Prior art keywords
steel
triangular truss
montant
angle
truss structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710400696.0A
Other languages
Chinese (zh)
Inventor
蒋昌盛
蒙幸
何崇雄
韦大川
何青龙
陆保佐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Road Construction Engineering Group Co Ltd
Original Assignee
Guangxi Road Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Road Construction Engineering Group Co Ltd filed Critical Guangxi Road Construction Engineering Group Co Ltd
Priority to CN201710400696.0A priority Critical patent/CN107165039A/en
Publication of CN107165039A publication Critical patent/CN107165039A/en
Pending legal-status Critical Current

Links

Classifications

    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00—Structural or constructional details of bridges
    • E01D19/02—Piers; Abutments ; Protecting same against drifting ice
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
    • E—FIXED CONSTRUCTIONS
    • E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D2101/00—Material constitution of bridges
    • E01D2101/20—Concrete, stone or stone-like material
    • E01D2101/24—Concrete
    • E01D2101/26—Concrete reinforced
    • E01D2101/28—Concrete reinforced prestressed
    • E01D2101/285—Composite prestressed concrete-metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to a kind of field of bridge pier angle-table bracket structure, disclose one kind and encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method, the construction includes triangular truss structure, shearing groove, prestressing apparatus and horizontal-associate structure;According to several pre-buried symmetrical shearing grooves of design requirement on concrete bodies both sides, triangular truss structure is fixedly mounted in correspondence on the shearing groove;And be connected two-by-two between symmetrical triangular truss structure by prestressing apparatus through the prestressing force passage in concrete bodies;Horizontal-associate structure is installed between homonymy two triangular truss structures adjacent to each other;Ultimately form a stable overall load for undertaking top mass concrete construction.The present invention has more convenient, overall structure of constructing stable relative to traditional full framing or conventional pre-buried bracket;Construction safety, standardization can be realized, be easier to have enough to meet the need, reduce construction cost, it is pollution-free the features such as.

