CN208686053U - A kind of elevator well sizing climbing platforms device - Google Patents
A kind of elevator well sizing climbing platforms device Download PDFInfo
- Publication number
- CN208686053U CN208686053U CN201821172427.XU CN201821172427U CN208686053U CN 208686053 U CN208686053 U CN 208686053U CN 201821172427 U CN201821172427 U CN 201821172427U CN 208686053 U CN208686053 U CN 208686053U
- Authority
- CN
- China
- Prior art keywords
- angle beam
- frame
- steel plate
- positioning bolt
- checkered steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000009194 climbing Effects 0.000 title claims abstract description 24
- 238000004513 sizing Methods 0.000 title abstract description 9
- 230000007246 mechanism Effects 0.000 claims abstract description 55
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 40
- 239000010959 steel Substances 0.000 claims abstract description 40
- 230000003139 buffering effect Effects 0.000 claims description 11
- 239000007787 solid Substances 0.000 claims 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 6
- 239000000463 material Substances 0.000 description 4
- 230000000694 effects Effects 0.000 description 3
- 229910052742 iron Inorganic materials 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 239000000725 suspension Substances 0.000 description 2
- 238000007792 addition Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The utility model discloses a kind of elevator well sizing climbing platforms device, including frame mechanism, top panel mechanism, base plate mechanism, anticollision mechanism, guardrail and fixation kit, frame mechanism includes top frame, lower section frame and first column of angles, lower section frame upper end connects top frame by four first columns of angles, top panel mechanism includes the first checkered steel plate and the first positioning bolt, on top frame of first checkered steel plate by the connection of the first positioning bolt, base plate mechanism includes the second checkered steel plate and the second positioning bolt, second checkered steel plate passes through the upper end of the second positioning bolt frame attached below, the upper end of top frame connects multiple hanging rings, multiple first threaded holes are offered on the frame of lower section, one fixation kit is set in each first threaded hole, above-mentioned climbing platforms device is reinforced simple, it lifts convenient, flexible, operation simultaneously Personnel construct more securely and reliably on platform, and overall structure is simple and novel.
Description
Technical field
The utility model relates to building engineering fields, and in particular to a kind of elevator well sizing climbing platforms device.
Background technique
Elevator is the hoistway for installing elevator, and the size of hoistway is determined according to elevator selection, and electricity is installed on the borehole wall
Terraced track and counterweight track, reserved door opening install elevator door, and well headroom has elevator(lift) machine room.Traditional elevator shaft inner frame body
It is set up using fastener type steel pipe scaffold, since floor bottom, needs to set up always steel pipe scaffold and to lead to
The top of elevator shaft.Frame body scaffolding height is excessively high, and cannot remove in time in the process, needs main structure all sides of binding
Dismountable, it is dangerous that there are certain high altitude operation;Waste facility material.Due to excessive height, and narrow space in elevator shaft, worker
Inconvenience is set up, peace tears difficulty open, and rubbish, sundries cleaning in elevator are influenced there is also certain.
Utility model content
The purpose of this utility model is to provide elevator well sizing climbing platforms device, above-mentioned climbing platforms device adds
Gu simple, lifting is convenient, flexible, while operating personnel constructs more securely and reliably on platform, saves facility material investment, saves
Manpower, and clear up and protect convenient for elevator shaft, be conducive to finished product protection, it is more economical.
To achieve the goals above, the technical solution of use is the utility model:
A kind of elevator well sizing climbing platforms device, including frame mechanism, top panel mechanism, base plate mechanism, anti-collision machine
Structure, guardrail and fixation kit, frame mechanism include top frame, lower section frame and first column of angles, and lower section frame upper end passes through
Four first columns of angles connect top frame, and top panel mechanism includes the first checkered steel plate and the first positioning bolt, the first riffled iron
On top frame of the plate by the connection of the first positioning bolt, base plate mechanism includes the second checkered steel plate and the second positioning bolt, the
Two checkered steel plates pass through the upper end of the second positioning bolt frame attached below, and anticollision mechanism has multiple and uniformly distributed first angle steel
On the outer wall of column;Guardrail has four groups, and one group of guardrail is arranged between every two adjacent first columns of angles;The upper end of top frame connects
Multiple hanging rings are connect, multiple first threaded holes are offered on the frame of lower section, a fixation kit is set in each first threaded hole.
Preferably, the top frame includes angle beam on first, angle beam on second, angle beam in third, on the 4th
Angle beam and third positioning bolt, angle beam on first, angle beam on second, angle beam passes through on angle beam and the 4th in third
Frame-like is rectangle in multiple third positioning bolt interconnections.
Preferably, first checkered steel plate has multiple, and multiple first checkered steel plates are arranged parallel to each other, the first riffled iron
The both ends of plate are separately connected on first angle beam on angle beam and third by the first positioning bolt.
