CN109592577A - One kind being used for inside-climbing tower crane steel construction switch rack and its construction method - Google Patents

One kind being used for inside-climbing tower crane steel construction switch rack and its construction method Download PDF

Info

Publication number
CN109592577A
CN109592577A CN201811395759.9A CN201811395759A CN109592577A CN 109592577 A CN109592577 A CN 109592577A CN 201811395759 A CN201811395759 A CN 201811395759A CN 109592577 A CN109592577 A CN 109592577A
Authority
CN
China
Prior art keywords
steel
tower crane
corbel
climbing tower
welded
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811395759.9A
Other languages
Chinese (zh)
Inventor
董浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201811395759.9A priority Critical patent/CN109592577A/en
Publication of CN109592577A publication Critical patent/CN109592577A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/62Constructional features or details
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C23/00Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
    • B66C23/18Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
    • B66C23/20Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures
    • B66C23/208Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes with supporting couples provided by walls of buildings or like structures with supporting couples provided from the side, e.g. by walls of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

The invention discloses one kind to be used for inside-climbing tower crane steel construction switch rack and its construction method, the switch rack includes being embedded in the two groups of pull rods of adjacent shearing within the walls, the outer end of every group of pull rod is welded with steel plate, it is welded with steel corbel on the steel plate, and there are differences in height between the steel corbel of two sides, steel box-girder is welded on the steel corbel of low level side, the both ends of " H " section steel beam are separately fixed at the steel corbel of high-order side and the top of steel box-girder, conversion steel bench is fixedly connected at the top both ends of " H " section steel beam, " C " type frame is bolted to connection on the conversion steel bench at both ends.The present invention solves that building level structural beams are undersized, bearing capacity is poor, is unable to satisfy inside-climbing tower crane load, leads to the technical problem of inside-climbing tower crane installation, operating difficulties.

Description

One kind being used for inside-climbing tower crane steel construction switch rack and its construction method
Technical field
The present invention relates to one kind to be used for inside-climbing tower crane steel construction switch rack and its construction method, belongs to lifting in architectural engineering Equipment technical field.
Background technique
Currently, horizontal structure beam section size is smaller in most of building core cylinder, inside-climbing tower crane work lotus cannot be born Carry, and vertically can bearing load structure spacing be less than 7m when, inside-climbing tower crane installation it is particularly difficult.It is asked to solve above-mentioned technology Topic, conventional method are the water for improving its bearing capacity by increasing the area of section of building level structural beams, and thickening or widening Flat structure beam not only makes troubles to subsequent construction, but also influences building beauty, and the later period is needed to carry out picking chisel modification, waste thus Man power and material influences construction efficiency.
Summary of the invention
That the object of the present invention is to provide a kind of structures is simple, safe and reliable, bearing capacity is strong is used for inside-climbing tower crane steel Structure switch rack and its construction method, to overcome deficiency in the prior art.
Technical solution of the present invention: one kind being used for inside-climbing tower crane steel construction switch rack and its construction method, including is embedded in The two groups of pull rods of adjacent shearing within the walls, the outer end of every group of pull rod are welded with steel plate, are welded with steel corbel on the steel plate, And there are differences in height between the steel corbel of two sides, are welded with steel box-girder on the steel corbel of low level side, the two of " H " section steel beam End is separately fixed at the steel corbel of high-order side and the top of steel box-girder, is fixedly connected with and turns at the top both ends of " H " section steel beam Steel bench is changed, " C " type frame is bolted to connection on the conversion steel bench at both ends.
Further, billet is provided between the bottom at the top and " H " section steel beam of the steel corbel or steel box-girder.
Meanwhile the present invention also provides a kind of for the above-mentioned construction method for inside-climbing tower crane steel construction switch rack, first Pre-buried two groups of pull rods are distinguished within the walls in adjacent shearing, and then in the outer end welding steel of every group of pull rod, and welding is solid on the steel plate Determine steel corbel, and make between the steel corbels of two sides that there are differences in height, welds steel box-girder on the steel corbel of low level side at this time, then The both ends of " H " section steel beam are separately fixed at the steel corbel of high-order side and the top of steel box-girder, then at the top of " H " section steel beam Conversion steel bench is welded and fixed in both ends, and " C " type frame is bolted to connection on the conversion steel bench at both ends, finally Inside-climbing tower crane is fixedly mounted on " C " type frame.
In the above method, the maximum spacing of the adjacent shear wall is no more than 7m.
In the above method, " H " section steel beam is horizontally disposed.
Due to the adoption of the above technical scheme, the present invention has the advantages that the present invention solves building level structural beams size It is too small, bearing capacity is poor, is unable to satisfy inside-climbing tower crane load, cause inside-climbing tower crane installation, operating difficulties technical problem.Cause This, the duration, assembly is flexible, simple to install, can be used in turn, is easy for construction, is economical and practical, is safe and reliable with saving by the present invention The advantages of, there is wide applicability and generalization.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention.
Description of symbols: 1- steel plate, 2- steel corbel, 3- steel box-girder, 4- " H " section steel beam, 5- convert steel bench, 6- " C " Type frame, 7- pull rod, 8- billet.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and examples to this hair It is bright to be described in further detail.
The embodiment of the present invention: the structural schematic diagram for inside-climbing tower crane steel construction switch rack is as shown in Figure 1, include pre-buried In the two groups of pull rods 7 of adjacent shearing within the walls, the outer end of every group of pull rod 7 is welded with steel plate 1, is welded on steel plate 1 Steel corbel 2, and there are differences in height between the steel corbel 2 of two sides, are welded with steel box-girder 3 on the steel corbel 2 of low level side, The both ends of " H " section steel beam 4 are separately fixed at the steel corbel 2 of high-order side and the top of steel box-girder 3, at the top of " H " section steel beam 4 Both ends are fixedly connected with conversion steel bench 5, and " C " type frame 6 is bolted to connection on the conversion steel bench 5 at both ends.It is described It is provided with billet 8 between the bottom at the top and " H " section steel beam 4 of steel corbel 2 or steel box-girder 3, for adjusting " H " section steel beam 4 Levelness.
When the bearing capacity for determining horizontal structure beam in original structure design be unable to satisfy under working condition inside-climbing tower crane load or When shear wall maximum spacing is not more than 7m when using shear wall as inside-climbing tower crane stress point, above-mentioned conversion frame can be used to install Inside-climbing tower crane.
When construction, pre-buried two groups of pull rods 7 are distinguished within the walls in adjacent shearing first, are then welded in the outer end of every group of pull rod 7 Steel plate 1, and steel corbel 2 is welded and fixed on steel plate 1, and make between the steel corbels 2 of two sides that there are differences in height, at this time in low level side Steel corbel 2 on weld steel box-girder 3, then the both ends of " H " section steel beam 4 are separately fixed to the steel corbel 2 and steel of high-order side The top of box beam 3, then conversion steel bench 5 is welded and fixed at the top both ends of " H " section steel beam 4, " C " type frame 6 is solid by bolt Surely it is connected on the conversion steel bench 5 at both ends, inside-climbing tower crane can be finally fixedly mounted on " C " type frame 6.

