CN205500628U - Climb in tower crane and install conversion equipment who climbs between roof beam and bracket - Google Patents
Climb in tower crane and install conversion equipment who climbs between roof beam and bracket Download PDFInfo
- Publication number
- CN205500628U CN205500628U CN201620235477.2U CN201620235477U CN205500628U CN 205500628 U CN205500628 U CN 205500628U CN 201620235477 U CN201620235477 U CN 201620235477U CN 205500628 U CN205500628 U CN 205500628U
- Authority
- CN
- China
- Prior art keywords
- plate
- steel
- upper plate
- tower crane
- corbel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000006243 chemical reaction Methods 0.000 title claims abstract description 31
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 28
- 239000010959 steel Substances 0.000 claims abstract description 28
- 230000009194 climbing Effects 0.000 claims abstract description 16
- 238000003466 welding Methods 0.000 claims abstract description 4
- 244000309464 bull Species 0.000 claims 1
- 238000004064 recycling Methods 0.000 abstract description 2
- 238000010276 construction Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
本实用新型公开了一种塔式起重机内爬安装爬升梁与牛腿之间的转换装置,它包括一根横向水平分布的钢梁,所述钢梁两端的下方各设有一连接转换件,连接转换件上部与钢梁下方之间通过螺栓连接,连接转换件的下部与平埋件或钢牛腿之间通过焊接方式连接,连接转换件有两块上下平行分布的上板和下板构成,上板的宽度大于下板的宽度,上板和下板之间设有三块项目平行分布的支撑板,三块支撑板垂直于上板和下板设置,上板两侧靠近边缘处分别设有一排螺栓孔。上述转换装置实用性强、处理成本低、在确保无损伤的情况下可多次使用,安装简便,比较可靠,保证了爬升梁的安全,便于循环使用。
The utility model discloses a conversion device between a climbing beam installed in a tower crane and a corbel. The upper part of the conversion part is connected with the lower part of the steel beam by bolts, and the lower part of the connection conversion part is connected with the flat buried part or steel corbel by welding. The connection conversion part consists of two upper and lower plates distributed in parallel up and down. The width of the upper plate is greater than that of the lower plate. There are three support plates distributed in parallel between the upper plate and the lower plate. The three support plates are arranged perpendicular to the upper plate and the lower plate. row of bolt holes. The above-mentioned conversion device has strong practicability, low processing cost, can be used for many times without damage, is easy to install, is relatively reliable, ensures the safety of the climbing beam, and is convenient for recycling.
Description
技术领域technical field
本实用新型涉及建筑施工的技术领域,具体地说是一种塔式起重机内爬安装爬升梁与牛腿之间的转换装置,特别涉及其机械连接结构。The utility model relates to the technical field of building construction, in particular to a conversion device between a climbing beam installed inside a tower crane and a corbel, in particular to its mechanical connection structure.
背景技术Background technique
随着楼建的越来越高,建筑核心筒结构越来越多,因此施工使用大型内爬式塔机越来越多,内爬式塔机的使用一般设备较大,楼层较高,爬升次数较多。因此对爬升钢梁的要求也就比较严格。同时爬升梁的制作成本也比较大,钢梁与建筑结构的连接为直接与牛腿或者埋件焊接。爬升钢梁若重复使用,拆除钢梁时容易对钢梁结构产生损害,引发施工时的安全问题。As buildings are built higher and higher, there are more and more building core tube structures, so more and more large-scale internal climbing tower cranes are used in construction. The use of internal climbing tower cranes generally has larger equipment, higher floors, and climbing More times. Therefore, the requirements for climbing steel beams are more stringent. At the same time, the production cost of the climbing beam is relatively high, and the connection between the steel beam and the building structure is directly welded to the corbel or embedded parts. If the climbing steel girder is reused, it is easy to cause damage to the steel girder structure when the steel girder is removed, causing safety problems during construction.
发明内容Contents of the invention
本实用新型的目的在于提供一种塔式起重机内爬安装爬升梁与牛腿之间的转换装置,该转换装置与钢梁采用螺栓连接,便于拆卸安装,可循环使用,克服了现有技术中存在的缺点和不足。The purpose of the utility model is to provide a conversion device between the climbing beam and the corbel installed in the tower crane. The conversion device and the steel beam are connected by bolts, which are easy to disassemble and install, and can be recycled. There are shortcomings and deficiencies.
