CN205677089U - There is coupled column and the base node structure of horizontal anti-seismic performance - Google Patents
There is coupled column and the base node structure of horizontal anti-seismic performance Download PDFInfo
- Publication number
- CN205677089U CN205677089U CN201620555387.1U CN201620555387U CN205677089U CN 205677089 U CN205677089 U CN 205677089U CN 201620555387 U CN201620555387 U CN 201620555387U CN 205677089 U CN205677089 U CN 205677089U
- Authority
- CN
- China
- Prior art keywords
- steel plate
- coupled column
- vertical steel
- seismic performance
- concrete
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 62
- 239000010959 steel Substances 0.000 claims abstract description 62
- 239000004567 concrete Substances 0.000 claims abstract description 29
- 239000011374 ultra-high-performance concrete Substances 0.000 claims abstract description 11
- 239000011159 matrix material Substances 0.000 claims abstract description 7
- 238000010276 construction Methods 0.000 abstract description 6
- 238000009435 building construction Methods 0.000 abstract description 3
- 239000002131 composite material Substances 0.000 description 28
- 239000010410 layer Substances 0.000 description 7
- 238000010586 diagram Methods 0.000 description 4
- 230000002787 reinforcement Effects 0.000 description 3
- 239000004574 high-performance concrete Substances 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000007596 consolidation process Methods 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000011241 protective layer Substances 0.000 description 1
- 229910000679 solder Inorganic materials 0.000 description 1
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
技术领域technical field
本实用新型提供了一种具有水平抗震性能的组合柱与基础节点结构。The utility model provides a combined column and foundation node structure with horizontal seismic performance.
背景技术Background technique
目前,常规的(组合)柱-基础连接节点构造主要是两者的竖向配筋与横向配筋进行绑扎后一起浇筑。该连接方式的节点虽然是刚性的,但延性较差,在地震作用下节点处易受损坏,尤其是柱-基础节点区域的混凝土易被损坏,导致混凝土保护层的开裂,使得其抗震性能不足。此外,为保证节点处的强度和刚度,会相应地增加节点处的配筋率,而此时钢筋与钢筋之间的净距会减小,在强大水平荷载作用下,一旦节点区域混凝土开裂或损坏,则节点处更容易遭到破坏。另外,对于单组合柱与基础连接处构造而言,其柱与基础的混凝土与钢筋用量皆消耗较多,柱中竖向钢筋要深入基础中并在一定的深度后弯曲锚固,给施工带来一定的不易和麻烦。At present, the conventional (composite) column-foundation joint construction is mainly to bind the vertical reinforcement and transverse reinforcement of the two and pour them together. Although the joints of this connection method are rigid, their ductility is poor, and the joints are easily damaged under the action of earthquakes, especially the concrete in the column-foundation joint area is easily damaged, resulting in cracking of the concrete protective layer, making its seismic performance insufficient . In addition, in order to ensure the strength and stiffness at the joints, the reinforcement ratio at the joints will be increased accordingly, and the net distance between the steel bars will be reduced at this time. Under the action of strong horizontal loads, once the concrete in the joint area cracks or damage, the nodes are more likely to be damaged. In addition, for the structure of the joint between the single composite column and the foundation, the amount of concrete and steel bars used for the column and the foundation is relatively large, and the vertical steel bars in the column must go deep into the foundation and be bent and anchored after a certain depth, which brings great inconvenience to the construction. Certainly difficult and troublesome.
实用新型内容Utility model content
本实用新型的目的是针对以上不足之处,提供了一种具有水平抗震性能的组合柱与基础节点结构。The purpose of the utility model is to provide a composite column and foundation node structure with horizontal seismic performance against the above deficiencies.
本实用新型解决技术问题所采用的方案是一种具有水平抗震性能的组合柱与基础节点结构,包括组合柱与基础,所述组合柱与基础的连接节点处经浇筑的混凝土层连接为一体,所述混凝土层内部至少横向埋设有两个竖向钢板,每个竖向钢板表面均矩阵式排列有若干个双头螺栓,所述双头螺栓垂直穿过竖向钢板表面并焊接在竖向钢板上,所述双头螺栓的两端部焊接有螺帽,所述双头螺栓的周部设有经超高性能混凝土浇筑制成的用以与双头螺栓的周部连接为一体的套体。The solution adopted by the utility model to solve the technical problem is a composite column and foundation node structure with horizontal seismic performance, including the composite column and the foundation, and the poured concrete layer at the connection node of the composite column and the foundation is integrated into one, At least two vertical steel plates are buried horizontally inside the concrete layer, and several stud bolts are arranged in a matrix on the surface of each vertical steel plate, and the stud bolts vertically pass through the surface of the vertical steel plate and are welded to the vertical steel plate The two ends of the stud bolts are welded with nuts, and the periphery of the stud bolts is provided with a casing made of ultra-high performance concrete to be connected with the periphery of the stud bolts. .