Claims (5)

1. one kind is used for inside-climbing tower crane steel construction switch rack, it is characterised in that: including being embedded in the two groups of drawings of adjacent shearing within the walls Bar (7), the outer end of every group of pull rod (7) are welded with steel plate (1), are welded on steel plate (1) steel corbel (2), and two There are differences in height between the steel corbel (2) of side, are welded with steel box-girder (3) on the steel corbel (2) of low level side, " H " fashioned iron The both ends of beam (4) are separately fixed at the steel corbel (2) of high-order side and the top of steel box-girder (3), on the top of " H " section steel beam (4) Portion both ends are fixedly connected with conversion steel bench (5), and " C " type frame (6) is bolted to connection the conversion steel bench (5) at both ends On.
2. it is according to claim 1 be used for inside-climbing tower crane steel construction switch rack, it is characterised in that: the steel corbel (2) or Billet (8) are provided between the top of steel box-girder (3) and the bottom of " H " section steel beam (4).
3. a kind of for the construction method as claimed in claim 1 or 2 for inside-climbing tower crane steel construction switch rack, it is characterised in that: Pre-buried two groups of pull rods (7) are distinguished within the walls in adjacent shearing first, then in the outer end welding steel (1) of every group of pull rod (7), and Steel corbel (2) are welded and fixed on steel plate (1), and make between the steel corbels (2) of two sides that there are differences in height, at this time in the steel of low level side On bracket (2) weld steel box-girder (3), then the both ends of " H " section steel beam (4) are separately fixed at the steel corbel (2) of high-order side with And the top of steel box-girder (3), then conversion steel bench (5) is welded and fixed at the top both ends of " H " section steel beam (4), by " C " type frame (6) it is bolted to connection on the conversion steel bench (5) at both ends, inside-climbing tower crane can be finally fixedly mounted on to " C " type On frame (6).
4. the construction method according to claim 3 for inside-climbing tower crane steel construction switch rack, it is characterised in that: the phase The maximum spacing of adjacent shear wall is no more than 7m.
5. the construction method according to claim 3 for inside-climbing tower crane steel construction switch rack, it is characterised in that: described " H " section steel beam (4) is horizontally disposed.
CN201811395759.9A 2018-11-22 2018-11-22 One kind being used for inside-climbing tower crane steel construction switch rack and its construction method Pending CN109592577A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811395759.9A CN109592577A (en) 2018-11-22 2018-11-22 One kind being used for inside-climbing tower crane steel construction switch rack and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811395759.9A CN109592577A (en) 2018-11-22 2018-11-22 One kind being used for inside-climbing tower crane steel construction switch rack and its construction method

