CN204225503U - Large span steel truss high altitude bulk conversion beam moulding bed - Google Patents

Large span steel truss high altitude bulk conversion beam moulding bed Download PDF

Info

Publication number
CN204225503U
CN204225503U CN201420725545.4U CN201420725545U CN204225503U CN 204225503 U CN204225503 U CN 204225503U CN 201420725545 U CN201420725545 U CN 201420725545U CN 204225503 U CN204225503 U CN 204225503U
Authority
CN
China
Prior art keywords
steel
support
transfer beam
tire frame
conversion beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201420725545.4U
Other languages
Chinese (zh)
Inventor
史公勋
康都如
全有维
巫海兵
王冰
石亚峰
程建军
沈兴东
扬中源
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Original Assignee
Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd filed Critical Third Construction Co Ltd of China Construction Eighth Engineering Divison Co Ltd
Priority to CN201420725545.4U priority Critical patent/CN204225503U/en
Application granted granted Critical
Publication of CN204225503U publication Critical patent/CN204225503U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本实用新型公开一种大跨度钢桁架高空散装转换梁胎架,针对现有技术中的采用高空散装方法时,现场需要按照钢桁架的分段和安装顺序搭设胎架,一旦场地受限时,胎架的搭设方法较难选择,很多工程为搭设胎架需要对结构进行加固,相对成本较高的问题。采取的技术方案是,一种大跨度钢桁架高空散装转换梁胎架,包括钢桁架,钢管胎架,转换梁和转换梁钢支座。优点,此大跨度钢桁架高空散装转换梁胎架,应用转换梁,既节省了大型移动吊装设备的投入及为此所进行的结构加固,也避免了搭设满堂脚手钢管支撑平台或者地下室各层结构的加固投入。

The utility model discloses a large-span steel truss high-altitude bulk conversion beam tire frame, aiming at the high-altitude bulk method in the prior art, the tire frame needs to be erected on site according to the segmentation and installation sequence of the steel truss, once the site is limited, It is difficult to choose the method of erecting the tire frame. Many projects need to reinforce the structure in order to erect the tire frame, which is relatively expensive. The technical solution adopted is a large-span steel truss high-altitude bulk transfer beam tire frame, including a steel truss, a steel tube tire frame, a transfer beam and a transfer beam steel support. Advantages, the large-span steel truss high-altitude bulk conversion beam tire frame, the application of the conversion beam, not only saves the investment of large-scale mobile hoisting equipment and the structural reinforcement for this, but also avoids the erection of scaffolding steel pipe support platforms or basement floors investment in reinforcement of the structure.