为了实现上述目的:本实用新型的技术方案是:一种塔式起重机内爬安装爬升梁与牛腿之间的转换装置,它包括一根横向水平分布的钢梁,其特征在于:所述钢梁两端的下方各设有一连接转换件,连接转换件上部与钢梁下方之间通过螺栓连接,连接转换件的下部与平埋件或钢牛腿之间通过焊接方式连接,连接转换件有两块上下平行分布的上板和下板构成,上板的宽度大于下板的宽度,上板和下板之间设有三块相互平行分布的支撑板,三块支撑板垂直于上板和下板设置,上板两侧靠近边缘处分别设有一排螺栓孔。本实用新型公开了一种塔式起重机内爬安装爬升梁与牛腿之间的转换装置,实用性强、处理成本低、在确保无损伤的情况下可多次使用,安装简便,比较可靠,保证了爬升梁的安全,便于循环使用。In order to achieve the above object: the technical solution of the utility model is: a conversion device between the climbing beam and the corbel installed in the tower crane, which includes a horizontally distributed steel beam, which is characterized in that: the steel There is a connection conversion piece under each of the two ends of the beam. The upper part of the connection conversion piece is connected to the lower part of the steel beam by bolts, and the lower part of the connection conversion piece is connected to the flat buried part or steel corbel by welding. The connection conversion piece has two It consists of an upper plate and a lower plate distributed parallel up and down. The width of the upper plate is greater than that of the lower plate. There are three support plates distributed parallel to each other between the upper plate and the lower plate. The three support plates are perpendicular to the upper plate and the lower plate. Setting, a row of bolt holes are respectively provided near the edge on both sides of the upper plate. The utility model discloses a conversion device between a climbing beam installed in a tower crane and a corbel, which has strong practicability, low processing cost, can be used multiple times without damage, is easy to install, and is relatively reliable. It ensures the safety of the climbing beam and is convenient for recycling.
附图说明Description of drawings
图1为本实用新型结构示意图。Fig. 1 is the structural representation of the utility model.
图2为连接转换件结构示意图。Fig. 2 is a structural schematic diagram of the connection conversion part.
图3为连接转换件侧视图。Figure 3 is a side view of the connection conversion piece.
其中:in:
1、钢梁;1. Steel beam;
2、连接转换件;2. Connection conversion parts;
3、螺栓;3. Bolts;
4、平埋件;4. Flat embedded parts;
5、钢牛腿;5. Steel corbel;
6、上板;6. Upper board;
7、下板;7. Lower plate;
8、支撑板;8. Support plate;
9、螺栓孔9. Bolt holes
10、加强筋;10. Reinforcing ribs;
11、吊装耳板。11. Lift the ear plate.
具体实施方式detailed description
下面参照附图,对本实用新型进一步进行描述。Below with reference to accompanying drawing, the utility model is further described.
本实用新型公开了一种塔式起重机内爬安装爬升梁与牛腿之间的转换装置,它包括一根横向水平分布的钢梁1,其区别于现有技术在于:所述钢梁1两端的下方各设有一连接转换件2,连接转换件2上部与钢梁1下方之间通过螺栓3连接,连接转换件2的下部与平埋件4或钢牛腿5之间通过焊接方式连接,连接转换件2有两块上下平行分布的上板6和下板7构成,上板6的宽度大于下板7的宽度,上板6和下板7之间设有三块相互平行分布的支撑板8,三块支撑板8垂直于上板6和下板7设置,上板6两侧靠近边缘处分别设有一排螺栓孔9,支撑板8与上板6和下板7的连接处设有加强筋10。The utility model discloses a conversion device between a climbing beam installed in a tower crane and a corbel, which comprises a horizontally distributed steel beam 1, which is different from the prior art in that: the steel beam 1 has two There is a connection conversion part 2 under each end, the upper part of the connection conversion part 2 is connected with the lower part of the steel beam 1 through a bolt 3, and the lower part of the connection conversion part 2 is connected with the flat buried part 4 or the steel corbel 5 by welding. The connection conversion part 2 is composed of two upper boards 6 and lower boards 7 arranged in parallel up and down. The width of the upper board 6 is greater than that of the lower board 7. There are three supporting boards distributed parallel to each other between the upper board 6 and the lower board 7. 8. Three support plates 8 are set perpendicular to the upper plate 6 and the lower plate 7, a row of bolt holes 9 are respectively provided on both sides of the upper plate 6 close to the edge, and the connection between the support plate 8 and the upper plate 6 and the lower plate 7 is provided with Rib 10.
在具体实施时,钢梁1上方设置有吊装耳板11,用拆卸后吊装至上层。During specific implementation, a hoisting ear plate 11 is arranged above the steel beam 1, and is hoisted to the upper floor after being disassembled.
施工时,平埋件与钢牛腿直接提前埋于建筑结构之中,将连接转换件直接焊接与平埋件或者钢牛腿之上,然后将爬升钢梁直接放置于转换件之上,连接件与钢梁采用8颗M30,10.9级高强螺栓,安装要求拧紧。即可正常使用。每次塔机爬升,使用后,直接将转换件螺栓拆除,将钢梁直接循环吊装至上一层,安装上述方式,继续使用。During construction, the flat buried parts and steel corbels are directly buried in the building structure in advance, and the connection conversion parts are directly welded to the flat buried parts or steel corbels, and then the climbing steel beams are placed directly on the conversion parts to connect 8 pieces of M30, 10.9 grade high-strength bolts are used for parts and steel beams, and the installation requires tightening. It can be used normally. Every time the tower crane climbs, after use, the bolts of the conversion part are directly removed, and the steel beam is hoisted directly to the upper floor in a circular manner, and the above method is installed to continue to use.