进一步的,所述组合柱的截面形状为矩形。Further, the cross-sectional shape of the combined column is a rectangle.
进一步的,所述竖向钢板的长度为基础高度的1/3-4/5。Further, the length of the vertical steel plate is 1/3-4/5 of the base height.
进一步的,所述竖向钢板的边缘距离组合柱及基础的混凝土面表层不小于30mm。Further, the edge of the vertical steel plate is no less than 30mm away from the composite column and the concrete surface of the foundation.
进一步的,所述竖向钢板的形状为矩形,竖向钢板之间均互相平行。Further, the shape of the vertical steel plates is rectangular, and the vertical steel plates are all parallel to each other.
与现有技术相比,本实用新型具有以下有益效果:该具有水平抗震性能的组合柱与基础节点的结构简单、紧凑,通过设置竖向钢板代替传统的钢筋,竖向钢板与周围混凝土之间的摩擦力和机械咬合力较大,使节点区域的混凝土不容易发生劈裂破坏,配合双头螺栓、螺帽与套体加大了与混凝土的接触面积,使节点具有较高的强度及较好的延性,具有水平抗震性能;本实用新型施工方便、节约材料,既可以用于房屋建筑中组合柱与基础节点处,也可以用于桥梁中墩与承台节点处,具有较大的意义。Compared with the prior art, the utility model has the following beneficial effects: the structure of the composite column with horizontal seismic performance and the foundation node is simple and compact, and by setting the vertical steel plate instead of the traditional steel bar, the gap between the vertical steel plate and the surrounding concrete The friction force and mechanical bite force are relatively large, so that the concrete in the joint area is not easy to be split and damaged, and the contact area with the concrete is increased with the stud bolts, nuts and sleeves, so that the joint has high strength and relatively high strength. Good ductility, with horizontal seismic performance; the utility model is convenient in construction and saves materials, and can be used not only at the joints of composite columns and foundations in building construction, but also at the joints of bridge piers and caps, which has great significance .
附图说明Description of drawings
下面结合附图对本实用新型专利进一步说明。Below in conjunction with accompanying drawing, the utility model patent is further described.
图1为该实用新型实施例的构造示意图一;Fig. 1 is the structural schematic diagram one of this utility model embodiment;
图2为该实用新型实施例的构造示意图二;Fig. 2 is the structural schematic diagram 2 of this utility model embodiment;
图3为该实用新型实施例的构造示意图三;Fig. 3 is a structural schematic diagram three of the utility model embodiment;
图4为竖向钢板、套体、双头螺栓的连接关系示意图;Fig. 4 is a schematic diagram of the connection relationship between the vertical steel plate, the sleeve body and the stud bolt;
图中:In the picture:
1-组合柱;2-基础;3-混凝土层;4-竖向钢板;5-双头螺栓;6-螺帽;7-套体。1-composite column; 2-foundation; 3-concrete layer; 4-vertical steel plate; 5-stud bolt; 6-nut; 7-sleeve.
具体实施方式detailed description
下面结合附图和具体实施方式对本实用新型进一步说明。Below in conjunction with accompanying drawing and specific embodiment the utility model is further described.
如图1-4所示,一种具有水平抗震性能的组合柱与基础节点结构,包括组合柱1与基础2,所述组合柱与基础的连接节点处经浇筑的混凝土层3连接为一体,所述混凝土层内部至少横向埋设有两个竖向钢板4,每个竖向钢板表面矩阵式排列有若干个双头螺栓5,所述双头螺栓垂直穿过竖向钢板表面并焊接在竖向钢板上,将双头螺栓与竖向钢板形成一个刚体,所述双头螺栓的两端部焊接有螺帽6,可提高整个双头螺栓的刚度,所述双头螺栓的周部设有经超高性能混凝土浇筑制成的用以与双头螺栓的周部连接为一体的套体7,竖向钢板将组合柱与基础有效地连接在一起,用以抵抗水平力及抗震的作用。As shown in Figures 1-4, a composite column and foundation node structure with horizontal seismic performance includes a composite column 1 and a foundation 2, and the poured concrete layer 3 at the connection node of the composite column and the foundation is connected as a whole. At least two vertical steel plates 4 are buried horizontally inside the concrete layer, and several stud bolts 5 are arranged in a matrix on the surface of each vertical steel plate, and the stud bolts pass through the surface of the vertical steel plate vertically and are welded on the vertical On the steel plate, the stud bolt and the vertical steel plate form a rigid body, and the two ends of the stud bolt are welded with nuts 6, which can improve the rigidity of the whole stud bolt. The casing 7 made of ultra-high-performance concrete pouring is used to connect with the periphery of the stud bolt as a whole, and the vertical steel plate effectively connects the composite column and the foundation together to resist horizontal force and earthquake resistance.