Description

Large span steel truss high altitude bulk conversion beam moulding bed
Technical field
The utility model relates to a kind of large span steel truss high altitude bulk conversion beam moulding bed, be mainly used in because of place is limited cannot the large span steel truss high altitude bulk of integral hoisting.
Background technology
Along with socioeconomic development, increasing new building adopts the design form of steel work, especially pursues high, large space and uses large-span truss structure in a large number, and this brings new challenge for engineering Steel Structure Installation.Conventional large-span truss beam is installed according to whether segmentation is divided into integral hoisting and high altitude bulk.
When adopting integral hoisting method, technical difficulty is large, resource input is many, cost is high and security risk is large; When adopting high altitude bulk method, on-the-spot needs sets up moulding bed according to the segmentation of steel truss and erection sequence, once place is by limited time, the more difficult selection of erection method of moulding bed, a lot of engineering needs to reinforce structure for setting up moulding bed, and relative cost is higher.
Utility model content
Technical problem to be solved in the utility model is: during for employing high altitude bulk method of the prior art, on-the-spot needs sets up moulding bed according to the segmentation of steel truss and erection sequence, once place is by limited time, the more difficult selection of erection method of moulding bed, a lot of engineering needs to reinforce structure for setting up moulding bed, the problem that relative cost is higher.
Design philosophy of the present utility model is, the method of setting up Two bors d's oeuveres H profile steel conversion beam in steel pipe moulding bed bottom is adopted to deal with problems, the reinforced concrete frame column top being arranged at basement selected by the conversion beam steel support of this conversion beam, like this, the load of the steel truss of installation is passed on concrete frame trestle by steel pipe moulding bed, conversion beam.
The purpose of this utility model is to provide a kind of large span steel truss high altitude bulk conversion beam moulding bed, adopt this conversion beam moulding bed, when effectively avoiding integral hoisting machinery have high input, structure temperature pier costly problem, it also avoid because of place that to set up operation by limited time high altitude bulk moulding bed many, the problem that structure temperature pier cost is high simultaneously.
For solving the problems of the technologies described above, the technical solution adopted in the utility model is:
A kind of large span steel truss high altitude bulk conversion beam moulding bed, comprises steel pipe moulding bed, conversion beam steel support and conversion beam; Described conversion beam steel support is arranged on basement roof, and the concrete frame trestle of the positive corresponding basement of described conversion beam steel support; Described conversion beam steel support supports conversion beam, and described steel pipe moulding bed is vertically fixed on conversion beam; Described steel truss is fixed on steel pipe moulding bed.
Further improvement, described conversion beam steel support comprises base-plate, bearing steel plate and anchor bar; Bearing steel plate is vertically installed on base-plate; Anchor bar is fixedly installed on the bottom surface of base-plate, and described anchor bar is fixedly connected with the main muscle of frame column, has built C60 and be in the milk the bed of material between described base-plate and basement roof.
Further improvement, described conversion beam steel support also comprises bearing stiffener; Described bearing stiffener is fixedly installed on the junction of base-plate and bearing steel plate.
Further improvement, is provided with the first shrouding between described steel truss and steel pipe moulding bed; The second shrouding is provided with between described steel pipe moulding bed and conversion beam steel support.
Further improvement, described conversion beam is Two bors d's oeuveres H profile steel conversion beam.
Compared with prior art, its beneficial effect is the utility model:
1, this large span steel truss high altitude bulk conversion beam tire, application conversion beam, both saved the input of Large-scale Mobile hanging device and be this structural strengthening carried out, and it also avoid the reinforcing of setting up full hall steel pipe scaffolding support platform or each Rotating fields of basement and drop into.
2, it is few with material, the node only comprising conversion beam component and be connected with framework capital; Install more convenient, can directly with mounted tower crane hoisted in position, then on-the-spot splicing is welded, and improves operating efficiency; Save the engineering time, the set-up time of conversion beam moulding bed is 2 working days, if lift according to Large-scale Mobile Whole Equipment, then in order to build interim sidewalk and floor reinforcing, approximately need the time to be 7 days, if according to setting up support platform, approximately need the time to be 8 days and quality be not easy ensure.
Accompanying drawing explanation
Fig. 1 is the schematic side view of the conversion beam of large span steel truss high altitude bulk described in embodiment 1 moulding bed.
Fig. 2 is the schematic diagram that conversion beam bearing is connected with the concrete frame trestle of basement.
Fig. 3 is the structural representation of conversion beam bearing.
Fig. 4 is the schematic front view of large span steel truss high altitude bulk conversion beam moulding bed described in the utility model.
Fig. 5 is the schematic side view of Two bors d's oeuveres H profile steel conversion beam described in the utility model.
Wherein, 1 is steel truss, and 2 is steel pipe moulding bed, 3 is conversion beam steel support, 3.1, base-plate, 3.2, bearing steel plate, 3.3, bearing stiffener, 3.4, bearing lower anchor reinforcing bar, 4 is Vierendeel girder, 5 is concrete frame trestle, 6 is the first shrouding, and 7 is the second shrouding, and 8 is the C60 grouting bed of material, 9 is conversion beam, and 10 is main muscle.
Detailed description of the invention
Below technical solutions of the utility model are described in detail, but protection domain of the present utility model is not limited to described embodiment.
For making content of the present utility model more become apparent, be further described below in conjunction with accompanying drawing 1-accompanying drawing 5 and detailed description of the invention.
In order to make the purpose of this utility model, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the utility model is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the utility model, and be not used in restriction the utility model.
Embodiment
Large span steel truss high altitude bulk conversion beam moulding bed in the present embodiment, comprises steel truss 1 to be installed, steel pipe moulding bed 2, conversion beam 9, first shrouding 6, second shrouding 7 and two conversion beam steel supports 3.
Described conversion beam steel support 3 comprises base-plate 3.1, bearing steel plate 3.2, bearing stiffener 3.3 and bearing lower anchor reinforcing bar 3.4.
The conversion beam 9 adopted in the present embodiment is Two bors d's oeuveres H profile steel conversion beam.Two H profile steel conversion beams of the prior art are namely welded into an entirety by described Two bors d's oeuveres H profile steel conversion beam.
Described conversion beam steel support 3 is arranged on basement roof 4, and the concrete frame trestle 5 of the positive corresponding basement of conversion beam steel support 3; Conversion beam steel support 3 supports conversion beam 9, and steel pipe moulding bed 2 is vertically fixed on conversion beam 9, and steel truss 1 is fixed on steel pipe moulding bed 2.The first shrouding 6 is provided with between steel truss 1 and steel pipe moulding bed 2; The second shrouding 7 is provided with between steel pipe moulding bed 2 and conversion beam steel support 3.
Conversion beam steel support 3 in the present embodiment comprises base-plate 3.1, bearing steel plate 3.2 and anchor bar 3.4; Bearing steel plate 3.2 is vertically installed on base-plate 3.1; Anchor bar 3.4 is fixedly installed on the bottom surface of base-plate 3.1, and anchor bar 3.4 is fixedly connected with the main muscle of frame column 5, has built C60 and be in the milk the bed of material 8 between base-plate 3.1 and basement roof 4.Bearing stiffener 3.3 is fixedly welded on the junction of base-plate 3.1 and bearing steel plate 3.2.
The building method of the large span steel truss high altitude bulk conversion beam moulding bed in the present embodiment, comprises the steps:
1.1, the position of the concrete frame trestle 5 of basement is accurately determined;
1.2, the making of conversion beam steel support 3, plug welding bearing lower anchor reinforcing bar 3.4 that base-plate 3.1 is bored a hole;
1.3, cut the concrete at concrete frame trestle 5 top of basement, make the main muscle 10 in the concrete frame trestle 5 of basement spill 10mm;
1.4, the bearing lower anchor reinforcing bar 3.4 in step 1.2 is welded and fixed with the main muscle 10 in step 1.3;
1.5, the weld in cleanup step 1.4, moistening rear formwork erection of spraying water builds C60 grouting material by closely knit for fill gaps bottom conversion beam steel support 3; Conversion beam steel support 3 installation;
1.6, conversion beam 9 is installed;
1.7, steel pipe moulding bed 2 is installed;
1.8, steel truss 1 is installed.
Building method described in step 1.6, step 1.7 and step 1.8 in this building method, is building method of the prior art, does not repeat them here.
As mentioned above, although represented with reference to specific preferred embodiment and described the utility model, it shall not be construed as the restriction to the utility model self.Under the spirit and scope prerequisite of the present utility model not departing from claims definition, various change can be made in the form and details to it.