Publications (1)

Publication Number Publication Date
CN109592577A true CN109592577A (en) 2019-04-09

Family

ID=65960251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811395759.9A Pending CN109592577A (en) 2018-11-22 2018-11-22 One kind being used for inside-climbing tower crane steel construction switch rack and its construction method

Country Status (1)

Country Link
CN (1) CN109592577A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173026A (en) * 2020-01-10 2020-05-19 中国华西企业股份有限公司 Steel structure conversion foundation of tower crane and construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202148154U (en) * 2011-04-22 2012-02-22 上海庞源机械租赁股份有限公司 Steel corbel fixing structure of internal climbing steel beam of tower crane
CN203497959U (en) * 2013-08-04 2014-03-26 中国建筑第四工程局有限公司 Support structure without inclined rod for tower crane
CN205500628U (en) * 2016-03-25 2016-08-24 河南兴源建筑机械租赁有限公司 Climb in tower crane and install conversion equipment who climbs between roof beam and bracket
KR101663135B1 (en) * 2016-04-06 2016-10-07 힐 중공업 주식회사 H-type steel girder for reducing the steel use
CN206375596U (en) * 2016-12-26 2017-08-04 广东庞源工程机械有限公司 Girder steel attachment structure is climbed in a kind of assembled
CN207048365U (en) * 2017-06-15 2018-02-27 中建三局集团有限公司 It is a kind of to have enough to meet the need steel member suitable for shear wall external reinforcement at tower crane attachment
CN210710456U (en) * 2019-09-23 2020-06-09 中国建筑第八工程局有限公司 Bearing structure of inner climbing frame of super high-rise tower crane

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN202148154U (en) * 2011-04-22 2012-02-22 上海庞源机械租赁股份有限公司 Steel corbel fixing structure of internal climbing steel beam of tower crane
CN203497959U (en) * 2013-08-04 2014-03-26 中国建筑第四工程局有限公司 Support structure without inclined rod for tower crane
CN205500628U (en) * 2016-03-25 2016-08-24 河南兴源建筑机械租赁有限公司 Climb in tower crane and install conversion equipment who climbs between roof beam and bracket
KR101663135B1 (en) * 2016-04-06 2016-10-07 힐 중공업 주식회사 H-type steel girder for reducing the steel use
CN206375596U (en) * 2016-12-26 2017-08-04 广东庞源工程机械有限公司 Girder steel attachment structure is climbed in a kind of assembled
CN207048365U (en) * 2017-06-15 2018-02-27 中建三局集团有限公司 It is a kind of to have enough to meet the need steel member suitable for shear wall external reinforcement at tower crane attachment
CN210710456U (en) * 2019-09-23 2020-06-09 中国建筑第八工程局有限公司 Bearing structure of inner climbing frame of super high-rise tower crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173026A (en) * 2020-01-10 2020-05-19 中国华西企业股份有限公司 Steel structure conversion foundation of tower crane and construction method

Similar Documents

Publication Publication Date Title
CN201437639U (en) Integral type deformation joint steel moulding plate
CN207702442U (en) A kind of Novel horizontal support node type of attachment
CN109592577A (en) One kind being used for inside-climbing tower crane steel construction switch rack and its construction method
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN209161335U (en) A kind of inside-climbing tower crane steel construction switch rack for 7m span
CN206581682U (en) A kind of interim transition structure in jacking framed bridge steel column for contacting net basis
CN215629471U (en) Bridge cantilever structure does not have bracket articulated formula bracket strutting arrangement
CN208502273U (en) It is a kind of for without bearing large space Steel Truss Beam hoisting frame
CN211689924U (en) High mound bracket supports bracket anchor structure
CN212129882U (en) Prefabricated construction outrigger drawknot structure
CN210032130U (en) Assembly type structure large-span steel structure beam and concrete column rigid connection mechanism
CN210029721U (en) Prefabricated bridge deck hoisting frame
CN202994492U (en) T-shaped bridge static loading test rack
CN202000266U (en) Supporting structure of bridge coping template
CN201942968U (en) Railway rail retracting device
CN205296579U (en) Combination reinforcing bar girder construction
CN205369292U (en) Control framing formula bridge steel structure tower crane basis
CN203867155U (en) Steel-structure operation platform
CN213358333U (en) Assembled bridge bent cap or tie beam safe operation platform
CN215564404U (en) Steel formwork for cast-in-place pile concrete hanging plate wall
CN210529515U (en) Upper hanging type electricity-proof small truss
CN209874075U (en) Circular steel core concrete column and unequal-height I-shaped beam connecting structure
CN212376020U (en) Steel corbel and support-free installation connecting node comprising same
CN218909592U (en) Steel box girder hoisting device for bridge construction
CN215592405U (en) Tool type gantry lifting equipment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination