

The invention discloses a kind of chimney to reinforce pylon high-altitude installation node security construction method, and pylon steel structure member is assembled into pylon burst by this method on the special stand of ground first, and the steel pipe column both ends of pylon burst are provided with flange;Temporary ladder and Hough operating platform are set on pylon burst;The two halves tight loop of Hough operating platform bottom plate wales pylon burst steel pipe column and fixation, and operating platform is located at cat ladder top;Pylon burst is lifted on tower foundation using crane;Then assembled upper strata pylon burst, upper strata pylon burst is lifted to lower floor's pylon burst using crane, is directed at steel pipe column, operating personnel are located at the docking construction operation that interlayer pylon burst flange is carried out on Hough operating platform, complete flange node installation;Hough operating platform is removed using crane, assembly and flange joint installation for next pylon burst.This method effectively improves the security of work high above the ground, reduces construction cost, improves efficiency of construction and the quality of pylon installation.

Description

Chimney reinforces pylon high-altitude installation node security construction method
Technical field
The present invention relates to a kind of chimney to reinforce pylon high-altitude installation node security construction method.
Background technology
Most steel mill is provided with steel stack, with use with the passing of time, the aging of chimney body structure, seriously corroded, summer in addition The gradual increase of typhoon increases, and chimney rocks increase, brings huge hidden danger to safety in production, it is therefore necessary to reinforce using pylon.
It is that puncheon foundation is connected with the box foundation of existing chimney to reinforce tower foundation, reinforces pylon and uses quadrangle tower Frame, pylon size determine according to reconnaissance trip, and pylon post uses Variable Section Steel tubing string from low to high according to stress difference, cross bar and Support bar uses isometrical steel pipe, sets sliding support to be connected with chimney at the different levels such as pylon 25m, 45m, 60m absolute altitude, right Chimney provides horizontal support, vertically to slip.
As shown in figure 1, when steel structure reinforcing pylon is installed, first on ground by steel pipe column 11, cross bar 12 and support bar 13 Pylon burst 1 is assembled into, upper strata pylon point is successively installed using crane 5 after the surrounding ground installing bottom layer pylon burst 2 of chimney 3 Piece, the overhead connection position 4 of interlayer pylon burst is mostly flange connection or welding, and it is several that this requires that workmen must climb up Rice even tens meters of high-altitudes are constructed, and using manually setting up operating platform or setting temporary operating platform on ground, are then operated The dismounting of platform is cumbersome, and is work high above the ground, dangerous high.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of chimney and reinforce pylon high-altitude installation node security construction party Method, this method overcome the defects of node construction is installed in conventional tower high-altitude, effectively improve the security of work high above the ground, reduce Construction cost, improve efficiency of construction and the quality of pylon installation.
In order to solve the above technical problems, chimney of the present invention reinforces pylon high-altitude installation node security construction method including as follows Step:
Step 1: steel pipe column, cross bar and support bar assembly pylon burst are used on ground, pylon burst both sides steel pipe column both ends point She You not flange;
Step 2: pylon burst both sides set temporary ladder respectively, and in the upper and lower part of pylon burst both sides steel pipe column point Falsework is not set;
Step 3: making Hough operating platform, Hough operating platform includes Hough bottom plate, fence, strengthens rib and Hough fastening Circle, fence are vertical at Hough bottom plate outer ring, and Hough bottom plate center is provided with through hole, and Hough tight loop leads to located at Hough bottom plate center Hole, strengthen rib and be located between Hough tight loop and Hough bottom plate outer ring;
Step 4: Hough operating platform is arranged on pylon burst both sides steel pipe column by fastening clip and is fixed on steel pipe column On, Hough operating platform is located at cat ladder top;
Step 5: pylon burst is lifted to tower foundation using crane;
Step 6: assembled upper strata pylon burst and Hough operating platform, cat ladder connect upper strata pylon to repeat step one to four successively Hough operating platform between burst and lower floor's pylon burst;
Step 7: upper strata pylon burst is lifted on by lower floor's pylon burst top using crane and is directed at steel pipe column, operating personnel The docking construction operation of interlayer pylon burst flange is carried out on Hough operating platform, completes flange node installation;
Step 8: remove Hough operating platform, the assembly for next pylon burst using crane after flange joint installation Installed with flange joint, so as to complete the construction that chimney reinforces pylon high-altitude installation node.
Further, when the Hough tight loop of Hough operating platform divides two halves banding pylon burst both sides steel pipe column, in Hough Rubber washer is encased inside between tight loop and steel pipe column.