Claims (5)

1.一种大跨度钢桁架高空散装转换梁胎架,包括钢管胎架(2),其特征在于,还包括转换梁钢支座(3)和转换梁(9);所述转换梁钢支座(3)设置于地下室顶板(4)上,且所述转换梁钢支座(3)正对应地下室的混凝土框架柱(5);所述转换梁钢支座(3)支撑转换梁(9),所述钢管胎架(2)竖直固定于转换梁(9)上;待安装钢桁架(1)固定于钢管胎架(2)上。1. a large-span steel truss high-altitude bulk transfer beam tire frame, comprising a steel pipe tire frame (2), is characterized in that, also includes a transfer beam steel support (3) and a transfer beam (9); the transfer beam steel support The seat (3) is arranged on the basement roof (4), and the transfer beam steel support (3) is corresponding to the concrete frame column (5) of the basement; the transfer beam steel support (3) supports the transfer beam (9 ), the steel tube frame (2) is vertically fixed on the transfer beam (9); the steel truss (1) to be installed is fixed on the steel tube frame (2). 2.如权利要求1所述的大跨度钢桁架高空散装转换梁胎架,其特征在于,所述转换梁钢支座(3)包括支座底板(3.1)、支座钢板(3.2)和锚固钢筋(3.4);支座钢板(3.2)垂直设置于支座底板(3.1)上;锚固钢筋(3.4)固定设置于支座底板(3.1)的底面,所述锚固钢筋(3.4)与框架柱(5)的主筋固定连接,所述支座底板(3.1)与地下室顶板(4)之间浇筑有C60灌浆料层(8)。2. The large-span steel truss high-altitude bulk transfer beam tire frame as claimed in claim 1, characterized in that, the transfer beam steel support (3) includes a support bottom plate (3.1), a support steel plate (3.2) and an anchor Steel bar (3.4); the support steel plate (3.2) is vertically arranged on the support bottom plate (3.1); the anchor steel bar (3.4) is fixedly arranged on the bottom surface of the support bottom plate (3.1), and the anchor steel bar (3.4) and the frame column ( 5) are fixedly connected to the main reinforcement, and a C60 grouting material layer (8) is poured between the support bottom plate (3.1) and the basement roof (4). 3.如权利要求2所述的大跨度钢桁架高空散装转换梁胎架,其特征在于,所述转换梁钢支座(3)还包括支座加劲板(3.3);所述支座加劲板(3.3)固定设置于支座底板(3.1)与支座钢板(3.2)的连接处。3. The large-span steel truss high-altitude bulk transfer beam tire frame as claimed in claim 2, characterized in that, the transfer beam steel support (3) also includes a support stiffener (3.3); the support stiffener (3.3) It is fixedly arranged at the junction of the support bottom plate (3.1) and the support steel plate (3.2). 4.如权利要求1所述的大跨度钢桁架高空散装转换梁胎架,其特征在于,所述钢桁架(1)与钢管胎架(2)之间设置有第一封板(6);所述钢管胎架(2)与转换梁钢支座(3)之间设置有第二封板(7)。4. The large-span steel truss high-altitude bulk transfer beam tire frame according to claim 1, characterized in that, a first sealing plate (6) is arranged between the steel truss (1) and the steel tube tire frame (2); A second sealing plate (7) is arranged between the steel tube tire frame (2) and the transfer beam steel support (3). 5.如权利要求1所述的大跨度钢桁架高空散装转换梁胎架,其特征在于,所述转换梁(9)为双拼H型钢转换梁。5. The large-span steel truss high-altitude bulk transfer beam tire frame according to claim 1, characterized in that, the transfer beam (9) is a double H-shaped steel transfer beam.
CN201420725545.4U 2014-11-27 2014-11-27 Large span steel truss high altitude bulk conversion beam moulding bed Expired - Lifetime CN204225503U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201420725545.4U CN204225503U (en) 2014-11-27 2014-11-27 Large span steel truss high altitude bulk conversion beam moulding bed