Preferably, the lower section frame is including under angle beam and the 4th under the first lower angle beam, the second lower angle beam, third
Angle beam and the 4th positioning bolt, angle beam, the 4th lower angle beam pass through under the first lower angle beam, the second lower angle beam, third
Frame-like is rectangle in multiple 4th positioning bolt interconnections.
Preferably, second checkered steel plate has multiple, and multiple second checkered steel plates are arranged parallel to each other, the second riffled iron
The both ends of plate are separately connected angle beam under the first lower angle beam and third by the second positioning bolt.
Preferably, the anticollision mechanism has eight, connects two anticollision mechanisms, anticollision on the outer wall of each first column of angles
Mechanism includes bracket and buffering wheel, and bracket is connected on the outer wall of first column of angles, and buffering wheel is connected on bracket, and buffering wheel is rubber
Rubber tire.
Preferably, there are six first threaded holes, six the first threaded holes are evenly arranged on the second lower angle beam, third inferior horn
On girder steel and the 4th lower angle beam.
Preferably, the fixation kit includes screw rod and swivel head, and the head of screw rod connects swivel head, and screw rod passes through first
Threaded hole.
The beneficial effects of the utility model are:
Above-mentioned elevator well sizing climbing platforms device, is placed in elevator when in use, needs when then needing mobile
Loop wheel machine is wanted to cooperate, the suspension hook of loop wheel machine catches on hanging ring, then slings entire climbing platforms device, and top panel mechanism is the flat of worker's standing
Platform, base plate mechanism are electronic box placement platform.Worker can stand on top panel mechanism, and then the two sides of frame mechanism are provided with anti-collision machine
Structure, anticollision mechanism connect with the inner wall of elevator, for single frame mechanism, can play buffering and prevent the work of collision
With.After stage apparatus reaches designated position, worker uses fixation kit, platform is fixed in elevator, due to elevator
Side wall on be provided with the structure preformed hole of formwork, screw rod can pass through the first threaded hole and structure preformed hole at this time.Due to setting
There is anticollision mechanism, anticollision mechanism connects with the inner wall of elevator, also functions to the effect of limit positioning.Above-mentioned climbing platforms are reinforced
Simply, it lifts convenient, flexible.Operating personnel constructs more safe and reliable on platform simultaneously, saves facility material investment, saves people
Power.And it clears up and protects convenient for elevator shaft, be conducive to finished product protection, it is more economical.
Detailed description of the invention
Fig. 1 is elevator well sizing climbing platforms device overall structure diagram.
Fig. 2 is fixation kit, base plate mechanism and structure preformed hole cooperation schematic cross-sectional view.
Specific embodiment
The utility model is described in detail with reference to the accompanying drawing:
A kind of elevator well is formed climbing platforms device combined with Figure 1 and Figure 2, including frame mechanism 1, top panel mechanism 2,
Base plate mechanism 3, anticollision mechanism 4, guardrail 5 and fixation kit 6.Frame mechanism 1 includes top frame 7, lower section frame 8 and first jiao
Steel column 9,8 upper end of lower section frame connect top frame 7 by four first columns of angles 9.Top panel mechanism 2 includes the first checkered steel plate
21 and first positioning bolt, on the top frame 7 that the first checkered steel plate 21 is connected by the first positioning bolt.
Base plate mechanism 3 includes the second checkered steel plate 31 and the second positioning bolt, and the second checkered steel plate 31 passes through the second positioning
It is bolted to the upper end of lower section frame 8.Anticollision mechanism 4 has on the outer wall of multiple and uniformly distributed first column of angles 9.Guardrail 5 has
Four groups, one group of guardrail 5 often is set between two adjacent first columns of angles 9.The upper end of top frame 7 connects multiple hanging rings 51,
Multiple first threaded holes 52 are offered on lower section frame 8, and a fixation kit 6 is set in each first threaded hole 52.
Top frame 7 includes angle beam 72 on angle beam 71, second on first, angle steel on angle beam the 73, the 4th in third
Beam 74 and third positioning bolt.Angle beam 72 on angle beam 71, second on first, angle beam on angle beam 73 and the 4th in third
74 are rectangle frame-like by the interconnection of multiple third positioning bolts.First checkered steel plate 31 has multiple, multiple first flowers
Line steel plate 31 is arranged parallel to each other, and the both ends of the first checkered steel plate 31 are separately connected angle beam on first by the first positioning bolt
71 and third on angle beam 73.In order to guarantee that the first checkered steel plate 31 is connect with angle beam 73 in angle beam 71 on first and third
Fastness, usually the first checkered steel plate 31 is welded on first on angle beam 71 and third again on angle beam 73.