Description

Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method
Technical field
The present invention relates to a kind of field of bridge pier angle-table bracket structure, specially one kind mass concrete construction of encorbelmenting is pre- Stress anchors angle-table bracket and its construction method, it is adaptable to which rigid frame bridge is particularly tall and big No. 0 block of rigid frame bridge or No. 1 block is encorbelmented substantially Product concrete construction and other architectural engineering concrete cantilever constructions.
Background technology
As highway foundation is implemented gradually to be drive on boldly to high and steep mountains mountain area from plains region or micro- mound area, and in Chong Shanjun Built in ridge the most economical method of highway be using large span rigid frame bridge even using continuous rigid frame bridge as design come Across deep big cheuch, so that rigid frame bridge is increasing in the ratio that highway is accounted for, while rigid frame bridge is in beam, pier(Tower)With reference to portion Generally there is the concrete of encorbelmenting of large volume position, and the construction bracket load bearing system of this part of concrete is meeting current routine It is how further economical, efficient, safe and environment-friendly on the basis of construction, it is the problem of needing thinking.
At present, China mainly uses raft support method and pre-buried bracket method in No. 0 block, No. 1 block construction of rigid frame bridge.By In the volume of concrete is big, weight big, requirement of the raft support method to ground is also very high, and early fallout and later stage are not Uniform settlement can all bring immeasurable destruction to concrete.It is past and pre-buried bracket method needs substantial amounts of Site Welding operation It is not fine toward Site Welding condition(Influence, the influence of high-altitude construction such as strong wind weather, the Unpredictability of vertical position welding operation Deng), cause built-in fitting to leave hidden danger of quality, so as to cause the weight bearing power of bracket to decline, deflection increases, and finally influences coagulation Soil property amount and site operation safety.
And the cost that raft support method and pre-buried both common methods of bracket method are once set up is very high, if will week Cost can more increase if turning use, include the transport of lot of materials, installation, remove, it is impossible to solve at all it is easy for installation, it is lossless Turnover.And security risk is very big.
Chinese patent literature through retrieving relevant angle-table bracket construction has, and now enumerates some as follows:
1st, Chinese patent<Application number>201620376336.2<Utility model title>A kind of assembled bracket structure<Applicant> Guizhou Co., Ltd of bridge construction group<Address>The 550001 Hong Xiang mansions of Yan'an Medium Road, Guiyang City, Guizhou Province 1<Invention People>Wang Qian, Tan Jiguang, Ou Yangbin, Luo Wenxiu<Summary>The utility model discloses a kind of assembled bracket structure, assembled ox Leg is arranged on pier stud both sides, and it is installed in the built-in groove on pier shaft, and essence pricks spiral and passes through assembled bracket and built-in groove After the preformed hole that place is provided with, it is fixed in built-in groove, the assembled bracket includes item plate, item plate two ends are connected with left side It is provided with plate and right plate, left and right side plate and penetrates hole, left plate bottom is connected with bottom plate, and the bottom plate other end is through inclined-plane side Plate is connected with right plate, is also included essence and is pricked spiral, whole assembled bracket constitutes 1 class inverted trapezoidal structure, in use, Bottom plate is fully seated on the bottom surface of built-in groove.O number sections are built using the supporting structure for being provided with assembled bracket, dropped Low security risk, it is safe, and also bridge quality more can guarantee that, while supporting structure is simple with respect to 3, reduce cost of erection With the duration can shorten 15 days in 10 number section process of construction, and expense can save up to 120,000.
2nd, Chinese patent<Application number>200720200918.6<Utility model title>Assembled steel bracket<Applicant>It is expensive Science of bridge building parent company of state province<Address>550001 26 building, the Hong Xiang mansions of Yan'an Medium Road, Guiyang City, Guizhou Province 2 Guizhou Province's bridges Engineering parent company General Engineer's Office<Inventor>Huang Sheng, Liu Zhi<Summary>The utility model discloses a kind of assembled steel bracket, it is wrapped Finish rolling deformed bar (1) is included, steel corbel (2), steel corbel (2) insertion built-in groove (3) are connected with finish rolling deformed bar (1) It is interior.Steel corbel of the present utility model is installed and stress using pre-buried finish rolling deformed bar, and easy for installation, support force is big. Brace groove can also be produced in steel corbel bottom, brace groove is stuck on the lower notch of built-in groove, passes through brace groove Mitigate the pressure that steel corbel is born, improve steel corbel stress.Compared with the existing technology, the utility model have it is simple in construction, The advantages of easy for installation, using effect is good.
3rd, Chinese patent<Application number>201410100300.7<Denomination of invention>Assembled architecture is without bracket concrete joist steel Column connected node<Applicant>Seventh Bureau Of Engineering Seventh China Architectural Co., Ltd<Address>450000 Zhengzhou City Henan Province Cheng Donglu No. 108<Inventor>Jiao Anliang, Zhang Peng, Huang Yanzheng, Zhang Haidong, Li Yonghui, Hou Zhenguo<Summary>The present invention relates to one kind assembling Formula building is without bracket concrete joist steel column connected node, including square steel concrete column (1), Reinforced Concrete Composite Beams (2) and mixes It is provided with solidifying soil layer (3), square steel concrete column (1) in punching reinforcing bar (4), Reinforced Concrete Composite Beams (2) and is provided with cage bar (5), punching reinforcing bar (4) is connected with cage bar (5) by sleeve (6), Reinforced Concrete Composite Beams (2) is arranged on square steel concrete On post (1), concrete layer (3) is covered in the contact site of square steel concrete column and Reinforced Concrete Composite Beams.The present invention is provided A kind of connected mode between steel construction and armored concrete different materials, simple in construction, quick and easy for installation, shear behavior Height, and be connected firmly, there is more preferable durability.