以上内容是结合具体的优选实施方式对本实用新型所作的进一步详细说明,不能认定本实用新型具体实施只局限于上述这些说明。对于本实用新型所属技术领域的普通技术人员来说,在不脱离本实用新型构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本实用新型的保护范围。The above content is a further detailed description of the utility model in combination with specific preferred embodiments, and it cannot be assumed that the specific implementation of the utility model is limited to the above descriptions. For a person of ordinary skill in the technical field to which the utility model belongs, without departing from the concept of the utility model, some simple deduction or substitutions can also be made, which should be regarded as belonging to the protection scope of the utility model.
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620235477.2U CN205500628U (en) | 2016-03-25 | 2016-03-25 | Climb in tower crane and install conversion equipment who climbs between roof beam and bracket |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620235477.2U CN205500628U (en) | 2016-03-25 | 2016-03-25 | Climb in tower crane and install conversion equipment who climbs between roof beam and bracket |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205500628U true CN205500628U (en) | 2016-08-24 |
Family
ID=56732963
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620235477.2U Expired - Fee Related CN205500628U (en) | 2016-03-25 | 2016-03-25 | Climb in tower crane and install conversion equipment who climbs between roof beam and bracket |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205500628U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109592577A (en) * | 2018-11-22 | 2019-04-09 | 中建四局第六建筑工程有限公司 | One kind being used for inside-climbing tower crane steel construction switch rack and its construction method |
| CN116517017A (en) * | 2023-03-21 | 2023-08-01 | 中建三局集团有限公司 | Steel corbel combination elevator steel platform |
-
2016
- 2016-03-25 CN CN201620235477.2U patent/CN205500628U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109592577A (en) * | 2018-11-22 | 2019-04-09 | 中建四局第六建筑工程有限公司 | One kind being used for inside-climbing tower crane steel construction switch rack and its construction method |
| CN116517017A (en) * | 2023-03-21 | 2023-08-01 | 中建三局集团有限公司 | Steel corbel combination elevator steel platform |
| CN116517017B (en) * | 2023-03-21 | 2026-04-10 | 中建三局集团有限公司 | A steel bracket combined lifting platform |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102912981B (en) | Gate type high-rise building connected structure construction device | |
| CN203499229U (en) | Operating platform for construction of elevator shaft | |
| CN203247868U (en) | Large-span steel structure construction temporary supporting frame | |
| CN205500628U (en) | Climb in tower crane and install conversion equipment who climbs between roof beam and bracket | |
| CN204983173U (en) | Steel construction beam -column connection node | |
| CN201908447U (en) | Lift-type horizontal safety net | |
| CN203096620U (en) | Steel pipe arch rib operation platform | |
| CN204265231U (en) | T beam forms suspender | |
| CN203022328U (en) | Climbing operation platform | |
| CN203891442U (en) | High-rise elevator shaft template supporting platform | |
| CN103556837B (en) | A kind of method realizing steel column at annex place and install | |
| CN102383613B (en) | Hoisting construction method for steel roof truss of main power house of power plant and special hoisting device | |
| CN206457187U (en) | A kind of pole of mounting steel chimney | |
| CN205577451U (en) | Instrument formula protection frame suitable for assemble integral concrete horizontal element | |
| CN205276843U (en) | Instrument formula protection frame suitable for assemble protruding type component of integral concrete | |
| CN203905436U (en) | Steel chimney annular installation platform | |
| CN205369948U (en) | Lifting device for daylighting top is used for installing | |
| CN204357138U (en) | Simple steel structure hoisting frame | |
| CN204662926U (en) | A kind of operating platform for steel pipe column top construction operation | |
| CN209924407U (en) | Combined working platform for steel structure high-altitude installation | |
| CN205330132U (en) | Boat scaffold | |
| CN209210183U (en) | fixed system | |
| CN209704028U (en) | Standardized protection system of assembled building | |
| CN206408919U (en) | A kind of hoistway operation stage apparatus | |
| CN105839905A (en) | Super high-rise core-tube elevator double-well rapid lifting operation platform device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP01 | Change in the name or title of a patent holder |
Address after: 450015 Henan City, Zhengzhou Province, No. 27 Huainan street, building 9, building 1, No. 2, No. 22 Patentee after: HENAN PANGYUAN MACHINERY ENGINEERING CO.,LTD. Address before: 450015 Henan City, Zhengzhou Province, No. 27 Huainan street, building 9, building 1, No. 2, No. 22 Patentee before: HENAN XINGYUAN CONSTRUCTION MACHINERY LEASING Co.,Ltd. |
|
| CP01 | Change in the name or title of a patent holder | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160824 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |