CN208502273U CN201820679089.2U CN201820679089U CN208502273U CN 208502273 U CN208502273 U CN 208502273U CN 201820679089 U CN201820679089 U CN 201820679089U CN 208502273 U CN208502273 U CN 208502273U
Authority
CN
China
Prior art keywords
cross bar
profile steel
jack
steel cross
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820679089.2U
Other languages
Chinese (zh)
Inventor
宋林
孙刚
徐国友
张望
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mcc Chongqing Construction Industry Co ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN201820679089.2U priority Critical patent/CN208502273U/en
Application granted granted Critical
Publication of CN208502273U publication Critical patent/CN208502273U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of for the hoisting frame without bearing large space Steel Truss Beam, including horizontally disposed H profile steel cross bar, it is equipped with a compression vertical bar vertically on H profile steel cross bar, is respectively equipped with fixing end tension diagonal and overhanging end tension diagonal in the two sides of compression vertical bar;It is fixed with jack chassis on the upside of the overhanging end of H profile steel cross bar, a centre-hole jack is equipped on the jack chassis;It is equipped with limiter between centre-hole jack and jack chassis, is equipped with moveable anchor in the upper end of centre-hole jack.The utility model is able to carry out the fast hoisting construction of Steel Truss Beam in narrow space and large span large space, easy for construction, and safety and reliability is higher, and economy is more preferable.

Description

It is a kind of for without bearing large space Steel Truss Beam hoisting frame
Technical field
The utility model relates to technical field of building construction, more particularly to one kind is for without bearing large space Steel Truss Beam Hoisting frame.
Background technique
With the quick steady-state growth of national economic development, infrastructure construction is greatly developed, in recent years long-span bridge Beam is built quantity and is continuously increased, and the asd number of large span venue is also continuously increased, and is designed as H for certain Cable stayed Bridge Main Towers Type, king-post lower beam are generally prestressed concrete box beams, and upper beam is typically designed as large space Steel Truss Beam, and upper cross Beam is in construction, it is difficult to provide enough construction sites, it is poor to lift condition without bearing for lower part, it is difficult to using conventional lifting side Method;Meanwhile for the narrow large span venue in certain construction sites or with basement, grandstand, periphery soil body backfill amount is big, Large-scale crane can not march into the arena, and the lifting construction difficulty for also resulting in Steel Truss Beam is very big.
Utility model content
In view of the above shortcomings of the prior art, utility model aims to solve large space Steel Truss Beams to hang It is big to fill difficulty, construction trouble, and safety and reliability is low, less economical problem, provides a kind of for large-scale without bearing The hoisting frame of Steel Space Truss beam is applied in the fast hoisting that narrow space and large span large space are able to carry out Steel Truss Beam Work, it is easy for construction, and safety and reliability is higher, and economy is more preferable.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is such that one kind for no bearing The hoisting frame of large space Steel Truss Beam, it is characterised in that: including horizontally disposed H profile steel cross bar, one end of the H profile steel cross bar For fixing end, the other end is overhanging end;It is equipped with a compression vertical bar, the lower end of the compression vertical bar and H-type vertically on H profile steel cross bar Steel cross bar is fixedly connected, and the distance between fixing end of the lower end of compression vertical bar and H profile steel cross bar is greater than itself and H profile steel cross bar The distance between overhanging end;Fixing end tension diagonal and overhanging end tension diagonal are respectively equipped in the two sides of compression vertical bar;Its In, the upper end of fixing end tension diagonal is fixedly connected with the upper end of compression vertical bar, and lower end is inclined to the fixation extreme direction of H profile steel cross bar Tiltedly, and with H profile steel cross bar it is fixedly connected;The upper end of overhanging end tension diagonal is fixedly connected with the upper end of compression vertical bar, and lower end is to H The overhanging extreme direction of fashioned iron cross bar tilts, and is fixedly connected with H profile steel cross bar;It is fixed in the upside at the overhanging end of H profile steel cross bar There is jack chassis, a centre-hole jack is equipped on the jack chassis, the centre-hole jack is vertically arranged, thousand On jin top chassis and H profile steel cross bar, it is equipped with several through-holes corresponding with via hole on centre-hole jack;In centre-hole jack It is equipped with limiter between jack chassis, is equipped with moveable anchor in the upper end of centre-hole jack.
Further, between H profile steel cross bar and fixing end tension diagonal and H profile steel cross bar and overhanging end tension diagonal Between be distributed with reinforced pull rod that is vertical and being obliquely installed.
It further, further include a sub-truss, the H profile steel cross bar is fixedly connected with the sub-truss, and it overhangs End is stretched out from one end of sub-truss.
It further, further include pre-embedded steel slab, the downside of the sub-truss is fixed by connection bolt with pre-embedded steel slab Connection, and the overhanging end of H profile steel cross bar is stretched out from the side of pre-embedded steel slab.
Compared with prior art, the utility model has the advantages that
1, structure is simple, mainly by the enough H profile steels of stress intensity (I-steel) welding formed, thus make it is easy to process, Stability is good, high reliablity, and low in cost;It substitutes large-scale crane using the hoisting frame to lift by crane, good economy performance.
2, the scope of application is wider, can be readily applied to city narrow space, basement, grandstand or the periphery soil body The promotion of big large span venue roofing, large span large space Steel Truss Beam is measured in backfill.
3, easy to operate, it only needs then to set on pre-embedded steel slab in advance in the upper end pre-plugged pre-embedded steel slab of tower (column) Hoisting frame is set, and hoisting frame is connected by logical sub-truss with the pre-embedded steel slab;In this way, by the hoisting frame of two towers (column) upper end and Centre-hole jack on hoisting frame, then cooperate and draw anchor device and control system etc., it will be able to realization directly mentions Steel Truss Beam It rises, efficiently solves certain Cable stayed Bridge Main Towers and be designed as H-type, in upper beam construction, it is difficult to enough construction sites are provided, under Portion is without bearing, and the upper beam for lifting condition difference promotes problem in place, and construction efficiency is high.
4, more convenient to use, reuse easy to remove can take hoisting frame after the completion of a steel truss two promotion Under, it is moved to the promotion for repeating Steel Truss Beam elsewhere.
Detailed description of the invention
Fig. 1 is the elevational schematic view of the utility model.
Fig. 2 is the attachment structure schematic diagram of hoisting frame and sub-truss and pre-embedded steel slab.
Fig. 3 is the schematic diagram promoted using this hoisting frame.
Fig. 4 is the top view on a wherein tower (column) top in Fig. 3.
In figure: 1-H profile steel cross bar, 2-compression vertical bars, 3-fixing end tension diagonals, 4-overhanging end tension diagonals, 5- Jack chassis, 6-centre-hole jacks, 7-reinforced pull rods, 8-sub-trusses, 9-pre-embedded steel slabs, 10-towers (column), 11-steel strand wires, 12-Steel Truss Beams, 13-connecting rods.
Specific embodiment
Below in conjunction with accompanying drawings and embodiments, the utility model is described in further detail.
Embodiment: a kind of to be set for the hoisting frame without bearing large space Steel Truss Beam, including level referring to Fig. 1 to Fig. 4 The H profile steel cross bar 1 set, one end of the H profile steel cross bar 1 are fixing end, and the other end is overhanging end.It is set vertically on H profile steel cross bar 1 There is a compression vertical bar 2, the lower end of the compression vertical bar 2 is fixedly connected with H profile steel cross bar 1, and the lower end of compression vertical bar 2 and H profile steel The distance between fixing end of cross bar 1 is greater than the distance between itself and the overhanging end of H profile steel cross bar 1;When it is implemented, it is perpendicular to be pressurized The distance between fixing end of the lower end of bar 2 and H profile steel cross bar 1 is outstanding for its (lower end of compression vertical bar 2) and H profile steel cross bar 1 Twice for choosing the distance between end;In such manner, it is possible to keep the bearing capacity of entire hoisting frame stronger, stability is more preferable, better reliability. Several connecting screw holes are respectively arranged at its both sides of the edge in the downside of H profile steel cross bar 1, in order to install fixation.
Fixing end tension diagonal 3 and overhanging end tension diagonal 4 are respectively equipped in the two sides of compression vertical bar 2.Wherein, fixing end The upper end of tension diagonal 3 is fixedly connected with the upper end of compression vertical bar 2, and lower end is tilted to the fixation extreme direction of H profile steel cross bar 1, and It is fixedly connected with H profile steel cross bar 1.The upper end of overhanging end tension diagonal 4 is fixedly connected with the upper end of compression vertical bar 2, and lower end is to H-type The overhanging extreme direction of steel cross bar 1 tilts, and is fixedly connected with H profile steel cross bar 1.In production process, in H profile steel cross bar 1 Between fixing end tension diagonal 3 and vertical and inclination is distributed between H profile steel cross bar 1 and overhanging end tension diagonal 4 to set The reinforced pull rod 7 set;So as to further promote the stability and intensity of entire hoisting frame.
It is fixed with jack chassis 5 on the upside of the overhanging end of H profile steel cross bar 1, one is equipped on the jack chassis 5 and is worn Core type jack 6.The centre-hole jack 6 is vertically arranged (i.e. the axial line of centre-hole jack 6 is vertical), at jack bottom On disk 5 and H profile steel cross bar 1, equipped with several through-holes corresponding with (steel strand wires 11) via hole on centre-hole jack 6.It is wearing It is equipped with limiter between core type jack 6 and jack chassis 5, moveable anchor is equipped in the upper end of centre-hole jack 6, by wearing Core type jack 6 cooperates limiter and moveable anchor to be able to carry out the lifting (tensioning) of steel strand wires 11, which is construction row Mature technology means in industry.
It further include a sub-truss 8, the height of the sub-truss 8 and steel truss fine strain of millet to be hoisted during actual processing Height it is consistent so that Steel Truss Beam 12 can be promoted to the upper end of tower (column) 10 in lifting process.The H profile steel Cross bar 1 is fixedly connected with the sub-truss 8, and it overhangs end and stretches out from one end of sub-truss 8;Wherein, H profile steel cross bar 1 with The sub-truss 8 welds together, to guarantee to have enough support strengths;Or H profile steel cross bar 1 and the sub-truss 8 It is connected by connection bolt, and it is easy to disassemble.
As an implementation, further include pre-embedded steel slab 9, in construction process, by the pre-embedded steel slab 9 be embedded in The top of tower (column) 10;Then the downside of institute's sub-truss 8 is fixedly connected by connection bolt with pre-embedded steel slab 9, and makes H-type The overhanging end of steel cross bar 1 is stretched out from the side of pre-embedded steel slab 9, and stretches out the side of tower (column) 10;In this way, very heavy by punching Cooperation limiter and moveable anchor directly can promote Steel Truss Beam 12 by steel strand wires 11, only without carrying out Vertical bearing does not need the Large-scale Hoistings equipment such as crane yet, makes to lift more convenient, quick, more efficient.
During practice of construction, two hoisting frames are respectively set on the top for the tower (column) 10 that two need to install steel truss two, and The overhanging end of two hoisting frames is stretched out from the adjacent side of Liang Ta (column) 10;And two hoisting frames are connected by connecting rod 13, with Improve the intensity and connective stability of two hoisting frames.In this way, the cooperation of 4 hoisting frames by two towers (column) 10 top, energy Enough liftings for easily and fast and reliablely and stablely carrying out steel truss two.
Finally, it should be noted that above embodiments are merely intended for describing the technical solutions of the present application, but not for limiting the present application technology Scheme, those skilled in the art should understand that, those are modified to the technical solution of the utility model or are equal Replacement, without departing from the objective and range of the technical program, should all cover in the scope of the claims of the utility model.