From disclosed document, it is known that, when installing corbels support frame, what is had need to open up groove or pre-buried on concrete bodies Welding bracing frame is carried out on plate, groove is opened up on concrete bodies certainly will destroy concrete bodies intensity, reduction of service life;It is pre-buried Welded on plate, take work consuming, and height is big, it is dangerous big, remove also pretty troublesome.
In summary, research and develop it is a kind of it is brand-new be convenient to mount and dismount, beneficial to turnover, construction safety mass concrete construction it is pre- Stress angle-table bracket system is significant.
The content of the invention
The purpose of the present invention is the defect for overcoming prior art, and provides one kind and encorbelment mass concrete construction prestressing force Anchor angle-table bracket and its construction method;The construction overcomes the shortcomings of that traditional full framing and pre-buried bracket structure are present, can Realize to standardize and manufacture, easy for installation during construction, sound construction improves efficiency of construction, shortens the construction period, while being answered using pre- The tensioning of power apparatus eliminates the montant of work progress intermediate cam truss structure because bearing the transversely deforming produced during overhung load, Resistance to overturning is good, safe, and reuses can be had enough to meet the need after having constructed, and construction method is simple, efficiently quickly, with compared with Good economic benefit and social benefit.
In order to realize the invention described above purpose, the technical scheme used for:
One kind is encorbelmented mass concrete construction prestress anchoraging angle-table bracket, and the construction includes triangular truss structure, shearing Groove, prestressing apparatus and horizontal-associate structure;According to several pre-buried symmetrical shearings of design requirement on concrete bodies both sides Triangular truss structure is fixedly mounted in correspondence on groove, the shearing groove;And two-by-two by advance should between symmetrical triangular truss structure Power apparatus is connected through the prestressing force passage in concrete bodies;Two adjacent to each other triangular truss structures of homonymy it Between horizontal-associate structure is installed, ultimately form a stable entirety and undertake top and encorbelment all lotuses of mass concrete construction Carry.
It is preferred that, described triangular truss structure includes top boom, lower boom, montant and hound;The montant it is upper One end of end connection top boom, the lower end connection lower boom of the montant;The other end of the top boom connects the upper of hound End, the lower end of the hound and the connection of montant lower end;Cross bar, the cross bar and diagonal brace are connected between the hound and montant Connecting upright pole between bar junction and top boom.
It is preferred that, A stiffeners are equipped with the junction of the top boom, hound and montant.
It is preferred that, the top boom, lower boom, montant, hound, cross bar and vertical rod take shaped steel welding to be made, and By design requirement provided with some pieces of B stiffeners inside it;The shaped steel is channel-section steel, I-steel, angle steel, H profile steel, T-steel or L It is any in shaped steel.
It is preferred that, the montant is provided with several through holes, and described through hole is mutually paired with prestressing force passage;It is described pre- Stress channel in the vertical direction aligns with shearing groove.
It is preferred that, described shearing groove is made of steel plate welding, straightforward face big 1- of its opening size than lower boom 2cm, depth ratio lower boom insertion depth depth 5-10cm, the section that the straightforward face is intercepted by vertical lower boom longitudinal center.
It is preferred that, described prestressing apparatus is fining twisted steel and its supporting nut or steel strand wires and its supporting anchor Tool;The fining twisted steel or steel strand wires be interspersed in triangular truss structure montant and on concrete bodies it is pre- according to design requirement The prestressing force passage stayed;Reuse the supporting nut of correspondence or supporting anchorage solid to tensing.
It is preferred that, described prestressing apparatus when mounted, need to carry out tensioning by calculated value to it, so as to eliminate whole outstanding When choosing the load that mass concrete construction prestress anchoraging angle-table bracket is produced when bearing top mass concrete construction, The montant of triangular truss structure is final to ensure whole mass concrete of encorbelmenting because bearing the transversely deforming produced during overhung load The stabilization and safety of construction prestress anchoraging angle-table bracket.
It is preferred that, described prestressing force passage takes pvc pipe, galvanized pipe, stainless steel or carbon steel tubing to be embedded in concrete in advance It is made in vivo, and runs through whole concrete bodies on pre-buried position by design.
It is preferred that, described horizontal-associate structure includes balancing pole, stabiliser bar and brace, the stabiliser bar parallel arrangement, two Some balancing poles are installed between stabiliser bar, brace is installed on the diagonal of balancing pole two-by-two.
It is preferred that, the angle-table bracket construction method comprises the following steps:
(1)By drawing processing component, and it is transported to job site;
(2)Groove and prestressing force passage are sheared by design attitude is pre-buried when bottom concrete bodies are poured;
(3)After bottom concrete bodies are emphasized to reach requirement, triangular truss structure is lifted, triangular truss structure lower boom is inserted Shear in groove, fining twisted steel in prestressing apparatus or steel strand wires are sequentially passed through into the montant of triangular truss structure, prestressing force and led to The montant in road, triangular truss structure on symmetrical side, tightens the nut or anchorage at two ends, makes concrete bodies symmetrical Montant on two Pin triangular truss structures is all close to concrete bodies;
(4)Other groups are by fining twisted steel and its supporting nut or steel strand wires and its match somebody with somebody on the same montant of repeat step completion The installation of the prestressing apparatus of the anchorage composition of set;
(5)By the fining twisted steel or steel strand wires on all montants by calculated value carry out tensioning, complete tensioning after tighten nut or Person's anchorage;
(6)Triangular truss structure adjacent two-by-two on horizontal-associate structure connection concrete bodies homonymy is lifted, using welding or bolt Connected mode connects montant, top boom, the hound of the adjacent triangular truss structure of homonymy respectively successively;Obtain anchoring bracket Support;
(7)After angle-table bracket is constructed according to design requirement installation, then follow-up work is carried out, be to install horizontal thereon To distribution beam, transverse distribution beam is installed on the top boom of triangular truss structure by spacing is calculated;
(8)Installation pours mount holder and end template, and carries out precompressed;
(9)After precompressed is qualified, installs and pour required side template, internal model, head plate etc., reinforcing bar and prestressing force ripple are installed in mould Line pipe, anchor plate and other embedded ribs etc.;
(10)Segmentation casting concrete is simultaneously conserved;
(11)After concrete is emphasized to reach requirement, head plate, internal model, side form, mount holder, bed die, transverse direction point are removed successively With beam, horizontal-associate structure, triangular truss structure, prestressing apparatus;Component transports after dismounting are used or transported to next building site Return the maintenance storage of material transfer shed.
The substantive distinguishing features for the protrusion that the present invention has relative to prior art and marked improvement are:
1st, the present invention overcomes the shortcomings of that traditional full framing and pre-buried bracket structure are present, and can realize standardization manufacture, construction When easy for installation, sound construction, improve efficiency of construction, shorten the construction period, and used triangular truss structure, horizontal-associate structure Shaped steel is used with shearing groove making material, material source is convenient, and concentrated processing in factory, welding quality can be protected sufficiently Card, standardization level is high.
2nd, the present invention eliminates the montant of work progress intermediate cam truss structure using the tensioning of prestressing apparatus because bearing The transversely deforming produced during overhung load, system resistance to overturning is good, safe.
3rd, shearing groove of the invention be it is pre- be embedded in concrete bodies, the integrally-built intensity of concrete bodies is not destroyed; When installing or removing triangular truss structure, any damage is not caused to shearing groove;And shear groove and welded using steel plate It is made, its opening size is than the big 1-2cm in straightforward face of the lower boom in triangular truss structure, depth ratio lower boom insertion depth depth 5-10cm, the section that the straightforward face is intercepted by vertical lower boom longitudinal center;Shearing groove greatly improves triangular truss structure Installation effectiveness, because install English truss when, by triangular truss structure lower boom insertion shearing groove in, shearing groove will under Chord member is entangled firm, can prevent triangular truss structure from being dropped in the loose hook of lifting;Shear the cross-sectional sizes phase of the notch and lower boom of groove Difference is small, and triangular truss structure gradient is small, can trample and carry out safety work thereon.
4th, installed when intermediate cam truss structure of the present invention, horizontal-associate structure, prestressing apparatus are installed for assembled, operation letter Single, it is convenient to construct, and progress is fast, and can have enough to meet the need reuse, is conducive to environmental protection.
5th, intermediate cam truss structure of the present invention include top boom, lower boom, montant and hound, and top boom, lower boom, Triangle is connected and composed between montant and hound;So that overall structure stability is high, endurance is strong;Top boom, montant Vertical rod, cross bar are connected with hound respectively;Vertical rod and cross bar are strengthened overall structure;Meanwhile, in top boom, hound With A stiffeners are equipped with montant junction, overall endurance can be improved, again can safety of structure significantly;Also montant is entered Row is strengthened, it is to avoid montant stress deformation.
6th, prestressing apparatus is fining twisted steel and its supporting nut or steel strand wires and its supporting anchorage in the present invention; The installation effectiveness of prestressing apparatus is improved, and can stable connection;And after the completion of use, dismounting is also convenient for quick;Prestressing force is filled Put and two symmetrical triangular truss structures of both sides are attached fixation, virtually also improve the installation of triangular truss structure Efficiency.
7th, triangular truss structure adjacent two-by-two is attached fixation by horizontal-associate structure in the present invention, can be according to construction need Using horizontal-associate structure, triangular truss structure is attached two-by-two, then integral hoisting, or first lifts triangular truss structure, then is made Adjacent triangular truss structure two-by-two is attached with horizontal-associate structure;, can be by horizontal-associate structure and triangle purlin after engineering terminates The overall structure of frame structure connection is hung to ground, then horizontal-associate structure and triangular truss structure are split, and improves efficiency of construction, and energy Ensure the safety of operating personnel, the connected mode between horizontal-associate structure and triangular truss structure is to be welded to connect or bolt connection side Formula, prioritizing selection bolt connection can larger saving material, reduction construction cost.
Brief description of the drawings
Fig. 1 be invention one kind encorbelment mass concrete construction prestress anchoraging angle-table bracket construction when structural representation Figure;
Fig. 2 is Fig. 1 main view figure structure schematic representation;
Fig. 3 is Fig. 1 vertical view figure structure schematic representation;
Fig. 4 is the structural representation of the partial enlargement for the prestressing force passage that prestressing apparatus is interspersed in lower concrete;
Fig. 5 is the dimensional structure diagram of triangular truss structure;
Fig. 6 is Fig. 5 main structure diagram;
Fig. 7 is the main structure diagram of horizontal-associate structure;
Component names and serial number in figure:Concrete bodies 1, triangular truss structure 2 shears groove 3, prestressing force passage 4, prestressing force dress Put 5, horizontal-associate structure 6, top boom 7, lower boom 8, montant 9, hound 10, cross bar 11, vertical rod 12, A stiffeners 13, balancing pole 14, stabiliser bar 15, brace 16, B stiffeners 17.
Embodiment
With reference to embodiments of the invention, the present invention is described in more detail.