Lower section frame 8 includes angle beam 83, the 4th lower angle steel under the first lower angle beam 81, second lower angle beam 82, third
Beam 84 and the 4th positioning bolt, angle beam 83 and the 4th lower angle beam under the lower angle beam 82 of the first lower angle beam 81, second, third
84 are rectangle frame-like by the interconnection of multiple 4th positioning bolts.Second checkered steel plate 31 has multiple, multiple second flowers
Line steel plate 31 is arranged parallel to each other, and the both ends of the second checkered steel plate 31 are separately connected the first lower angle beam by the second positioning bolt
81 and third under angle beam 82.
Anticollision mechanism 4 has eight, and two anticollision mechanisms 4 are connected on the outer wall of each first column of angles 9, and anticollision mechanism 4 wraps
Bracket 41 and buffering wheel 42 are included, bracket 41 is connected on the outer wall of first column of angles 9, and buffering wheel 42, buffering are connected on bracket 41
Wheel 42 is rubber wheel.
There are six first threaded holes 52, and six the first threaded holes 52 are evenly arranged on angle beam under the second lower angle beam 82, third
Under 83 and the 4th on angle beam 84.A fixation kit 6 is connected in each first threaded hole 52.Fixation kit 6 includes screw rod
61 and swivel head 62, the head of screw rod 61 connects swivel head 62, and screw rod 61 passes through the first threaded hole 52.
Above-mentioned elevator well sizing climbing platforms device, is placed in elevator when in use, needs when then needing mobile
Loop wheel machine is wanted to cooperate, the suspension hook of loop wheel machine catches on hanging ring 51, then slings entire climbing platforms device, and top panel mechanism 2 is worker's standing
Platform, base plate mechanism 3 be electronic box placement platform.Worker can stand on top panel mechanism 2, then the two sides setting of frame mechanism 1
Have anticollision mechanism 4, anticollision mechanism 4 connects with the inner wall of elevator, for single frame mechanism 1, can play buffering and
Prevent the effect of collision.After stage apparatus reaches designated position, worker uses fixation kit 6, and platform is fixed on elevator
In, due to being provided with the structure preformed hole 101 of formwork on the side wall of elevator, screw rod 61 can be across the first threaded hole and knot at this time
Structure preformed hole 101.Due to being provided with anticollision mechanism 4, anticollision mechanism 4 connects with the inner wall of elevator, also functions to limit positioning
Effect.Above-mentioned climbing platforms are reinforced simply, and lifting is convenient, flexible, while operating personnel constructs more securely and reliably on platform,
Facility material investment is saved, manpower is saved.And it clears up and protects convenient for elevator shaft, be conducive to finished product protection, it is more economical.
Certainly, the above description is not intended to limit the present invention, and the utility model is also not limited to the example above,
The variations, modifications, additions or substitutions that those skilled in the art are made in the essential scope of the utility model, are also answered
Belong to the protection scope of the utility model.
Claims (8)
- The climbing platforms device 1. a kind of elevator well is formed, which is characterized in that including frame mechanism, top panel mechanism, bottom plate machine Structure, anticollision mechanism, guardrail and fixation kit, frame mechanism include top frame, lower section frame and first column of angles, lower section frame Upper end connects top frame by four first columns of angles, and top panel mechanism includes the first checkered steel plate and the first positioning bolt, the On top frame of one checkered steel plate by the connection of the first positioning bolt, base plate mechanism includes the second checkered steel plate and the second positioning Bolt, the second checkered steel plate pass through the upper end of the second positioning bolt frame attached below, and anticollision mechanism has multiple and uniformly distributed On the outer wall of first column of angles;Guardrail has four groups, and one group of guardrail is arranged between every two adjacent first columns of angles;Top frame Upper end connect multiple hanging rings, multiple first threaded holes are offered on the frame of lower section, in each first threaded hole setting one it is solid Determine component.
- The climbing platforms device 2. a kind of elevator well according to claim 1 is formed, which is characterized in that the upper box Frame includes angle beam on first, angle beam on second, angle beam in third, angle beam and third positioning bolt on the 4th, and first Upper angle beam, angle beam on second, angle beam is connected with each other by multiple third positioning bolts on angle beam and the 4th in third It is rectangle frame-like.
- The climbing platforms device 3. a kind of elevator well according to claim 2 is formed, which is characterized in that first flower Line steel plate has multiple, and multiple first checkered steel plates are arranged parallel to each other, and the both ends of the first checkered steel plate pass through the first positioning bolt Angle beam on angle beam and third is separately connected on first.
- The climbing platforms device 4. a kind of elevator well according to claim 1 is formed, which is characterized in that the lower box Frame includes angle beam and the 4th lower angle beam and the 4th positioning bolt under the first lower angle beam, the second lower angle beam, third, and first Angle beam, the 4th lower angle beam are in by the interconnection of multiple 4th positioning bolts under lower angle beam, the second lower angle beam, third Rectangular frame shape.