Claims (4)

1. a kind of for the hoisting frame without bearing large space Steel Truss Beam, it is characterised in that: horizontal including horizontally disposed H profile steel Bar, one end of the H profile steel cross bar are fixing end, and the other end is overhanging end;It is equipped with a compression vertical bar vertically on H profile steel cross bar, The lower end of the compression vertical bar is fixedly connected with H profile steel cross bar, and between the lower end of compression vertical bar and the fixing end of H profile steel cross bar Distance is greater than the distance between itself and the overhanging end of H profile steel cross bar;Fixing end is respectively equipped in the two sides of compression vertical bar to be skewed Bar and overhanging end tension diagonal;Wherein, the upper end of fixing end tension diagonal is fixedly connected with the upper end of compression vertical bar, and lower end is to H The fixation extreme direction of fashioned iron cross bar tilts, and is fixedly connected with H profile steel cross bar;Overhang upper end and the compression vertical bar of end tension diagonal Upper end be fixedly connected, lower end is tilted to the overhanging extreme direction of H profile steel cross bar, and is fixedly connected with H profile steel cross bar;In H profile steel It is fixed with jack chassis on the upside of the overhanging end of cross bar, a centre-hole jack is equipped on the jack chassis, it is described to wear Core type jack is vertically arranged, and on jack chassis and H profile steel cross bar, is equipped with several opposite with via hole on centre-hole jack The through-hole answered;It is equipped with limiter between centre-hole jack and jack chassis, is equipped with work in the upper end of centre-hole jack Has anchor.
2. according to claim 1 a kind of for the hoisting frame without bearing large space Steel Truss Beam, it is characterised in that: Be distributed between H profile steel cross bar and fixing end tension diagonal and between H profile steel cross bar and overhanging end tension diagonal it is vertical and The reinforced pull rod being obliquely installed.
3. according to claim 1 a kind of for the hoisting frame without bearing large space Steel Truss Beam, it is characterised in that: also Including a sub-truss, the H profile steel cross bar is fixedly connected with the sub-truss, and it overhangs end and stretches from one end of sub-truss Out.
4. according to claim 3 a kind of for the hoisting frame without bearing large space Steel Truss Beam, it is characterised in that: also Including pre-embedded steel slab, the downside of the sub-truss is fixedly connected by connection bolt with pre-embedded steel slab, and H profile steel cross bar is outstanding End is chosen to stretch out from the side of pre-embedded steel slab.
CN201820679089.2U 2018-05-08 2018-05-08 It is a kind of for without bearing large space Steel Truss Beam hoisting frame Active CN208502273U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820679089.2U CN208502273U (en) 2018-05-08 2018-05-08 It is a kind of for without bearing large space Steel Truss Beam hoisting frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820679089.2U CN208502273U (en) 2018-05-08 2018-05-08 It is a kind of for without bearing large space Steel Truss Beam hoisting frame