Referring to shown in Fig. 1~7, one kind is encorbelmented mass concrete construction prestress anchoraging angle-table bracket, the construction bag Include triangular truss structure 2, shearing groove 3, prestressing apparatus 5 and horizontal-associate structure 6;According to design requirement on the both sides of concrete bodies 1 Triangular truss structure 2 is fixedly mounted in correspondence on several pre-buried symmetrical shearing grooves 3, the shearing groove 3;And it is symmetrical two-by-two Triangular truss structure 2 between be connected by prestressing apparatus 5 through the prestressing force passage 4 in concrete bodies 1;Same Horizontal-associate structure 6 is installed between two triangular truss structures 2 adjacent to each other of side.
Described triangular truss structure 2 includes top boom 7, lower boom 8, montant 9 and hound 10;The montant 9 it is upper One end of end connection top boom 7, the lower end connection lower boom 8 of the montant 9;The other end connection hound of the top boom 7 10 upper end, the lower end of the hound 10 and the connection of the lower end of montant 9;Cross bar 11 is connected between the hound 10 and montant 9, Connecting upright pole 12 between the cross bar 11 and the junction of hound 10 and top boom 7.
A stiffeners 13 are equipped with the junction of the top boom 7, hound 10 and montant 9.
The top boom 7, lower boom 8, montant 9, hound 10, cross bar 11 and vertical rod 12 take shaped steel welding to be made, And it is provided with some pieces of B stiffeners 17 by design requirement inside it;The shaped steel is channel-section steel, I-steel, angle steel, H profile steel, T-shaped It is any in steel or L-type steel.
The montant 9 is provided with several through holes, and described through hole is mutually paired with prestressing force passage 4;The prestressing force The in the vertical direction of passage 4 aligns with shearing groove 3.
Described shearing groove 3 is made of steel plate welding, and its opening size is than the big 1-2cm in straightforward face of lower boom 8, depth Than the insertion depth of lower boom 8 depth 5-10cm.
Described prestressing apparatus 5 is fining twisted steel and its supporting nut or steel strand wires and its supporting anchorage;Institute State fining twisted steel or steel strand wires be interspersed in triangular truss structure 2 montant 9 and on concrete bodies 1 it is reserved according to design requirement Prestressing force passage 4;Reuse the supporting nut of correspondence or supporting anchorage solid to tensing.
Described prestressing force passage 4 takes pvc pipe, galvanized pipe, stainless steel or carbon steel tubing to be embedded in system in concrete bodies 1 in advance , and run through whole concrete bodies 1 on pre-buried position by design.
Described horizontal-associate structure 6 includes balancing pole 14, stabiliser bar 15 and brace 16, and the stabiliser bar 15 is arranged in parallel, Some balancing poles 14 are installed between two stabiliser bars 15, brace 16 is installed on the diagonal of balancing pole 14 two-by-two.
The angle-table bracket construction method comprises the following steps:
(1)By drawing processing component, and it is transported to job site;
(2)Groove 3 and prestressing force passage 4 are sheared by design attitude is pre-buried when bottom concrete bodies are poured;
(3)After bottom concrete bodies are emphasized to reach requirement, triangular truss structure 2 is lifted, by the lower boom 8 of triangular truss structure 2 Insertion shearing groove 3 in, by fining twisted steel or steel strand wires in prestressing apparatus 5 sequentially pass through triangular truss structure 2 montant 9, The montant 9 of triangular truss structure 2 on prestressing force passage 4, symmetrical side, tightens the nut or anchorage at two ends, makes concrete Montant 9 on two symmetrical Pin triangular truss structures 2 of body 1 is all close to concrete bodies 1;
(4)Repeat step(3)Complete on same montant 9 other groups by fining twisted steel and its supporting nut or steel strand wires and The installation of the prestressing apparatus 5 of its supporting anchorage composition;
(5)By the fining twisted steel or steel strand wires on all montants 9 by calculated value carry out tensioning, complete tensioning after tighten nut or Person's anchorage;
(6)Lift horizontal-associate structure 6 and connect triangular truss structure 2 adjacent two-by-two on the homonymy of concrete bodies 1, using welding or spiral shell Bolt connected mode connects montant 9, top boom 7, the hound 10 of the adjacent triangular truss structure 2 of homonymy respectively successively;Obtain Anchor angle-table bracket;
(7)After angle-table bracket is constructed according to design requirement installation, then follow-up work is carried out, laterally divided installing thereon With beam, transverse distribution beam is installed on the top boom 7 of triangular truss structure 2 by spacing is calculated,
(8)Mounting base support and required end template is poured on transverse distribution beam, and carry out precompressed;
(9)After precompressed is qualified, side template, internal model, head plate etc., and installation reinforcing bar and prestressing force bellows, anchor in mould are installed Backing plate and other embedded ribs etc.;
(10)Segmentation casting concrete is simultaneously conserved;
(11)After concrete is emphasized to reach requirement, head plate, internal model, side form, mount holder, bed die, transverse direction point are removed successively With beam, horizontal-associate structure 6, triangular truss structure 2, prestressing apparatus 5;Component transports after dismounting used to next building site or Transport the maintenance storage of material transfer shed back.
Case study on implementation 1:
The high 64m of certain Large Bridge Pier, upper structure is continuous rigid frame, and boom width 3m, volume of concrete is 69.7m3, weight about 175t. Full space support construction is such as used, support base need to change to fill out processing, and the workload that support is set up is very big, the engineering time Long, so high support, which is set up, can not ensure operating personnel's safety, easily occur rod member even personnel's drop event.Such as using pre- The construction of bracket method is buried, then can carry out artificial destruction to the template of infrastructure, be unfavorable for being used in turn, while cannot guarantee that existing The weld job condition of field, larger hidden danger is caused to safety and quality.Using the present invention, settling amount is small, and concrete quality is good, Security performance is high, and quality and security incident do not occur.
Case study on implementation 2:
The high 70m of certain Large Bridge Pier, upper structure is continuous rigid frame, and boom width 3m, volume of concrete is 69.7m3, weight about 175t. According to the practice of case 1 and experience, had enough to meet the need with the material in case 1, cost is greatly reduced, while also saving the duration. Using the present invention, settling amount is small, and concrete quality is good, and security performance is high, and quality and security incident do not occur.