Pylon high-altitude installation node security construction method is reinforced due to chimney of the present invention and employs above-mentioned technical proposal, i.e., first will Pylon steel structure member is assembled into pylon burst on the special stand of ground, and the steel pipe column both ends of pylon burst are provided with flange; Temporary ladder and Hough operating platform are set on pylon burst;The two halves tight loop of Hough operating platform bottom plate wales pylon burst Steel pipe column and fixation, Hough operating platform are located at cat ladder top;Pylon burst is lifted on tower foundation using crane;Then With same method assembly upper strata pylon burst, upper strata pylon burst is lifted to lower floor's pylon burst using crane, is directed at steel Tubing string, operating personnel carry out the docking construction operation of interlayer pylon burst flange on Hough operating platform, complete flange joint Installation;Hough operating platform is removed using crane, assembly and flange joint installation for upper strata pylon burst.This method overcomes The defects of conventional tower high-altitude installation node construction, the security of work high above the ground is effectively improved, reduce construction cost, improve Efficiency of construction and the quality of pylon installation.
Brief description of the drawings
The present invention is described in further detail with embodiment below in conjunction with the accompanying drawings:
Fig. 1 is that chimney reinforces pylon burst scheme of installation;
Fig. 2 is that chimney of the present invention reinforces pylon high-altitude installation node security construction method schematic diagram;
Fig. 3 is the structural representation of operating platform in this method.
Embodiment
As shown in Figures 2 and 3, chimney of the present invention reinforces pylon high-altitude installation node security construction method to be included such as embodiment Lower step:
Step 1: use steel pipe column 11, cross bar 12 and the assembled pylon burst 1 of support bar 13, the both sides steel pipe of pylon burst 1 on ground The both ends of post 11 are respectively equipped with flange 14;
Step 2: the both sides of pylon burst 1 set temporary ladder 6 respectively, and on the top of the both sides steel pipe column 11 of pylon burst 1 with Portion sets falsework 7 respectively;
Step 3: making Hough operating platform 8, Hough operating platform 8 includes Hough bottom plate 81, fence 82, strengthens the and of rib 83 Hough tight loop 84, fence 82 are vertical at the outer ring of Hough bottom plate 81, and the center of Hough bottom plate 81 is provided with through hole 85, Hough tight loop 84 are located at the central through hole 85 of Hough bottom plate 81, strengthen rib 83 and are located between Hough tight loop 84 and the outer ring of Hough bottom plate 81;
Step 4: Hough operating platform 8 is arranged on the both sides steel pipe column 11 of pylon burst 1 by fastening clip 87 and is fixed on On steel pipe column 11, Hough operating platform 8 is located at the top of cat ladder 6;
Step 5: pylon burst 1 is lifted to tower foundation using crane;
Step 6: assembled upper strata pylon burst and Hough operating platform, cat ladder connect upper strata pylon to repeat step one to four successively Hough operating platform between burst and lower floor's pylon burst;
Step 7: upper strata pylon burst is lifted on by lower floor's pylon burst top using crane and is directed at steel pipe column 11, operator Member carries out the docking construction operation of interlayer pylon burst flange 14 on Hough operating platform 8, completes flange node installation;
Step 8: remove Hough operating platform 8, the assembly for next pylon burst using crane after flange joint installation Installed with flange joint, so as to complete the construction that chimney reinforces pylon high-altitude installation node.
Preferably, when the Hough tight loop 84 of Hough operating platform 8 divides two halves banding pylon 1 both sides steel pipe column 11 of burst, Rubber washer 86 is encased inside between Hough tight loop 84 and steel pipe column 11.Rubber washer increases rubbing between tight loop and steel pipe column Power is wiped, so that operating platform can be stably fixed on steel pipe column, while avoids the abrasion of tight loop and steel pipe column, improves construction matter Amount.
This method only needs some Hough operating platforms to be made, in tower according to pylon steel pipe column dimension before pylon installation The Hough operating platform is fixed in pylon connecting node before frame installation.After pylon structure lifting, workmen can be safe Constructed on the Hough operating platform, after the completion of the lifting connection of adjacent pylon burst, the Hough operating platform is removed, under being used for The installation of one pylon burst.The problem of present method solves steelwork tower truss overhead connection node construction process without safety guarantee, The security of steel structural overhead installation node construction can be effectively ensured, improve efficiency of construction and quality.Use this method can be with Accomplish unified making, the operating platform of unified standard when pylon is installed, avoid fragmentary fabrication and installation from causing operating platform to make Quality and the potential safety hazard using process, and the Hough operating platform in this method can recycle, and reduce cost.

