CN206375596U - Girder steel attachment structure is climbed in a kind of assembled - Google Patents

Girder steel attachment structure is climbed in a kind of assembled Download PDF

Info

Publication number
CN206375596U
CN206375596U CN201621434274.2U CN201621434274U CN206375596U CN 206375596 U CN206375596 U CN 206375596U CN 201621434274 U CN201621434274 U CN 201621434274U CN 206375596 U CN206375596 U CN 206375596U
Authority
CN
China
Prior art keywords
girder steel
attachment structure
climbed
stirrup
flange disk
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201621434274.2U
Other languages
Chinese (zh)
Inventor
龙进辉
陈欣
洪英伟
杨浩涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd
Original Assignee
Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd filed Critical Guangdong Pang Yuan Construction Machinery And Equipment Co Ltd
Priority to CN201621434274.2U priority Critical patent/CN206375596U/en
Application granted granted Critical
Publication of CN206375596U publication Critical patent/CN206375596U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ladders (AREA)

Abstract

The utility model discloses climbing girder steel attachment structure in a kind of assembled, including it is interior climb girder steel attachment structure body, inside climb girder steel for trapezium structure;Installed part is climbed on the frame of girder steel including being fixedly mounted successively from left to right;First flange disk is linked together by way of welding with interior girder steel of climbing;Bracket is linked together by way of welding with the lower surface of stirrup;The lower surface of bracket fixture and bracket links together;Ring flange of the present utility model has just been welded when dispatching from the factory, during the stirrup of Site Welding, stirrup is first connected with girder steel ring flange, it is positioned after leveling and directly stirrup is welded on bracket, when dismounting girder steel is had bad luck, directly unclamping bolt can carry out having bad luck operation, greatly reduce the time span of cutting weld seam in the past, production efficiency is improved, and does not cause any damage in itself to girder steel.

Description

Girder steel attachment structure is climbed in a kind of assembled
Technical field
The utility model is related to interior climb and girder steel connection knot is climbed in girder steel attachment structure technical field, especially a kind of assembled Structure.
Background technology
More and more with high-rise high-rise building, the application of internally climbing tower crane is also more and more;High level is high-rise to be built A feature has been built, has been exactly often to catch up with very much the duration, raising efficiency of construction by every means is doing one's utmost for each project Pursuit, the connection between present girder steel and bracket embedded part is still often accustomed to directly with the mode welded or uses material The design of especially many big bracket compression types, the former install girder steel and remove girder steel be required to the long time handle girder steel with The weld seam of bracket, not only have impact on the normal use time of tower crane, and the cutting repeatedly during entirely climbing is tended to Cause a certain degree of infringement in itself to girder steel, reduce the safe handling coefficient of girder steel;The latter wastes excessive material again, no Enough economy.
Utility model content
The purpose of this utility model, which is to provide, climbs girder steel attachment structure in a kind of assembled, save letter in cost, construction Folk prescription just, effectively improves operating efficiency, to solve the problems mentioned in the above background technology.
To achieve the above object, the utility model provides following technical scheme:Girder steel attachment structure is climbed in a kind of assembled, Climb girder steel attachment structure body including interior, it is described in climb girder steel attachment structure body be provided with climb girder steel, it is ladder inside to climb girder steel Shape structure;Girder steel attachment structure body, which is climbed, in described is provided with the first installed part, the second installed part, the 3rd installed part and the 4th peace Piece installing, the first installed part, the second installed part, the 3rd installed part and the 4th installed part climb steel including being fixedly mounted successively from left to right On the frame of beam;Girder steel attachment structure body is climbed in described and is provided with first flange disk, and first flange disk is by way of welding Linked together with interior girder steel of climbing;Girder steel attachment structure body, which is climbed, in described is provided with first flange disk through hole, first flange disk Through hole is opened in the upper surface of first flange disk;Girder steel attachment structure body, which is climbed, in described is provided with second flange disk, the second method Blue disk is linked together by way of welding with interior girder steel of climbing;Girder steel attachment structure body, which is climbed, in described is provided with second flange Disk through hole, second flange disk through hole is opened in the upper surface of second flange disk;Girder steel attachment structure body is climbed in described to be provided with Stirrup, stirrup is fixedly installed togather with first flange disk;Girder steel attachment structure body, which is climbed, in described is provided with stirrup through hole, horse Stirrup through hole is opened in the upper surface of stirrup;Girder steel attachment structure body, which is climbed, in described is provided with bracket, the side that bracket passes through welding The lower surface of formula and stirrup links together;Girder steel attachment structure body is climbed in described and is provided with bracket fixture, and bracket is fixed The lower surface of part and bracket links together.
It is used as further program of the utility model:The first flange disk through hole and stirrup through hole are bolted.
It is used as further program of the utility model:The through hole that girder steel attachment structure body is climbed in described uses power auger Hole.
It is used as further program of the utility model:It is described it is each in climb girder steel attachment structure body and buried using two stirrups At part top.
It is used as further program of the utility model:Climbing the weldment material of girder steel attachment structure body in described is Q345B, welding rod model J506 welding rod.
Compared with prior art, the utility model beneficial effect:Girder steel connection knot is climbed in a kind of assembled of the utility model Structure, by the stirrup of setting, ring flange has just been welded when dispatching from the factory, during the stirrup of Site Welding, stirrup elder generation and girder steel method Blue disk connection, is positioned after leveling and directly stirrup is welded on bracket, when dismounting girder steel is had bad luck, and directly unclamps bolt and is It can carry out having bad luck operation, greatly reduce the time span of cutting weld seam in the past, improve production efficiency.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is front view of the present utility model;
Fig. 3 is top view of the present utility model;
Fig. 4 is side view of the present utility model;
Fig. 5 is stirrup front view of the present utility model;
Fig. 6 is stirrup side view of the present utility model;
Fig. 7 is stirrup top view of the present utility model.
In figure:Girder steel attachment structure body is climbed in 1-;Girder steel is climbed in 2-;The installed parts of 3- first;The installed parts of 4- second;5- Three installed parts;The installed parts of 6- the 4th;7- first flange disks;8- first flange disk through holes;9- second flange disks;10- second flanges Disk through hole;11- stirrups;12- stirrup through holes;13- brackets;14- bracket fixtures.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Refer in Fig. 1-7, the utility model embodiment, girder steel attachment structure is climbed in a kind of assembled, including interior climb steel Beam attachment structure body 1, inside climb girder steel attachment structure body 1 be provided with climb girder steel 2, inside climb girder steel 2 for trapezium structure;Inside climb Girder steel attachment structure body 1 is provided with the first installed part 3, the second installed part 4, the 3rd installed part 5 and the 4th installed part 6, first Installed part 3, the second installed part 4, the 3rd installed part 5 and the 4th installed part 6 climb girder steel 2 including being fixedly mounted successively from left to right On frame;Inside climb girder steel attachment structure body 1 and be provided with first flange disk 7, first flange disk 7 is climbed by way of welding with interior Girder steel 2 links together;Inside climb girder steel attachment structure body 1 and be provided with first flange disk through hole 8, first flange disk through hole 8 is opened It is located at the upper surface of first flange disk 7;Inside climb girder steel attachment structure body 1 and be provided with second flange disk 9, second flange disk 9 leads to The mode for crossing welding links together with interior girder steel 2 of climbing;Inside climb girder steel attachment structure body 1 and be provided with second flange disk through hole 10, second flange disk through hole 10 is opened in the upper surface of second flange disk 9;Inside climb girder steel attachment structure body 1 and be provided with stirrup 11, stirrup 11 is fixedly installed togather with first flange disk 7;Inside climb girder steel attachment structure body 1 and be provided with stirrup through hole 12, horse Stirrup through hole 12 is opened in the upper surface of stirrup 11;First flange disk through hole 8 and stirrup through hole 12 are bolted;Inside climb girder steel Attachment structure body 1 is provided with bracket 13, and lower surface of the bracket 13 with stirrup 11 by way of welding links together;Inside climb Girder steel attachment structure body 1 is provided with bracket fixture 14, and the lower surface of bracket fixture 14 and bracket 13 links together;It is interior The through hole for climbing girder steel attachment structure body 1 uses machine drilling;Girder steel attachment structure body 1 is climbed in each using two stirrups At 11 embedded part tops;The weldment material for inside climbing girder steel attachment structure body 1 is Q345B, welding rod model J506 welding rod.
In summary:Girder steel attachment structure is climbed in a kind of assembled of the utility model, girder steel attachment structure sheet is climbed by interior The weldment material of body 1 uses Q345B, and welding rod model J506 welding rod, the welding effect realized inside climbs girder steel connection knot The through hole of structure body 1 uses machine drilling, must not gas cutting reaming, it is each in climb girder steel attachment structure body 1 using two horses At the embedded part top of stirrup 11, i.e., the utility model is welded every time can consume the material of two stirrups 11;A kind of assembled of the utility model Girder steel attachment structure is inside climbed, it is simple and convenient in cost and construction in order to save, it is to avoid girder steel is caused during climbing need not The damage wanted, ring flange has just been welded when dispatching from the factory, the stirrup 11 of Site Welding, when installing girder steel, the elder generation of stirrup 11 and steel Beam ring flange is connected, and is positioned after leveling and directly stirrup 11 is welded on bracket 13, when dismounting girder steel is had bad luck, directly pine Opening bolt can carry out having bad luck operation, greatly reduce the time span of cutting weld seam in the past, interior steel is climbed using of the present utility model Beam connected mode, can effectively improve operating efficiency, reduce time cost, and do not cause any damage, phase in itself to girder steel Many material costs can be saved for other designs for pressing the big bracket of formula, productivity effect is substantially increased.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and And in the case of without departing substantially from spirit or essential attributes of the present utility model, can realize that this practicality is new in other specific forms Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped Containing an independent technical scheme, this narrating mode of specification is only that for clarity, those skilled in the art should Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art It may be appreciated other embodiment.

Claims (5)

1. climb girder steel attachment structure in a kind of assembled, including interior climb girder steel attachment structure body(1), it is characterised in that:It is described Inside climb girder steel attachment structure body(1)Girder steel is climbed in being provided with(2), inside climb girder steel(2)For trapezium structure;Girder steel company is climbed in described Connect structural body(1)It is provided with the first installed part(3), the second installed part(4), the 3rd installed part(5)With the 4th installed part(6), First installed part(3), the second installed part(4), the 3rd installed part(5)With the 4th installed part(6)It is fixedly mounted successively from left to right Girder steel is climbed inside(2)Frame on;Girder steel attachment structure body is climbed in described(1)It is provided with first flange disk(7), first flange Disk(7)By way of welding girder steel is climbed with interior(2)Link together;Girder steel attachment structure body is climbed in described(1)It is provided with First flange disk through hole(8), first flange disk through hole(8)It is opened in first flange disk(7)Upper surface;Girder steel company is climbed in described Connect structural body(1)It is provided with second flange disk(9), second flange disk(9)By way of welding girder steel is climbed with interior(2)Connection Together;Girder steel attachment structure body is climbed in described(1)It is provided with second flange disk through hole(10), second flange disk through hole(10) It is opened in second flange disk(9)Upper surface;Girder steel attachment structure body is climbed in described(1)It is provided with stirrup(11), stirrup (11)With first flange disk(7)It is fixedly installed togather;Girder steel attachment structure body is climbed in described(1)It is provided with stirrup through hole (12), stirrup through hole(12)It is opened in stirrup(11)Upper surface;Girder steel attachment structure body is climbed in described(1)It is provided with bracket (13), bracket(13)By way of welding and stirrup(11)Lower surface link together;Girder steel attachment structure is climbed in described Body(1)It is provided with bracket fixture(14), bracket fixture(14)With bracket(13)Lower surface link together.
2. climb girder steel attachment structure in a kind of assembled according to claim 1, it is characterised in that:The first flange disk Through hole(8)With stirrup through hole(12)It is bolted.
3. climb girder steel attachment structure in a kind of assembled according to claim 1, it is characterised in that:Girder steel company is climbed in described Connect structural body(1)Through hole use machine drilling.
4. climb girder steel attachment structure in a kind of assembled according to claim 1, it is characterised in that:It is described it is each in climb steel Beam attachment structure body(1)Using two stirrups(11)At embedded part top.
5. climb girder steel attachment structure in a kind of assembled according to claim 1, it is characterised in that:Girder steel company is climbed in described Connect structural body(1)Weldment material be Q345B, welding rod model J506 welding rod.
CN201621434274.2U 2016-12-26 2016-12-26 Girder steel attachment structure is climbed in a kind of assembled Active CN206375596U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621434274.2U CN206375596U (en) 2016-12-26 2016-12-26 Girder steel attachment structure is climbed in a kind of assembled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621434274.2U CN206375596U (en) 2016-12-26 2016-12-26 Girder steel attachment structure is climbed in a kind of assembled

Publications (1)

Publication Number Publication Date
CN206375596U true CN206375596U (en) 2017-08-04

Family

ID=59408406

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621434274.2U Active CN206375596U (en) 2016-12-26 2016-12-26 Girder steel attachment structure is climbed in a kind of assembled

Country Status (1)

Country Link
CN (1) CN206375596U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109592577A (en) * 2018-11-22 2019-04-09 中建四局第六建筑工程有限公司 One kind being used for inside-climbing tower crane steel construction switch rack and its construction method
CN111170178A (en) * 2018-11-12 2020-05-19 广东庞源工程机械有限公司 Sectional type combination internal climbing steel beam structure
CN111285267A (en) * 2020-02-18 2020-06-16 上海建工四建集团有限公司 Monitoring and adjusting system for climbing beam of swing arm tower crane

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111170178A (en) * 2018-11-12 2020-05-19 广东庞源工程机械有限公司 Sectional type combination internal climbing steel beam structure
CN109592577A (en) * 2018-11-22 2019-04-09 中建四局第六建筑工程有限公司 One kind being used for inside-climbing tower crane steel construction switch rack and its construction method
CN111285267A (en) * 2020-02-18 2020-06-16 上海建工四建集团有限公司 Monitoring and adjusting system for climbing beam of swing arm tower crane

Similar Documents

Publication Publication Date Title
CN206375596U (en) Girder steel attachment structure is climbed in a kind of assembled
CN204960269U (en) Integral pylon
CN206052555U (en) Hood type safe operation platform
CN207957508U (en) A kind of Novel lifting lugs
CN201705594U (en) Foundation reinforcing cage of wind generating set
CN209635738U (en) Steel structure rod piece multi-purpose type lifting lug device
CN205840468U (en) The three pipe towers that a kind of stability is high
CN107013049B (en) A kind of method that faying face reinforces beam column component
CN104499578B (en) Space free-form surface wood latticed shell assembly type node for through bolt
CN107738978A (en) A kind of removable tower crane Integral transporting hanging beam and its operation principle
CN206467798U (en) Beam-beam splicing joint
CN207177421U (en) A kind of anti-climbing steel tube tower
CN207686220U (en) A kind of welding process hole for elevator shaft installation
CN207660275U (en) A kind of scaffold disk
CN207226867U (en) The anti-climbing safety device of tower crane
CN207110060U (en) A kind of novel embedded part device applied to internally climbing tower crane
CN206928683U (en) A kind of lifeline standing rigging
CN206702898U (en) Shield owner's driving pinion mounting tool
CN202148154U (en) Steel corbel fixing structure of internal climbing steel beam of tower crane
CN203669094U (en) Concrete-filled steel tube latticed column shoulder beam
CN206530029U (en) A kind of construction scaffold
CN218566872U (en) Class string beam structure feed bin component connection monitoring devices
CN206646655U (en) A kind of attachment structure of floor and prefabricated air-conditioning plate
CN203578007U (en) Integrated ash bucket beam component structure of dust collector
CN107313588A (en) Catch pit bottom plate tool-typed formwork and its construction usage method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee after: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

Address before: 510635 Unit 212, Second Floor, Comprehensive Building of Science and Technology Innovation Base, No. 80 Lanyue Road, Science City, Guangzhou High-tech Industrial Development Zone, Guangdong Province

Patentee before: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: Room 109-12, Building 3, 43 Yingbin Avenue West, Huadu District, Guangzhou City, Guangdong 510000

Patentee after: Guangdong Pang Yuan construction machinery and equipment Co., Ltd

Address before: 510000 Room 1130, 11th Floor, Traffic Building, 95 Yingbin Avenue, Xinhua Street, Huadu District, Guangzhou City, Guangdong Province

Patentee before: Guangdong Pang Yuan construction machinery and equipment Co., Ltd