在本实施例中,超高性能混凝土的抗压强度是普通混凝土的3-5倍,其抗拉强度大于3倍以上,甚至与钢筋材料性能相近,固结在组合柱与基础中竖向钢板上的超高性能混凝土的套体、双头螺栓能较大程度的改善该节点的延性,本实用新型的组合柱与基础节点处为刚接点,可允许节点处大约6mm的滑移,具有较大的刚度和较好的抗震性能。In this example, the compressive strength of ultra-high performance concrete is 3-5 times that of ordinary concrete, and its tensile strength is more than 3 times, even similar to the performance of steel bars, and the vertical steel plates consolidated in the composite column and foundation The super-high-performance concrete casing and stud bolts on the top can greatly improve the ductility of the joint. The composite column of the utility model and the joint of the foundation are rigid joints, which can allow about 6mm of slippage at the joint, and have a relatively high performance. Great rigidity and better seismic performance.
在本实施例中,竖向钢板上的超高性能混凝土的套体、双头螺栓及竖向钢板与周围混凝土之间的摩擦力、机械咬合力等作用,充分发挥了节点区域混凝土的力学性能,同时显著提高了节点处的刚度、抗震性能与延性。In this embodiment, the super high performance concrete casing on the vertical steel plate, the stud bolts, and the frictional force and mechanical bite force between the vertical steel plate and the surrounding concrete fully exert the mechanical properties of the concrete in the node area , while significantly improving the stiffness, seismic performance and ductility at the joints.
在本实施例中,所述组合柱的截面形状为矩形,竖向钢板之间均互相平行。In this embodiment, the cross-sectional shape of the combined column is rectangular, and the vertical steel plates are all parallel to each other.
在本实施例中,所述竖向钢板的长度为基础高度的1/3-4/5。In this embodiment, the length of the vertical steel plate is 1/3-4/5 of the base height.
在本实施例中,所述竖向钢板的边缘距离组合柱及基础的混凝土面表层不小于30mm。In this embodiment, the distance between the edge of the vertical steel plate and the concrete surface of the composite column and the foundation is not less than 30 mm.
在本实施例中,所述竖向钢板的形状为矩形。In this embodiment, the shape of the vertical steel plate is rectangular.
在本实施例中,所述竖向钢板伸入基础中心线的长度不小于竖向钢板长度的1/10。In this embodiment, the length of the vertical steel plate protruding into the centerline of the foundation is not less than 1/10 of the length of the vertical steel plate.
在本实施例中,具有水平抗震性能的组合柱与基础节点结构的施工方法包括以下步骤:In this embodiment, the construction method of the composite column and foundation node structure with horizontal seismic performance includes the following steps:
(1)在竖向钢板的两面都预留焊点,将若干个双头螺栓垂直穿设于竖向钢板表面,在焊点处进行焊接,固定在竖向钢板上的若干个双头螺栓呈矩阵式排列;(1) Solder spots are reserved on both sides of the vertical steel plate, and several stud bolts are vertically pierced on the surface of the vertical steel plate, and welded at the spot, and several stud bolts fixed on the vertical steel plate are in the form of matrix arrangement;
(2)在竖向钢板两面的双头螺栓周侧均套入PVC管,再用超高性能混凝土在双头螺栓与PVC管之间的型腔内进行浇筑,并对其进行适当养护,待超高性能混凝土达到强度后对PVC管进行拆模,最后在双头螺栓的两端部焊接螺帽;(2) Insert PVC pipes around the stud bolts on both sides of the vertical steel plate, then use ultra-high performance concrete to pour in the cavity between the stud bolts and the PVC pipe, and properly maintain it. After the ultra-high-performance concrete reaches its strength, the PVC pipe is demolished, and finally the nuts are welded at both ends of the stud bolts;
(3)将(1)至(2)步骤中做成的竖向钢板固定在组合柱与基础的连接节点处,最后在组合柱与基础的连接节点处现场浇筑混凝土层,并对其进行适当养护。(3) Fix the vertical steel plates made in steps (1) to (2) at the connection node between the composite column and the foundation, and finally pour the concrete layer on site at the connection node between the composite column and the foundation, and properly maintenance.