Claims (2)

1. a kind of chimney reinforces pylon high-altitude installation node security construction method, it is characterised in that this method comprises the following steps:
Step 1: steel pipe column, cross bar and support bar assembly pylon burst are used on ground, pylon burst both sides steel pipe column both ends point She You not flange;
Step 2: pylon burst both sides set temporary ladder respectively, and in the upper and lower part of pylon burst both sides steel pipe column point Falsework is not set;
Step 3: making Hough operating platform, Hough operating platform includes Hough bottom plate, fence, strengthens rib and Hough fastening Circle, fence are vertical at Hough bottom plate outer ring, and Hough bottom plate center is provided with through hole, and Hough tight loop leads to located at Hough bottom plate center Hole, strengthen rib and be located between Hough tight loop and Hough bottom plate outer ring;
Step 4: Hough operating platform is arranged on pylon burst both sides steel pipe column by fastening clip and is fixed on steel pipe column On, Hough operating platform is located at cat ladder top;
Step 5: pylon burst is lifted to tower foundation using crane;
Step 6: assembled upper strata pylon burst and Hough operating platform, cat ladder connect upper strata pylon to repeat step one to four successively Hough operating platform between burst and lower floor's pylon burst;
Step 7: upper strata pylon burst is lifted on by lower floor's pylon burst top using crane and is directed at steel pipe column, operating personnel The docking construction operation of interlayer pylon burst flange is carried out on Hough operating platform, completes flange node installation;
Step 8: remove Hough operating platform, the assembly for next pylon burst using crane after flange joint installation Installed with flange joint, so as to complete the construction that chimney reinforces pylon high-altitude installation node.
2. chimney according to claim 1 reinforces pylon high-altitude installation node security construction method, it is characterised in that:Hough When the Hough tight loop of operating platform divides two halves banding pylon burst both sides steel pipe column, padded between Hough tight loop and steel pipe column Enter rubber washer.
CN201610742824.5A 2016-08-29 2016-08-29 Chimney reinforces pylon high-altitude installation node security construction method Pending CN107795185A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610742824.5A CN107795185A (en) 2016-08-29 2016-08-29 Chimney reinforces pylon high-altitude installation node security construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610742824.5A CN107795185A (en) 2016-08-29 2016-08-29 Chimney reinforces pylon high-altitude installation node security construction method

Publications (1)

Publication Number Publication Date
CN107795185A true CN107795185A (en) 2018-03-13

Family

ID=61527815

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610742824.5A Pending CN107795185A (en) 2016-08-29 2016-08-29 Chimney reinforces pylon high-altitude installation node security construction method

Country Status (1)

Country Link
CN (1) CN107795185A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109626212A (en) * 2018-12-21 2019-04-16 中国电建集团核电工程有限公司 Chimney installation auxiliary device
CN110566029A (en) * 2019-08-26 2019-12-13 常州第一建筑集团有限公司 gradual installation and construction method for high-rise steel tower
CN113323362A (en) * 2021-06-08 2021-08-31 中国建筑第八工程局有限公司 Overhead supporting operation frame based on bottom steel platform
CN116146024A (en) * 2022-12-19 2023-05-23 中国二十二冶集团有限公司 Installation construction method for glass fiber reinforced plastic chimney of granulating tower of blast furnace granulated slag system