Publications (1)

Publication Number Publication Date
CN208502273U true CN208502273U (en) 2019-02-15

Family

ID=65299469

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820679089.2U Active CN208502273U (en) 2018-05-08 2018-05-08 It is a kind of for without bearing large space Steel Truss Beam hoisting frame

Country Status (1)

Country Link
CN (1) CN208502273U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302366A (en) * 2020-10-29 2021-02-02 江苏东南特种技术工程有限公司 Rapid and synchronous lifting device for building structure and construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112302366A (en) * 2020-10-29 2021-02-02 江苏东南特种技术工程有限公司 Rapid and synchronous lifting device for building structure and construction method

Similar Documents

Publication Publication Date Title
CN107165039A (en) Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method
CN211498526U (en) Self-lifting type corrugated steel web cast-in-situ box girder hanging basket
CN208502273U (en) It is a kind of for without bearing large space Steel Truss Beam hoisting frame
CN219175013U (en) Whole support that moves down of double-deck overhead bridge
CN101793012B (en) Novel non-bracket bridge constructing method
CN115341701B (en) Hanging formwork construction method for high-altitude overhanging steel bar truss floor support plate
CN217326486U (en) Hollow superstructure diaphragm capsule location structure of concrete
CN108343251A (en) A kind of continuance lifting method without bearing large space Steel Truss Beam
CN216512520U (en) Lifting system suitable for small space
CN214117597U (en) Connecting joint of existing concrete column and heightened steel column
CN205677089U (en) There is coupled column and the base node structure of horizontal anti-seismic performance
CN112282418A (en) Connecting joint of existing concrete column and heightened steel column and construction method
CN209584740U (en) The concrete track beam that empty iron stressed seamless connects
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN219343961U (en) Detachable climbs frame and prevents attaching means that inclines
CN212128891U (en) Modular anchor system behind bridge hanging basket
CN210684492U (en) Simple tensioning operation platform
CN109592577A (en) One kind being used for inside-climbing tower crane steel construction switch rack and its construction method
CN218813912U (en) Anti-floating anchor rod tensioning device convenient to move
CN218090580U (en) Inclined leg rigid frame bridge dismantling device
CN211713706U (en) Large cantilever prefabricated bent cap installation lattice support device
CN218434470U (en) Device for quickly hoisting bridge deck by cable crane
CN209161335U (en) A kind of inside-climbing tower crane steel construction switch rack for 7m span
CN215925683U (en) Cable tower main reinforcement hoisting bracket
CN218521625U (en) Cast-in-place box girder construction bearing structure of pier department

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200511

Address after: 400050 no.39-1 Jianshe Avenue, Banan District, Chongqing

Patentee after: Chongqing Steel Structure Co., Ltd. of China Metallurgical Construction Engineering Group

Address before: No. 1 West Road 400084 Dadukou District of Chongqing

Patentee before: CHINA METALLURGICAL CONSTRUCTION ENGINEERING GROUP Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 39-1 Jianshe Avenue, Banan District, Chongqing, 400050

Patentee after: MCC Chongqing Construction Industry Co.,Ltd.

Address before: No. 39-1 Jianshe Avenue, Banan District, Chongqing, 400050

Patentee before: Chongqing Steel Structure Co., Ltd. of China Metallurgical Construction Engineering Group