在本实施例中,在步骤(2)中,超高性能混凝土的浇筑方向为由钢板表面往双头螺栓的端部方向。In this embodiment, in step (2), the pouring direction of the ultra-high performance concrete is from the surface of the steel plate to the end of the stud bolt.
在本实施例中,所述混凝土层内部横向埋设有两个互相平行的竖向钢板,每个所述竖向钢板中均布设有若干个双头螺栓,所述若干个双头螺栓呈五行两列的矩阵式排列;其中竖向钢板与双头螺栓的分布及数目仅为本实用新型的一种实施例,随着组合柱与基础的连接节点大小的不同,相应的竖向钢板、竖向钢板上的双头螺栓的分布及数目也不同,本实用新型的竖向钢板、竖向钢板上的双头螺栓的分布及数目并不局限于此。In this embodiment, two vertical steel plates parallel to each other are buried horizontally inside the concrete layer, and several stud bolts are evenly distributed in each of the vertical steel plates, and the several stud bolts are arranged in five rows and two The matrix arrangement of columns; the distribution and number of vertical steel plates and stud bolts is only an embodiment of the present utility model, and the corresponding vertical steel plates, vertical The distribution and number of the stud bolts on the steel plate are also different, the vertical steel plate of the present invention, and the distribution and number of the stud bolts on the vertical steel plate are not limited thereto.
在本实施例中,将组合柱与基础的连接节点内部采用竖向钢板连接,在竖向钢板两面适当的位置矩阵式排列有若干个双头螺栓,双头螺栓的两端部焊接有螺帽,双头螺栓的周部设有经超高性能混凝土浇筑制成的用以与双头螺栓的周部连接为一体的套体,套体采用超高性能混凝土,无论是在抗拉及抗压强度都得到显著的提高,皆为普通混凝土强度的3-5倍;该具有水平抗震性能的组合柱与基础节点结构不仅可以代替传统中组合柱与基础连接处用的竖向、横向钢筋,简化其繁琐的构造,而且在一定程度上提高组合柱与基础连接节点处的承载能力,尤其是水平抗力得到显著提高;其次,竖向钢板与周围混凝土之间的摩擦力和机械咬合力,提高了组合柱与基础节点区域混凝土的工作性能,使混凝土发挥较大作用,而传统中组合柱与基础节点处的混凝土,由于较大的水平荷载,易发生劈裂破坏;另外,固结在竖向钢筋上的超高性能混凝土的套体与双头螺栓,可使节点具有较高的强度及较好的延性,降低其上部结构的危险系数,一旦节点处的延性增加了,则其上部结构不会轻易损害或垮塌,给抗震救灾提供更多的抢救时间;本发明具有施工方便、节约材料、显著提高组合柱与基础节点上的强度及延性,既可以用于房屋建筑中组合柱与基础节点处,也可以用于桥梁中墩与承台节点处,具有较大的意义。In this embodiment, vertical steel plates are used to connect the joints between the composite column and the foundation. Several stud bolts are arranged in a matrix at appropriate positions on both sides of the vertical steel plate, and nuts are welded at both ends of the stud bolts. The periphery of the stud bolts is provided with a casing made of ultra-high-performance concrete pouring to connect with the periphery of the stud bolts. The casing is made of ultra-high-performance concrete, whether it is tensile or compressive. The strength has been significantly improved, all of which are 3-5 times the strength of ordinary concrete; the composite column and foundation node structure with horizontal seismic performance can not only replace the vertical and transverse steel bars used in the traditional connection between composite columns and foundations, simplify Its cumbersome structure, and to a certain extent, improve the bearing capacity of the joint between the composite column and the foundation, especially the horizontal resistance has been significantly improved; secondly, the friction force and mechanical bite force between the vertical steel plate and the surrounding concrete have improved The working performance of the concrete in the joint area of the composite column and the foundation makes the concrete play a greater role, while the concrete at the joint of the composite column and the foundation in the traditional way is prone to splitting damage due to the large horizontal load; in addition, the consolidation in the vertical The ultra-high performance concrete casing and stud bolts on the steel bars can make the joints have higher strength and better ductility, and reduce the risk factor of the superstructure. Once the ductility of the joints increases, the superstructure will not It will be easily damaged or collapsed, providing more rescue time for earthquake relief; the invention has the advantages of convenient construction, material saving, and significantly improved strength and ductility on the composite column and foundation joints, and can be used for composite columns and foundation joints in building construction It can also be used at the node of the middle pier and cap of the bridge, which has great significance.