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08246659A (en) * 1995-03-14 1996-09-24 Hitachi Plant Eng & Constr Co Ltd Scaffolding
CN202039587U (en) * 2011-03-21 2011-11-16 苏州工业园区云白华鼎烟囱制造有限公司 Temporary platform for installing mating flange on steel chimney
CN203008344U (en) * 2012-11-22 2013-06-19 中国石油天然气第一建设公司 Detachable and reusable operating platform device
CN203559570U (en) * 2013-11-11 2014-04-23 中建钢构有限公司北京分公司 Operating platform for steel pipe support frame overhung on surrounding columns
CN203640247U (en) * 2013-10-30 2014-06-11 五冶集团上海有限公司 Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08246659A (en) * 1995-03-14 1996-09-24 Hitachi Plant Eng & Constr Co Ltd Scaffolding
CN202039587U (en) * 2011-03-21 2011-11-16 苏州工业园区云白华鼎烟囱制造有限公司 Temporary platform for installing mating flange on steel chimney
CN203008344U (en) * 2012-11-22 2013-06-19 中国石油天然气第一建设公司 Detachable and reusable operating platform device
CN203640247U (en) * 2013-10-30 2014-06-11 五冶集团上海有限公司 Hoop type detachable operating platform for blast furnace granulating slag steam exhaust barrel
CN104594618A (en) * 2013-10-30 2015-05-06 五冶集团上海有限公司 Hoop type disassembling operating platform of blast furnace granulated slag steam exhausting barrel
CN203559570U (en) * 2013-11-11 2014-04-23 中建钢构有限公司北京分公司 Operating platform for steel pipe support frame overhung on surrounding columns

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109626212A (en) * 2018-12-21 2019-04-16 中国电建集团核电工程有限公司 Chimney installation auxiliary device
CN109626212B (en) * 2018-12-21 2020-05-15 中国电建集团核电工程有限公司 Chimney installation auxiliary device
CN110566029A (en) * 2019-08-26 2019-12-13 常州第一建筑集团有限公司 gradual installation and construction method for high-rise steel tower
CN113323362A (en) * 2021-06-08 2021-08-31 中国建筑第八工程局有限公司 Overhead supporting operation frame based on bottom steel platform
CN113323362B (en) * 2021-06-08 2023-06-09 中国建筑第八工程局有限公司 High altitude support operation frame based on bottom steel platform
CN116146024A (en) * 2022-12-19 2023-05-23 中国二十二冶集团有限公司 Installation construction method for glass fiber reinforced plastic chimney of granulating tower of blast furnace granulated slag system
CN116146024B (en) * 2022-12-19 2025-07-25 中国二十二冶集团有限公司 Installation construction method for glass fiber reinforced plastic chimney of granulating tower of blast furnace granulated slag system

Similar Documents

Publication Publication Date Title
CN107795185A (en) Chimney reinforces pylon high-altitude installation node security construction method
CN207919363U (en) A kind of Filled Steel Tubular Arch Bridge low level assembly lifting system
CN207700068U (en) A kind of modularization Bridge Pier Construction job platform
CN206692235U (en) A kind of steel structure dome lifts by crane erecting device
CN201367728Y (en) Derrick-less hydraulic slip form device used for reinforced concrete water tower supporting tube construction
CN101845912A (en) Segmental-body assembly type emergency communication tower
CN202530769U (en) Large span steel structure high-altitude subsection hoisting support system
CN105804400A (en) Curved surface net frame lifting construction method
CN103899093A (en) Step-by-step hoisting construction method of mega-frame steel truss beam
CN204185120U (en) Mobile unit dolly in place
CN106193780A (en) A kind of overall installation method of segmentation highrise steel structure building
CN106655009A (en) Hydraulic lifting type crossing structure
CN102493666A (en) High-altitude translation installation and construction method for super-large super-heavy member
CN104989111A (en) Construction method for steel structure high-rise hoisting
CN206144124U (en) A scaffold for construction of tall and big space
CN204530493U (en) A kind of high pier over-form construction platform
CN207512610U (en) A kind of assembled bridge pier construction operation platform
CN106544959A (en) The construction method of the lifting sections of the king-tower containing saddle and bridge main tower saddle
CN206769349U (en) Light clamper formula scaffold on joist steel upright
CN104404883A (en) Inner working platform for rapid construction of bridge pier and construction method using inner working platform
CN201635390U (en) Automatic formwork supporting machine for high-rise building elevator shaft construction
CN206220534U (en) The pump line support meanss of concrete pumping equipment
CN204212065U (en) Bridge crossing anticollision barrier punching block erection equipment
CN204530492U (en) A kind of hydraulic climbing mould construction platform
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20180313