- The climbing platforms device 5. a kind of elevator well according to claim 4 is formed, which is characterized in that second flower Line steel plate has multiple, and multiple second checkered steel plates are arranged parallel to each other, and the both ends of the second checkered steel plate pass through the second positioning bolt It is separately connected angle beam under the first lower angle beam and third.
- The climbing platforms device 6. a kind of elevator well according to claim 1 is formed, which is characterized in that the anti-collision machine Structure has eight, connects two anticollision mechanisms on the outer wall of each first column of angles, anticollision mechanism includes bracket and buffering wheel, bracket It is connected on the outer wall of first column of angles, buffering wheel is connected on bracket, buffering wheel is rubber wheel.
- The climbing platforms device 7. a kind of elevator well according to claim 4 is formed, which is characterized in that first spiral shell There are six pits, and six the first threaded holes are evenly arranged under the second lower angle beam, third on angle beam and the 4th lower angle beam.
- The climbing platforms device 8. a kind of elevator well according to claim 1 is formed, which is characterized in that described fixed group Part includes screw rod and swivel head, and the head of screw rod connects swivel head, and screw rod passes through the first threaded hole.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821172427.XU CN208686053U (en) | 2018-07-24 | 2018-07-24 | A kind of elevator well sizing climbing platforms device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201821172427.XU CN208686053U (en) | 2018-07-24 | 2018-07-24 | A kind of elevator well sizing climbing platforms device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN208686053U true CN208686053U (en) | 2019-04-02 |
Family
ID=65881729
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201821172427.XU Expired - Fee Related CN208686053U (en) | 2018-07-24 | 2018-07-24 | A kind of elevator well sizing climbing platforms device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN208686053U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110304590A (en) * | 2019-05-22 | 2019-10-08 | 陈斌 | A kind of high-altitude operation vehicle radar collision equipment |
| CN113513140A (en) * | 2020-12-30 | 2021-10-19 | 北京城建六建设集团有限公司 | Self-stabilizing elevator shaft platform with distribution box hung below layer and construction method of self-stabilizing elevator shaft platform |
-
2018
- 2018-07-24 CN CN201821172427.XU patent/CN208686053U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110304590A (en) * | 2019-05-22 | 2019-10-08 | 陈斌 | A kind of high-altitude operation vehicle radar collision equipment |
| CN113513140A (en) * | 2020-12-30 | 2021-10-19 | 北京城建六建设集团有限公司 | Self-stabilizing elevator shaft platform with distribution box hung below layer and construction method of self-stabilizing elevator shaft platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN106400691B (en) | Anti-collision wall mould bases integrated construction technique | |
| CN218373367U (en) | Bent cap construction platform hangs tears construction structures open | |
| CN208686053U (en) | A kind of elevator well sizing climbing platforms device | |
| CN207294093U (en) | A kind of large span steel truss integral lifting apparatus | |
| CN210598083U (en) | Elevator shaft construction platform | |
| CN206707237U (en) | Cable-stayed type top layer construction platform for elevator installation | |
| CN207048345U (en) | Construction discharge platform device | |
| CN112177309A (en) | Assembled protection platform used in building elevator shaft | |
| CN208966003U (en) | A kind of outer overhanging type Mobile operating platform | |
| CN205743040U (en) | A kind of integrated form material hoisting platform | |
| CN202441045U (en) | Rail-type electric attached lifting scaffold | |
| CN212103679U (en) | A construction platform for installation of assembled tower | |
| CN102583149B (en) | Removing method of lifting cover for hoisting | |
| CN219059723U (en) | Wet joint connection module | |
| CN207048281U (en) | A kind of ore deposit Jiao groove feed hopper liner installation system | |
| CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
| CN213952921U (en) | Assembled protection platform used in building elevator shaft | |
| CN217054270U (en) | Automatic elevator shaft construction platform that climbs | |
| CN206220460U (en) | For the operating platform of tower | |
| CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
| CN205955165U (en) | Elevator shaft operation platform | |
| CN214899827U (en) | High-altitude outdoor cable terminal work platform | |
| CN208201662U (en) | High pier bridge pier shaft reinforcing bar binding operation protective frame | |
| CN206957180U (en) | A kind of movable operating platform for inner climbing crane tower installation, dismounting | |
| CN105060124B (en) | Intra-frame portal crane system and hoisting use method thereof |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 300450 No. 173, No. 2 Road, Tanggu Xingang, Binhai New Area, Tianjin Patentee after: Civil Aviation Airport Construction Engineering Co.,Ltd. Address before: 300450 No. 173, No. 2 Road, Tanggu Xingang, Binhai New Area, Tianjin Patentee before: NO.4 ENGINEERING COMPANY LTD. OF CCCC FIRST HARBOR ENGINEERING Co.,Ltd. |
|
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20190402 |