上列较佳实施例,对本实用新型的目的、技术方案和优点进行了进一步详细说明,所应理解的是,以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above preferred embodiments have further described the purpose, technical solutions and advantages of the utility model in detail. It should be understood that the above descriptions are only preferred embodiments of the utility model and are not intended to limit the utility model. For new models, any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present utility model shall be included within the protection scope of the present utility model.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620555387.1U CN205677089U (en) | 2016-06-12 | 2016-06-12 | There is coupled column and the base node structure of horizontal anti-seismic performance |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201620555387.1U CN205677089U (en) | 2016-06-12 | 2016-06-12 | There is coupled column and the base node structure of horizontal anti-seismic performance |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205677089U true CN205677089U (en) | 2016-11-09 |
Family
ID=57435893
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201620555387.1U Expired - Fee Related CN205677089U (en) | 2016-06-12 | 2016-06-12 | There is coupled column and the base node structure of horizontal anti-seismic performance |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205677089U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105863073A (en) * | 2016-06-12 | 2016-08-17 | 福州大学 | Combined column and foundation node structure with horizontal seismic performance and construction method thereof |
| CN108612189A (en) * | 2018-06-29 | 2018-10-02 | 东南大学 | A kind of prefabricated U HPC shells local enhancement assembly concrete frame structure |
-
2016
- 2016-06-12 CN CN201620555387.1U patent/CN205677089U/en not_active Expired - Fee Related
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105863073A (en) * | 2016-06-12 | 2016-08-17 | 福州大学 | Combined column and foundation node structure with horizontal seismic performance and construction method thereof |
| CN108612189A (en) * | 2018-06-29 | 2018-10-02 | 东南大学 | A kind of prefabricated U HPC shells local enhancement assembly concrete frame structure |
| CN108612189B (en) * | 2018-06-29 | 2023-09-15 | 东南大学 | A prefabricated UHPC shell partially reinforced assembled concrete frame structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103850392B (en) | Vertical floor concrete column with holes and the practice is established between outer square steel pipe inner circle steel pipe | |
| CN105297617B (en) | Double-column type swinging shock-insulation bridge pier structure system | |
| CN102493602B (en) | Ductile concrete column capable of delaying local buckling of steel bars and manufacturing method thereof | |
| CN111733986A (en) | Double CFST beam-column joint with built-in FRP reinforcement connection device and installation method | |
| CN108532760B (en) | Semi-through combined column-through double steel beam connection structure and construction method thereof | |
| CN207277561U (en) | Built-in profile steel high-strength concrete stem superposed column-girder steel group frame | |
| CN105926427B (en) | Pier beam transition connecting construction | |
| CN202347446U (en) | Supporting structure for construction of zero block of reinforced concrete continuous beam | |
| CN111809526A (en) | Prefabricated bridge double-column pier system and construction method with recoverable function after earthquake | |
| CN202644385U (en) | Aluminum alloy pipe restriction reinforced concrete bridge pier post | |
| CN207419229U (en) | A kind of Concrete-Filled Square Steel Tube combination pier of double wave folding steel webplate shear wall | |
| CN203403358U (en) | Latticed bridge tower of concrete filled steel pipe | |
| CN102061742A (en) | Shockproof reinforced concrete pseudo-classic building structural system | |
| CN103711231A (en) | Combined shear wall formed by steel pipe concrete frame, double-steel-plate shear wall and inside welded concealed bracing mild steel plates under equivalent steel | |
| CN202131600U (en) | Dual cross fixing end | |
| CN102561552A (en) | Steel tube concrete shear wall comprising vertical soft steel energy consuming straps with horizontal seams and manufacturing method | |
| CN105863073B (en) | Coupled column and base node structure and its construction method with horizontal anti-seismic performance | |
| CN204282803U (en) | To encorbelment formwork structure for mounting platform | |
| CN214656419U (en) | Steel pipe sand-filled super high bracket | |
| CN202644384U (en) | Aluminum alloy pipe restricting type steel concrete pier column | |
| CN201671227U (en) | Diagonal Arrangement Cross-shaped Steel SRC Columns with Flanges | |
| CN205577187U (en) | Prefabricated steel pipe concrete constructional column rammed earth wall | |
| CN209443360U (en) | A kind of concrete pier of steel tube | |
| CN107558487A (en) | A kind of goaf transmission line foundation bracing means and reinforcement means | |
| CN218562658U (en) | Easy-to-recover shear wall structure with steel-concrete combined wall footing connecting piece |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20161109 Termination date: 20190612 |