CN209161335U - A kind of inside-climbing tower crane steel construction switch rack for 7m span - Google Patents

A kind of inside-climbing tower crane steel construction switch rack for 7m span Download PDF

Info

Publication number
CN209161335U
CN209161335U CN201821927527.9U CN201821927527U CN209161335U CN 209161335 U CN209161335 U CN 209161335U CN 201821927527 U CN201821927527 U CN 201821927527U CN 209161335 U CN209161335 U CN 209161335U
Authority
CN
China
Prior art keywords
steel
tower crane
corbel
welded
climbing tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821927527.9U
Other languages
Chinese (zh)
Inventor
董浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority to CN201821927527.9U priority Critical patent/CN209161335U/en
Application granted granted Critical
Publication of CN209161335U publication Critical patent/CN209161335U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of inside-climbing tower crane steel construction switch racks for 7m span, including being embedded in the two groups of pull rods of adjacent shearing within the walls, the outer end of every group of pull rod is welded with steel plate, it is welded with steel corbel on the steel plate, and there are differences in height between the steel corbel of two sides, steel box-girder is welded on the steel corbel of low level side, the both ends of " H " section steel beam are separately fixed at the steel corbel of high-order side and the top of steel box-girder, conversion steel bench is fixedly connected at the top both ends of " H " section steel beam, " C " type frame is bolted to connection on the conversion steel bench at both ends.The utility model solves that building level structural beams are undersized, bearing capacity is poor, is unable to satisfy inside-climbing tower crane load, leads to the technical problem of inside-climbing tower crane installation, operating difficulties.Therefore, the utility model has the advantages that the saving duration, assembly is flexible, simple to install, can be used in turn, is easy for construction, is economical and practical, is safe and reliable, has wide applicability and generalization.

Description

A kind of inside-climbing tower crane steel construction switch rack for 7m span
Technical field
The utility model relates to a kind of inside-climbing tower crane steel construction switch racks for 7m span, belong to lifting in architectural engineering Equipment technical field.
Background technique
Currently, horizontal structure beam section size is smaller in most of building core cylinder, inside-climbing tower crane work lotus cannot be born Carry, and vertically can bearing load structure spacing be less than 7m when, inside-climbing tower crane installation it is particularly difficult.It is asked to solve above-mentioned technology Topic, conventional method are the water for improving its bearing capacity by increasing the area of section of building level structural beams, and thickening or widening Flat structure beam not only makes troubles to subsequent construction, but also influences building beauty, and the later period is needed to carry out picking chisel modification, waste thus Man power and material influences construction efficiency.
Utility model content
That the purpose of the utility model is to provide a kind of structures is simple, safe and reliable, bearing capacity is strong is used for 7m span Inside-climbing tower crane steel construction switch rack, to overcome deficiency in the prior art.
The technical solution of the utility model includes: a kind of inside-climbing tower crane steel construction switch rack for 7m span, including be embedded in The two groups of pull rods of adjacent shearing within the walls, the outer end of every group of pull rod are welded with steel plate, are welded with steel corbel on the steel plate, And there are differences in height between the steel corbel of two sides, are welded with steel box-girder on the steel corbel of low level side, the two of " H " section steel beam End is separately fixed at the steel corbel of high-order side and the top of steel box-girder, is fixedly connected with and turns at the top both ends of " H " section steel beam Steel bench is changed, " C " type frame is bolted to connection on the conversion steel bench at both ends.
Further, billet is provided between the bottom at the top and " H " section steel beam of the steel corbel or steel box-girder.
Due to the adoption of the above technical scheme, utility model has the advantages that the utility model solves building level knot Structure beam is undersized, bearing capacity is poor, is unable to satisfy inside-climbing tower crane load, leads to the technology of inside-climbing tower crane installation, operating difficulties Problem.Therefore, the duration, assembly is flexible, simple to install, can be used in turn, is easy for construction, economic reality with saving for the utility model With, safe and reliable advantage, there is wide applicability and generalization.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the utility model.
Description of symbols: 1- steel plate, 2- steel corbel, 3- steel box-girder, 4- " H " section steel beam, 5- convert steel bench, 6- " C " Type frame, 7- pull rod, 8- billet.
Specific embodiment
It is right with reference to the accompanying drawings and examples in order to keep the purpose of this utility model, technical solution and advantage clearer The utility model is described in further detail.
The embodiments of the present invention: structural schematic diagram such as Fig. 1 of the inside-climbing tower crane steel construction switch rack for 7m span Shown, including being embedded in the two groups of pull rods 7 of adjacent shearing within the walls, the outer end of every group of pull rod 7 is welded with steel plate 1, in steel plate 1 On be welded with steel corbel 2, and there are differences in height between the steel corbel 2 of two sides, are welded and fixed on the steel corbel 2 of low level side There is steel box-girder 3, the both ends of " H " section steel beam 4 are separately fixed at the steel corbel 2 of high-order side and the top of steel box-girder 3, in " H " type The top both ends of girder steel 4 are fixedly connected with conversion steel bench 5, and " C " type frame 6 is bolted to connection the conversion steel plate at both ends On stool 5.It is provided with billet 8 between the bottom at the top and " H " section steel beam 4 of the steel corbel 2 or steel box-girder 3, for adjusting The levelness of " H " section steel beam 4.
When the bearing capacity for determining horizontal structure beam in original structure design be unable to satisfy under working condition inside-climbing tower crane load or When shear wall maximum spacing is not more than 7m when using shear wall as inside-climbing tower crane stress point, above-mentioned conversion frame can be used to install Inside-climbing tower crane.
When construction, pre-buried two groups of pull rods 7 are distinguished within the walls in adjacent shearing first, are then welded in the outer end of every group of pull rod 7 Steel plate 1, and steel corbel 2 is welded and fixed on steel plate 1, and make between the steel corbels 2 of two sides that there are differences in height, at this time in low level side Steel corbel 2 on weld steel box-girder 3, then the both ends of " H " section steel beam 4 are separately fixed to the steel corbel 2 and steel of high-order side The top of box beam 3, then conversion steel bench 5 is welded and fixed at the top both ends of " H " section steel beam 4, " C " type frame 6 is solid by bolt Surely it is connected on the conversion steel bench 5 at both ends, inside-climbing tower crane can be finally fixedly mounted on " C " type frame 6.