Claims (10)

  1. The mass concrete construction prestress anchoraging angle-table bracket 1. one kind is encorbelmented, it is characterised in that:The construction includes triangle Truss structure(2), shearing groove(3), prestressing apparatus(5)With horizontal-associate structure(6);In concrete bodies(1)According to design on both sides Several pre-buried symmetrical shearing grooves of demand(3), the shearing groove(3)Triangular truss structure is fixedly mounted in upper correspondence(2); And symmetrical triangular truss structure two-by-two(2)Between pass through prestressing apparatus(5)Through concrete bodies(1)Interior prestressing force leads to Road(4)It is connected;In homonymy two triangular truss structures adjacent to each other(2)Between horizontal-associate structure is installed(6).
  2. 2. mass concrete construction prestress anchoraging angle-table bracket according to claim 1 of encorbelmenting, it is characterised in that:Institute The triangular truss structure stated(2)Including top boom(7), lower boom(8), montant(9)And hound(10);The montant(9)'s Upper end connects top boom(7)One end, the montant(9)Lower end connection lower boom(8);The top boom(7)The other end Connect hound(10)Upper end, the hound(10)Lower end and montant(9)Lower end is connected;The hound(10)With it is perpendicular Bar(9)Between connect cross bar(11), the cross bar(11)With hound(10)Junction and top boom(7)Between connecting upright pole (12).
  3. 3. mass concrete construction prestress anchoraging angle-table bracket according to claim 2 of encorbelmenting, it is characterised in that:Institute State top boom(7), hound(10)And montant(9)Junction on be equipped with A stiffeners(13).
  4. 4. mass concrete construction prestress anchoraging angle-table bracket according to claim 2 of encorbelmenting, it is characterised in that:Institute State top boom(7), lower boom(8), montant(9), hound(10), cross bar(11)And vertical rod(12)Take shaped steel welding system Into, and it is provided with some pieces of B stiffeners by design requirement inside it(17);The shaped steel is channel-section steel, I-steel, angle steel, H types It is any in steel, T-steel or L-type steel.
  5. 5. the mass concrete construction prestress anchoraging angle-table bracket of encorbelmenting according to Claims 2 or 3, its feature exists In:The montant(9)It is provided with several through holes, described through hole and prestressing force passage(4)It is mutually paired;The prestressing force leads to Road(4)In the vertical direction and shearing groove(3)Alignment.
  6. 6. mass concrete construction prestress anchoraging angle-table bracket according to claim 1 of encorbelmenting, it is characterised in that:Institute The shearing groove stated(3)It is made of steel plate welding, its opening size compares lower boom(8)The big 1-2cm in straightforward face, depth ratio lower edge Bar(8)Insertion depth depth 5-10cm.
  7. 7. mass concrete construction prestress anchoraging angle-table bracket according to claim 1 of encorbelmenting, it is characterised in that:Institute The prestressing apparatus stated(5)For fining twisted steel and its supporting nut or steel strand wires and its supporting anchorage;The finish rolling spiral shell Line steel or steel strand wires are interspersed in triangular truss structure(2)Middle montant(9)With in concrete bodies(1)On according to design requirement reserve Prestressing force passage(4);Reuse the supporting nut of correspondence or supporting anchorage solid to tensing.
  8. 8. mass concrete construction prestress anchoraging angle-table bracket according to claim 1 of encorbelmenting, it is characterised in that:Institute The prestressing force passage stated(4)Pvc pipe, galvanized pipe, stainless steel or carbon steel tubing is taken to be embedded in concrete bodies in advance(1)It is interior to be made, and Run through whole concrete bodies on pre-buried position by design(1).
  9. 9. mass concrete construction prestress anchoraging angle-table bracket according to claim 1 of encorbelmenting, it is characterised in that:Institute The horizontal-associate structure stated(6)Including balancing pole(14), stabiliser bar(15)And brace(16), the stabiliser bar(15)Parallel arrangement, Two stabiliser bars(15)Between some balancing poles are installed(14), balancing pole two-by-two(14)Diagonal on brace is installed(16).
  10. 10. mass concrete construction prestress anchoraging angle-table bracket according to claim 1 of encorbelmenting, it is characterised in that The angle-table bracket construction method comprises the following steps:
    (1)By drawing processing component, and it is transported to job site;
    (2)Groove and prestressing force passage are sheared by design attitude is pre-buried when bottom concrete bodies are poured;
    (3)After bottom concrete bodies are emphasized to reach requirement, triangular truss structure is lifted, triangular truss structure lower boom is inserted Shear in groove, fining twisted steel in prestressing apparatus or steel strand wires are sequentially passed through into the montant of triangular truss structure, prestressing force and led to The montant in road, triangular truss structure on symmetrical side, tightens the nut or anchorage at two ends, makes concrete bodies symmetrical Montant on two Pin triangular truss structures is all close to concrete bodies;
    (4)Other groups are by fining twisted steel and its supporting nut or steel strand wires and its match somebody with somebody on the same montant of repeat step completion The installation of the prestressing apparatus of the anchorage composition of set;
    (5)By the fining twisted steel or steel strand wires on all montants by calculated value carry out tensioning, complete tensioning after tighten nut or Person's anchorage;
    (6)Triangular truss structure adjacent two-by-two on horizontal-associate structure connection concrete bodies homonymy is lifted, using welding or bolt Connected mode connects montant, top boom, the hound of the adjacent triangular truss structure of homonymy respectively successively.
CN201710400696.0A 2017-05-31 2017-05-31 Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method Pending CN107165039A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710400696.0A CN107165039A (en) 2017-05-31 2017-05-31 Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710400696.0A CN107165039A (en) 2017-05-31 2017-05-31 Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method