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201420725545.4U CN204225503U (en) 2014-11-27 2014-11-27 Large span steel truss high altitude bulk conversion beam moulding bed

Publications (1)

Publication Number Publication Date
CN204225503U true CN204225503U (en) 2015-03-25

Family

ID=52923616

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201420725545.4U Expired - Lifetime CN204225503U (en) 2014-11-27 2014-11-27 Large span steel truss high altitude bulk conversion beam moulding bed

Country Status (1)

Country Link
CN (1) CN204225503U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060070A (en) * 2017-05-27 2017-08-18 中国建筑第二工程局有限公司 Load transfer device and construction method for hoisting steel gallery by using same
CN109750687A (en) * 2019-01-27 2019-05-14 浙江大学城市学院 Adjustable size steel structure tower crane foundation cap

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107060070A (en) * 2017-05-27 2017-08-18 中国建筑第二工程局有限公司 Load transfer device and construction method for hoisting steel gallery by using same
CN109750687A (en) * 2019-01-27 2019-05-14 浙江大学城市学院 Adjustable size steel structure tower crane foundation cap
CN109750687B (en) * 2019-01-27 2024-05-10 浙江大学城市学院 Steel structure tower crane foundation bearing platform with adjustable size

Similar Documents

Publication Publication Date Title
CN104088397B (en) A kind of prefabricated post and precast construction method thereof
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN103935911B (en) Tower crane attached wall supporting construction and construction method thereof
CN103866693B (en) A kind of mounting method of steel concrete bowstring arch bridge arch rib
CN103352428A (en) Suspension bridge cable bent tower beam non-support construction method
CN105442839A (en) Erecting method of cantilever structure formwork bent
CN105952061A (en) Prefabricated shear wall reinforcement cage member and column reinforcement cage member as well as manufacturing and assembling methods thereof
CN103122691A (en) Tower crane standard knot bearing upper air supporting formwork steel platform structure and construction method
CN105952060A (en) Precast beam reinforcement cage component and assembling method thereof
CN103485574B (en) A kind of granulation tower tower top structure of reinforced concrete method
CN204676881U (en) Large span intersection truss steel structure supporting system
CN204225503U (en) Large span steel truss high altitude bulk conversion beam moulding bed
CN204386152U (en) The sliding formwork system of large-diameter cylinder body structure
CN203034799U (en) Tower hoist standard knot bearing overhead support formwork steel platform structure
CN203213019U (en) Long cantilever bent cap cast-in-place construction support system
CN102787717B (en) Self-supporting combined steel template construction method
CN213204915U (en) Overweight overhanging suspended component supporting system of super high-rise residential conversion layer
CN104831928B (en) High-altitude long-span concrete conjoined structure shuttering supporting steel platform construction method
CN104453228A (en) Construction method of large-span super-large-section steel plate wall beam
CN104947804B (en) A kind of steel bracket and the construction method that beam-column node structure is built using it
CN204173804U (en) A kind of inside-climbing tower crane of structural beams bearing-type is installed and climbing structure
CN203947417U (en) A kind of realization without the cast-in-place supporting structure of cushion cap approach viaduct concrete case beam limited bracket
CN206053132U (en) Precast reinforced cage component, shear wall and diaphram wall
CN104963344B (en) The deep basal pit underground construction method that concrete supporting removal and structure construction are synchronously carried out

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20150325