Claims (2)

1. a kind of inside-climbing tower crane steel construction switch rack for 7m span, it is characterised in that: including being embedded in adjacent shearing within the walls Two groups of pull rods (7), the outer end of every group of pull rod (7) is welded with steel plate (1), is welded with steel corbel on steel plate (1) (2), and between the steel corbel of two sides (2) there are differences in height, are welded with steel box-girder (3) on the steel corbel (2) of low level side, The both ends of " H " section steel beam (4) are separately fixed at the steel corbel (2) of high-order side and the top of steel box-girder (3), in " H " section steel beam (4) top both ends are fixedly connected with conversion steel bench (5), and " C " type frame (6) is bolted to connection the conversion steel at both ends On stool (5).
2. the inside-climbing tower crane steel construction switch rack according to claim 1 for 7m span, it is characterised in that: the steel ox Billet (8) are provided between the bottom at the top and " H " section steel beam (4) of leg (2) or steel box-girder (3).
CN201821927527.9U 2018-11-22 2018-11-22 A kind of inside-climbing tower crane steel construction switch rack for 7m span Expired - Fee Related CN209161335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821927527.9U CN209161335U (en) 2018-11-22 2018-11-22 A kind of inside-climbing tower crane steel construction switch rack for 7m span

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821927527.9U CN209161335U (en) 2018-11-22 2018-11-22 A kind of inside-climbing tower crane steel construction switch rack for 7m span

Publications (1)

Publication Number Publication Date
CN209161335U true CN209161335U (en) 2019-07-26

Family

ID=67339401

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821927527.9U Expired - Fee Related CN209161335U (en) 2018-11-22 2018-11-22 A kind of inside-climbing tower crane steel construction switch rack for 7m span

Country Status (1)

Country Link
CN (1) CN209161335U (en)

Similar Documents

Publication Publication Date Title
CN201437639U (en) Integral type deformation joint steel moulding plate
CN203855866U (en) Large-span frame bridge overhead roof with beams convenient to construct
CN203066090U (en) Assembled bracing structure for steel sheet piling cofferdam construction
CN209161335U (en) A kind of inside-climbing tower crane steel construction switch rack for 7m span
CN109592577A (en) One kind being used for inside-climbing tower crane steel construction switch rack and its construction method
CN208934394U (en) One kind can turnover type hydraulic climbing formwork wall-attaching equipment
CN2490261Y (en) Device for changing and supporting post of house by structural steel
CN202689585U (en) Ground fitting up assembly mould of large steel truss
CN205741917U (en) A kind of marine mobile formwork independent support device and marine mobile formwork
CN208502273U (en) It is a kind of for without bearing large space Steel Truss Beam hoisting frame
CN210029721U (en) Prefabricated bridge deck hoisting frame
CN205296579U (en) Combination reinforcing bar girder construction
CN208981120U (en) The queen post superelevation frame pier of multiple steel member connection
CN202000266U (en) Supporting structure of bridge coping template
CN202994492U (en) T-shaped bridge static loading test rack
CN208267379U (en) A kind of trapezoidal steel structure support being used to support 24-32m cast-in-situ box girder and adjustable span
CN203113908U (en) Full assembly structure with enclosing wall and advertising board integrated
CN201722065U (en) Gate type portal gantry
CN207435918U (en) A kind of box beam hoisting platform and the lifting beam machine using the hoisting platform
CN205223823U (en) Highway with stride a formula single track and build bilateral case section structure of bridge jointly
CN201686367U (en) Machine-room-less elevator
CN205348389U (en) Influence of intelligence jacking steel platform truss is steel plate wall segmentation merogenesis structure down
CN215717287U (en) Bracket structure suspension connection construction device
CN216476314U (en) Assembly type formwork system of cast-in-place plate of steel structure building
CN211689940U (en) Front supporting leg structure of segmental assembling bridge girder erection machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190726

Termination date: 20191122