Publications (1)

Publication Number Publication Date
CN107165039A true CN107165039A (en) 2017-09-15

Family

ID=59821264

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710400696.0A Pending CN107165039A (en) 2017-05-31 2017-05-31 Encorbelment mass concrete construction prestress anchoraging angle-table bracket and its construction method

Country Status (1)

Country Link
CN (1) CN107165039A (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542037A (en) * 2017-09-28 2018-01-05 谢晓燕 A kind of new supporting bracket of bridge construction
CN108756328A (en) * 2017-10-13 2018-11-06 黄河科技学院 Structurally stable glass view platform
CN109024885A (en) * 2018-06-25 2018-12-18 安徽海螺建材设计研究院有限责任公司 A kind of conveying gallery security structure
CN110565676A (en) * 2019-08-01 2019-12-13 中交二公局第二工程有限公司 Cantilever type tower crane foundation structure and construction method thereof
CN111910537A (en) * 2020-08-28 2020-11-10 河南省正航建设工程有限公司 A space truss reinforcement system for bridge piers
CN113174866A (en) * 2021-05-12 2021-07-27 中交二公局东萌工程有限公司 High-pier continuous steel bridge bracket and construction method
CN114232489A (en) * 2021-12-20 2022-03-25 福建宏盛建设集团有限公司 Construction method of large-span steel-concrete structure building
CN116084307A (en) * 2023-02-23 2023-05-09 北京工业大学 Inclined bracket stay cable anchoring combined structure and construction method thereof
CN116446529A (en) * 2022-07-07 2023-07-18 中国建筑第二工程局有限公司 Super high-rise double-core tube non-lateral unloading giant cantilever structure and construction method
CN117127753A (en) * 2023-06-15 2023-11-28 浙江省建工集团有限责任公司 A stiff steel corbel structure for fair-faced concrete columns and its construction method
CN121654034A (en) * 2026-01-05 2026-03-13 广西路建工程集团有限公司 Construction method for weld-free side span brackets of high-pier cantilever continuous beam bridge

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010015178A1 (en) * 2008-08-06 2010-02-11 中铁大桥局股份有限公司 Upper-bearing typed movable formwork
CN101824801A (en) * 2010-05-07 2010-09-08 中铁大桥局集团第五工程有限公司 Non-in-situ prepressing method of self-anchored type support frame and self-anchored type support frame thereof
CN201751461U (en) * 2010-07-21 2011-02-23 中铁六局集团有限公司 Bracket for constructing high pier capping beam
CN101994293A (en) * 2010-11-11 2011-03-30 中铁六局集团有限公司 High pier coping construction method
CN102877414A (en) * 2012-09-28 2013-01-16 中铁四局集团第一工程有限公司 Universal triangular basket and bracket mounting structure and construction method thereof
CN203188589U (en) * 2013-04-15 2013-09-11 张增娟 Rigid-frame continuous beam zero block construction bracket supporting system
CN206815197U (en) * 2017-05-31 2017-12-29 广西路建工程集团有限公司 A kind of prestress anchoraging angle-table bracket construction of mass concrete construction of encorbelmenting

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2010015178A1 (en) * 2008-08-06 2010-02-11 中铁大桥局股份有限公司 Upper-bearing typed movable formwork
CN101824801A (en) * 2010-05-07 2010-09-08 中铁大桥局集团第五工程有限公司 Non-in-situ prepressing method of self-anchored type support frame and self-anchored type support frame thereof
CN201751461U (en) * 2010-07-21 2011-02-23 中铁六局集团有限公司 Bracket for constructing high pier capping beam
CN101994293A (en) * 2010-11-11 2011-03-30 中铁六局集团有限公司 High pier coping construction method
CN102877414A (en) * 2012-09-28 2013-01-16 中铁四局集团第一工程有限公司 Universal triangular basket and bracket mounting structure and construction method thereof
CN203188589U (en) * 2013-04-15 2013-09-11 张增娟 Rigid-frame continuous beam zero block construction bracket supporting system
CN206815197U (en) * 2017-05-31 2017-12-29 广西路建工程集团有限公司 A kind of prestress anchoraging angle-table bracket construction of mass concrete construction of encorbelmenting

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
焦胜军等, 西南交通大学出版社 *

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107542037A (en) * 2017-09-28 2018-01-05 谢晓燕 A kind of new supporting bracket of bridge construction
CN107542037B (en) * 2017-09-28 2018-12-04 谢志坚 A kind of supporting bracket of bridge construction
CN108756328A (en) * 2017-10-13 2018-11-06 黄河科技学院 Structurally stable glass view platform
CN109024885A (en) * 2018-06-25 2018-12-18 安徽海螺建材设计研究院有限责任公司 A kind of conveying gallery security structure
CN110565676A (en) * 2019-08-01 2019-12-13 中交二公局第二工程有限公司 Cantilever type tower crane foundation structure and construction method thereof
CN111910537A (en) * 2020-08-28 2020-11-10 河南省正航建设工程有限公司 A space truss reinforcement system for bridge piers
CN111910537B (en) * 2020-08-28 2021-11-12 河南省正航建设工程有限公司 A space truss reinforcement system for bridge piers
CN113174866A (en) * 2021-05-12 2021-07-27 中交二公局东萌工程有限公司 High-pier continuous steel bridge bracket and construction method
CN114232489A (en) * 2021-12-20 2022-03-25 福建宏盛建设集团有限公司 Construction method of large-span steel-concrete structure building
CN114232489B (en) * 2021-12-20 2023-08-25 福建宏盛建设集团有限公司 Construction method of large-span reinforced concrete structure building
CN116446529A (en) * 2022-07-07 2023-07-18 中国建筑第二工程局有限公司 Super high-rise double-core tube non-lateral unloading giant cantilever structure and construction method
CN116446529B (en) * 2022-07-07 2025-07-22 中国建筑第二工程局有限公司 Super high-rise double-core tube non-lateral unloading giant cantilever structure and construction method
CN116084307A (en) * 2023-02-23 2023-05-09 北京工业大学 Inclined bracket stay cable anchoring combined structure and construction method thereof
CN116084307B (en) * 2023-02-23 2026-04-24 北京工业大学 An inclined bracket cable anchorage combination structure and its construction method
CN117127753A (en) * 2023-06-15 2023-11-28 浙江省建工集团有限责任公司 A stiff steel corbel structure for fair-faced concrete columns and its construction method
CN121654034A (en) * 2026-01-05 2026-03-13 广西路建工程集团有限公司 Construction method for weld-free side span brackets of high-pier cantilever continuous beam bridge

Similar Documents

Publication Publication Date Title
CN206815197U (en) A kind of prestress anchoraging angle-table bracket construction of mass concrete construction of encorbelmenting
CN203809220U (en) Wind driven generator tower
CN111926690A (en) Novel pier is assembled in prefabrication
CN106012872B (en) Cable-stayed reinforcement system and construction method for continuous rigid frame bridges without back-cable
CN110468713B (en) Dual-purpose device used as pier column template and prestressed support and construction method thereof
CN111455833B (en) Self-resetting prefabricated assembled bridge pier and construction method thereof
CN219731647U (en) Detachable concrete guardrail structure with buffer function
CN219175013U (en) Whole support that moves down of double-deck overhead bridge
CN210797285U (en) Dual-purpose device used as pier column template and prestress support
CN216690514U (en) Take bracket railway canopy or protection canopy fabricated structure
CN113186854B (en) Concrete guardrail prefabricated thin plate structure and recycling construction method thereof
CN214116279U (en) Flange counter-pulling type cable-stayed bridge main tower upper cross beam construction support
CN221566860U (en) Pier top large cantilever rear anchor type lifting frame for integrally lifting arch rib of arch bridge
CN120099994A (en) A steel-framed concrete prestressed fan foundation and construction method
CN210002942U (en) transformation structure of old building brick column
CN220433439U (en) Splicing device for splicing wide prefabricated T-beam bridge
CN219411282U (en) Cantilever steel beam mounting structure suitable for protruding cantilever structure and throwing construction
CN208267379U (en) A kind of trapezoidal steel structure support being used to support 24-32m cast-in-situ box girder and adjustable span
CN216947881U (en) Formwork support of I-shaped composite beam cast-in-situ bridge deck
KR20030039259A (en) incremental launching method(I.L.M) for bridge construction and I.L.M bridge structure using a temporary segment-supporter installed to substructure of bridge
CN215925635U (en) Monitoring warning is unsettled bracket of prestressing force for bridge
CN214882981U (en) Whole device that unloads of urban area railway bailey beam support
CN212533734U (en) Cable buckle integrated tower
CN215164738U (en) Tied-rod arch type fast-splicing support
CN215714720U (en) Reinforcing system for rapidly improving bearing capacity of bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20170915